Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Economic Risk-Informed Maintenance Planning and Asset Management (Final Report)

The proposed work will provide a holistic framework for cost-minimizing risk-informed maintenance planning, including inspection, in light water reactors (LWRs). Specifically, we develop a two-tier framework that (a) coarsely minimizes the total maintenance cost during the remaining normal operating cycle of the plant prior to the next scheduled outage (long-term), subject to safety requirements, and (b) uses the outputs of the first model to develop a secondary optimization model to finely schedule maintenance activities to maximize the financial impact of these activities in the next week (short-term).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advancing Federal Infrastructure Through Innovation: Customer Damage Function Calculator

Provides an overview of the National Renewable Energy Laboratory (NREL) Customer Damage Function (CDF) Calculator web tool, developed with funding and support from the Federal Energy Management Program (FEMP). The CDF Calculator is a screening tool that provides justification to site and/or headquarters leadership for resilience investments. It generates monetary values to justify investments in resilience solutions to prevent or lessen the impact of a grid outage at a facility.

CDF calculator↗

Nuclear Physics Science Network Requirements Workshop, May 2008 - Final Report

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In May 2008, ESnet and the Nuclear Physics (NP) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the NP Program Office. Most of the key DOE sites for NP related work will require significant increases in network bandwidth in the 5 year time frame. This includes roughly 40 Gbps for BNL, and 20 Gbps for NERSC. Total transatlantic requirements are on the order of 40 Gbps, and transpacific requirements are on the order of 30 Gbps. Other key sites are Vanderbilt University and MIT, which will need on the order of 20 Gbps bandwidth to support data transfers for the CMS Heavy Ion program. In addition to bandwidth requirements, the workshop emphasized several points in regard to science process and collaboration. One key point is the heavy reliance on Grid tools and infrastructure (both PKI and tools such as GridFTP) by the NP community. The reliance on Grid software is expected to increase in the future. Therefore, continued development and support of Grid software is very important to the NP science community. Another key finding is that scientific productivity is greatly enhanced by easy researcher-local access to instrument data. This is driving the creation of distributed repositories for instrument data at collaborating institutions, along with a corresponding increase in demand for network-based data transfers and the tools to manage those transfers effectively. Network reliability is also becoming more important as there is often a narrow window between data collection and data archiving when transfer and analysis can be done. The instruments do not stop producing data, so extended network outages can result in data loss due to analysis pipeline stalls. Finally, as the scope of collaboration continues to increase, collaboration tools such as audio and video conferencing are becoming ever more critical to the productivity of scientific collaborations.

97 MATHEMATICS AND COMPUTING↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scoping Study Investigating PWR Instrumentation during a Severe Accident Scenario

The accidents at the Three Mile Island Unit 2 (TMI-2) and Fukushima Daiichi Units 1, 2, and 3 nuclear power plants demonstrate the critical importance of accurate, relevant, and timely information on the status of reactor systems during a severe accident. These events also highlight the critical importance of understanding and focusing on the key elements of system status information in an environment where operators may be overwhelmed with superfluous and sometimes conflicting data. While progress in these areas has been made since TMI-2, the events at Fukushima suggests that there may still be a potential need to ensure that critical plant information is available to plant operators. Recognizing the significant technical and economic challenges associated with plant modifications, it is important to focus on instrumentation that can address these information critical needs. As part of a program initiated by the Department of Energy, Office of Nuclear Energy (DOE-NE), a scoping effort was initiated to assess critical information needs identified for severe accident management and mitigation in commercial Light Water Reactors (LWRs), to quantify the environment instruments monitoring this data would have to survive, and to identify gaps where predicted environments exceed instrumentation qualification envelop (QE) limits. Results from the Pressurized Water Reactor (PWR) scoping evaluations are documented in this report. The PWR evaluations were limited in this scoping evaluation to quantifying the environmental conditions for an unmitigated Short-Term Station BlackOut (STSBO) sequence in one unit at the Surry nuclear power station. Results were obtained using the MELCOR models developed for the US Nuclear Regulatory Commission (NRC)-sponsored State of the Art Consequence Assessment (SOARCA) program project. Results from this scoping evaluation indicate that some instrumentation identified to provide critical information would be exposed to conditions that significantly exceeded QE limits for extended time periods for the low frequency STSBO sequence evaluated in this study. It is recognized that the core damage frequency (CDF) of the sequence evaluated in this scoping effort would be considerably lower if evaluations considered new FLEX equipment being installed by industry. Nevertheless, because of uncertainties in instrumentation response when exposed to conditions beyond QE limits and alternate challenges associated with different sequences that may impact sensor performance, it is recommended that additional evaluations of instrumentation performance be completed to provide confidence that operators have access to accurate, relevant, and timely information on the status of reactor systems for a broad range of challenges associated with risk important severe accident sequences.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Idaho-Developed Technologies, Processes Offer Unique Solutions to Waste Management Challenges - 19281

INL Site cleanup contractor Fluor Idaho, LLC (Fluor Idaho) and its predecessors have developed a host of state-of-the-art technologies and specialized processes for nuclear waste handling, treatment, storage, and shipping. The cleanup program has also repurposed and upgraded previously idled Cold War-era buildings to treat and repackage both on- and off-site generated radioactive and hazardous wastes. And lastly, Fluor Idaho is using one-of-a-kind equipment to protect waste management personnel as they undertake their work to meet cleanup commitments that the Department of Energy (DOE) made to the state of Idaho. Such applications, although developed for Idaho's wastes, have the potential to benefit other facilities within the DOE Complex. Engineers and fabricators have teamed up to develop truly unique devices made of specialized metals, like stainless steel alloys, and more readily available materials such as Lexan. All waste types that Fluor Idaho manages daily - spent nuclear fuel, both high- and low-level wastes, and both remote-handled (RH) and CH-TRU - benefit from these innovations. Without question, the greatest number of specialized equipment, processes, and worker-protection technologies developed are for the retrieving, characterizing, repackaging, and shipping of TRU wastes, which makes sense considering the INL Site stores the most TRU waste in the DOE Complex. On the CH-TRU retrieval front, crews are using specially modified Gradall excavators to protect workers while they exhume Rocky Flats Plant wastes that were sent to Idaho in the 1950's and 1960's and buried in a shallow landfill. The excavators are supplied with extra Lexan windows to protect operators from the potential for flying debris during exhumation. On-board supplied air, pumped into the cab, and individual air supplies protect workers from inhalation hazards. Also on-board infrared cameras allow operators to detect heat generating from reactive metals at the dig face. At the Advanced Mixed Waste Treatment Facility (AMWTP), Brokk robotic arm operators use a 'super clam' claw, designed and built at the INL Site, on the remotely operated heavy equipment to size-reduce waste boxes, drums, concrete, and metal containing TRU constituents. The super clam is so powerful and dexterous that operators can crush a 55-gallon drum into the size of a basketball, but also delicately turn the pages of a magazine. Boxes too large to be sized at the AMWTP's box-lines are sent to the Accelerated Retrieval Project VII facility to be sized by Waste Management personnel. Such waste boxes, which sometimes contain 'flighty' plutonium-238 material, have forced the project to employ a heavily ventilated and filtered interior tent. Not all technologies developed for the Waste Management program are high-technology; in fact, one piece of equipment is so simple it's literally ingenious. Operators who inspect and repackage RH-TRU inside a hot cell at the Idaho Nuclear Technology and Engineering Center (INTEC) needed a backup plan in case the hot cell port couldn't be closed in the event of a power outage. Engineers and fabricators collaborated to develop a port cover actuator mechanism, which allows operators to open and close the cell's hatch cover with nothing more than a cordless drill. Also at INTEC, Maintenance Shop fabricators developed a Lexan container or 'pig' suitable for shielding neutron-emitting TRU waste sources. Lexan was chosen as the preferred shielded container material for this special type of waste because neutrons are best shielded with materials containing lots of hydrogen, such as plastics, which are composed of carbon and hydrogen molecules. Once approved for shipment, the high-activity waste will be loaded into specialty casks and shipped to WIPP for permanent disposal. Although all these technologies and processes were initially developed for resolving challenges at the INL Site, their applications could be far-reaching. Like the INL Site, many other facilities in the DOE Complex manage, treat, store, and ship TRU, low-and high-level wastes, and spent nuclear fuel. The technologies and processes developed in Idaho protect Waste Management personnel as they undertake their work, but these benefits could be utilized by other facilities and personnel doing similar work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic Boundary Microgrids Under Privatization Considerations

Microgrids have physical, electrical, and logical (data, network, and ownership) boundaries. To power unserved customer loads during an outage, microgrids can extend the traditional operational boundaries. This can become complex when considering microgrid-to-microgrid (M2M) interactions where sensitive information such as competitive microgrid operational data is not shared. This work proposes an optimization method coordinated between microgrid controllers and distribution management systems that limits data sharing. The method involves a competitive bidding strategy that maximizes unserved load coverage while minimizing resource utilization and sensitive operational data sharing among entities. The work is validated on a two-microgrid system with photovoltaic and energy storage systems and curves of load derived from real world residential buildings datasets. Results show that the proposed method, when applied for three distinct use cases of energy storage sufficiency to cover the predefined boundary and/or the expanded boundary, can successfully select and bid the available load coverage.

Starke, Michael [ORNL] (ORCID:0000000221211195)↗

RAPIDS: Reconciling Availability, Accuracy, and Performance in Managing Geo-Distributed Scientific Data

In modern science, big data plays an increasingly important role. Many scientific applications, such as running simulations on supercomputers or conducting experiments on advanced instruments, produce huge amount of data at unprecedented speed. Analyzing and understanding such big data is the key for scientists to make scientific breakthroughs. However, data might become unavailable for scientists to access when outages or maintenance of the storage system occur, which severely hinders scientific discovery. To improve the data availability, data duplication and erasure coding (EC) are often used. But as the scientific data gets larger, using these two methods can cause considerable storage and network overhead.In this paper, we propose RAPIDS, a hybrid approach that combines the multigrid-based error-bounded lossy compression with erasure coding, to significantly reduce the storage and network overhead required for maintaining high data availability. Our experiments show that RAPIDS reduces the storage overhead by up to 7.5x and network overhead by up to 3x to achieve the same level of availability compared to the regular EC method. We improve RAPIDS by building two models to optimize the fault tolerance configurations and data gathering strategy. We demonstrate that RAPIDS significantly improves performance when running on many CPU cores in parallel or on GPUs.

Wan, Lipeng↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Scientific Technical Report for "Microgrid RD&D and Testing of PIDC and PWD Systems"

Alstom Grid Inc’s (ALSTOM Grid) Research Design and Development (RD&D) project, “Microgrid RD&D and Testing for PIDC and PWD” was conducted in partnership with Philadelphia Industrial Development Corporation (PIDC) in its role as owner’s representative and manager of a vibrant commercial and industrial community, involving critical loads in one of the nation’s largest unregulated, non-military electric distribution systems. PIDC needed to develop solutions to address the planned considerable growth in Distributed Energy Resources (DER) Combined Heat Plan (CHP), Renewables, Distributed Generation (DG), Demand Response (DR) and Storage. In supporting the corporate objective, PIDC needed a new class of control systems for achieving enhanced energy resilience of their critical infrastructure operation during adverse conditions together with carbon emission reduction and optimization of the overall system operation economics through system energy efficiency during normal and emergency operating conditions. Additionally, PIDC anticipated the need to support a new class of commercial agreements with tenants, such as those for Urban Outfitters, for guaranteed one hundred percent (100%) grid resilience and electric power supply in case of utility outage conditions. The project was designed to address the challenges for the commercial & industrial (C&I) communities. But more importantly, the project included development of scalable and replicable solutions intended to target a multitude of the nation’s electric distribution communities. The project researched and developed a fully comprehensive prototype consisting of microgrid operation and control functions including islanding, synchronization and reconnection, protection, voltage, frequency, and power quality management, dispatch, and system resiliency. The project provided the foundation required to significantly enhance the overall national objectives set by the DOE for energy resilience, emission reduction and system energy efficiency improvement, including protection of critical infrastructure and public resources.

14 SOLAR ENERGY↗

The Resilient Economy: Integrating Competitiveness and Security

Globalization, technological complexity, interdependence, terrorism, climate and energy volatility, and pandemic potential are increasing the level of risk that societies and organizations now face. Risks also are increasingly interrelated; disruptions in one area can cascade in multiple directions. The ability to manage emerging risks, anticipate the interactions between different types of risk, and bounce back from disruption will be a competitive differentiator for companies and countries alike in the 21st century. What Policymakers Should Know The national objective is not just homeland protection, but economic resilience: the ability to mitigate and recover quickly from disruption. Businesses must root the case for investment in resilience strategies to manage a spectrum of risks, not just catastrophic ones. Making a business case for investment in defenses against low-probability events (even those with high impact) is difficult. However, making a business case for investments that assure business continuity and shareholder value is not a heavy lift. There are an infinite number of disruption scenarios, but only a finite number of outcomes. Leading organizations do not manage specific scenarios, rather they create the agility and flexibility to cope with turbulent situations. The investments and contingency plans these leading companies make to manage a spectrum of risk create a capability to respond to high-impact disasters as well. Government regulations tend to stovepipe different types of risk, which impedes companies abilities to manage risk in an integrated way. Policies to strengthen risk management capabilities would serve both security and competitiveness goals. What CEOs and Boards Should Know Operational risks are growing rapidly and outpacing many companies abilities to manage them. Corporate leadership has historically viewed operational risk management as a back office control function. But managing operational risks increasingly affects real-time financial performance. The 835 companies that announced a supply chain disruption between 1989 and 2000 experienced 33 percent to 40 percent lower stock returns than their industry peers. Twenty-five percent of companies that experienced an IT outage of two to six days went bankrupt immediately. Ninety-three percent of companies that lost their data center for 10 days or more filed for bankruptcy within a year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Towards Risk-Based Management of Critical Infrastructures: Enabling Insights and Analysis Methodologies from a Focused Study of the Bulk Power Grid

This report summarizes research on a holistic analysis framework to assess and manage risks in complex infrastructures, with a specific focus on the bulk electric power grid (grid). A comprehensive model of the grid is described that can approximate the coupled dynamics of its physical, control, and market components. New realism is achieved in a power simulator extended to include relevant control features such as relays. The simulator was applied to understand failure mechanisms in the grid. Results suggest that the implementation of simple controls might significantly alter the distribution of cascade failures in power systems. The absence of cascade failures in our results raises questions about the underlying failure mechanisms responsible for widespread outages, and specifically whether these outages are due to a system effect or large-scale component degradation. Finally, a new agent-based market model for bilateral trades in the short-term bulk power market is presented and compared against industry observations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evolution of the Preliminary Fault Management Architecture and Design for the Psyche Mission

The Psyche Mission presents the first opportunity toexplore the largest metal asteroid in the solar system, (16)Psyche, which is believed to be the exposed core of a largerplanetesimal that was stripped of its rocky mantle throughmultiple collisions during early solar system formation. Themission was selected in January 2017 for a 2022 launch as partof NASA’s Discovery Program and is uniquely enabled by theintegration of a Solar Electric Propulsion (SEP) Chassisdelivered by Maxar Space Solutions with JPL’s core deepspace avionics, flight software, and fault managementarchitectures. One of the key design tasks is the development ofa fault management system capable of being responsive to theunique elements of the combined JPL and Maxar spacecraftarchitecture. This new design leverages the strengths of eachorganization, with Maxar delivering its well-proven highvoltage power bus and low-thrust electric propulsionsubsystem from its GEO communications satellite product line,and JPL delivering its deep space mission expertise and thehardware and software most critical to deep space missiondesign. The development of a robust low-thrust mission andthe integration of design philosophies and hardware from twoorganizations is not without its challenges though.A key challenge in the development of the Psyche faultmanagement architecture and design is in the integration ofdesign philosophies and hardware from JPL and Maxar. Atthe architecture level, Maxar GEO communications satellitesare developed under the premise of highly responsive groundin the loop for the resolution of anomalies, and theimplementation takes a fail-operational approach to minimizedown time for its customers. In contrast, a deep space missionmust be able to maintain safety with long periods of groundcommunication outage. Additionally, with no time-criticalevents after launch, the Psyche spacecraft will generally failsafe in the presence of anomalous conditions; specialconsideration is being given to this approach, however, tominimize the loss of electric propulsion thrust time, which iscritical to low-thrust missions. At the hardware level, thedetailed definition of interfaces between JPL and Maxarhardware presents a unique challenge in the development andflowdown of fault management requirements, the developmentand implementation of fault monitors and responses, and thedevelopment and verification of fault containment boundaries.This paper describes the evolution of the Psyche faultmanagement architecture and design from the concept studyinto the preliminary design phase, with a focus on the uniquechallenges associated with flying GEO communicationssatellite hardware in deep space, implementing a robust lowthrust mission, and the integration of design philosophies andhardware from JPL and Maxar. Details regarding how thesechallenges are addressed in the fault management design inorder to maximize heritage, leverage the strengths of eachorganization, and minimize risk across the design are alsodiscussed.

Marsh, Danielle↗

Evaluating the Magnitude and Duration of Cold Load Pick-up on Residential Distribution Feeders Using Multi-State Load Models

The increased level of demand that is associated with the restoration of service after an outage, Cold Load Pick-Up (CLPU), can be significantly higher than pre-outage levels, even exceeding the normal distribution feeder peak demand. These high levels of demand can delay restoration efforts and in extreme cases damage equipment. The negative impacts of CLPU can be mitigated with strategies that restore the feeder in sections, minimizing the load current. The challenge for utilities is to manage the current level on critical equipment while minimizing the time to restore service to all customers. Accurately modeling CLPU events is the first step in developing improved restoration strategies that minimize restoration times. This paper presents a new method for evaluating the magnitude of the CLPU peak, and its duration, using multi-state load models. The use of multi-state load models allows for a more accurate representation of the end-use loads that are present on residential distribution feeders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Net-zero Microgrid Program Report: Microrred de la Montaña Feasibility Study (Executive Summary Extended)

This feasibility study provides the technical and economic rationale for the Microrred de la Montaña as a viable solution for supplying reliable and resilient electricity to an underserved region in Puerto Rico – a region that is the first to be disconnected from the grid and the last to be restored, enduring months long outages. It begins the process of the development of the microgrid through conceptual design, engineering, detailed electrical design, implementation, and operation. The Microrred de la Montaña is organized under the governance of the Cooperativa Hidroeléctrica de la Montaña (Cooperativa) which has legal status as a cooperative and power provider under the laws of Puerto Rico. The members are the municipalities of Adjuntas, Jayuya, Lares and Utuado with a combined population of 90,000. These municipalities are in central Puerto Rico – a mountainous region that is extremely vulnerable to weather events and excessive, long-duration power outages and are among the poorest and most disadvantaged regions in Puerto Rico. Funding from external sources is necessary to acquire the resources for a resilient power delivery system. Regulatory support is necessary to establish operational relationships with the incumbent power providers. The Microrred de la Montaña is envisioned as a resilient microgrid that manages distributed energy resources – local solar, storage, and hydroelectricity over an upgraded distribution network within the boundaries of four municipalities. This feasibility study provides the results of an extensive techno-economic analysis to form a sound basis for decision-making by community leaders, their constituents, funding and investment agencies, and regulators to realize the benefits that are achievable by fully implementing the design and planning recommended for the Microrred de la Montaña.

13 HYDRO ENERGY↗

Review of Data Landscape: Challenges and Opportunities

Traditional (macro-) economic impact analysis has a role in the long-run analysis of the effects of changes in resilience, since in the long-run the economy adjusts to the microeconomic impacts through various mechanisms (Kunreuther & Roth, 1998). However, measures of economic health, growth, or expansion are not sufficient for measuring resilience. The majority of infrastructure in the United States is privately owned and operated or is managed through some private-public arrangement. Most effects from changes in resilience should be assessed through short-run microeconomic analysis since the actions of firms will be spurred by internal economic decisionmaking that will have immediate impacts on local economies. Any forthcoming efforts to include resilience in the economic impacts of long duration EP outages must accommodate the private and simultaneously public nature of the EP infrastructure as well as its role as lifeline infrastructure. Resilience metrics and methodologies will only be helpful to stakeholders if these metrics help them understand the value of improvements to the resilience of communities, infrastructures, or industries. In their paper, Schellenberg et al. (2018) have provided a well thought out "lay of the lane of the common methods of estimating the economic costs of EP disruptions, which includes discussion of the difference between costs of outage and regional economic modeling, strengths and weaknesses of methods, the difficulty in incorporating resilience, data collection and availability issues, and recommendations for future research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗