Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optical telescopes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

The NASA Meter Class Autonomous Telescope: Ascension Island

The Meter Class Autonomous Telescope (MCAT) is the newest optical sensor dedicated to NASA's mission to characterize the space debris environment. It is the successor to a series of optical telescopes developed and operated by the JSC Orbital Debris Program Office (ODPO) to monitor and assess the debris environment in (1) Low Earth Orbit (LEO), (2) Medium Earth Orbit (MEO), and (3) Geosynchronous Orbit (GEO), with emphasis on LEO and GEO altitudes. A joint NASA - Air Force Research Labs project, MCAT is a 1.3m optical telescope dedicated to debris research. Its optical path and sensor yield a large survey fence at the cutting edge of current detector performance. It has four primary operational observing modes, two of which were not computationally feasible a decade ago. Operations are supported by a sophisticated software suite that monitors clouds and weather conditions, and controls everything from data collection to dome rotation to processing tens of gigabytes of image data nightly. With fainter detection limits, precision detection, acquisition and tracking of targets, multi-color photometry, precision astrometry, automated re-acquisition capability, and the ability to process all data at the acquisition rate, MCAT is capable of producing and processing a volume and quality of data far in excess of any current (or prior) ODPO operations. This means higher fidelity population inputs and eliminating the multi-year backlog from acquisition-to-product typical of optical campaigns. All of this is possible given a suitable observing location. Ascension Island offers numerous advantages. As a British overseas territory with a US Air Force base presence, the necessary infrastructure and support already exists. It is located mid-way between Brazil and Africa at 7.93S latitude and 14.37 W longitude. With the Ground-based Electro-Optical Deep Space Surveillance (GEODSS) asset in Moron, Spain shutting down, this presents access to the sky from a unique latitude/longitude for an optical telescope. Constant trade winds from the SSE, originating from Africa, give promise to a steady laminar airflow over an island, a trait sought after to create stable atmospheric and good astronomical 'seeing' conditions with very low annual rainfall values. This combination of attributes created the necessary compelling argument to redirect MCAT to its final destination: Ascension Island.

Lederer, S. M.↗

Observations of GEO Debris with the Magellan 6.5-m Telescopes

Optical observations of geosynchronous orbit (GEO) debris are important to address two questions: 1. What is the distribution function of objects at GEO as a function of brightness? With some assumptions, this can be used to infer a size distribution. 2. Can we determine what the likely composition of individual GEO debris pieces is from studies of the spectral reflectance of these objects? In this paper we report on optical observations with the 6.5-m Magellan telescopes at Las Campanas Observatory in Chile that attempt to answer both questions. Imaging observations over a 0.5 degree diameter field-of-view have detected a significant population of optically faint debris candidates with R > 19th magnitude, corresponding to a size smaller than 20 cm assuming an albedo of 0.175. Many of these objects show brightness variations larger than a factor of 2, suggesting either irregular shapes or albedo variations or both. The object detection rate (per square degree per hour) shows an increase over the rate measured in the 0.6-m MODEST observations, implying an increase in the population at optically fainter levels. Assuming that the albedo distribution is the same for both samples, this corresponds to an increase in the population of smaller size debris. To study the second issue, calibrated reflectance spectroscopy has been obtained of a sample of GEO and near GEO objects with orbits in the public U.S. Space Surveillance Network catalog. With a 6.5-m telescope, the exposures times are short (30 seconds or less), and provide simultaneous wavelength coverage from 4500 to 8000 Angstroms. If the observed objects are tumbling, then simultaneous coverage and short exposure times are essential for a realistic assessment of the object fs spectral signature. We will compare the calibrated spectra with lab-based measurements of simple spacecraft surfaces composed of a single material.

Seitzer, Patrick↗

The NASA Meter Class Autonomous Telescope: Ascension Island

The Meter Class Autonomous Telescope (MCAT) is the newest optical sensor dedicated to NASA s mission to characterize the space debris environment. It is the successor to a series of optical telescopes developed and operated by the JSC Orbital Debris Program Office (ODPO) to monitor and assess the debris environment in (1) Low Earth Orbit (LEO), (2) Medium Earth Orbit (MEO), and (3) Geosynchronous Orbit (GEO), with emphasis on LEO and GEO altitudes. A joint NASA-Air Force Research Labs project, MCAT is a 1.3m optical telescope dedicated to debris research. Its optical path and sensor yield a large survey fence at the cutting edge of current detector performance. It has four primary operational observing modes, two of which were not computationally feasible a decade ago. Operations are supported by a sophisticated software suite that monitors clouds and weather conditions, and controls everything from data collection to dome rotation to processing tens of GB of imagery data nightly. With fainter detection limits, precision detection, acquisition and tracking of targets, multi-color photometry, precision astrometry, automated reacquisition capability, and the ability to process all data at the acquisition rate, MCAT is capable of producing and processing a volume and quality of data far in excess of any current (or prior) ODPO operations. This means higher fidelity population inputs and eliminating the multi-year backlog from acquisition-to-product typical of optical campaigns. All of this is possible given a suitable observing location. Originally planned for the island of Legan, part of the Kwajalein Atoll Islands, recent developments have led to a change in venue. Specifically, the Ground-based Electro-Optical Deep Space Surveillance, or GEODSS, System of telescopes is the United States major tracking system for deep space. This network consists of telescopes in Maui, Hawaii; Diego Garcia (Indian Ocean), and Socorro, New Mexico. A fourth optical telescope, though smaller in size, has been operating in conjunction with this effort until recently in M.ron, Spain. With the M.ron site closing, a significant gap in longitude exists between the New Mexico and Diego Garcia sites. This longitudinal gap is well covered by placing a telescope on Ascension Island (7degrees 58'20" S, 14degrees 24'4"W), in the Atlantic Ocean. Ascension Island offers the benefits of both location and weather. The near equatorial location affords the opportunity to access under-sampled low-inclination orbits and new GEO longitudes, while simultaneously filling in the GEODSS longitudinal gap. Ascension Island is a volcanic, desert island, receiving only 7" of rain per year on average. With consistent trade winds blowing from the SSE direction off Africa, the combination of an island location with consistent winds will create the smooth laminar flow sought after by all astronomical sites, which creates stable atmospheric ('seeing') conditions. Finally, this low population island has minimal lighting, resulting in very dark skies, ideal for an observatory.

Lederer, S. M.↗

Cryogenic Optical Performance of a Lightweighted Mirror Assembly for Future Space Astronomical Telescopes: Correlating Optical Test Results and Thermal Optical Model

A 43cm diameter stacked core mirror demonstrator was interferometrically tested at room temperature down to 250 degrees Kelvin for thermal deformation. The 2.5m radius of curvature spherical mirror assembly was constructed by low temperature fusing three abrasive waterjet core sections between two CNC pocket milled face sheets. The 93% lightweighted Corning ULE® mirror assembly represents the current state of the art for future UV, optical, near IR space telescopes. During the multiple thermal test cycles, test results of interferometric test, thermal IR images of the front face were recorded in order to validate thermal optical model.

Eng, Ron↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

Thermal↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

JWST↗

New Method for Characterizing the State of Optical and Opto-Mechanical Systems

James Webb Space Telescope Optical Telescope Element (OTE) is a three mirror anastigmat consisting of a 6.5 m primary mirror (PM), secondary mirror (SM) and a tertiary mirror. The primary mirror is made out of 18 segments. The telescope and instruments will be assembled at Goddard Space Flight Center (GSFC) to make it the Optical Telescope Element-Integrated Science Instrument Module (OTIS). The OTIS will go through environmental testing at GSFC before being transported to Johnson Space Center for testing at cryogenic temperature. The objective of the primary mirror Center of Curvature test (CoC) is to characterize the PM before and after the environmental testing for workmanship. This paper discusses the CoC test including both a surface figure test and a new method for characterizing the state of the primary mirror using high speed dynamics interferometry.

Optical Testing↗

Overview and Status of EXCLAIM, the Experiment for Cryogenic Large-Aperture Intensity Mapping

The EXperiment for Cryogenic Large-Aperture Intensity Mapping (EXCLAIM) is a balloon-borne far-infrared telescope that will survey star formation history over cosmological time scales to improve our un-derstanding of why the star formation rate declined at redshiftz <2, despite continued clustering of darkmatter. Specifically, EXCLAIM will map the emission of redshifted carbon monoxide and singly ionized carbon lines in windows over a redshift range0< z <3.5, following an innovative approach known asintensity mapping. Intensity mapping measures the statistics of brightness fluctuations of cumulative lineemissions, as opposed to detecting individual galaxies, thus enabling a blind, complete census of the emittinggas. To detect this emission unambiguously, EXCLAIM will cross-correlate with a rich spectroscopic galaxycatalog. The EXCLAIM mission will use a cryogenic design to cool the telescope optics to approximately1.7K. The telescope will feature a90-cm primary mirror to probe spatial scales on the sky from the linearregime up to shot-noise-dominated scales. The telescope optical elements will couple to six μ-Spec spectrom-eter modules, operating over a420–540-GHz frequency band with a spectral resolution of512and featuringMicrowave Kinetic Inductance Detectors (MKIDs). In the baseline design, the detectors will be read out witha Radio Frequency System-on-Chip (RFSoC). The cryogenic telescope and the sensitive detectors will allowEXCLAIM to reach high sensitivity in spectral windows of low emission in the upper atmosphere. Here, anoverview of the mission design and development status since the start of the EXCLAIM project in early 2019 is presented.

Giuseppe Cataldo↗

Adaptive compensation for an optical tracking telescope

The application of model referenced adaptive control theory to an optical tracking telescope is discussed. The capability of the adaptive technique to compensate for mount irregularities such as inertial variations and bearing friction is demonstrated via field test results on a large tracking telescope. Results are presented which show a 6 to 1 improvement in tracking accuracy for a worst-case satellite trajectory.

Gilbart, J. W.↗

Optical Communications Telescope Laboratory (OCTL) Support of Space to Ground Link Demonstrations

The NASA/JPL Optical Communication Telescope Laboratory (OCTL) was built for dedicated research and development toward supporting free-space laser communications from space. Recently, the OCTL telescope was used to support the Lunar Laser Communication Demonstration (LLCD) from the Lunar Atmospheric Dust Environment Explorer (LADEE) spacecraft and is planned for use with the upcoming Optical Payload for Lasercomm Science (OPALS) demonstration from the International Space Station (ISS). The use of OCTL to support these demonstrations is discussed in this report. The discussion will feed forward to ongoing and future space-to-ground laser communications as it advances toward becoming an operational capability.

ground operations↗

Hubble Space Telescope: SRM/QA observations and lessons learned

The Hubble Space Telescope (HST) Optical Systems Board of Investigation was established on July 2, 1990 to review, analyze, and evaluate the facts and circumstances regarding the manufacture, development, and testing of the HST Optical Telescope Assembly (OTA). Specifically, the board was tasked to ascertain what caused the spherical aberration and how it escaped notice until on-orbit operation. The error that caused the on-orbit spherical aberration in the primary mirror was traced to the assembly process of the Reflective Null Corrector, one of the three Null Correctors developed as special test equipment (STE) to measure and test the primary mirror. Therefore, the safety, reliability, maintainability, and quality assurance (SRM&QA) investigation covers the events and the overall product assurance environment during the manufacturing phase of the primary mirror and Null Correctors (from 1978 through 1981). The SRM&QA issues that were identified during the HST investigation are summarized. The crucial product assurance requirements (including nonconformance processing) for the HST are examined. The history of Quality Assurance (QA) practices at Perkin-Elmer (P-E) for the period under investigation are reviewed. The importance of the information management function is discussed relative to data retention/control issues. Metrology and other critical technical issues also are discussed. The SRM&QA lessons learned from the investigation are presented along with specific recommendations. Appendix A provides the MSFC SRM&QA report. Appendix B provides supplemental reference materials. Appendix C presents the findings of the independent optical consultants, Optical Research Associates (ORA). Appendix D provides further details of the fault-tree analysis portion of the investigation process.

Rodney, George A.↗

SHARPI/PICTURE Sounding Rocket Telescope

The Solar High Angular Resolution Photometric Imager (SHARPI)/Planet Imaging Concept Testbed Using a Rocket Experiment (PICTURE) Sounding Rocket Telescope is described. The topics include: 1) Lightweight precision mirror development; 2) Two sounding rocket concepts sharing a telescope; 3) Optical Telescope Assembly (OTA) overview; 4) PM development program; 5) PM figure testing; 6) Mirror coatings; 7) PM mount and verification; 8) Secondary Mirror (SM); and 9) OTA.

Content, D.↗

Structural Feasibility Analysis of a Robotically Assembled Very Large Aperture Optical Space Telescope

This paper presents a feasibility study of robotically constructing a very large aperture optical space telescope on-orbit. Since the largest engineering challenges are likely to reside in the design and assembly of the 150-m diameter primary reflector, this preliminary study focuses on this component. The same technology developed for construction of the primary would then be readily used for the smaller optical structures (secondary, tertiary, etc.). A reasonable set of ground and on-orbit loading scenarios are compiled from the literature and used to define the structural performance requirements and size the primary reflector. A surface precision analysis shows that active adjustment of the primary structure is required in order to meet stringent optical surface requirements. Two potential actuation strategies are discussed along with potential actuation devices at the current state of the art. The finding of this research effort indicate that successful technology development combined with further analysis will likely enable such a telescope to be built in the future.

space telescopes↗

Feasibility study of an optically coherent telescope array in space

Numerical methods of image construction which can be used to produce very high angular resolution images at optical wavelengths of astronomical objects from an orbiting array of telescopes are discussed and a concept is presented for a phase-coherent optical telescope array which may be deployed by space shuttle in the 1990's. The system would start as a four-element linear array with a 12 m baseline. The initial module is a minimum redundant array with a photon-counting collecting area three times larger than space telescope and a one dimensional resolution of better than 0.01 arc seconds in the visible range. Later additions to the array would build up facility capability. The advantages of a VLBI observatory in space are considered as well as apertures for the telescopes.

Traub, W. A.↗

Optical tracking telescope compensation

In order to minimize the effects of parameter variations in the dynamics of an optical tracking telescope, a model referenced parameter adaptive control system is described that - in conjunction with more traditional forms of compensation - achieves a reduction of rms pointing error by more than a factor of six. The adaptive compensation system utilizes open loop compensation, closed loop compensation, and model reference compensation to provide the precise input to force telescope axis velocity to follow the ideal velocity.

Gilbart, J. W.↗

Development of a safe ground to space laser propagation system for the optical communications telescope laboratory

Furthering pursuits in high bandwidth communications to future NASA deep space and neat-Earth probes, the Jet Propulsion Laboratory (JPL) is building the Optical communications Telescope Laboratory (OCTL) atop Table Mountain in Southern California. This R&D optical antenna will be used to develop optical communication strategies for future optical ground stations. Initial experiments to be conducted include propagating high-powered, Q-switched laser beams to retro-reflecting satellites. Yet laser beam propagation from the ground to space is under the cognizance of various government agencies, namely: the Occupational Safety and Health Administration (ISHA) that is responsible for protecting workforce personnel; the Federal Aviation Administration (FAA) responsible for protecting pilots and aircraft; and the Laser Clearinghouse of Space Command responsible for protecting space assets. To ensure that laser beam propagation from the OCTL and future autonomously operated ground stations comply with the guidelines of these organizations, JPL is developing a multi-tiered safety system that will meet the coordination, monitoring, and reporting functions required by the agencies. At Tier 0, laser operators will meet OSHA safety standards for protection and access to the high power lasers area will be restricted and interlocked. Tier 1, the area defined from the telescope dome out to a range of 3.4-km, will utilize long wave infrared camera sensors to alert operators of at risk aircraft in the FAA controlled airspace. Tier 2, defined to extend from 3.4-km out to the aircraft service ceiling in FAA airspace, will detect at risk aircraft by radar. Lastly, beam propagation into space, defined as Tier 3, will require coordination with the Laser Clearinghouse. A detailed description of the four tiers is presented along with the design of the integrated monitoring and beam transmission control system.

laser safety↗