Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “maintenance optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Compact, Achromatic Non-scaling FFAG Accelerator for HEP, Commercial and Medical Applications (CRADA FRA-2008-0005 Final Report)

Proton and light-ion accelerators have many research and medical applications, but the current state of technology in accelerators severely limits their widespread use: (1) synchrotrons have an intrinsic low duty cycle and become quite large for light ions; and (2) cyclotrons do not have energy variability and require complex superconducting magnets for high energy. A new concept in non-scaling Fixed-Field Alternating-Gradient (FFAGs) has been invented that incorporates both the energy variability of the synchrotron and the high duty cycle of the cyclotron. The concept uses normal-conducting, combined-function magnets that apply only constant (dipole) and linear-gradient (quadrupole) fields to stabilize the accelerator. This project will develop an optimized design for a new non-scaling and cost-effective innovation in FFAG accelerators. The accelerator design will have optics that can stably accelerate protons to 250 MeV (or higher) and carbon ions to =200 MeV, an energy considered ideal for radiation therapy. Phase I will optimize, fully simulate, and demonstrate the feasibility of this accelerator. Commercial Applications and other Benefits as described by the awardee: The fixed-field acceleration concept should eliminate some of the most pronounced technical difficulties, expense, maintenance, and required expertise faced in conventional proton and light-ion accelerators. In addition to the application for high energy physics, these accelerators should have application in cancer treatment, radiopharmaceuticals, and medical isotope production, and materials science.

43 PARTICLE ACCELERATORS↗

A Systematic Review and Integrated Approach to Modeling of Aging Utility Scale PV Systems

The growing deployment of utility-scale photovoltaic (PV) systems has increased the importance of techno-economic modeling operational photovoltaic (PV) systems for predicting energy yield, optimizing asset management, and informing financial decisions. Through a systematic review of literature and current industry practices, we review the different common modeling practices of a system's configuration and age, performance and degradation, operation and maintenance (O&M), while also focusing on specific considerations for repowering, revamping, and decommissioning. Building on the synthesis, we develop a structured framework for techno-economic modeling of operating PV systems that integrate performance and degradation analysis, a decommissioning and repowering cost model that estimates the system's end-of-life costs to reduce uncertainty quantifications and improve consistency across the sector. This research contributes to improved modeling methodologies and potentially to reduced financial performance requirements by providing practitioners with input resources and practical approaches to estimate performance, degradation, and costs associated with continued operation, revamping, repowering, or decommissioning decisions.

14 SOLAR ENERGY↗

Enhancement of Optical Efficiency of CSP Mirrors for Reducing O&M Cost via Near-Continuous Operation of Self-Cleaning Electrodynamic Screens (EDS). Final Report

Over the past decade, techno-economical advancements in solar energy systems, particularly the improvement in the conversion efficiency of PV modules made with mono-crystalline silicon solar cells from 12% to 20%, as well as the cost reduction in manufacturing by a factor of about 10%, have made it possible to achieve a levelized cost of electricity (LCOE) in PV plants that is comparable to, or less than, the cost of deriving electricity from fossil fuels. Operating PV plants in mid-latitude sun-belt regions, where the solar irradiance level is highest, provides a high annual energy-yield (kWh/kWp) due to two factors: (1) the availability of predictable high solar irradiance throughout the year with the fewest interruptions in solar flux from clouds and rain, and (2) the increased conversion efficiency of crystalline solar cells, as recombination loss has decreased with increased intensity of the sunlight that illuminates the silicon solar cells. Semi-arid and desert regions, however, are plagued by high atmospheric dust concentrations and frequent sand storms. The deposition of a layer of dust on the optical surfaces of solar collectors such as PV modules and concentrating mirrors reduces the transmission efficiency of sunlight that actually reaches the solar cells or receivers, resulting in high energy-yield soiling loss. There are two major cost components to operating a solar plant: (1) installation costs, and (2) operation-and-maintenance (O&M) costs. There is no fuel cost; hence operating a solar plant in a semi-arid or desert region provides high returns on investment if soiling losses are mitigated via efficient cleaning methods and optimized cleaning frequency. If solar collectors are not cleaned, the accumulation of dust layers on solar collectors may cause the operation of such plants in arid regions to become economically unviable. Washing solar collectors with water and detergent, as is most commonly done now, is an efficient method for cleaning. The conventional approach in utility-scale solar plants is to use a large truck with a water tank and pump system for spraying deionized water on the surface of the solar collectors. Robotic cleaning with brushes, used for many solar plants, requires lesser water for cleaning. The water consumed using semi-automated cleaning of PV modules in utility-scale solar plants is approximately 2 liters/m 2 per cleaning cycle. The total optical surface area of the solar collectors in 1 TW-scale solar installation will be more than 3 × 109 m 2 ; hence an enormous amount of water be needed for cleaning. There simply is not enough fresh water in the sun-belt areas of the world for predicted cleaning needs. In solar power plants, the estimated cost of cleaning solar collectors includes expenses related to the equipment used, labor, cost of transportation of water, the energy required for cleaning, plus ancillary costs whereas the cost of water is not considered. The water used is obtained from sources located close to plant sites, unmindful of the environmental and societal impact as the power plants are oftentimes located in regions that face severe drought. This practice is very similar to the cost calculations in deriving the levelized cost of electricity (LCOE) in conventional power plants based on burning fossil fuel such as coal and gas, while disregarding the cost of climate change and health effects. Unless a water-free or low-water cleaning method is established, the expansion of solar plants may lose public support in areas suffering long intervals of drought. The goal of this research project has been the development and application of the Electrodynamic Screen (EDS) as a means for a water-free, scalable cleaning process applicable to solar-power installations, including rooftop applications. We describe here the development of an EDS film-based cleaning process as an emerging method for use on PV modules, parabolic troughs, and heliostats. This report aims to show the feasibility of integrating or retrofitting EDS films onto the optical surfaces of solar collectors (both PV and CSP) while maintaining high transmission or reflection efficiency. The cleaning action provided by the EDS film is an active method to remove dust deposits by electrodynamic force. Current lab-scale prototype EDS films, retrofitted onto solar panels and mirrors, have shown to be capable of maintaining optical transmission or specular-reflection efficiencies higher than 90% of initial values under clean conditions. The optical surfaces of solar collectors laminated with EDS films can remove more than 90% of deposited dust when the EDS is activated for less than two minutes. As an electrodynamic dust removal process, the EDS film-based method is designed primarily for the removal of dust in solar installations located in semi-arid and desert areas, where the atmosphere is often dry and dusty and rainfall is infrequent. While EDS film application minimizes water consumption and facilitates cleaning as frequently as needed, it has limitations in removing contaminants such as soot, organic pollutants deposited as fine films on the surface, and bird droppings. The dust removal efficiency of the EDS is maximum at relative humidity RH is 40 to 50% and decreases at when RH > 65%. Many solar plant sites undergo diurnal and seasonal cycles of high ambient, early afternoon temperatures and an RH that reaches the dew point early in the morning. These variations in atmospheric conditions do not limit the operation of the EDS film. This report presents a brief review of the progress and the potential of EDS film technology for mitigating the impact of dust on solar collectors via water-free cleaning, as well as current technical challenges regarding efficiency and durability. Our experimental data on the performance of EDS films show that: (1) the dust-removal efficiency (DRE) can reach levels higher than 90%, (2) the specular reflectivity (SR) of EDS film-laminated second-surface mirrors reach levels in excess of 90%, (3) the specular reflectivity restoration (SRR) can exceed 90%, (4) the output-power restoration (OPR) of PV modules can exceed 95%, and (5) the optical transmission efficiency (TE) of the EDS films can be greater than 90%. Working with Sandia National Laboratories (NM), Corning Research and Development Corporation (NY), Eastman Kodak (NY), Tomark-Worthen Industries (NH), and EDS Chile SPA (Chile), we have produced EDS film-laminated PV modules and demonstrated their self-cleaning functions without requiring water. We have demonstrated that the operational range of EDS films will cover the expected ambient temperature of solar fields at RH cycling varying from 20 to 95% as long as the EDS films are activated in the RH range 20 to 50%. (Typical solar-field climates in deserts and semi-arid lands often reach near dew point in coastal areas.) Our experiments on the application of hydrophobic-fluorinated nanoparticle coatings on EDS film surfaces show that the EDS operational range can be extended to higher RH levels that approach the dew point. At Eastman Kodak, as one of our industrial partners, we were able to establish a process for manufacturing EDS films using flexographic printing of the electrodes onto transparent polymer films. This process utilizes an existing manufacturing line at Eastman Kodak that allows fabrication of medium-scale EDS films (26 cm × 30 cm). The manufacturing process has the capacity to produce EDS films at high production speeds. The medium-scale EDS films that have been printed at Kodak were evaluated in the lab at Boston University. The EDS films produced at Kodak were laminated at Tomark-Worthen using an industrial scale vacuum laminator to produce EDS film stacks, which can be affixed onto the optical surfaces of PV modules or concentrating mirrors. The EDS film stack consists of the EDS films that have Willow® Glass (WG) which has a thickness of 100 μm as the front surface. The WG sheets obtained from Corning Research and Development Corporation are customized in size and shape to cover the active area of the EDS films. The back surface of the EDS film stack is integrated onto the optical surface of the solar panel or mirror using optically clear adhesive (OCA) films or silicone adhesives. The OCA films (thickness 25 μm) are produced by 3M. The EDS film stacks have the architecture: WG/OCA/EDS Film/OCA/ over PV module or solar mirror. The power-supply units needed for activating the electrodes of the EDS film were designed and produced at Boston University. These power supply units provide three-phase, 1.2 kV voltage pulses at a very low current (micro-ampere) level and at a low frequency (≈ 5 Hz). The voltage pulses are applied to the electrodes in a sequence such that the train of pulses resembles a unidirectional traveling wave of electrical field on the surface of the EDS film. The dust particles on the surface become charged electrostatically and are levitated by the Coulomb force. The lateral sweeping action of the traveling electric field created by the three-phase voltages pulses then sweeps the dust off the surface. The energy consumed by the EDS electrodes is less than 0.2 Wh/m 2 /cleaning cycle, enabling energy-efficient restoration of output power (OPR) of PV module or specular reflectivity restoration (SRR) for solar mirrors. The EDS system consists of (1) an EDS film stack laminated onto the solar collectors, (2) connection of the EDS film to its power supply unit and (3) Interconnection of the power supply to PV modules or solar mirrors. Design, construction and assessment of field-testing units that have EDS stack laminated PV modules for evaluating the performance of the EDS films in solar fields is being carried out at BU. Our progress under this project, aimed at the advancement of EDS film technology, has reached DOE Technology Readiness Level (TRL) 6. Based on the extensive laboratory evaluations and limited field trials, as well as contacts with potential users, we believe that the technology has reached its commercial stage. We are conducting a cost analysis using the National Renewable Energy Laboratory (NREL) System Advisory Model (SAM) and are preparing for field trials of EDS films in different solar fields in the US, Chile, India and in the Middle East. A brief description of EDS film performance, construction and testing of the field-test unit, autonomous operation of the field-test unit for evaluating EDS performance in increasing energy yield, associated revenue savings, and water conservation is presented.

14 SOLAR ENERGY↗

Engineering Services in a Mission Critical Environment: Engineering Services - Science and Technology Operations’ Infrastructure Support at Los Alamos National Laboratory

As an engineering team within a facilities-driven organization, Engineering Services – Science and Technology Operations (ES-STO), supports Los Alamos National Laboratory (LANL), playing a pivotal role in the U.S. nuclear stockpile mission. This report outlines ES-STO’s contributions through the installation of crucial systems such as HVAC units, compressors, and scientific specialty equipment, as well as providing expert consultation to optimize laboratory operations. ES-STO’s goal is to ensure that LANL's infrastructure and research facilities are aligned with mission-critical needs, supporting both operational efficiency and safety in the nuclear stockpile management and maintenance. This report discusses the installation processes, ongoing consultations, and the significant impact of our efforts on national security objectives.

42 ENGINEERING↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴ speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously previously impossible with conventional tools while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

Degradability of Biodegradable Soil Moisture Sensor Components and Their Effect on Maize (Zea mays L.) Growth

Inexpensive and no-maintenance biodegradable soil moisture sensors could improve existing knowledge on spatial and temporal variability of available soil water at field-scale. Such sensors can unlock the full potential of variable-rate irrigation (VRI) systems to optimize water applications in irrigated cropping systems. The objectives of this study were to assess (i) the degradation of soil moisture sensor component materials and (ii) the effects of material degradation on maize (Zea Mays L.) growth and development. This study was conducted in a greenhouse at Colorado State University, Colorado, USA, by planting maize seeds in pots filled with three growing media (field soil, silica sand, and Promix commercial potting media). The degradation rate of five candidate sensor materials (three blends of beeswax and soy wax, balsa wood, and PHBV (poly(3-hydroxybutyrate-co-3-hydroxyvalerate))) was assessed by harvesting sensor materials at four maize growth stages (30, 60, 90, and 120 days after transplanting). All materials under consideration showed stability in terms of mass and dimension except PHBV. PHBV was degraded entirely within 30 days in soil and Promix, and within 60 days in sand. Balsa wood did now show any significant reduction in mass and dimensions in all growth media. Similarly, there was no significant mass loss across wax blends (p = 0.05) at any growth stage, with a few exceptions. Among the wax blends, 3:1 (beeswax:soy wax) was the most stable blend in terms of mass and dimension with no surface cracks, making it a suitable encapsulant for soil sensor. All materials under consideration did not have any significant effect on maize growth (dry biomass, green biomass, and height) as compared to control plants. These results indicated that 3:1 beeswax:soy wax blend, PHBV, and balsa wood could be suitable candidates for various components of biodegradable soil moisture sensors.

Dahal, Subash (ORCID:0000000205489103)↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴× speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously—previously impossible with conventional tools—while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

CRADA Final Report: Open Microgrid Platform

Current microgrid control technology is mostly proprietary, expensive, and inflexible. An open-source, vendor-neutral, publish-subscribe controller will significantly lower the barrier to entry for new technologies and market entrants: inverter, battery, and load control manufacturers; cloud and services providers; and energy aggregators. An OpenFMB controller can significantly reduce the acquisition, integration, and ongoing operating and maintenance costs and increase revenue opportunities for energy producers and consumers. It allows distributed energy resource (DER) owners to replace individual DER components as richer-function, lower-cost devices become available or to incorporate new forecast and optimization algorithms as they are developed. A standard, secure, full-function DER field controller will also provide a low-cost means for grid operators to effectively manage the variability and uncertainty of solar photovoltaics (PV). Under the terms of this CRADA, ORNL has worked with Open Energy Solutions (OES) to advance the transition of ORNL’s existing open-source microgrid controller into a platform geared toward mainstream implementation. Using a more prevalent and memory-safe programming language, Rust, OES has converted ORNL’s current generation on-grid optimization into an application more suitable for industry use. The results of the ported optimization were analyzed by inputting the same arguments in both the current-generation and next-generation optimizers and verifying that the results were equivalent.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wearable Technology and Its Influence on Motor Development and Biomechanical Analysis

The convergence among biomechanics, motor development, and wearable technology redefines our understanding of human movement. These technologies allow for the continuous monitoring of motor development and the state of motor abilities from infancy to old age, enabling early and personalized interventions to promote healthy motor skills. For athletes, they offer valuable insights to optimize technique and prevent injuries, while in old age, they help maintain mobility and prevent falls. Integration with artificial intelligence further extends these capabilities, enabling sophisticated data analysis. Wearable technology is transforming the way we approach motor development and maintenance of motor skills, offering unprecedented possibilities for improving health, performance, and quality of life at every stage of life. The promising future of these technologies paves the way for an era of more personalized and effective healthcare, driven by innovation and interdisciplinary collaboration.

Morouço, Pedro (ORCID:0000000259569790)↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wyandotte Integrated Renewable Energy Strategy (WIRES 2) (Final Technical Report)

Wyandotte Municipal Services (WMS), a Michigan Municipal Utility offering electric generation, transmission & distribution, water filtration & distribution and Broadband/Video sought to deploy a set of renewable energy projects for their Electric Utility that contributed to reducing the City’s environmental and energy impact, provided examples that would encourage businesses and citizens to adopt cleaner energy practices and help WMS meet the required renewable energy standards of the State of Michigan (10% in 2015, 15% in 2021). WMS generates and delivers roughly 280,000 megawatt hours (MWh) of electricity annually to more than 10,000 homes and 1,000 businesses within the City of Wyandotte. The Wyandotte Integrated Renewable Energy Strategy – WIRES 2 resulted in deployment of a set of community-scale micro-wind turbines, evaluation and installation of energy-efficient and low-maintenance light-emitting diode (LED) street lights and park lights in highly visible locations in the City and expansion of the geothermal heating and cooling district that already included residential geothermal systems, to include larger scale business/institutional systems at the Utility’s largest electric customer and at the City Library. Finally, WMS identified the need for job training in energy efficiency and renewable energy technologies to further develop a local skilled workforce in these areas. Partially funded by the grant, the wind turbine project provides a benchmark for WMS, local businesses and residents in the evaluation of utility-scale wind v. micro-wind in an urban environment as a renewable energy strategy. Also partially funded by the grant, the LED project benefited the City of Wyandotte by reducing load on the electric system for the public utility but also reduced City costs for streetlighting, parking lot lighting and park lighting without a compromise in security. The project also resulted in a visual success that has led to additional approvals for non-Grant related LED lighting installations resulting in further reduction in the electric load in the City. Commercial Geothermal installations resulted in the Utility being able to eliminate steam customers who formerly utilized the byproduct of steam from WMS electric production. Due to the reduction in natural gas prices and the overall reduction in market purchased power, it was no longer feasible for WMS to operate its Power Plant as a base load plant and to only operate on a market dispatch philosophy when market prices dictated that WMS could produce electricity cheaper than the market purchase price. This has resulted in fewer operating days for the WMS Power Plant, resulting in less environmental impact. WMS has now completely exited the steam business and the ability to offer a geothermal option to two (2) former steam customers (BASF-Wyandotte and the Bacon Memorial Library) allowed for that. In addition, peak loads have been shaved for these two (2) large customers due to the consistent temperature offered by geothermal heating and cooling, reducing the swings associated with thermostat changes caused by outside temperature changes during extreme high and low temperatures. Finally, energy efficiency and renewable energy college-level classes at Wayne County Community College allowed a group of interested students to pursue studies in those technologies through grant provided tuition, books and course materials. This effort provided a foundation of potential future employees not only for WMS but other energy efficiency/renewable energy employers such as Franklin Energy, a partner with WMS in energy optimization efforts with Wyandotte businesses.

17 WIND ENERGY↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High-Temperature Multi-Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings.

20 FOSSIL-FUELED POWER PLANTS↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗