Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Preventive Power Outage Estimation Based on A Novel Scenario Clustering Strategy: Preprint

The increasing occurrence of extreme weather events is challenging the power grid operation. In front of the extreme weather, the system operator is responsible for estimating the power outage and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The predicted vulnerable lines of an outage prediction model tool are utilized to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers the schedule of repair crews and mobile energy resources. Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative ones for straightforward analysis. Finally, case studies on a distribution system evaluate the damage level brought by extreme weather and verify the effectiveness of the proposed scenario clustering strategy.

mobile energy resources↗

Population-based learning of load balancing policies for a distributed computer system

Effective load-balancing policies use dynamic resource information to schedule tasks in a distributed computer system. We present a novel method for automatically learning such policies. At each site in our system, we use a comparator neural network to predict the relative speedup of an incoming task using only the resource-utilization patterns obtained prior to the task's arrival. Outputs of these comparator networks are broadcast periodically over the distributed system, and the resource schedulers at each site use these values to determine the best site for executing an incoming task. The delays incurred in propagating workload information and tasks from one site to another, as well as the dynamic and unpredictable nature of workloads in multiprogrammed multiprocessors, may cause the workload pattern at the time of execution to differ from patterns prevailing at the times of load-index computation and decision making. Our load-balancing policy accommodates this uncertainty by using certain tunable parameters. We present a population-based machine-learning algorithm that adjusts these parameters in order to achieve high average speedups with respect to local execution. Our results show that our load-balancing policy, when combined with the comparator neural network for workload characterization, is effective in exploiting idle resources in a distributed computer system.

Mehra, Pankaj↗

Message Mode Operations for Spacecraft: A Proposal for Operating Spacecraft During Cruise and Mitigating the Network Loading Crunch

The NASA Deep Space Network (DSN) is a world-class spacecraft tracking facility with stations located in Spain, Australia and USA, servicing Deep Space Missions of many space agencies. The current system of scheduling spacecraft during cruise for multiple 8 hour tracking sessions per week currently leads to an overcommitted DSN. Studies indicate that future projected mission demands upon the Network will only make the loading problem worse. Therefore, a more efficient scheduling of DSN resources is necessary in order to support the additional network loading envisioned in the next few years: The number of missions is projected to increase from 25 in 1998 to 34 by 2001. In fact given the challenge of the NASA administrator, Dan Goldin, of launching 12 spacecraft per year, the DSN would be tracking approximately 90 spacecraft by 2010. Currently a large amount of antenna time and network resources are subscribed by a project in order to have their mission supported during the cruise phase. The recently completed Mars Pathfinder mission was tracked 3 times a week (8 hours/day) during the majority of its cruise to Mars. This paper proposes an innovative approach called Message Mode Operations (MMO) for mitigating the Network loading problem while continuing to meet the tracking, reporting, time management, and scheduling requirements of these missions during Cruise while occupying very short tracking times. MMO satisfies these requirements by providing the following services: Spacecraft Health and Welfare Monitoring Service Command Delivery Service Adaptive Spacecraft Scheduling Service Orbit Determination Service Time Calibration Service Utilizing more efficient engineering telemetry summarization and filtering techniques on-board the spacecraft and collapsing the navigation requirements for Doppler and Range into shorter tracks, we believe spacecraft can be adequately serviced using short 10 to 30 minute tracking sessions. This claim assumes that certain changes would have to he made in the way the Network traditionally services missions in Cruise. Furthermore, limiting spacecraft to short sessions will free up larger blocks of time in the tracking schedule to help accommodate future tracking demands soon to be placed upon the Network. This paper describes the key characteristics and benefits of MMO, the operational scenarios for its use, the required changes to the ground system in order to make this approach feasible and the results of two simulations: 1) to determine the effects of MMO on projected mission loading on the DSN and, 2) to determine the effect MMO has on spacecraft orbit determination.

Greenberg, Ed↗

Norton-Thevenin Receptance Coupling (NTRC) as a Payload Design Tool

The NASA Engineering and Safety Center (NESC) is funding a study to develop an alternate method for performing coupled loads analysis called Norton-Thevenin Receptance Coupling (NTRC). NTRC combines Receptance Coupling (RC), a frequency-domain synthesis method and Norton-Thevenin (NT) theory, an impedance based approach for simulating the interaction between dynamic systems. The goal of developing the NTRC method is to provide a tool that payload developers can use to reduce the conservatism in defining preliminary design loads, assess the impact of design changes between formal load cycles, and to perform trade studies for design optimization with a minimum amount of data required from the launch vehicle (LV) provider. NTRC also has the ability to perform parametric loads analysis where many different design configurations can be evaluated. This will result in cost and schedule benefits to the payload developer that are currently not possible under the standard coupled loads analysis (CLA) flow where typically only 2-3 official load cycles are performed by the LV provider over the life of a payload program. NTRC is not envisioned as a replacement for the official load cycles performed by the LV provider but rather as a means to address the types of design issues faced by the payload developer before and between official load cycles.The presentation provides an overview of the NTRC methodology and discusses how NTRC can be used to replicate the results from a standard LV CLA. The presentation covers the benchmarking that has been performed as part of the NESC study to demonstrate the accuracy of the technique for both frequency and time domain dynamic analyses. Future plans for benchmarking the NTRC approach against CLA results for NASAs Space Launch System (SLS) and commercial launch vehicles are discussed and the role that NTRC is envisioned to play in the payload development cycle.

Structural Dynamics↗

Norton-Thevenin Receptance Coupling (NTRC) as a Payload Analysis Tool

The NASA Engineering and Safety Center (NESC) has funded a study of a new method formulated by NASA Engineers called Norton-Thevenin Receptance Coupling (NTRC) to perform coupled loads analysis (CLA). The problem that NTRC attempts to solve is the dependency of the payload organization to high CLA costs, long schedules, lack of standard capabilities to evaluate multiple configurations and unavailability of loads when needed. NTRC solves the problem by providing a tool that payload developers can use to obtain loads at a fraction of the cost of a CLA at any time that it is required. While NTRC is not intended to replace the formal load cycles performed by the launch vehicle (LV) provider, it will provide the ability to reduce the conservatism in defining preliminary design loads, assess the impact of design changes between formal load cycles, perform trade studies and perform parametric loads analysis where many different design configurations can be evaluated with a minimum amount of data required from the LV provider. NTRC condenses all the necessary information into the launch vehicle to payload/s connection points or boundary degrees of freedom (BD). The launch vehicle model is represented by its impedance at its BDs; its forcing functions are represented by the acceleration at those BDs when the payload is absent and the latter is represented by its impedance at the same BDs. Payload responses are represented by transfer functions of selected response to interface BDs. The methodology has contributed to the Loads and Dynamics discipline advancement and successfully passed Peer Reviews. NTRC is exact in the frequency domain. Time domain replication and accuracy is outstanding. A second phase is envisioned to benchmark the whole set of CLA events for the Agency's most utilized Launch Vehicles, and ready it for operational deployment at NASA.

Kaufman, Daniel↗

CRADA Number NFE-24-10110 with Qubit Engineering Inc. (CRADA Final Report)

Over the past year, the Qubit Engineering team has pushed the frontiers of power‑grid optimization, working in close collaboration with Oak Ridge National Laboratory (ORNL) and the Tennessee Valley Authority (TVA). Their progress is reflected in three newly submitted conference papers, “Unified Relational GNN Architecture for AC Optimal Power Flow Calculations in Electric Grids,” “Graph‑Based Attention Mechanisms for Solving the AC Optimal Power Flow Problem in Electrical‑Power Networks,” and “Enhanced Power‑Grid Maintenance Planning and Quantum‑Inspired Combinatorial Prospects.” These publications showcase state‑of‑the‑art graph‑neural‑network methods for AC‑OPF and novel quantum‑inspired heuristics for maintenance scheduling. Beyond the academic results, the Qubit team has converted the research into two production‑grade tools built on TVA data: Neuro‑Grid, an AI‑driven power‑flow simulator that provides instant, interactive full‑grid load‑flow visualizations, and Quanta‑Grid, a quantum‑inspired maintenance‑scheduling engine to support logistics optimization for power utilities. Together, these advances demonstrate how Qubit’s partnership with ORNL and TVA is delivering practical, physics‑grounded analytics for next‑generation grid management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Autonomous Vehicle Sensing and Compute Load on a Chassis Dynamometer

The sensing and compute load auxiliary energy consumption in autonomous vehicles may be significant due to the large number of sensors and the high compute load from sensor processing and route planning. To understand this issue, this study investigates the top-down energy usage of an electric 2015 Kia Soul fully instrumented with state sensors and a state-specific computer for path planning and sensor processing. A chassis dynamometer was then used to evaluate the cases of (1) no sensors or computation, (2) only sensors operating, and (3) sensors plus compute load. The vehicle was operated autonomously on the dynamometer using a PolySync drive-kit with drive-by-wire longitudinal control. The DynoJet model 224xLC was used to adapt the eddy current dynamometer's road load parameters to comply with an Environmental Protection Agency drive schedule and to evaluate performance against the Argonne National Laboratory Digital Dynamometer Dataset. On the UDDS-HWFET combined driving cycle, the stock battery's range was reduced by 5.6% for sensors alone and 12.2% for sensors and compute load. These results show that the added sensing and compute auxiliary load from automated and autonomous systems is significant and that research efforts need to be spent investigating new energy efficient systems.

Brown, Nicholas E.↗

A fast acting electrical servo for the actuation of full span, Fowler-type wing flaps in DLC applications: A detail design study

The philosophy and detail design of an electro-mechanical actuator for Fowler-type wing flaps which have a response time constant of 0.025 seconds are described. A conventional electrical servomotor with a power rating twice the maximum power delivered to the load is employed along with adaptive, gain-scheduled feedback and various logic circuits, including one to remove electrical excitation from the motor during extended periods when no motion of the flap is desired.

Smetana, F. O.↗

NERVA 400E thrust train dynamic analysis

The natural frequencies and dynamic responses of the NERVA 400E engine thrust train were determined for nuclear space operations (NSO), and earth-orbital shuttle (EOS) during launch and boost conditions. For NSO, a mini-tank configuration was analyzed with the forward end of the upper truss assumed fixed at the stage/mini-tank interface. For EOS, both a mini-tank and an engine only configuration were analyzed for a specific engine assembly support (EAS) stiffness. For all cases the effect of the shield on dynamic response characteristics was determined by performing parallel analyses with and without the shield. Gimbaling loads were not generated as that effort was scheduled after the termination date. The analysis, while demonstrating the adequacy of the engine design, revealed serious deficiencies in the EAS. Responses at the unsupported ends of the engine are excessive. Responses at the nuclear subsystem interface appear acceptable. It is recommended that additional analysis and design effort be expended upon the EAS to ensure that all engine responses stay within reasonable bounds.

Vronay, D. F.↗

Supersonic market and economic analyses

Advanced supersonic transport markets of the free world were projected for the period 1985 to 2004. Passenger traffic volume and airplane range and seat capacity requirements were estimated for Mach 2.2 service by international regional area market areas and by city pairs within and between these areas. Market factors and traffic factors examined include variable loads, growth rates, supersonic transport market shares, and schedule frequencies considering the different makeup of passenger traffic and individual city pairs. Direct, indirect, and total operating costs and yield levels were economically analyzed for first class and full fare economy class traffic.

Rochte, L. S.↗

Variable camber rotor study

Deployment of variable camber concepts on helicopter rotors was analytically assessed. It was determined that variable camber extended the operating range of helicopters provided that the correct compromise can be obtained between performance/loads gains and mechanical complexity. A number of variable camber concepts were reviewed on a two dimensional basis to determine the usefulness of leading edge, trailing edge and overall camber variation schemes. The most powerful method to vary camber was through the trailing edge flaps undergoing relatively small motions (-5 deg to +15 deg). The aerodynamic characteristics of the NASA/Ames A-1 airfoil with 35% and 50% plain trailing edge flaps were determined by means of current subcritical and transonic airfoil design methods and used by rotor performance and loads analysis codes. The most promising variable camber schedule reviewed was a configuration with a 35% plain flap deployment in an on/off mode near the tip of a blade. Preliminary results show approximately 11% reduction in power is possible at 192 knots and a rotor thrust coefficient of 0.09. The potential demonstrated indicates a significant potential for expanding the operating envelope of the helicopter. Further investigation into improving the power saving and defining the improvement in the operational envelope of the helicopter is recommended.

Dadone, L.↗

Environmental concept for engineering software on MIMD computers

The issues related to developing an environment in which engineering systems can be implemented on MIMD machines are discussed. The problem is presented in terms of implementing the finite element method under such an environment. However, neither the concepts nor the prototype implementation environment are limited to this application. The topics discussed include: the ability to schedule and synchronize tasks efficiently; granularity of tasks; load balancing; and the use of a high level language to specify parallel constructs, manage data, and achieve portability. The objective of developing a virtual machine concept which incorporates solutions to the above issues leads to a design that can be mapped onto loosely coupled, tightly coupled, and hybrid systems.

Lopez, L. A.↗

A proven approach for more effective software development and maintenance

Modern space flight mission operations and associated ground data systems are increasingly dependent upon reliable, quality software. Critical functions such as command load preparation, health and status monitoring, communications link scheduling and conflict resolution, and transparent gateway protocol conversion are routinely performed by software. Given budget constraints and the ever increasing capabilities of processor technology, the next generation of control centers and data systems will be even more dependent upon software across all aspects of performance. A key challenge now is to implement improved engineering, management, and assurance processes for the development and maintenance of that software; processes that cost less, yield higher quality products, and that self-correct for continual improvement evolution. The NASA Goddard Space Flight Center has a unique experience base that can be readily tapped to help solve the software challenge. Over the past eighteen years, the Software Engineering Laboratory within the code 500 Flight Dynamics Division has evolved a software development and maintenance methodology that accommodates the unique characteristics of an organization while optimizing and continually improving the organization's software capabilities. This methodology relies upon measurement, analysis, and feedback much analogous to that of control loop systems. It is an approach with a time-tested track record proven through repeated applications across a broad range of operational software development and maintenance projects. This paper describes the software improvement methodology employed by the Software Engineering Laboratory, and how it has been exploited within the Flight Dynamics Division with GSFC Code 500. Examples of specific improvement in the software itself and its processes are presented to illustrate the effectiveness of the methodology. Finally, the initial findings are given when this methodology was applied across the mission operations and ground data systems software domains throughout Code 500.

Pajerski, Rose↗

Mission Planning and Scheduling System for NASA's Lunar Reconnaissance Mission

In the framework of NASA's return to the Moon efforts, the Lunar Reconnaissance Orbiter (LRO) is the first step. It is an unmanned mission to create a comprehensive atlas of the Moon's features and resources necessary to design and build a lunar outpost. LRO is scheduled for launch in April, 2009. LRO carries a payload comprised of six instruments and one technology demonstration. In addition to its scientific mission LRO will use new technologies, systems and flight operations concepts to reduce risk and increase productivity of future missions. As part of the effort to achieve robust and efficient operations, the LRO Mission Operations Team (MOT) will use its Mission Planning System (MPS) to manage the operational activities of the mission during the Lunar Orbit Insertion (LOI) and operational phases of the mission. The MPS, based on GMV's flexplan tool and developed for NASA with Honeywell Technology Solutions (prime contractor), will receive activity and slew maneuver requests from multiple science operations centers (SOC), as well as from the spacecraft engineers. flexplan will apply scheduling rules to all the requests received and will generate conflict free command schedules in the form of daily stored command loads for the orbiter and a set of daily pass scripts that help automate nominal real-time operations.

Garcia, Gonzalo↗

Economic Storage Size Optimization for Electric Vehicle Extreme-Fast Charging Stations

En-route charging infrastructure for electric vehicles is critical to support transportation needs. These charging stations are likely to have high loads and especially sharp peak loads given fast charging capabilities needed to meet transportation schedules. In order to reduce both strain on distribution grid infrastructure and charging station operational costs, many stations are likely to employ behind the meter storage. This paper demonstrates a behind the meter storage sizing optimization that employs an open-source agent-based vehicle behavior model (BEAM) to determine the best sizing across many scenarios. This optimization and analysis is novel in that it examines how storage size impacts not only charging station cost and peak load, but also vehicle queue times. The optimization is also applied across a wide analysis region with sufficient diversity and numbers to provide novel statistical analysis of optimal sizes.

Aka, Julius↗

Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems

Major technological advancements and recent policy support are improving the outlook for heavy-duty truck electrification in the United States. In particular, short-haul operations (=200 miles (=322 km)) are prevalent and early candidates for plug-in electric vehicles (EVs) given their short, predictable routes and return-to-base applications, which allows vehicles to recharge when off shift at their depots. Although previous studies investigated the impacts of added electrical loads on distribution systems, which included light-duty EVs, the implications for heavy-duty EV charging are underexplored. Here we summarize the causes, costs and lead times of distribution system upgrades anticipated for depot charging. We also developed synthetic depot charging load profiles for heavy-duty trucks from real-world operating schedules, and found that charging requirements are met at common light-duty EV charging rates (=100 kW per vehicle). Finally, we applied depot charging load profiles to 36 distribution real-world substations, which showed that most can accommodate high levels of heavy-duty EV charging without upgrades.

47 OTHER INSTRUMENTATION↗

Scheduling lessons learned from the Autonomous Power System

The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

Ringer, Mark J.↗

A 10,000-gpm liquid hydrogen transfer system for the Saturn/Apollo program.

Brief description of the design and operation of the liquid hydrogen transfer system used to service the Saturn V launch vehicle. The cryogenic loading of the huge booster begins eight hours before the scheduled liftoff. The first three hours of fueling are spent in cold hydrogen gas conditioning of the fuel tank. The cold hydrogen gas is provided by vaporizing liquid hydrogen from the storage tank and routing the resultant gas through the fill system. Boil-off losses after loading are continuously replaced through control valves which are driven by a computer system. The liquid hydrogen transfer system is made up of a number of subsystems including the 850,000 gal storage tank whose boil-off losses amount to only 200 gal/day, the pressurization system, the burn pond for controlled disposal of hydrogen waste gas, the storage tank fill manifold, and the hazardous gas monitoring system. Some of the subsystems and components are redundant to provide a high degree of reliability.

Wybranowski, E., Jr.↗