Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Assessment of the Orion-SLS Interface Management Process in Achieving the EIA 731.1 Systems Engineering Capability Model Generic Practices Level 3 Criteria

NASA is currently developing the next generation crewed spacecraft and launch vehicle for exploration beyond earth orbit including returning to the Moon and making the transit to Mars. Managing the design integration of major hardware elements of a space transportation system is critical for overcoming both the technical and programmatic challenges in taking a complex system from concept to space operations. An established method of accomplishing this is formal interface management. In this paper we set forth an argument that the interface management process implemented by NASA between the Orion Multi-Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) achieves the Level 3 tier of the EIA 731.1 System Engineering Capability Model (SECM) for Generic Practices. We describe the relevant NASA systems and associated organizations, and define the EIA SECM Level 3 Generic Practices. We then provide evidence for our compliance with those practices. This evidence includes discussions of: NASA Systems Engineering Interface (SE) Management standard process and best practices; the tailoring of that process for implementation on the Orion to SLS interface; changes made over time to improve the tailored process, and; the opportunities to take the resulting lessons learned and propose improvements to our institutional processes and best practices. We compare this evidence against the practices to form the rationale for the declared SECM maturity level.

Jellicorse, John J.↗

Resource Allocation Planning Helper (RALPH): Lessons learned

The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

Durham, Ralph↗

Projections of future climate for U.S. national assessments: past, present, future

Climate assessments consolidate our understanding of possible future climate conditions as represented by climate projections, which are largely based on the output of global climate models. Over the past 30 years, the scientific insights gained from climate projections have been refined through model structural improvements, emerging constraints on climate feedbacks, and increased computational efficiency. Within the same period, the process of assessing and evaluating information from climate projections has become more defined and targeted to inform users. As the size and audience of climate assessments has expanded, the framing, relevancy, and accessibility of projections has become increasingly important. This paper reviews the use of climate projections in national climate assessments (NCA) while highlighting challenges and opportunities that have emerged over time. Reflections and lessons learned address the continuous process to understand the broadening assessment audience and evolving user needs. Insights for future NCA development include (1) identifying benchmarks and standards for evaluating downscaled datasets, (2) expanding efforts to gather research gaps and user needs to inform how climate projections are presented in the assessment (3) providing practitioner guidance on the use, interpretation, and reporting of climate projections and uncertainty to better inform decision-making.

Assessment↗

Leveraging object-oriented development at Ames

This paper presents lessons learned by the Software Engineering Process Group (SEPG) from results of supporting two projects at NASA Ames using an Object Oriented Rapid Prototyping (OORP) approach supported by a full featured visual development environment. Supplemental lessons learned from a large project in progress and a requirements definition are also incorporated. The paper demonstrates how productivity gains can be made by leveraging the developer with a rich development environment, correct and early requirements definition using rapid prototyping, and earlier and better effort estimation and software sizing through object-oriented methods and metrics. Although the individual elements of OO methods, RP approach and OO metrics had been used on other separate projects, the reported projects were the first integrated usage supported by a rich development environment. Overall the approach used was twice as productive (measured by hours per OO Unit) as a C++ development.

Wenneson, Greg↗

Antarctic Exploration Parallels for Future Human Planetary Exploration: Science Operations Lessons Learned, Planning, and Equipment Capabilities for Long Range, Long Duration Traverses

The purpose for this workshop can be summed up by the question: Are there relevant analogs to planetary (meaning the Moon and Mars) to be found in polar exploration on Earth? The answer in my opinion is yes or else there would be no reason for this workshop. However, I think some background information would be useful to provide a context for my opinion on this matter. As all of you are probably aware, NASA has been set on a path that, in its current form, will eventually lead to putting human crews on the surface of the Moon and Mars for extended (months to years) in duration. For the past 50 V 60 years, starting not long after the end of World War II, exploration of the Antarctic has accumulated a significant body of experience that is highly analogous to our anticipated activities on the Moon and Mars. This relevant experience base includes: h Long duration (1 year and 2 year) continuous deployments by single crews, h Established a substantial outpost with a single deployment event to support these crews, h Carried out long distance (100 to 1000 kilometer) traverses, with and without intermediate support h Equipment and processes evolved based on lessons learned h International cooperative missions This is not a new or original thought; many people within NASA, including the most recent two NASA Administrators, have commented on the recognizable parallels between exploration in the Antarctic and on the Moon or Mars. But given that level of recognition, relatively little has been done, that I am aware of, to encourage these two exploration communities to collaborate in a significant way. [Slide 4] I will return to NASA s plans and the parallels with Antarctic traverses in a moment, but I want to spend a moment to explain the objective of this workshop and the anticipated products. We have two full days set aside for this workshop. This first day will be taken up with a series of presentations prepared by individuals with experience that extends back as far as the late 1940s and includes contemporary experience. The people presenting bring a variety of points of view, including not only U.S. but international, although most, if not all, have collaborated on international teams. The second day will consist of a series of small focused group interactions centered on those elements likely to be needed for traverse missions, such as mobility, habitation, and extravehicular activity (EVA, aka space suits). Our invited participants will be talking with people that specialize in these elements so that we can foster more direct interaction and exchange of experiences between these two exploration communities. After the workshop we will be preparing a report documenting these presentations and the essence of the focused interactions.

Hoffman, Stephen J.↗

An ASIC memory buffer controller for a high speed disk system

The need for large capacity, high speed mass memory storage devices has become increasingly evident at NASA during the past decade. High performance mass storage systems are crucial to present and future NASA systems. Spaceborne data storage system requirements have grown in response to the increasing amounts of data generated and processed by orbiting scientific experiments. Predictions indicate increases in the volume of data by orders of magnitude during the next decade. Current predictions are for storage capacities on the order of terabits (Tb), with data rates exceeding one gigabit per second (Gbps). As part of the design effort for a state of the art mass storage system, NASA Langley has designed a 144 CMOS ASIC to support high speed data transfers. This paper discusses the system architecture, ASIC design and some of the lessons learned in the development process.

Hodson, Robert F.↗

Coal-dependent Communities in Transition: Identifying Best Practices to Ensure Equitable Outcomes

The U.S. coal industry is experiencing a sharp increase in the numbers of retired and/or decommissioned coal-fired power plants across the U.S. In the years between 2010-2019, around 102 gigawatts (GW) of coal-fired generating capacity has been announced to be decommissioned, representing more than 546 coal-fired power plant units, and an additional 17 GW is planned to be decommissioned by 2025. This change in the energy production landscape presents an impact on the social, environmental, and economic prospects of coal-dependent communities. This report examined the role of communities in the coal power plant decommissioning process and provided community-identified best practices to ensure an equitable process. The experiences of four coal-dependent communities—Wise County, VA, Muskegon, MI, Anderson County, TN, and Becker, MN—are presented as case studies to understand the impacts of the decommissioning process, and associated best practices, from the communities’ perspective. The report results highlight the need to recognize that the decommissioning decision-making process must be community-based to be equitable. Each community’s input is key to the transition away from coal power because there is no one-size-fits-all development plan. In other words, each community’s trajectory through the decommissioning process—from the retirement decision-making stage to the final site redevelopment phase—is unique because each community has distinct needs and wants from the energy transition. What is best for one community may not be suited for another. Ultimately, the framework for site development and community revitalization post-decommissioning cannot be universal because each community’s profile—from a social, cultural, and economic perspective—is different. Community impacts of power plant decommissioning are not limited to job and revenue losses. Communities are likely to be impacted culturally, socially, environmentally, and have long-term health-based impacts that should be acknowledged and addressed in post-retirement plans. Commonly identified decommissioning best practices include: Early and continued engagement throughout, with a number of mediums for communication and feedback (e.g., in-person sessions, virtual meetings, written comment opportunities); Early planning of post-decommissioning projects to replace lost jobs, revenue, and economic activity; Recognition (and mitigation, if possible) of social impacts on the community due to plant closure; Transparency throughout the process, with trusted information being provided about the decommissioning process and timeline; potential impacts on the workforce, economy, and environment; and the feasibility of alternative site uses; Identification of funding sources, technical experts, and/or strategic partnerships to support decommissioning and the affected communities upfront; and, Acknowledgment of communities as stakeholders who have a role in the conversation and right to determine their futures. Three key areas for assisting coal-dependent communities affected by the energy transition: Technical assistance: assessment of site feasibility for alternative uses or to repower with new technologies; Cross-partnership engagement and collaboration: facilitate knowledge-sharing of “lessons learned” about the decommissioning process between communities and provide guidance for decision-making processes; and, Financial assistance: access to grant and/or loan programs to assist with redevelopment survey, bolster community economic security through job creation, and cover environmental clean-up costs. Technical assistance, cross-partnership engagement, and financial aid can be mobilized to help communities throughout various stages of the decommissioning process, including the retirement decision, the site reclamation phase, and eventual revitalization of the site and surrounding community.

01 COAL, LIGNITE, AND PEAT↗

Re-Engineering the Mission Operations System (MOS) for the Prime and Extended Mission

One of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation

Extended Mission↗

Lessons Learned for Improving Spacecraft Ground Operations

NASA has a unique history in processing the Space Shuttle fleet for launches. Some of this experience has been captured in the NASA Lessons Learned Information System (LLIS). This tool provides a convenient way for design engineers to review lessons from the past to prevent problems from reoccurring and incorporate positive lessons in new designs. At the Kennedy Space Center, the LLIS is being used to design ground support equipment for the next generation of launch and crewed vehicles. This paper describes the LLIS process and offers some examples.

Bell, Michael A.↗

International Space Station Satellite Deployment: Jettison Policy and Best Practices for Satellite Payload Developers

The International Space Station (ISS) deploys dozens of small satellites into Low Earth Orbit (LEO) each year. This presentation and associated paper cover the ISS Jettison Policy requirements and review/approval process, as well as best practices for satellite Payload Developers who have satellites manifested for deployment from ISS. Specifically, topics will include ISS Jettison Policy requirements to limit generation of orbital debris, limit risk of collision with ISS, and limit risk of collision with ISS visiting vehicles. The paper will include details on the ISS Program jettison candidate analysis and approval process, timelines for data submittal to ISS Program, resources for small satellite developers, and design & analysis recommendations for small satellite developers to maximize their likelihood of successful deployment from ISS. New Station deploy capabilities and ways the ISS Program addresses and facilitates innovations in small satellite technology, including propulsion systems, deorbit devices, constellation development, and novel tech demos, will also be explored. The 2024 session topic that best fits this abstract is Orbital Debris, SSA & STM. The ISS Jettison Policy intends to quantify and control the risks of deploying and operating small satellites, not only to ensure the safety of the humans flying in space, but also to preserve the orbital environment for world space activities and enable the significant benefits brought by such utilization. The ISS Program is committed to working with smallsat providers to address their challenges and enable safe, accessible, innovative missions. The Policy has grown with the industry, with each deploy yielding hard-earned lessons learned that improve our process – not only for the next deploy campaign, but with applicability and adaptability for future applications in LEO and beyond.

Jettison Policy↗

Fabrication and Testing of 18-mm-Period, 0.5-m-Long Nb 3 Sn Superconducting Undulator

The Advanced Photon Source at Argonne National Laboratory, in collaboration with FNAL and LBNL, is developing a Nb 3 Sn superconducting undulator with the goal of installing this device on the APS storage ring and providing APS users with the novel radiation source. A series of short, similar to ~ 8-cm-long, 18-mm-period undulator prototype magnets have been designed, fabricated, and tested. The same design was scaled to fabricate a 0.5-m-long undulator prototype. Tests of this prototype showed that the designed peak magnetic field of 1.2 T at 850 A was successfully achieved. It represents at least a 20% improvement in comparison with a NbTi SCU having the same period and magnetic gap. Test results and lessons learned from the design process are reported here.

43 PARTICLE ACCELERATORS↗

An application of computer aided requirements analysis to a real time deep space system

The entire procedure of incorporating the requirements and goals of a space flight project into integrated, time ordered sequences of spacecraft commands, is called the uplink process. The Uplink Process Control Task (UPCT) was created to examine the uplink process and determine ways to improve it. The Problem Statement Language/Problem Statement Analyzer (PSL/PSA) designed to assist the designer/analyst/engineer in the preparation of specifications of an information system is used as a supporting tool to aid in the analysis. Attention is given to a definition of the uplink process, the definition of PSL/PSA, the construction of a PSA database, the value of analysis to the study of the uplink process, and the PSL/PSA lessons learned.

Farny, A. M.↗

International Space Station Multi-Element Integrated Test

The International Space Station offers a unique challenge for integrated testing since the entire station is not launched as an integrated vehicle. The ISS design evolved for over 10 years from the station Freedom program that was based on a "ship and shoot" approach. Ship and shoot assumed the program would accept the hardware for launch and integrate the vehicle on orbit without any ground element-to-element integrated testing. Element-to-Element powered-on integrated testing is needed to identify operational problems on the ground rather than once the hardware is on orbit. The industry is accustomed to testing an integrated vehicle and then verifying it is ready for its operational missions. These tests require ground element emulators to represent on-orbit elements. The ISS Multi-Element Integrated Tests (MEIT) are element-to-element integrated tests bringing together hardware representing several flights. The major purpose of these tests is: 1) Element-to-Element interface compatibility, 2) Systems end-to-end operability and functionality and 3) utilize on-orbit procedures with the crew and mission control center. Execution of these tests is critical since the hardware is available for only a limited period of time. Test configurations are defined which test specific interfaces or functionality. These tests develop operational confidence in the Element-to-Element interfaces and identify major problems on the ground to avoid on-orbit anomalies that could threaten mission success, element survivability or assembly activities. This paper addresses the MEIT process, configurations and lessons-learned from these tests.

Filler, Russell E.↗

Development of the Flight Tether for ProSEDS

The Propulsive Small Expendable Deployer System (ProSEDS) space experiment will demonstrate the use of an electrodynamic tether propulsion system to generate thrust in space by decreasing the orbital altitude of a Delta 11 Expendable Launch Vehicle second stage. ProSEDS will use the flight-proven Small Expendable Deployer System to deploy a newly designed and developed tether which will provide tether generated drag thrust of approx. 0.4 N. The development and production of very long tethers with specific properties for performance and survivability will be required to enable future tether missions. The ProSEDS tether design and the development process may provide some lessons learned for these future missions. The ProSEDS system requirements drove the design of the tether to have three different sections of tether each serving a specialized purpose. The tether is a total of 15 kilometers long: 10 kilometers of a non-conductive Dyneema lead tether; 5 km of CCOR conductive coated wire; and 220 meters of insulated wire with a protective Kevlar overbraid. Production and joining of long tether lengths involved many development efforts. Extensive testing of tether materials including ground deployment of the full-length ProSEDS tether was conducted to validate the tether design and performance before flight.

Curtis, Leslie↗

The Successful Development of an Automated Rendezvous and Capture (AR&C) System for the National Aeronautics and Space Administration

During the 1990's, the Marshall Space Flight Center (MSFC) conducted pioneering research in the development of an automated rendezvous and capture/docking (AR&C) system for U.S. space vehicles. Development and demonstration of a rendezvous sensor was identified early in the AR&C Program as the critical enabling technology that allows automated proximity operations and docking. A first generation rendezvous sensor, the Video Guidance Sensor (VGS), was developed and successfully flown on STS-87 and STS-95, proving the concept of a video- based sensor. A ground demonstration of the entire system and software was successfully tested. Advances in both video and signal processing technologies and the lessons learned from the two successful flight experiments provided a baseline for the development, by the MSFC, of a new generation of video based rendezvous sensor. The Advanced Video Guidance Sensor (AGS) has greatly increased performance and additional capability for longer-range operation with a new target designed as a direct replacement for existing ISS hemispherical reflectors.

Roe, Fred D.↗

Successful Development of an Automated Rendezvous and Capture System

During the 1990's, the Marshall Space Flight Center (MSFC) conducted pioneering research in the development of an automated rendezvous and capture/docking system for U.S. space vehicles. Development and demonstration of a rendezvous sensor was identified early in the AR&C Program as the critical enabling technology that allows automated proximity operations and docking. A first generation rendezvous sensor, the Video Guidance Sensor (VGS) was developed and successfully flown on STS 87 and again on STS 95, proving the concept of a video-based sensor. Advances in both video and signal processing technologies and the lessons learned from the two successful flight experiments provided a baseline for the development, by the MSFC, of a new generation of video based rendezvous sensor. The Advanced Video Guidance Sensor (AVGS) has greatly increased performance and additional capability for longer-range operation with a new Target designed as a direct replacement for existing ISS hemispherical reflectors. A ground demonstration of the entire system and software was successfully tested.

Roe, Fred D.↗

SDM Virtualness Project

In the summer of 2001, NASA and Ford Motor Company co-sponsored a research project aimed at improving the education process and application of lessons learned through distant education. The System Design & Management Program (SDM) was used as a laboratory for improving distance learning capabilities. The research project was a follow up to previous research on globally dispersed teams.

Lim, Christopher Yit-Seong↗

Project Galileo: completing Europa, preparing for Io

Galileo has completed the Europa leg of the Galileo Europa Mission, and is now pumping down the apojove in each succeeding orbit in preparation for the Io phase. Including three encounters earlier in the primary mission, the total of ten close passes by Europa have provided a wealth of interesting and provocative information about this intriguing body. The results presented include new and exciting information about Europa's interactions with Jupiter's magnetosphere, its interior structure, and its tantalizing surface features, which strongly hint at a watery subsurface layer. Additional data concerning Callisto, and its own outlook for a subsurface ocean are also presented. In addition the engineering aspects of operating the spacecraft during the past year are explored, as well as a brief examination of what will be the challenges to prepare for the Io encounters. The steadily increasing radiation dosage that the spacecraft is experiencing is well beyond the original design parameters, and is contributing to a number of spacecraft problems and concerns. The ability of the flight team to analyze and solve these problems, even at the reduced staffing levels of an extended mission, is a testament to their tenacity and loyalty to the mission. The engineering data being generated by these continuing radiation-induced anomalies will prove invaluable to designers of future spacecraft to Jupiter and its satellites. The lessons learned during this arduous process are presented. c 2000 International Astronautical Federation. Published by Elsevier Science Ltd. All rights reserved.

long duration↗