Acquisition/expulsion system for earth orbital propulsion system study. Volume 2: Cryogenic design

Detailed designs were made for three earth orbital propulsion systems; (1) the space shuttle (integrated) OMS/RCS, (2) the space shuttle (dedicated) OMS (LO2), and (3) the space tug. The preferred designs from the integrated OMS/RCS were used as the basis for the flight test article design. A plan was prepared that outlines the steps, cost, and schedule required to complete the development of the prototype DSL tank and feedline (LH2 and LO2) systems. Ground testing of a subscale model using LH2 verified the expulsion characteristics of the preferred DSL designs.

Source record↗

Current results from a Rover Science Data Analysis System

In this paper, we provide a brief overview of the OASIS system, and then describe our recent successes in integrating with and using rover hardware. OASIS currently works in a closed loop fashion with onboard control software (e.g., navigation and vision) and has the ability to autonomously perform the following sequence of steps: analyze gray scale images to find rocks, extract the properties of the rocks, identify rocks of interest, retask the rover to take additional imagery of the identified target and then allow the rover to continue on its original mission. We also describe the early 2004 ground test validation of specific OASIS components on selected Mars Exploration Rover (MER) images. These components include the rockfinding algorithm, RockIT, and the rock size feature extraction code. Our team also developed the RockIT GUI, an interface that allows users to easily visualize and modify the rock-finder results. This interface has allowed us to conduct preliminary testing and validation of the rockfinder's performance.

Coupled Layer Architecture for Robotic Autonomy (C↗

Sensor Web Dynamic Measurement Techniques and Adaptive Observing Strategies

Sensor Web observing systems may have the potential to significantly improve our ability to monitor, understand, and predict the evolution of rapidly evolving, transient, or variable environmental features and events. This improvement will come about by integrating novel data collection techniques, new or improved instruments, emerging communications technologies and protocols, sensor mark-up languages, and interoperable planning and scheduling systems. In contrast to today's observing systems, "event-driven" sensor webs will synthesize real- or near-real time measurements and information from other platforms and then react by reconfiguring the platforms and instruments to invoke new measurement modes and adaptive observation strategies. Similarly, "model-driven" sensor webs will utilize environmental prediction models to initiate targeted sensor measurements or to use a new observing strategy. The sensor web concept contrasts with today's data collection techniques and observing system operations concepts where independent measurements are made by remote sensing and in situ platforms that do not share, and therefore cannot act upon, potentially useful complementary sensor measurement data and platform state information. This presentation describes NASA's view of event-driven and model-driven Sensor Webs and highlights several research and development activities at the Goddard Space Flight Center.

Talabac, Stephen J.↗

Design and Evaluation of the Terminal Area Precision Scheduling and Spacing System

This paper describes the design, development and results from a high fidelity human-in-the-loop simulation of an integrated set of trajectory-based automation tools providing precision scheduling, sequencing and controller merging and spacing functions. These integrated functions are combined into a system called the Terminal Area Precision Scheduling and Spacing (TAPSS) system. It is a strategic and tactical planning tool that provides Traffic Management Coordinators, En Route and Terminal Radar Approach Control air traffic controllers the ability to efficiently optimize the arrival capacity of a demand-impacted airport while simultaneously enabling fuel-efficient descent procedures. The TAPSS system consists of four-dimensional trajectory prediction, arrival runway balancing, aircraft separation constraint-based scheduling, traffic flow visualization and trajectory-based advisories to assist controllers in efficient metering, sequencing and spacing. The TAPSS system was evaluated and compared to today's ATC operation through extensive series of human-in-the-loop simulations for arrival flows into the Los Angeles International Airport. The test conditions included the variation of aircraft demand from a baseline of today's capacity constrained periods through 5%, 10% and 20% increases. Performance data were collected for engineering and human factor analysis and compared with similar operations both with and without the TAPSS system. The engineering data indicate operations with the TAPSS show up to a 10% increase in airport throughput during capacity constrained periods while maintaining fuel-efficient aircraft descent profiles from cruise to landing.

Swenson, Harry N.↗

Designing Autonomy into Interfaces for Long-Duration Missions

As NASA develops technologies for long-duration crewed missions, we must understand how communication between ground control teams and astronauts differs from the current dynamic to adapt new concepts for long-duration mission operations. Today, ground control teams support astronauts with immediate availability to answer questions, resolve issues, and manage activities. In the near future, however, extended communication delays during long-duration missions will require astronauts to become more autonomous. As many of the responsibilities shift from the ground control teams to the astronauts on-board, the concept of operations must also change from how it functions today. With increased astronaut autonomy, software tools must be developed that enable efficient completion of mission tasks without increased mental workload. Designing software tools to facilitate crew autonomy requires development teams to know which data will enhance quick decision making while providing necessary context for situational awareness of systems being managed on-board. NASA's Autonomous Systems and Operations (ASO) team is presently developing a software interface tool, EXPRESS (EXpedite the PRocessing of Experiments for Space Station) 2.5 to enable a long-duration crew to schedule activities for and operate autonomous systems. This paper describes details of the integrated human factors approach that drove the design of the elements of the software tool, including self-managed scheduling, constraint-driven planning, autonomous system fault recovery, and recommended troubleshooting actions. Additionally, this paper will chronicle ASO modifications of the user interface after the team's first flight demonstration, how it was based on lessons learned during software development, as well as from crew feedback in order to develop the current version which will be demonstrated on ISS in 2021. In the upcoming ISS demonstration, the astronaut crew will be given scenarios for scheduling and operating autonomous system activities, including off-nominal scenarios and autonomous system recoveries. The demonstration of the EXPRESS 2.5 tool is a step towards improved levels of autonomy as our new journeys take us farther into space.

autonomy↗

The Habitat Demonstration Unit System Integration

The Lunar Surface System Habitat Demonstration Unit (HDU) will require a project team to integrate a variety of contributions from National Aeronautics and Space Administration (NASA) centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the first version of the HDU, the Pressurized Excursion Module (PEM), from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Laboratory, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into HDU PEM are planned to facilitate the integration process. A coordinated effort to establish simplified Computer Aided Design (CAD) standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU design to maximize the efficiency of both integration and field operations.

Gill, Tracy R.↗

Space Station Systems Technology Study. Volume 1: Executive summary

The four study areas addressed are: (1) attitude control, (2) data management, (3) long-life thermal management, and (4) automated housekeeping integration. The design concepts in each area were refined. The cost benefits, schedules, and life cycle costs for the options were evaluated. Technology advancement plans were prepared for each of the selected items, and documentation was prepared.

Source record↗

Advanced Platform Systems Technology study. Volume 4: Technology advancement program plan

An overview study of the major technology definition tasks and subtasks along with their interfaces and interrelationships is presented. Although not specifically indicated in the diagram, iterations were required at many steps to finalize the results. The development of the integrated technology advancement plan was initiated by using the results of the previous two tasks, i.e., the trade studies and the preliminary cost and schedule estimates for the selected technologies. Descriptions for the development of each viable technology advancement was drawn from the trade studies. Additionally, a logic flow diagram depicting the steps in developing each technology element was developed along with descriptions for each of the major elements. Next, major elements of the logic flow diagrams were time phased, and that allowed the definition of a technology development schedule that was consistent with the space station program schedule when possible. Schedules show the major milestone including tests required as described in the logic flow diagrams.

Source record↗

Artificial intelligence techniques for scheduling Space Shuttle missions

Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.

Henke, Andrea L.↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 payload, part of NASA s New Millennium Program headquartered at JPL, consisted of three micro satellites (approx. 30 kg each) deployed into orbit from the Pegasus XL launch. ST5 was a technology demonstration mission, intended to test new technologies for potential use for future missions. In order to meet the launch date schedule of ST 5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The I&T phase was planned for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 in tandem. A team of engineers and technicians planned and executed the integration of all three spacecraft emphasizing versatility and commonality. They increased their knowledge and efficiency through spacecraft #1 integration and testing and utilized their experience and knowledge to safely execute I&T for spacecraft #2 and #3. Each integration team member could perform many different roles and functions and thus better support activities on any of the three spacecraft. The I&T campaign was completed with STS s successful launch on March 22,2006

Sauerwein, Timothy A.↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing and Building a Crew-Centric Mobile Scheduling and Planning Tool for Exploring Crew Autonomy Concepts Onboard the International Space Station

During 2015, as part of our ongoing research on crew autonomy, our team adapted and extended the plan viewing tool, Playbook, into a mobile tool for exploring crew autonomy onboard the International Space Station (ISS). This work enables crewmembers to intuitively re-plan and schedule on their own with limited input from mission control. Designed for ease of use, re-planning is composed of simple drag and drop interactions and learning the tool requires little to no training. Playbook was successfully uplinked onto ISS as a technology demonstration and completed its onboard ground and crew checkouts in August and September 2015, respectively. We will discuss and describe how Playbook was able to integrate with actual ISS operational plans and operational procedures without disrupting real mission operations. This work will also outline the design and technical constraints required to build a collaborative tool that allows multiple users to simultaneously self-schedule and synchronize during communication dropouts in the restricted networking and computing environment onboard ISS. Finally, we will explore the aspects of crew autonomy that this technology enables as well as discuss our next steps and possible extensions.

ISS↗

Optimal Design of Sustainable Ammonia-Based Food–Energy–Water Systems with Nitrogen Management

As the basis for virtually any form of nitrogen fertilizers, ammonia plays a vital role in agriculture; in addition, there has been an increased interest in its use as a carbon-free energy carrier. However, ammonia is also associated with two major environmental concerns: CO 2 emissions from the conventional production process and nitrogen pollution from the excessive use of ammonia-based fertilizers. To mitigate these environmental impacts, we develop an optimization framework for the design of a sustainable ammonia-based agricultural system that synergistically integrates the production of ammonia from renewable resources and effective measures for nitrogen management. The proposed model captures the effect of intermittency by incorporating both design and detailed operational decisions. Here, by applying a multiscale time representation that reduces the problem size and a tailored surrogate model that accurately approximates model nonlinearity, we are able to achieve optimal solutions within reasonable computation times. A computational case study is conducted using real-world data from a local farm in Morris, Minnesota, and the results indicate the trade-off between cost and nitrogen loss. Importantly, we show that practicing effective nitrogen management can significantly reduce the nitrogen loss with only a small increase in net present cost.

10 SYNTHETIC FUELS↗

An expert system for satellite and instrument data anomaly and fault isolation

A prototype Generic Payload Operations Control System (GPOCC) is being developed at the NASA Jet Propulsion Laboratory to provide a low-cost command and control processing center for science instruments and small payloads. The GPOCC supports the difficult transition from integration and test to flight operations. The prototype will incorporate four expert systems to perform telemetry, command, and mission planning functions as well as telecommunications scheduling. The first of these expert systems to be developed will perform telemetry data analysis and fault isolation, as well as propose corrective action. This Data Analysis Module (DAM) will monitor telemetry data and perform continual data monitoring and trend analysis based on a knowledge base and historic data archived on an optical disk storage device. The system maintains a continuous knowledge database of past system performance characteristics. The goal of the Data Analysis Module is to achieve consistent, dependable and validatable performance, to demonstrate thorough, reliable and fast reasoning, and to reduce the concentration demanded of flight analysis personnel.

Busse, Carl↗

A Strategy for Autogeneration of Space Shuttle Ground Processing Simulation Models for Project Makespan Estimations

Space Shuttle Processing is a complicated and highly variable project. The planning and scheduling problem, categorized as a Resource Constrained - Stochastic Project Scheduling Problem (RC-SPSP), has a great deal of variability in the Orbiter Processing Facility (OPF) process flow from one flight to the next. Simulation Modeling is a useful tool in estimation of the makespan of the overall process. However, simulation requires a model to be developed, which itself is a labor and time consuming effort. With such a dynamic process, often the model would potentially be out of synchronization with the actual process, limiting the applicability of the simulation answers in solving the actual estimation problem. Integration of TEAMS model enabling software with our existing schedule program software is the basis of our solution. This paper explains the approach used to develop an auto-generated simulation model from planning and schedule efforts and available data.

Madden, Michael G.↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗

Used Nuclear Fuel Management Using the Next Generation System Analysis Model

The U.S. Department of Energy (DOE) is leading the National effort to manage the back end of the nuclear fuel cycle, encompassing the safe transportation, storage/staging, and/or eventual disposal of used nuclear fuel (UNF) and high-level radioactive waste. The Next Generation System Analysis Model (NGSAM) is DOE’s discrete-event, agent-based simulation tool designed to model the full life cycle of UNF from reactor discharge to final disposal. NGSAM supports the DOE Office of Spent Fuel and High-Level Waste Disposition by enabling a detailed, scenario-based analysis of logistics, infrastructure, and shipping strategies. NGSAM replaces legacy models with a modern, flexible platform built on Repast Simphony and enhanced by the Process Analysis Tool. NGSAM simulates the movement and interaction of individual fuel assemblies with system components such as canisters, casks, railcars, and facilities. The model integrates with the Java Transportation Operations Model to plan and execute transportation scenarios, supporting both constrained and unconstrained resource allocation. Key features include customizable allocation and acceptance algorithms, detailed facility-level operations, and a Quick Edit tool for rapid scenario adjustments. NGSAM supports multimodal transportation modeling (e.g. rail, road, barge) and provides comprehensive cost, schedule, and infrastructure data. NGSAM utilizes data from sources such as DOE’s STANDARDS UNF database and DOE’s Stakeholder Tool for Assessing Radioactive Transportation, while also allowing user-defined inputs for scenario customization. NGSAM enables stakeholders to evaluate complex UNF management strategies, assess system performance under varying assumptions, and inform decision making for future infrastructure investments. Its modular architecture and integration with other Integrated Waste Management System tools make it a critical asset for planning the safe and efficient disposition of the Nation’s growing UNF inventory.

Craig, Brian [Argonne National Laboratory (ANL)]↗