Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “innovative building system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Technical Committee on Noise: Researchers and Practitioners

The Technical Committee on Noise (TCNS) includes researchers and industry practitioners interested in understanding noise generation from a variety of sources, its propagation, and its impact on structures, objects, and people. The goal of reducing the impact of this noise, i.e. unwanted sound, has led to innovative model development, measurement techniques, mitigation strategies, and input towards the establishment of regulations. Community noise definition and abatement is of particular interest and motivates the advancement of research on a variety of topics, such as transportation noise, hearing protection, jet and rocket noise, building systems noise and vibration, atmospheric sound propagation, soundscapes, and low-frequency sound. The diverse technical background of TCNS members is essential, given the interdisciplinary nature of this research, and it is mirrored in the topics of special sessions typically held jointly with other ASA technical committees.

noise↗

Updating Nuclear Energy Cost Estimates for Net Zero World Initiative

Energy modeling of decarbonized scenarios in integrated energy systems requires nuclear energy parameters that are critical for forecasting, modeling and cost structure analysis. Using updated real-world data has always been a challenge to estimate current nuclear reactors costs and deployment scenarios. Given this, an updated set of parameters for overnight capital costs and operation and maintenance costs are estimated for the Net Zero World initiative using recent reports that provided a vast set of open sources data inputs. This paper follows the methodology developed in the Net Zero World report and applies the new ranges estimated in the Gateway for Accelerated Innovation in Nuclear report that address many of the current challenges in obtaining accurate cost data for advanced nuclear concepts. The final goal is to provide new estimates of the overnight capital costs and operational costs for different countries. The present paper improves the earlier capital cost estimations, building on recent literature that aims to obtain accurate data for modeling and simulation to enhance energy system evaluations and support decision-making in areas like de-carbonization and capacity expansion. Finally, the paper compares the new cost estimates with the old cost results.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA’s Human Landing System: Enabling the Next Generation of Lunar Science

The Human Landing System (HLS) is the mode of transportation that will take astronauts to the lunar surface as part of NASA's Artemis exploration program. HLS also serves as a research platform both on the surface and in lunar orbit, enabling critical scientific investigations on and of the Moon. With support at NASA centers around the country, the HLS program, based at Marshall Space Flight Center in Huntsville, Alabama, is working closely with its commercial partners throughout the development process to design and build innovative and technically advanced lunar landers – new vehicles designed for the modern era of space travel – leveraging decades of human spaceflight experience and the speed of the commercial sector. In 2019, NASA asked U.S. industry for proposals to design and develop a human lander for the first human mission to the lunar surface under Artemis. Initial contracts were awarded to Blue Origin Federation, Dynetics, and SpaceX to advance their designs. Following the execution of the ten-month Base Period, NASA announced in April 2021 that the agency selected SpaceX to move forward with its human landing system [1] and land the first two astronauts on the lunar surface during the Artemis III mission. Following two protest periods, NASA awarded the contract, known as Option A, to SpaceX in July 2021 and resumed work in November 2021 (Fig. 1). In parallel, the HLS program has been preparing for the acquisition that will procure regular crewed transportation to the lunar surface following Artemis III. NASA released a request for information (RFI) in July 2021 asking U.S. industry for feedback to help inform the future solicitation, known as Lunar Exploration Transportation Services (LETS) [2]. Also in July 2021, NASA released the NextSTEP-2 Appendix N broad agency announcement soliciting new work from U.S. industry to mature their HLS designs and perform risk reduction activities in advance of the LETS procurement [3]. NASA selected Blue Origin Federation, Dynetics, Lockheed Martin, Northrop Grumman, and SpaceX to participate [4]. This work will also help better inform the LETS procurement and prepare industry to propose. NASA hopes to release a draft request for proposals (RFP) in Spring 2022.

R C Weber↗

Strategies for Validation Testing of Ground Systems

In order to accomplish the full Vision for Space Exploration announced by former President George W. Bush in 2004, NASA will have to develop a new space transportation system and supporting infrastructure. The main portion of this supporting infrastructure will reside at the Kennedy Space Center (KSC) in Florida and will either be newly developed or a modification of existing vehicle processing and launch facilities, including Ground Support Equipment (GSE). This type of large-scale launch site development is unprecedented since the time of the Apollo Program. In order to accomplish this successfully within the limited budget and schedule constraints a combination of traditional and innovative strategies for Verification and Validation (V&V) have been developed. The core of these strategies consists of a building-block approach to V&V, starting with component V&V and ending with a comprehensive end-to-end validation test of the complete launch site, called a Ground Element Integration Test (GEIT). This paper will outline these strategies and provide the high level planning for meeting the challenges of implementing V&V on a large-scale development program. KEY WORDS: Systems, Elements, Subsystem, Integration Test, Ground Systems, Ground Support Equipment, Component, End Item, Test and Verification Requirements (TVR), Verification Requirements (VR)

Annis, Tammy↗

Imagine Moving Off the Planet

Moving off the planet will be a defining moment of this century as landing on the Moon was in the last. For that to happen for humans to go where humans cannot go-- simulation is the sole solution. NASA supports simulation for life-cycle activities: design, analysis, test, checkout, operations, review and training. We contemplate time spans of a century and more, teams dispersed to different planets and the need for systems that endure or adapt as missions, teams and technology change. Without imagination such goals are impossible. But with imagination we can go outside our present perception of reality to think about and take action on what has been, is and, especially, what might be. Consciously maturing an imagined, possibly workable, idea through framing it to optimization to design, and building the product provides us with a new approach to innovation and simulation fidelity. We address options, analyze, test and make improvements in how we think and work. Each step includes increasingly exact information about costs, schedule, who will be needed, where, when and how. NASA i integrating such thinking into its Exploration Product Realization Hierarchy for simulation and analysis, test and verification, and stimulus response goals. Technically NASA follows a timeline of studies, analysis, definition, design, development and operations with concurrent documentation. We have matched this Product Realization Hierarchy with a continuum from image to realization that incorporates commitment, current and needed research and communication to ensure superior and creative problem solving as well as advances in simulation. One result is a new approach to collaborative systems. Another is a distributed observer network prototyped using game engine technology bringing advanced 3-D simulation of a simulation to the desktop enabling people to develop shared consensus of its meaning. Much of the value of simulation comes from developing in people their ability to make good decisions and reflexes supporting impressive achievement. Synthesizing imagination systematically into our work - and thus our success - is a challenge. NASA engineers have inventive minds, and the task is determining how best to enable them to devise the simulation and other innovations that will make a story so clear and so intellectually sound that people can carry out the mission for 50-100 years. This demands skills and knowledge traditionally under-respected and under-represented in technology organizations. But we are beginning to see that the process encourages efficiency and enables us to attain more effective results. We have to elicit imaginative, intelligent and effective ways to make better use than ever of the minds we have and will have available. We have to accept the challenge to accomplish tasks among dispersed interdisciplinary teams who must overcome changing priorities and technology, time and distance in order to maximize interactivity and innovation as never before. Attention to the process of innovation is a practical means to increase the efficiency of our intelligence. We have an obligation to reexamine and improve the process by which we approach and exercise innovation as we accept the charge to move off the planet.

Elfrey, Priscilla R.↗

Peak Demand Limiting and Optimization of HVAC Systems for Common Areas in High-Rise Multi-Family Housing (CRADA 518)

This project aims to create an innovative energy saving solution that is affordable and easy to implement. Initially, the proposed solution will fulfill an existing need for HVAC systems that serve multi-family housing. However, the solution can be easily expanded to other markets such as large hospitals, hotels, and commercial buildings. The proposed solution will be creatively packaged so that it can work where peak demand charge is high or where goal is to conserve energy and reduce carbon footprint. Of course, both Peak Demand Limiting (PDL) and Set-point optimization (SPO) can also operate simultaneously.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multipath Mitigation via Clustering for Position Estimation Refinement in Urban Environments

Position estimation using global navigation satellite systems (GNSS) suffers from poor accuracy within urban canyons due to significant signal disruption caused by tall buildings. This issue can be attributed to the GNSS signals reflecting off buildings resulting in severe multipath reflections which degrade the receiver's performance. In this paper, we introduce an innovative approach to filter GNSS satellite measurements to improve the accuracy of the estimated position by leveraging a clustering algorithm. This approach utilizes a predictive GNSS availability service to filter out non-line-of-sight measurements. Then, a subset of line-of-sight satellite measurement combinations are evaluated using a clustering algorithm. When combined, results show these techniques can reduce the mean horizontal error measured in an urban canyon by nearly an order of magnitude, from ~ 18 meters to ~ 2 meters when using a single point positioning solver.

GPS↗

Multipath Mitigation via Clustering for Position Estimation Refinement in Urban Environments

Position estimation using global navigation satellite systems (GNSS) suffers from poor accuracy within urban canyons due to significant signal disruption caused by tall buildings. This issue can be attributed to the GNSS signals reflecting off buildings resulting in severe multipath reflections which degrade the receiver's performance. In this paper, we introduce an innovative approach to filter GNSS satellite measurements to improve the accuracy of the estimated position by leveraging a clustering algorithm. This approach utilizes a predictive GNSS availability service to filter out non-line-of-sight measurements. Then, a subset of line-of-sight satellite measurement combinations are evaluated using a clustering algorithm. When combined, results show these techniques can reduce the mean horizontal error measured in an urban canyon by nearly an order of magnitude, from ~ 18 meters to ~ 2 meters when using a single point positioning solver.

GPS↗

ARIES: Advanced Research on Integrated Energy Systems

One of the primary challenges to achieving a clean energy future is closing the gap between ambitions and real-world deployment. To accelerate solutions for a clean energy future, the National Renewable Energy Laboratory (NREL), in partnership with the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy, developed a visionary research platform called Advanced Research on Integrated Energy Systems (ARIES). ARIES takes in the full picture - from community energy needs to technology developers and service providers - rather than evaluating clean energy and technologies in isolation. This innovative approach uncovers opportunities and risks in the spaces where energy technologies and sectors - such as transportation, industry, buildings, and the electric grid - meet.

ARIES↗

Equity Considerations in Siting Consolidated Interim Storage Facilities for Commercial Spent Nuclear Fuel

Questions of equity and fairness are often raised by representatives from State, Tribal and local governments and members of the public when resolving conflicts over siting of nuclear facilities. However, the two terms are not synonymous: equity can be quantified while fairness is much more subjective. The Department of Energy's (DOE) December 2021 Request for Information sought input on how to site federal facilities for the temporary, consolidated storage of spent nuclear fuel (SNF) using a consent-based approach. It is anticipated that just such questions about equity and fairness associated with the potential emergence of more than one host site may be raised by the twelve groups of university, nonprofit and private sector partners (Consortia) working to support community engagement, inclusively involve stakeholders, build relationships, and develop innovative forms of mutual learning and public capacity to participate in the consent-based siting process for a federal consolidated interim storage facility during the current Planning & Capacity Building stage of the consent-based siting process. In terms of DOE's Integrated Waste Management System (IWMS), sociopolitical equity concepts are a factor in all aspects of IWMS development and operations and will be particularly applicable should two or more host sites become a possibility, either by the emergence of multiple volunteer hosts or by pursuit as a IWMS program strategy. This paper summarizes recent analyses that explore how four equity metrics - number of states, division of the projected SNF total by the year 2083, current population and land area - might be perceived by host communities, states and regions if two, three or four sites for hosting federal consolidated interim storage facilities were to be contemporaneously realized. Existing institutional arrangements, including Nuclear Regulatory Commission regions, Federal Energy Regulatory Commission regions and Low-Level Radioactive Waste Disposal Compacts, were selected to create hypothetically merged two, three and four-region scenarios to calculate how the four metrics balance out. Projected SNF burden was prioritized with regional contiguity of the consolidated regions a requirement for a functional scenario. The intent was not to promote or suggest any construct as a program objective; the configurations are geopolitical abstractions only to explore potential perceptions of equity. Understanding the possible issues of equity that could arise may benefit program efforts toward achieving a cooperative federalism wherein both the federal and multiple State governments share the goal of manifesting more than one federal consolidated interim storage facility. The main finding is that it is not possible to optimize for all four metrics simultaneously. The analyses demonstrate that trying to create a sense of equity by backfitting a solution to a random population and land distribution will always contain a degree of artificiality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pushing the Envelope-Moving Dynamic Building Envelope Thermal Energy Storage Systems Mainstream: Preprint

Buildings contribute to nearly 40% of the U.S. national energy consumption and a significant portion of CO2 emissions. More importantly, disadvantaged communities are disproportionately affected by energy burden and thermal discomfort in their homes. This paper will discuss two novel DOE's BTO supported thermal energy storage (TES) integrated dynamic building envelope technologies, their ability to harvest ambient energy, and improve energy efficiency by reducing HVAC loads and peak electricity demand while enhancing energy and thermal resilience in buildings. The paper will also discuss the recent advancements that have made these systems more affordable and easier to integrate into new and existing buildings. The first solution is a thermally anisotropic building envelope (TABE) system that can redirect ambient thermal energy (heat or coolness) from diurnal outdoor conditions, solar irradiance, and night sky radiation from the envelope to a hydronic loop. The redirected thermal energy can be stored in a TABE-integrated thermal energy storage system and use the stored energy to offset HVAC energy use and peak demand. The second solution is an innovative plug-and-play thermal switch in the form of insertable plugs integrated with a phase change material (PCM). The plug can vary its thermal resistance based on the indoor and outdoor conditions, thus allowing preferential directional heat flow, and enhancing utilization of free ambient cooling and heating to charge/discharge the PCM, much like a solid-state economizer. While the fist solution can be actively controlled, the second solution is passive, requiring no external power, and work solely based on the ambient temperature.

anisotropic envelope↗

Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

Selvakumar, Balaji [ORNL]↗

Technology Strategy Assessment: Findings from Storage Innovations 2030 Thermal Energy Storage

The concept of thermal energy storage (TES) can be traced back to early 19th century, with the invention of the ice box to prevent butter from melting. Modern TES development began with building heating and cooling and concentrated solar thermal technologies for power generation in the early 1900s and late 1970s, respectively. TES systems provide many advantages compared with other long-duration energy storage (LDES) technologies, which include low costs, long operational lives, high energy density, synchronous power generation capability with inertia that inherently stabilizes the grid, and the ability to output both heat and electricity. TES Use Cases TES technologies can couple with most renewable energy systems, including wind, photovoltaic, and concentrated solar thermal energy, and can be used for heat-to-heat, heat-to-electricity, electricity-to-heat, and electricity-to-electricity (bidirectional electricity) applications. The three types of TES that have heat as an input or output are grouped together for the purposes of this report. Retrofitting retired thermal power plants can be a potential cost-effective option for TES with electricity output because they both use a similar thermal-to-electricity type of conversion. Additionally, TES can directly serve heat demand for buildings and industrial processes, displacing fossil fuels to achieve broad decarbonization. Bidirectional Electricity Figure 1 shows a bidirectional electricity TES (ETES) architecture that is emerging as a prime technology for LDES at a grid scale. The ETES technology can utilize existing TES technology infrastructures, has no geological limitations (such as mountains and water for pumped storage hydro, underground natural caverns for compressed-air energy storage, etc.), and is capable of deployment anywhere in the United States and the world for broad uses. Particularly, ETES technology can be placed at retired fossil-fueled thermal power plants to reuse decommissioned assets, protect job security in associated communities, and provide resilient and high-inertia (i.e., spinning) power to the grid. Heat Input and Output There also are many ways to integrate TES within heat-to-electricity, heat-to-heat, and electricity-to-heat applications, such as those used in concentrating solar power (CSP), buildings, district heating, and industry process heat applications. These categories can be further classified for low- and high-temperature applications. High-temperature thermal energy storage (HTTES) heat-to-electricity TES applications are currently associated with CSP deployments for power generation. TES with CSP has been deployed in the Southwestern United States with rich solar resources and has proved its value to the electric grid. Electricity-to-heat and heat-to-heat HTTES applications present great potential for decarbonizing energy-intensive industrial process heat applications [8, 9], such as iron ore processing, iron smelting, cement production, glass manufacturing, mineral processing, and chemical production. Some industrial processes require process heat at temperatures > 1,400°C, so HTTES can be utilized to reduce fuel consumption in those processes through fuel, oxidizer, and process material pre-heating. Thermal energy storage for augmenting existing industrial process heat applications makes a much more attractive economic case because the energy penalty due to thermal-to-electric conversion is eliminated. Co-located applications of power production and heat also can add to the value stacking of integrating utility-scale TES; however, these scenarios are very case specific and not practically possible in many cases. These constraints are primarily attributed to the existing infrastructure being designed, developed, and constructed for many decades around the most economically feasible technologies, such as electricity and a selection of fossil fuels for heat input. Low-temperature TES can be utilized for building and district heating and cooling, as well as some process heat applications in electricity-to-heat and heat-to-heat configurations. Lower temperature TES (LTTES) can be added to heat pump equipment (electric input), either directly interacting with the refrigerant in the condenser or evaporator, or through a secondary heat transfer fluid. It also can be integrated in the building envelope or within the ducts of the heating, ventilation, and air conditioning (HVAC) system. Cost-effective integration of TES into buildings adds significant cost, and it is one of the key barriers preventing the commercialization and deployment of TES. The optimal strategy for integrating TES with buildings has yet to be determined for various applications of TES. Nevertheless, thermal storage materials are far less costly per unit of energy stored than electricity storage materials. This means that thermal storage has the potential to reduce the cost to society of energy storage.

25 ENERGY STORAGE↗

Low-cost, Risk-Reduction Testing of Class D Spacecraft Photovoltaic Systems

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A low-cost, portable, and end-to-end photovoltaic-system test appropriate for NASAs new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metal-halide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, high-fidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility.At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendors panel-level data and periodic inspection, the method ensures system integrity from Integration and Test (IT) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

photovoltaic↗

Heating performance of a vapor compression heat pump cascaded with a thermoelectric heat pump

Air source heat pumps (ASHPs) are widely utilized for heating and cooling in residential buildings; however, their effectiveness in heating mode is compromised during extreme weather conditions. Extensive research endeavors have been undertaken to develop, test, and assess a cost-effective vapor compression ASHP suitable for cold climate regions. Further, this study takes an innovative approach by developing component and system prototypes for a cold climate heat pump. This design combines a thermoelectric heat pump (TEHP) with a traditional residential split ASHP to augment heating capacity in low ambient temperature conditions. The component and system prototypes underwent experimental testing in the psychrometric chambers. The experimental findings revealed a 13.6% to 13.7% increase in total heat pump heating capacity, accompanied by a 3.1% to 5.0% decrease in the coefficient of performance (COP) at ambient temperatures of -15°C and -19°C, when compared to the original ASHP. The COP of the TEHP is relatively constant, ranging from 1.63 to 1.76. This prototype offers a solution to address the challenges associated with reduced heat pump capacity at low ambient temperatures. The experimental results indicated that the lower the ambient temperature, thermoelectric heat pump auxiliary heating can increase the heating efficiency 60% in comparison to electric resistance.

42 ENGINEERING↗

Integration of energy systems

This article in MRS Bulletin and the framework set out in the introductory article articulate a scenario of renewable electrons and electrification of end use appliances and industrial processes as a plausible paradigm to realize a carbon-free energy economy. The subsequent articles cover specific sectoral or chemical applications of those renewable electrons (e.g., for hydrogen, transportation, building use, electrochemical storage, and within the chemical industry). This article addresses the intersections among and across those sectors. We describe the importance of considering integrated systems and systems of systems as we consider pathways to a decarbonized energy economy. Further, we review and summarize key insights into the innovation challenges that reside at the particular integration interfaces among sectors, and highlight the opportunity for advances in materials and processes that will be critical to successful achievement of economy-wide, low-carbon energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Jitter Controller Software

Sinusoidal jitter is produced by simply modulating a clock frequency sinusoidally with a given frequency and amplitude. But this can be expressed as phase jitter, frequency jitter, or cycle-to-cycle jitter, rms or peak, absolute units, or normalized to the base clock frequency. Jitter using other waveforms requires calculating and downloading these waveforms to an arbitrary waveform generator, and helping the user manage relationships among phase jitter crest factor, frequency jitter crest factor, and cycle-to-cycle jitter (CCJ) crest factor. Software was developed for managing these relationships, automatically configuring the generator, and saving test results documentation. Tighter management of clock jitter and jitter sensitivity is required by new codes that further extend the already high performance of space communication links, completely correcting symbol error rates higher than 10 percent, and therefore typically requiring demodulation and symbol synchronization hardware to operating at signal-to-noise ratios of less than one. To accomplish this, greater demands are also made on transmitter performance, and measurement techniques are needed to confirm performance. It was discovered early that sinusoidal jitter can be stepped on a grid such that one can connect points by constant phase jitter, constant frequency jitter, or constant cycle-cycle jitter. The tool automates adherence to a grid while also allowing adjustments off-grid. Also, the jitter can be set by the user on any dimension and the others are calculated. The calculations are all recorded, allowing the data to be rapidly plotted or re-plotted against different interpretations just by changing pointers to columns. A key advantage is taking data on a carefully controlled grid, which allowed a single data set to be post-analyzed many different ways. Another innovation was building a software tool to provide very tight coupling between the generator and the recorded data product, and the operator's worksheet. Together, these allowed the operator to sweep the jitter stimulus quickly along any of three dimensions and focus on the response of the system under test (response was jitter transfer ratio, or performance degradation to the symbol or codeword error rate). Additionally, managing multi-tone and noise waveforms automated a tedious manual process, and provided almost instantaneous decision- making control over test flow. The code was written in LabVIEW, and calls Agilent instrument drivers to write to the generator hardware.

Lansdowne, Chatwin↗