Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “incentive”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Scheduling and Pricing for Expected Ramp Capability in Real-Time Power Markets

Higher variable renewable generation penetrations are occurring throughout the world on different power systems. These resources increase the variability and uncertainty on the system which must be accommodated by an increase in the flexibility of the system resources in order to maintain reliability. Many scheduling strategies have been discussed and introduced to ensure that this flexibility is available at multiple timescales. To meet variability, that is, the expected changes in system conditions, two recent strategies have been introduced: time-coupled multi-period market clearing models and the incorporation of ramp capability constraints. To appropriately evaluate these methods, it is important to assess both efficiency and reliability. But it is also important to assess the incentive structure to ensure that resources asked to perform in different ways have the proper incentives to follow these directions, which is a step often ignored in simulation studies. Here we find that there are advantages and disadvantages to both approaches. We also find that look-ahead horizon length in multi-period market models can impact incentives. This paper proposes scheduling and pricing methods that ensure expected ramps are met reliably, efficiently, and with associated prices based on true marginal costs that incentivize resources to do as directed by the market. Case studies show improvements of the new method.

25 ENERGY STORAGE↗

Stakeholder opinions on the use of the added value approach in siting radioactive waste management facilities

In some countries nuclear waste facility siting programs include social and economic benefits, compensation, local empowerment and motivation measures and other incentives for the potential host community. This can generally be referred to as an 'added value approach'. Demonstration of the safety of a repository is seen as a precondition of an added value approach. Recently much focus has been placed on studying and developing public participation approaches but less on the use of such incentive and community benefit packages, although they are becoming a more common element in many site selection strategies for nuclear waste management facilities. The primary objective of this paper is to report on an ongoing study of stakeholders' opinions of the use of an added value approach in siting a radioactive waste facility in the Czech Republic, Poland and Slovenia. The paper argues that an added value approach should adapt to the interests and needs of stakeholders during different stages of a siting process. The main question posed in the study is as follows: What are the measures which should be included in 'added value approach' according to the stakeholders? The research data consists of stakeholders' responses to a survey focusing on the use of added value (community benefits) and incentives in siting nuclear waste management facilities. The survey involved use of a questionnaire developed as part of the EU-funded IPPA* project in three countries: the Czech Republic, Poland and Slovenia. (* Implementing Public Participation Approaches in Radioactive Waste Disposal, FP7 Contract Number: 269849). The target audiences for the questionnaires were the stakeholders represented in the national stakeholder groups established to discuss site selection for a nuclear waste repository in their country. A total of 105 questionnaires were sent to the stakeholders between November 2011 and January 2012. 44 questionnaires were returned, resulting in a total response rate of 41% (10/29 in the Czech Republic, 11/14 in Poland and in 23/64 in Slovenia). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2012 Market Report on U.S. Wind Technologies in Distributed Applications

At the end of 2012, U.S. wind turbines in distributed applications reached a 10-year cumulative installed capacity of more than 812 MW from more than 69,000 units across all 50 states. In 2012 alone, nearly 3,800 wind turbines totaling 175 MW of distributed wind capacity were documented in 40 states and in the U.S. Virgin Islands, with 138 MW using utility-scale turbines (i.e., greater than 1 MW in size), 19 MW using mid-size turbines (i.e., 101 kW to 1 MW in size), and 18.4 MW using small turbines (i.e., up to 100 kW in size). Distributed wind is defined in terms of technology application based on a wind project’s location relative to end-use and power-distribution infrastructure, rather than on technology size or project size. Distributed wind systems are either connected on the customer side of the meter (to meet the onsite load) or directly to distribution or micro grids (to support grid operations or offset large loads nearby). Estimated capacity-weighted average costs for 2012 U.S. distributed wind installations was $\$$2,540/kW for utility-scale wind turbines, $\$$2,810/kW for mid-sized wind turbines, and $\$$6,960/kW for newly manufactured (domestic and imported) small wind turbines. An emerging trend observed in 2012 was an increased use of refurbished turbines. The estimated capacity-weighted average cost of refurbished small wind turbines installed in 2012 was $\$$4,080/kW. As a result of multiple projects using utility-scale turbines, Iowa deployed the most new overall distributed wind capacity, 37 MW, in 2012. Nevada deployed the most small wind capacity in 2012, with nearly 8 MW of small wind turbines installed in distributed applications. In the case of mid-size turbines, Ohio led all states in 2012 with 4.9 MW installed in distributed applications. State and federal policies and incentives continued to play a substantial role in the development of distributed wind projects. In 2012, U.S. Treasury Section 1603 payments and grants and loans from the U.S. Department of Agriculture’s Rural Energy for America Program were the main sources of federal funding for distributed wind projects. State and local funding varied across the country, from rebates to loans, tax credits, and other incentives. Reducing utility bills and hedging against potentially rising electricity rates remain drivers of distributed wind installations. In 2012, other drivers included taking advantage of the expiring U.S. Treasury Section 1603 program and a prosperous year for farmers. While 2012 saw a large addition of distributed wind capacity, considerable barriers and challenges remain, such as a weak domestic economy, inconsistent state incentives, and very competitive solar photovoltaic and natural gas prices. The industry remains committed to improving the distributed wind marketplace by advancing the third-party certification process and introducing alternative financing models, such as third-party power purchase agreements and lease-to-own agreements more typical in the solar photovoltaic market. Continued growth is expected in 2013.

distributed wind↗

Pecan Street Grid Demonstration Program. Final technology performance report

This document represents the final Regional Demonstration Project Technical Performance Report (TPR) for Pecan Street Inc.’s (Pecan Street) Smart Grid Demonstration Program, DE-OE-0000219. Pecan Street is a 501(c)(3) smart grid/clean energy research and development organization headquartered at The University of Texas at Austin (UT). Pecan Street worked in collaboration with Austin Energy, UT, Environmental Defense Fund (EDF), the City of Austin, the Austin Chamber of Commerce and selected consultants, contractors, and vendors to take a more detailed look at the energy load of residential and small commercial properties while the power industry is undergoing modernization. The Pecan Street Smart Grid Demonstration Program signed-up over 1,000 participants who are sharing their home or businesses’s electricity consumption data with the project via green button protocols, smart meters, and/or a home energy monitoring system (HEMS). Pecan Street completed the installation of HEMS in 750 homes and 25 commercial properties. The program provided incentives to increase the installed base of roof-top solar photovoltaic (PV) systems, plug-in electric vehicles with Level 2 charging, and smart appliances. Over 200 participants within a one square mile area took advantage of Austin Energy and Pecan Street’s joint PV incentive program and installed roof-top PV as part of this project. Of these homes, 69 purchased or leased an electric vehicle through Pecan Street’s PV rebate program and received a Level 2 charger from Pecan Street. Pecan Street studied the impacts of these technologies along with a variety of consumer behavior interventions, including pricing models, real-time feedback on energy use, incentive programs, and messaging, as well as the corresponding impacts on Austin Energy’s distribution assets.The primary demonstration site was the Mueller community in Austin, Texas. The Mueller development, located less than three miles from the Texas State Capitol, is a 711-acre LEED Neighborhood Development mixed-use, urban infill redevelopment on the site of Austin’s former airport, currently under development through a public-private project between the City of Austin, and Catellus Austin LLC. Currently, Mueller is less than 50% complete and more than 3,500 people live or work at Mueller. At full build-out, the project will include more than 3 million square feet of commercial and institutional space, more than 13,000 residents from approximately 5,700 single-family and multi-family dwelling units. Figure 1 shows a Google Map image of the Mueller community, zoomed in on the residential streets participating in the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Orange County Government Solar Demonstration and Research Facility

Orange County Florida completed the construction of a 20 kilowatt Solar Demonstration and Research Facility in March 2015. The system was constructed at the Orange County/University of Florida Cooperative Extension Center whose electric service address is 6021 South Conway Road, Orlando, Florida 32802. The Solar Demonstration and Research Facility is comprised of 72 polycrystalline photovoltaic modules and 3 inverters which convert direct current from the solar panels to alternating current electricity. Each module produces 270 watts of direct current power, for a total canopy production of just under 20,000 watts. The solar modules were installed with a fixed tilt of 5 degrees and face south, toward the equator to maximize the amount of sunlight captures. Each year, the electricity generated by the solar array will help eliminate 20 metric tons of carbon dioxide emissions as well as provide covered parking for staff and visitors vehicles. The solar array is expected to generate 27,000 kilowatt hours of electricity annually equating to an estimated $\$$266 savings in the monthly electric bill, or $\$$3,180 annually for the Orange County/University of Florida Cooperative Extension Center. In addition to reducing the electric bill for the Extension Center, Orange County’s solar array also takes advantage of a rebate incentive offered by the local utility, Orlando Utility Commission, which provided a meter that measures the amount of power produced by the solar array. The local utility company’s Solar Photovoltaic Production Incentive will pay Orange County $\$$0.05 per kilowatt hour for the power that is produced by the solar array. This incentive is provided in addition to Net Metering benefits, which is an effort to promote the use of clean, renewable energy on the electric grid. The Photovoltaic Solar Demonstration and Research Facility also serves an educational tool to the public; the solar array is tied directly into a data logger that provides real time power generation accessible for public viewing on an interactive kiosk located in the Orange County/University of Florida Cooperative Extension Center’s lobby where visitors can review “real time” power generation, cost savings and environmental benefits of the system. Site commissioning with the software program was delayed due to Internal Security Software issues within Orange County that needed to be resolved, therefore the “real time” capture of the production data for the solar array using the software program commenced on May 1, 2015. In addition an educational flyer was developed and is available in the Orange County Education Center’s main lobby. The project completed under this grant award assisted Orange County in demonstrating leadership by installing the application of a renewable energy technology combined with energy efficiency measures; resulting in reduced energy costs for the Orange County University of Florida Cooperative Extension Center, and helping Orange County citizens and visitors move towards the goals of greater energy independence and climate protection. The addition of the new Solar Demonstration and Research Facility has advanced the Orange County/University of Florida Cooperative Extension Center’s mission of extending, educating and providing research-based information to residents and visitors of Orange County by demonstrating the application of renewable energy technology combined with energy efficiency measures; resulting in reduced energy costs, and helping Orange County move towards the goal of greater energy independence and climate protection. In 2014, the Orange County Cooperative Extension Center hosted nearly 10,800 visitors to their on-site Exploration Gardens plus 12,686 walk-in visitors to their office plant clinic and other services. The Education Center held 2,217 educational events that were attended by 46,434 adults and youth, but about half of those events occurred off-site. Based on the visitation numbers in 2014 the Orange County Cooperative Extension Center Education is a vital partner to Orange County’s continued outreach and education efforts concerning renewable energy technologies and greenhouse gas emission reduction well in the current 2015 year and future years of operation of the solar array to the future visitors of the Center which help stimulate market demand that will continue to advance the commercialization and the widespread application and use of renewable energy technologies in Orange County and the state of Florida. The project period performance date for this grant was November 1, 2009 through March 1, 2015. The Final Project costs to complete the project as reported in the FINAL SF 425 were $\$$195,512.50 (50% recipient cost share was satisfied as required by grant terms and conditions).

14 SOLAR ENERGY↗

Effects of Deployment Investment on the Growth of the Biofuels Industry. 2016 Update

This report updates the 2013 report of the same title. Some text originally published in that report is retained and indicated in gray. In support of the national goals for biofuel use in the United States, numerous technologies have been developed that convert biomass to biofuels. Some of these biomass to biofuel conversion technology pathways are operating at commercial scales, while others are in earlier stages of development. The advancement of a new pathway toward commercialization involves various types of progress, including yield improvements, process engineering, and financial performance. Actions of private investors and public programs can accelerate the demonstration and deployment of new conversion technology pathways. These investors (both private and public) will pursue a range of pilot, demonstration, and pioneer scale biorefinery investments; the most cost-effective set of investments for advancing the maturity of any given biomass to biofuel conversion technology pathway is unknown. In some cases, whether or not the pathway itself will ultimately be technically and financially successful is also unknown. This report presents results from the Biomass Scenario Model--a system dynamics model of the biomass to biofuels system--that estimate effects of investments in biorefineries at different maturity levels and operational scales. The report discusses challenges in estimating effects of such investments and explores the interaction between this deployment investment and a volumetric production incentive. Model results show that investments in demonstration and deployment have a substantial growth impact on the development of the biofuels industry. Results also show that other conditions, such as accompanying incentives, have major impacts on the effectiveness of such investments. Results from the 2013 report are compared to new results. This report does not advocate for or against investments, incentives, or policies, but analyzes simulations of their hypothetical effects.

09 BIOMASS FUELS↗

Drive Electric Vermont Case Study

Currently in the United States, the heavy majority of plug-in electric vehicle (PEV) sales have been in highly conducive, selected, metropolitan areas; opposed to more broad distribution across the country. The U.S. Department of Energy’s EV Everywhere Grand Challenge is looking carefully at the barriers and opportunities that exist to enable small and midsize communities to partake in the PEV market and benefit from the economic and environmental advantages of PEVs. In order to gain insight into these challenges and barriers, DOE selected a success story (i.e., Drive Electric Vermont) as the subject of this case study, as the state of Vermont is tied with Detroit, Michigan in having the highest percentage of 2014 (most recent complete data) PEV registrations for cold weather U.S. cities and has seen more than a sixfold increase in charging stations over the last three years. The overall objective of this case study was to use the lessons learned from Drive Electric Vermont to determine what activities are most effective at encouraging acquisitions of PEVs and deployment of charging infrastructure in small to midsize communities, prioritizing and sequencing their implementation, identifying robust means for extrapolation, and applying this understanding to other small to midsize communities across the nation. The Drive Electric Vermont Program was formed in 2012 with a goal of increasing the use of electrified transportation in Vermont through policy development, education and outreach, and infrastructure development. The Drive Electric Vermont Program can be broadly broken into four components: (1) strategic planning/leadership, (2) stakeholder/partnership development, (3) education and outreach, and (4) incentives. The early phases of the program focused heavily on strategic planning, and stakeholder and partnership development, followed by a transition to education and outreach activities, charging infrastructure development, and grant and incentive programs that support charging infrastructure deployment and PEV purchases. Future plans include an additional round of consumer/dealer PEV incentives, continuation of the marketing campaign, and utilization of consumer surveys to develop new campaign themes and to optimize information distribution channels. In Vermont, the number of PEVs grew from 88 in July 2012 to 1,113 in January 2016, with a high percentage of the PEVs being plug-in hybrids (i.e., 865) versus all electric vehicles (i.e., 248). The most popular PEVs are Toyota’s Prius Plug-in and Ford’s C-Max Energi, which make up a combined 48% of the total PEV ownership in the state. The PEVs are predominantly clustered in four counties: Lamoille, Caledonia, Washington, and Chittenden. There is no evident correlation between community size and PEV penetration; however, over 70% of PEV owners are in communities of 1,000 to 10,000 people. On the other hand, there is a close correlation between where PEVs are registered and where they publically charge. The number of PEV charging stations in Vermont grew from 17 in January 2013 to 111 in January 2016, at a variety of charging venues, including retail, parking (short term and long term), workplace, dealerships, hotels, education, leisure, and hospitals. The vast majority of the charging venues contain Level 2 electric vehicle supply equipment (EVSE) solely or combined with Level 1 EVSE or direct current fast charging. The average power transferred per charging event for communities across Vermont ranged from 4.8 to 13.8 kWh for direct current fast charging and 1.0 to 11.9 kWh for and Level 2 EVSE. Over half the charging locations offer free charging. For those that do require payment, different pricing models are employed, including monthly memberships, hourly payment (where there is often a higher fee for the first hour followed by a lower hourly fee for the remaining hours), and energy use based on kWh drawn from the EVSE. There is no correlation between pricing models and community size and region, the strongest correlation is by network provider. Charging events across Vermont generally correlate with east-west bands of chargers (Figure ES-1) running from Burlington to Montpelier and in the area of Rutland.

33 ADVANCED PROPULSION SYSTEMS↗

Potential Avenues for Significant Biofuels Penetration in the U.S. Aviation Market

Industry associations have set goals to reduce greenhouse gas (GHG) emissions and increase fuel efficiency. One focal area for reducing GHG emissions is in the use of aviation biofuel. This study examines assumptions under which the United States could see large production in aviation biofuel. Our results suggest that a high penetration (6 billion gallons) of aviation biofuels by 2030 could be possible, but factors around policy design (in the absence of high oil prices) contribute to the timing and magnitude of aviation biofuels production: 1) Incentives targeted towards jet fuel production such as financial incentives (e.g., producer tax credit, carbon tax) can be sufficient; 2) Investment in pre-commercial cellulosic technologies is needed to reduce the cost of production through learning-by-doing; 3) Reduction of investment risk through loan guarantees may allow production to ramp up more quickly through accelerating industry learning. In cases with high levels of incentives and investment in aviation biofuels, there could be a 25 percent reduction in overall GHG emissions from the aviation sector.

09 BIOMASS FUELS↗

Workshop Summary for Maintaining Innovation and Security in Biotechnology: Lessons Learned from Nuclear, Chemical, and Informational Technologies

In the fast-paced field of biotechnology where innovation has such far-reaching impacts on human health and the environment, dealing with the implications of possible illicit activities, accidents or unintended research consequences with potential detrimental societal impacts tends to remain in the background. While controls may be inevitable for the biotech industry, workshop attendees agreed that the way in which controls are implemented will play a major role in the agility and innovation of the biotechnology industry. There is little desire to slow down the pace of the gains while dealing with the security issues that arise. As was seen from the brief examinations of the Nuclear, Chemical, and Information Technology sectors explored in this workshop, establishing a regulatory regime needs to be a partnership between the public, corporate interests, scientists, and the government. Regulation is often written to combat perceived risk rather than actual risk—the public’s perceptions (occasionally even fictional portrayals) can spur regulatory efforts. This leads to the need for a thorough and continuing assessment of the risks posed by modern biotechnology. Inadequate or minimal risk assessment might expedite development in the short term but has potential negative long-term security and economic consequences. Industry and the technical community also often have a large role in setting regulatory policy, especially when well-crafted incentives are incorporated into the regulations. Such incentives might actually lead to enhanced innovation while poorly designed incentives can actually reduce safety and security. Any regulations should be as agile and flexible as the technology they regulate and when applied to biotechnologies they will need a new framework for thinking and implementing. The new framework should consider biotechnology as a technology and not simply a science since it is an extremely complex and adaptive system. This suggests the need to invest in social and political systems, rather than exclusively in technology, as a part of maintaining not only robust, but agile regulation. Modeling and simulations to illustrate how the biotech ecosystem might respond to new policies may be a promising approach to crafting regulations.

59 BASIC BIOLOGICAL SCIENCES↗

California Publicly-Owned Utilities (POUs) – LBNL ‘Beyond Widgets’ Project. Task: ambient lighting and occupancy-based plug load control. System Program Manual

This program manual contains detailed technical information for implementing an incentive program for task-ambient lighting and occupancy-based plug load control. This manual was developed by Lawrence Berkeley National Laboratory, in collaboration with the California Publicly-Owned Utilities (CA POUs) as a partner in the ‘Beyond Widgets’ program funded by the U.S. Department of Energy Building Technologies Office. The primary audience for this manual is the program staff of the various CA POUs. It may also be used by other utility incentive programs to help develop similar programs. It is anticipated that the content of this manual be utilized by the CA POU staff for developing related documents such as the Technical Resource Manual and other filings pertaining to the rollout of an energy systems-based rebate incentive program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Policy, Permit, Perform: Using City Benchmarking Data and Building Construction Permit History to Identify Energy Performance Improvements

The City of Portland (City) and Multnomah County 2015 Climate Action Plan targets a 40 percent reduction in carbon emissions below 1990 levels by 2030. To reach this goal, the plan includes a key objective to reduce the total energy use of existing buildings by 25 percent. Buildings are responsible for one-half of carbon emissions in Portland, Oregon, U.S., and improving their performance is critical to achieving the City’s climate goals. As part of its climate action planning, the City passed an ordinance on April 22, 2015, requiring commercial buildings 20,000 ft2 and larger to benchmark and disclose annual energy performance metrics through ENERGY STAR® Portfolio Manager® (ESPM), including greenhouse gas emissions, building energy use intensity (EUI) and ENERGY STAR scores. Twenty-five cities in the U.S. have adopted similar policies requiring energy benchmarking. These policies are generating a treasure trove of data about the drivers of building performance, but practitioners are only beginning to link benchmarking data to other datasets to produce actionable insight into improving building performance. In 2016, the City received a financial assistance award from the U.S. Department of Energy (DOE) through the Cities Leading through Energy Analysis and Planning project (Award Number DE-0007737). Portland’s project evaluated the application of the DOE Building Energy Asset Score Tool and rating system developed by Pacific Northwest National Laboratory (PNNL) to commercial buildings that report to the City. The City used building construction permit history to develop Asset Scores for a set of office buildings that reported energy performance for 2015 – the first year the City mandated energy benchmarking and reporting for commercial buildings 50,000 ft2 and larger. The primary project objective was to link energy benchmarking data and commercial building permit data to analyze commercial buildings systems that present the best, specific opportunities to improve energy performance. Integrating these datasets from two City departments, the Bureau of Development Services and the Bureau of Planning and Sustainability, could expand Portland’s use of analytics to inform climate policy decisions and strategic targeting of financial incentives for building owners and managers who are best positioned to improve the performance of their buildings. The project began with the commercial benchmarking data received for 340 commercial buildings that submitted calendar year 2015 energy reports. The City retained Research Into Action and Energy 350 (RIA team) to evaluate this self-reported benchmarking data. Based on a survey of 53 building managers, the RIA team found that most respondents used the City’s compliance tools, including a How-to Guide and Help Desk, and found access to utility data to be straightforward. However, almost one-third of the respondents encountered challenges when estimating the gross floor area (GFA), and some experienced confusion regarding the input of property use types and details into ESPM. Based on the RIA team’s recommendations, the City refined its How-to Guide, created online answers to frequently asked questions, and hosted office hour sessions to help building managers accurately characterize their building’s physical characteristics and operations in ESPM. Concurrently with the RIA team’s evaluation, the City worked with PNNL to estimate DOE Asset Score Preview (Preview) scores for 181 of the 340 commercial buildings that submitted ESPM reports to the City. Asset Score Tool is a web-based tool developed by PNNL for DOE to evaluate and rate the as-built energy efficiency of a building. Asset Score Tool’s full analysis capability runs a detailed energy model based on building geometry, age, envelope, lighting and mechanical systems using standard operating assumptions to give the building a score, similar to a miles per gallon rating for a car. Preview, a simplified deployment of the full Asset Score Tool, provides a preliminary score range using only seven data points, six of which are readily available in the ESPM benchmarking data. Analysis of the combined Preview scores and the operational ESPM scores identified buildings with a high potential for energy improvements through either retro-commissioning and retuning of existing operations or capital investments into building systems. The City contracted Whole Building Solutions (WBS) to mine building permit history and develop full Asset Scores for a subset of 26 office buildings that were eligible for both ENERGY STAR scores and Asset Scores. WBS researched permits and building plans to identify mechanical, lighting and envelope systems and other building characteristics necessary to complete Asset Scores. This historical data was recorded using the web-based Asset Score Tool, which evaluates the as designed energy efficiency of existing buildings. Much of this City information was available online after 2010; however, WBS had to search through microfiche files and the City’s database to obtain permit and plan history prior to 2010. Although building geometry, mechanical system type and basic envelope information was consistently identifiable, WBS found permit data gaps that prevented complete and accurate Asset Scores for most of the office buildings. If the City decides to develop Asset Scores based on building permit information in the future, WBS recommended requiring lighting plans, control diagrams and as-built drawings that reflect how the buildings are actually constructed. In addition, WBS recommended uploading plans and permits from microfiche storage into a more comprehensive, searchable database consistent with the City’s current online permit information. To identify the actual lighting types, WBS and City staff conducted site visits of all 26 office buildings. As part of managing the flow of ESPM and Asset Score data for the project, Earth Advantage, a sub-recipient of the Cities-LEAP award, created a DOE Standard Energy Efficiency Data (SEED) (USDOE 2018) instance for the City and used Asset Score’s Application Programming Interface (API) (Asset Score 2018) capabilities to develop two new features in the SEED Platform™: (1) automated Asset Score Preview ranges calculated based on benchmarking data and the City’s estimate of number of building floors; and (2) storage of full Asset Score information. Leveraging the construction permit history and site visit information for the 26 office buildings, The Cadmus Group (Cadmus) analyzed benchmarking data and Asset Score information to identify opportunities and drivers to improve performance. Correlation and regression analysis of the combined dataset was completed to determine whether building operations or specific systems – mechanical, lighting or envelope – present the best opportunities to improve energy performance. The central outcome of this project was Cadmus’ detailed analysis of the richer dataset that was created by combining the City of Portland’s commercial building permit activity and building-specific energy performance information based on metrics from ESPM and Asset Score Tool. Some of their findings collaborate with well-known facts, such as buildings with less efficient lighting systems are good targets for efficiency improvements through lighting upgrades. This analysis also helped identify that individual heating, ventilation, and air conditioning (HVAC) equipment efficiency does not necessarily correlate with building performance. However, overall HVAC system performance, as measured with the Total System Performance Ratio (TSPR) metric, is a better indicator of building performance (Goel et al. 2014). As a metric, TSPR considers whole system performance that includes equipment efficiency and system controls, such as resets for static pressure and chilled water setpoints, which can be more effective and financially feasible options for improving building performance. Given the high cost associated with envelope retrofits, opportunities to upgrade envelope insulation are likely to be limited. However, buildings with single-pane and non-thermal break windows are good candidates for window replacements, such as upgrading to double-pane windows with thermal breaks. This research project determined that developing Asset Scores based on site visits is preferable to mining City building permit data. In addition, the use of benchmarking data to develop Asset Score Preview Scores is recommended as a first step in engaging building managers to develop full Asset Scores. Asset Score Tool outputs can help building managers quickly identify opportunities for improvement and then work with the utility incentive administrator and energy service providers to develop their retrofit plan. Where full Asset Scores are available, analysis using a quadrant matrix with ENERGY STAR scores is recommended to identify buildings that present the best opportunities for operational-behavioral improvements versus ones with opportunities for upgrades to physical building systems. This workflow and the tools will help cities, utility incentive administrators, building portfolio managers and energy service providers develop energy programs and strategies for screening and analysis of buildings with the greatest energy savings potential. This report describes the project approach and research results to inform future coordination of ESPM and Asset Score data, including the use of benchmarking data to generate Preview scores. Given better awareness of energy performance, building managers can make more informed decisions to reduce energy consumption and carbon emissions. With cities, states and jurisdictions adopting benchmarking and auditing ordinances, there are substantial amounts of data submitted to cities that could be used to inform investments in energy efficiency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaic (PV) Manufacturing Expansions in the United States, 2017-2019: Motives, Challenges, Opportunities, and Policy Context

This report analyzes U.S. PV manufacturing announcements from 2017 through July-2019 and explores the potential impact of tariffs on the competitiveness of U.S. PV module manufacturing. First, the fraction of announcements that resulted in established facilities in the time frame specified is analyzed, as well as firm nationality and the existence of any other U.S. facilities for the firm. The prevalence of different PV product types among the announcements was also analyzed, as well as the type of facilities selected for development (greenfield, existing PV factories, or repurposed buildings). The cost to build these facilities was also analyzed in the context of their capacity, the value of incentives received by state and local governments, and the number of jobs created. Case studies of Auxin Solar, First Solar, Hanwha Q Cells, JinkoSolar, LG, Silfab, Solaria, and SunPower were conducted and highlight five factors influencing firms’ decisions to expand their U.S. PV production capacity. These included: 1) proximity to demand, including supply contracts and demand for domestic content 2) tariffs and other incentives. The Section 201 tariffs on PV module imports were often described helpful but tariffs on cell imports (Section 201) or materials (Section 301, Section 232) were often described as counterproductive since U.S. supply chains do not exist for many necessary goods. The corporate tax decrease and local incentives were often mentioned as helpful. 3) the ability to move quickly in order to maximize the benefit of the Section 201 tariffs. This affected decisions to select localities with faster permitting or moving into existing buildings. 4) competition with scale, where competing with Asian PV imports or avoiding imports of material from China was challenging due to the larger scale of Asian manufacturers. Additionally, smaller firms expressed concerns that larger firms may not need their U.S. facilities to profitable. 5) access to capital, which was a particular challenge for smaller firms. Several U.S. tariffs affect the economics of PV cells, modules, and balance-of-module (BOM) materials, some of which are applicable to a long list of countries and others applicable only to China or Taiwan. We analyze how the tariffs interact to affect the prices of c-Si modules sourced under various assumptions about domestic and imported components and assembly. We estimate module prices under a range of baseline scenarios featuring U.S.-assembled modules with Southeast Asian cells (not from China or Taiwan). When all BOM components are sourced from the United States, baseline module prices are $0.37/W (below the 2.5-GW Section 201 cell cap) to $0.42/W (above the 2.5-GW cell cap). If all BOM components are sourced from China, the module price in this baseline U.S.-assembly scenario can reach up to $0.60/W. Imported module prices are lower than or within the range of the U.S.-assembled baseline prices under some conditions. Importing bifacial modules from Southeast Asia is the lowest-priced alternative, at $0.35/W, because bifacial modules are excluded from the Section 201 tariffs. Importing Southeast Asia modules that contain U.S. cells results in a price of $0.38/W, also owing to a Section 201 exclusion. Importing Southeast Asian modules that have Southeast Asian cells yields a price of $0.44/W, and importing Chinese modules that have U.S. cells yields a price of $0.58/W. These results suggest that U.S. tariff policy in 2019 may encourage U.S. assembly of mono-facial c-Si modules if the 2.5-GW cell import cap is not reached and Chinese BOM imports are negligible. However, some imported module options may offer the lowest prices if the 2.5-GW cell import cap is reached and/or U.S. module manufacturers must rely on significant Chinese BOM content. The analysis shows the 2.5-GW cell cap may be exceeded in 2019 and following years. It is also likely that U.S. module manufacturers will need to use at least some Chinese BOM content, since U.S. module manufacturers have stated that U.S. supply chains do not exist (or do not exist at a sufficient scale) for most BOM components, which makes them at least partially reliant on Chinese BOM and thus subject to Section 301 tariffs.

14 SOLAR ENERGY↗

Michigan Hydrogen and Fuel Cell Electric Vehicle Deployment Plan: H2 FCEV Roadmap 2022

This report describes a roadmap for hydrogen fuel cell electric vehicles in the state of Michigan. This plan provides links to relevant information to assess, plan, and initiate hydrogen and FCEV deployment to help meet the energy, economic, and environmental goals for the State of Michigan. Policies and incentives that support hydrogen and fuel cell technology will increase deployment, thus increasing production and creating jobs throughout the supply chain. As deployment increases, an economy of scale will develop and manufacturing costs will decline, positioning hydrogen and fuel cell technology to compete more effectively in a global market without incentives. Policies and incentives to purchase and support the deployment of FCEVs, FCEBs, and hydrogen refueling can be coordinated regionally to maintain this advanced clean transportation sector as a global exporter for long-term growth and economic development. Overall, the execution of this plan will maintain Michigan's role as a global showcase for regionally manufactured transportation technology while reducing NOx and CO 2 emissions and as new jobs are created for businesses and industry.

08 HYDROGEN↗

Assessment of Nuclear Energy to Support Negative Emission Technologies

The feasibility and performance of nuclear energy coupled with Negative Emission Technology (NET) processes were investigated in this report. Three overarching questions from nuclear NET systems guided this research: which NET would be able to use heat and/or electricity from nuclear power plants (NPPs); what is the performance and cost of a nuclear NET system; and what would be the market outlook for this system? Among the various NETs that are actively being developed, several were found to potentially benefit from coupling with an NPP via (1) large amounts of decarbonized and constant-output electricity; (2) free waste heat or cheap low-temperature heat; or (3) high-temperature heat. NPPs were found to be compatible with Direct Air Capture (DAC) systems, and a detailed techno-economic analysis of coupled NPP&DAC systems was performed. Preliminary analysis also indicated that biomass and water-based NETs are potentially compatible with NPPs, but further work is needed to quantify the performance of these nuclear NET systems. Design and performance analyses were completed for both liquid solvent DAC (L-DAC) and solid sorbent DAC (S-DAC) technologies. A 1.0-GWth NPP coupled with L-DAC and S-DAC was found to be able to capture 12–15 Mt CO 2 /yr and 1.0–1.5 Mt CO 2 /yr, respectively. While the L-DAC process enables much greater CO 2 capture than the S-DAC process when both are sized with a 1 GWth NPP, the NPP&L-DAC system considered also requires >2 GWth natural gas oxy-combustion to reach adequate temperature in the calciner. CO 2 generated from natural gas combustion is also captured as part of the calcination process, in addition to the CO 2 captured from air, resulting in overall CO 2 sequestration of close to 30% more than what is captured from air. The cost of carbon capture calculated with the levelized cost of DAC (LCOD) had a range of $\$170–260$/tCO 2 for NPP&L-DAC systems and a range of $\$650–680$/tCO 2 for NPP&S-DAC systems. For both DAC systems, the NPP provides economic benefit when compared to previous National Energy Technology Laboratory (NETL) studies of non-nuclear DAC systems, leading to reduction of LCOD by 5–7% for L-DAC, and 8–13% for S-DAC. For the NPP&DAC systems, a preliminary market analysis reviewed potential CO 2 market prices and eligibility for incentives. The estimated potential revenues for CO 2 capture (coming from federal incentive, CO 2 commodity markets, or offset market) is in the range of $\$170–979$ tCO 2 , and the results show that because of lower LCOD, the NPP&L-DAC process would be more attractive to a market than the NPP&S-DAC process. The large investment needed for NPP&DAC processes would require long-term certainty of sufficient market size, CO 2 prices, and incentives. Enabling NPPs to ramp DAC operation up or down based on electricity market price is not expected to significantly increase revenues of the NPP&DAC system. This is because the revenues from CO 2 sequestration are required to be very high to justify the deployment and continuous operation of the very expensive DAC technologies. In this analysis, several new research questions were uncovered, and follow-up analyses are recommended for further investigation, including a detailed feasibility study of NPP coupled with other NET systems such as biomass pyrolysis and gasification with carbon capture and storage, and seawater carbon capture.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine-Learning-Based Mapping and Modeling of Solar Energy with Ultra-High Spatiotemporal Granularity

Despite the rapid growth of solar energy, we still lack a dynamic, high-fidelity database that tracks the spatiotemporal variations of solar PVs and their associated infrastructures across different places at a spatially resolved scale. The absence of such data presents a barrier to various applications such as solar PV growth projection, solar energy integration, solar incentive design, and climate risk assessment. In this project, we aim to bridge this gap by developing AI-based algorithms to extract granular information about solar PV installations and their associated infrastructures (i.e., distribution grids) from widely available unstructured data like remote sensing images and street views. As a result, we have built the Solar Energy Atlas, a fine-grained, large-scale geospatial overlay of distributed solar PVs and distribution grids. On top of it, we have advanced the understanding of solar adoption and distribution grid vulnerability to climate-induced extremes. Our major contributions can be summarized as follow: (1) By developing new AI algorithms, we have built the most comprehensive solar PV spatiotemporal database covering the entire US. This is the first time we obtained the exact GPS locations, size, subtype, and installation year information for rooftop solar PVs across the US. This database can be used for solar PV growth projection, solar energy integration, solar energy policy analysis and design, and spatially-resolved climate risk assessment. (2) Leveraging this database, we have uncovered the socioeconomic driving factors that are correlated with earlier onset of solar adoption and higher saturated adoption levels. We have identified the heterogeneity in the effects of different types of financial incentives on solar adoption and provided implications for tailoring incentive design based on local income levels to promote equitable solar adoption. (3) We have developed a distribution grid GIS mapping algorithm which can obtain granular geospatial and topology information about distribution grids using multi-modal open data, reducing the dependency on hard-to-obtain smart meter data of conventional approaches. It shows effectiveness in both the U.S. and Sub-Saharan Africa. Using this algorithm, we have uncovered the non-uniform vulnerability of distribution grids to wildfires in California in the aspects of undergrounding protection and Distributed Energy Resources (DER) preparedness. This has provided important implications for improving the affordability and equity of grid adaptation approaches. (3) We have made our produced database publicly available and provided user-friendly interface to enable various stakeholders and the general public to interact with the data. We have also integrated the produced data into the Data Commons platform to enable the public to access the data and correlate it with other location-specific characteristics simply using natural language as queries. The impact of our project is three-fold: (1) New algorithms for mapping solar PVs and distribution grids across space and time, which are open source to facilitate researchers and industry; (2) New databases of solar PVs and distribution grids that have been made publicly available for engineering, social, and policy applications; (3) New understandings and actionable insights on the potential approaches to promoting solar adoption and reducing energy infrastructure vulnerabilities. In this report, we start by discussing the project background and motivation (section 5), followed by the overview of project objectives (section 6). Results and discussion for each task are presented in section 7. Significant accomplishments are summarized in section 8. This report will be concluded by discussing the paths forwards (section 9), products (section 10), and team roles (section 11).

14 SOLAR ENERGY↗

Systems Analysis of Biomass and Coal Co-firing Power Plants with Deep Carbon Capture Toward Net-zero Emissions

Achieving a net-zero emission economy in the United States requires integrating diverse low-carbon and negative-emission technologies into the existing fossil fuel-dominant power fleet. Potential technologies from the low-carbon portfolio include renewable power, fossil power with carbon capture and storage (CCS), bioenergy with CCS (BECCS), and direct air capture (DAC). Renewable power is a clean energy source but has to pair with costly battery storage to provide dispatchable electricity. Fossil power with CCS offers dispatchable electricity yet still relies on DAC to offset residual emissions, even when deploying deep CCS with more than 90% CO2 capture. Coal-biomass co-firing with CCS, a subset of BECCS, is a reliable energy production technology that can be retrofitted from existing electricity generation units (EGUs). Power plant retrofit maximizes the use of the current U.S. coal power fleet without the need for large-scale deployment of new renewable power, battery storage, or DAC. Retrofitting coal-biomass co-firing with deep CCS in EGUs is a promising option, but not a universal solution. Biomass co-firing at a power plant introduces economic challenges and indirectly poses pressure on land and water resources. Meanwhile, retrofitting deep CCS affects plant efficiency and raises electricity generation costs. Overall, the technical feasibility and economic viability of plant retrofits vary across EGUs, as they are contingent upon the regional availability of biomass, unit-specific characteristics, site-specific fuel supply costs, and adjacent CO2 storage potential. Government incentives like 45Q can improve the retrofit viability, though the impact requires further quantification. A comprehensive analysis at the unit level is essential to address the question regarding the fate of the U.S. coal-fired electricity generation fleet toward the net-zero emission goal. This study conducts a systematic techno-economic-environmental assessment of EGUs to identify the viability of biomass co-firing and deep CCS retrofits in the U.S. coal-fired power fleet. Specifically, it characterizes the techno-economic performance of deep carbon capture, estimates life cycle greenhouse gas (GHG) emissions, and conducts a fleet-level assessment on retrofit viability. The key objectives are (1) to estimate the unit-specific performance and retrofitted cost under various biomass co-firing levels and CO2 capture rates; (2) to determine the possibility of reaching net-zero emission at the fleet level; (3) to quantify the cumulative capacities that are suitable for plant retrofits under current and future biomass supply scenarios; and (4) to improve the understanding of policy impacts on such retrofits to help the power sector’s transition to a net-zero economy. Techno-economic Model of Deep Carbon Capture. This study develops the performance and economic models for Monoethanolamine-based post-combustion CO2 capture at 95–99% capture rates. The process is simulated in Aspen Plus, analyzing the performance of carbon capture technology by varying the plant sizes, solvent lean loading, CO2 concentrations, and flue gas inlet temperature. Based on the key inputs and output parameters of CO2 capture, a reduced-order performance model of deep carbon capture is formulated. In addition, an engineering-economic model integrating the performance metrics is developed to estimate the capital as well as operation and maintenance (O&M) costs. Capital cost estimations follow the framework of the Integrated Environmental Control Model (IECM) and incorporate data regressions from three technical reports by IECM, the National Energy Technology Laboratory (NETL), and the National Renewable Energy Laboratory. The O&M cost estimation utilizes the actual inventory consumption rate and labor requirements. Both performance and cost models are embedded into IECM v13.0-beta, a fossil-fuel power plant modeling tool. Life Cycle Assessment of Power Plants. This study estimates the GHG emissions of power plants through life cycle assessment (LCA). The LCA scope includes fuel supply, combustion-based power generation, and CO2 transport and storage. The fuel-based life cycle module is designed following the framework of the NETL Unit Process Library and CO2U LCA Guidance Toolkit. The module is then incorporated into IECM v13.0-beta. The process-based LCA is applied to estimate the GHG emissions of coal and biomass supply, coal- and coal-biomass co-firing power plant operation, as well as CO2 pipeline transport and geographical sequestration. An uncertainty analysis is conducted to quantify the variability and uncertainty associated with the LCA using the Latin Hypercube Sampling (LHS) method. Fleet-level Assessment. This study evaluates the technical and economic feasibility of selected coal-fired EGUs, examines the role of tax credits in retrofit viability, and assesses the competitiveness of retrofitted units against other low-carbon options. Unit screening identifies EGUs for the study, focusing on new, efficient baseload units with air pollution controls. The power plant databases are then established to organize unit-specific information on performance and operating conditions from the relevant public databases. Biomass for co-firing retrofits is selected based on home and neighboring county availability, ensuring sustained operation with at least a 5% co-firing level. The CO2 storage site is determined by state-level storage potential, with ArcGIS Pro and NETL CO2 Saline Storage Cost Model used to identify the optimal balance between the nearest transport distances and affordable storage costs. The latest IECM v13.0-beta is then employed to configure and evaluate the eligible EGUs with or without the deployment of deep CCS and biomass co-firing. A supply curve is established to illustrate the cumulative installed capacity suitable for retrofits at different cost levels. A sensitivity analysis on tax credits for carbon sequestration is performed. Finally, a unit-level cost comparison is conducted among retrofitted plants, renewable power with battery storage, and abated fossil fuels with DAC. Expected Results. This study evaluates the technical, economic, and environmental metrics of each EGU across an array of CO2 capture rates and biomass co-firing level scenarios. Unit-level comparisons will identify critical factors influencing technical performance. The supply curves with and without tax incentives will provide insights into the impact of tax credits on biomass co-firing and CCS deployment. The cost comparisons with renewables and DAC-retrofit will assess the competitiveness of the retrofitted units. Life cycle emissions from each unit will be assessed to identify the scenarios under which net-zero emissions can be achieved. These analyses are expected to determine the total coal-fired capacity suitable for serving as a low-carbon energy source with or without tax incentives. The study results are novel in identifying optimal unit-specific strategies for producing carbon-neutral power, whether through retrofitting EGUs with deep CCS, biomass co-firing, DAC, or installing renewable power with battery. The findings will provide insight into nationwide efforts to ensure reliable, affordable, and low-carbon electricity. It also will inform investment decisions and policies in the deployment of deep carbon capture and negative emission technologies for a net-zero energy future.

Biomass Co-firing↗