Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fault current”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

GHOST (Grid Hardware Open Source Testbed) [SWR-18-32]

The software was developed for the purpose of Microgrid Controller Procurement where multiple Microgrid Controller vendors were competing to prove the best performance. Each microgrid controller was connected to Real-Time Simulator (Opal-RT) where the Real-Time model of microgrid was simulated. Microgrid controllers were able to control most of the assets in the model. To be able to fairly compare controller's performance each controller was evaluated using exactly the same model, with the same initial conditions and exactly the same test sequence. The microgrid evaluation test sequence lasted 100 minutes and consist of various grid disturbances to which a microgrid controller must respond. The microgrid and power system will experience multiple types of disturbances while performing dispatch functions. Many functions are tested in grid-connected and islanded modes such as unexpended failures of generators, energy storage trip events, and large load fluctuations. The test sequence focuses on fault scenarios that cause the highest short-circuit fault current contribution; force a swing bus or generator capable of being a swing bus offline; cause the most reconfigurations; and cause conflicting objectives for the microgrid controller. During the test sequence execution multiple datapoints are being recorded and stored. During data postprocessing key performance parameters are extracted allowing quantitative comparison of performance on multiple aspects including: resiliency, fuel utilization, grid interconnection, ancillary services and power quality and eventually after summing all key performance parameters by comparing the overall result. To be able to perform such testing multiple tools had to be developed included in this repository including: - Real time model of microgrid (Urban-Banshee, Remote-smaller model) - Test sequence configuration tools - Test execution real-time scripts - Post processing scripts - Human Machine Interface software

Koralewicz, Przemyslaw↗

Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and outreach mission to provide future energy workforce talent and support the electric system stakeholder community. Building upon and extending portions of that research effort, this project has been focused in the following areas: (1) Building high-fidelity integrated power and controls hardware-in-the-loop research and development testbed capabilities (Figure 1). (2) Distributed Energy Resources Integration - (a) Testing Requirements and Methods for Fault Current Limiters, (b) Contributions to the Development of IEEE 1547.7, (c) Analysis of a STATCOM Application for Wind Resource Integration, (d) Development of a Grid-Interactive Inverter with Energy Storage Elements, (e) Simulation-Assisted Advancement of Microgrid Understanding and Applications; (3) Availability of High-Fidelity Dynamic Simulation Tools for Grid Disturbance Investigations; (4) HTS Material Characterization - (a) AC Loss Studies on High Temperature Superconductors, (b) Local Identification of Current-Limiting Mechanisms in Coated Conductors; (5) Cryogenic Dielectric Research; and (6) Workshops, education, and outreach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low AC Loss YBCO Coated Conductor Geometry by Direct Inkjet Printing

The second generation (2G) high temperature superconductors (HTS) wire offers potential benefits for many electric power applications, including ones requiring filamentized conductors with low ac loss, such as transformers and fault current limiters. However, the use of 2G wire in these applications requires the development of both novel multi-filamentary conductor designs with lower ac losses and the development of advanced manufacturing technologies that enable the low-cost manufacturing of these filamentized architectures. This Phase I SBIR project focused on testing inkjet printing as a potential low-cost, roll-to-roll manufacturing technique to fabricate potential low ac loss filamentized architectures directly on the 2G template strips.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Protection of 100% Inverter-dominated Power Systems with Grid-Forming Inverters and Protection Relays – Gap Analysis and Expert Interviews

This report summarizes a gap analysis resulting from a literature review and expert interviews conducted by subject matter experts from Sandia National Laboratory, Siemens, and the Electric Power Research Institute (EPRI) in Spring 2023. The gap analysis consists of two main parts: The fault-ride through (FRT) behavior of grid-forming (GFM) inverter-based resources (IBR) and the response of state-of-the-art protection relays to the fault currents and voltages from GFM IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Experience with Inverter-Based Resource Impacts on Transmission Protection

High penetration of inverter-based resources (IBR) can adversely affect the transmission protection schemes in the area. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems because the existing system has been designed based on the fault current response of conventional rotating-machine-based generators. This report identifies various protection challenges due to IBRs that industry is facing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV-EVSE Fault Study: An Analysis of Thermal Events Caused by Electrical Faults during DC Charging

This report outlines multiple avenues of analysis of electrical faults associated with electric vehicles (EVs) during charging, focusing specifically on the interactions between EVs and EV supply equipment (EVSE). Key concerns include the identification and mitigation of overtemperature events that can result in fires, which are commonly initiated by localized heating of connectors, wiring, or high-impedance fault current paths.

42 - ENGINEERING↗

Study the Protection Improvements for a Weak Grid Area With High IBRs

NLR is collaborating with Florida Power & Light (FPL) and GE to investigate power system stability and protection reliability challenges in a weak-grid region with high penetration of inverter-based resources (IBRs). This presentation will primarily focus on the protection aspects of the study. We will share key insights from this real-world project, including best practices for developing high-fidelity fault study models, establishing a controller-hardware-in-the-loop (CHIL) platform for testing physical relays, identifying system-level protection challenges, and designing enhanced protection schemes to address those issues. Through this discussion, the audience will gain practical understanding of protection studies in IBR-dominated systems, the emerging challenges associated with reduced fault current and altered transient behavior, and effective mitigation strategies. In particular, we will highlight the critical importance of IBR compliance with IEEE 2800-2022 to ensure dependable and secure protection relay operation in modern transmission systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design analysis and computer-aided performance evaluation of shuttle orbiter electrical power system. Volume 1: Summary

Studies were conducted to develop appropriate space shuttle electrical power distribution and control (EPDC) subsystem simulation models and to apply the computer simulations to systems analysis of the EPDC. A previously developed software program (SYSTID) was adapted for this purpose. The following objectives were attained: (1) significant enhancement of the SYSTID time domain simulation software, (2) generation of functionally useful shuttle EPDC element models, and (3) illustrative simulation results in the analysis of EPDC performance, under the conditions of fault, current pulse injection due to lightning, and circuit protection sizing and reaction times.

Source record↗

Floating frame grounding system

The development of a floating frame grounding system (FFGS) for the 40- by 80-foot low speed wind tunnel facility at the NASA Ames Research Center National Full Scale Aerodynamics Complex is addresssed. When electrical faults are detected, the FFGS ensures a ground path for the fault current. In addition, the FFGS alerts the tunnel operator when a mechanical foul occurs.

Forsyth, T. J.↗

Serial and parallel power equipment with high-temperature superconducting elements

One of the prospective, practical applications of high-temperature superconductors is the fault-current limitation in electrical energy networks. The development and testing of experimental HTSC serial current limiters have been reported in the literature. A Hungarian electric power company has proposed the development of a parallel equipment for arc suppressing both in the industrial and customers' networks. On the basis of the company's proposal the authors have outlined the scheme of a compound circuit that can be applied both for current limitation and arc suppressing. In this paper the design principles and methods of the shunt equipment are presented. These principles involve the electrical, mechanical and cryogenic aspects with the special view on the electrical and mechanical connection between the HTSC material and the current lead. Preliminary experiments and tests have been carried out to demonstrate the validity of the design principles developed. The results of the experiments and of the technological investigations are presented.

Bencze, Laszlo↗

Ultra-long-life spacecraft for long duration space exploration missions

The predominant failure mode in an ultra longlife system is the wear-out of components. In order to survive long duration missions, current fault tolerant design techniques would require excessive number of redundant components. This paper describes a more efficient fault tolerant avionics system architecture that requires much less redundant components. This architecture employs generic function blocks that can be programmed to replace a wide variety of components in-flight. Hence, each individual generic block is essentially equivalent to almost an entire redundant string of components in the conventional approach. In that way, the ultra long-life system can achieve much higher level of reliability while carrying much less components. On the other hand, due to the programmability of the generic redundant blocks, the physical location of a specific component might not be pre-determined. Therefore, wireless interconnection is employed to provide the necessary flexibility in connectivity. A testbed of this architecture is being developed at the Jet Propulsion Laboratory.

return missions↗

Space Shuttle Upgrades Advanced Hydraulic Power System

Three Auxiliary Power Units (APU) on the Space Shuttle Orbiter each provide 145 hp shaft power to a hydraulic pump which outputs 3000 psi hydraulic fluid to 41 hydraulic actuators. A hydrazine fuel powered APU utilized throughout the Shuttle program has undergone many improvements, but concerns remain with flight safety, operational cost, critical failure modes, and hydrazine related hazards. The advanced hydraulic power system (AHPS), also known as the electric APU, is being evaluated as an upgrade to replace the hydrazine APU. The AHPS replaces the high-speed turbine and hydrazine fuel supply system with a battery power supply and electric motor/pump that converts 300 volt electrical power to 3000 psi hydraulic power. AHPS upgrade benefits include elimination of toxic hydrazine propellant to improve flight safety, reduction in hazardous ground processing operations, and improved reliability. Development of this upgrade provides many interesting challenges and includes development of four hardware elements that comprise the AHPS system: Battery - The battery provides a high voltage supply of power using lithium ion cells. This is a large battery that must provide 28 kilowatt hours of energy over 99 minutes of operation at 300 volts with a peak power of 130 kilowatts for three seconds. High Voltage Power Distribution and Control (PD&C) - The PD&C distributes electric power from the battery to the EHDU. This 300 volt system includes wiring and components necessary to distribute power and provide fault current protection. Electro-Hydraulic Drive Unit (EHDU) - The EHDU converts electric input power to hydraulic output power. The EHDU must provide over 90 kilowatts of stable, output hydraulic power at 3000 psi with high efficiency and rapid response time. Cooling System - The cooling system provides thermal control of the Orbiter hydraulic fluid and EHDU electronic components. Symposium presentation will provide an overview of the AHPS upgrade, descriptions of the four hardware elements, and a summary of development results to date.

Source record↗

Splice Resistance Measurements in 2G YBCO Coated Conductor

Abstract The Oak Ridge National Laboratory has been investigating the electrical splice resistance of second-generation (2G) YBCO coated conductor. The purpose of the experimental investigation is to study the splice resistance of 2G YBCO coated conductor as a function of: a) operating temperature, b) magnetic field strength (B-field), and c) magnetic field orientation ( ). Understanding the splice resistance with its corresponding variation as a function of surface preparation and operating conditions is essential to the practical implementation of electric utility devices; e.g., motors, generators, transformers, cables, and fault-current limiters, etc. Preliminary test results indicate that the 2G YBCO splice resistance shows a weak temperature dependence and a significantly stronger dependence upon magnetic field strength and magnetic field orientation. Surface preparation conditions are also briefly discussed. Index Terms coated conductor, splice, critical current, YBCO

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Combining Partial Redundancy and Checkpointing for HPC

Today's largest High Performance Computing (HPC) systems exceed one Petaflops (10^15 floating point operations per second) and exascale systems are projected within seven years. But reliability is becoming one of the major challenges faced by exascale computing. With billion-core parallelism, the mean time to failure is projected to be in the range of minutes or hours instead of days. Failures are becoming the norm rather than the exception during execution of HPC applications. Current fault tolerance techniques in HPC focus on reactive ways to mitigate faults, namely via checkpoint and restart (C/R). Apart from storage overheads, C/R-based fault recovery comes at an additional cost in terms of application performance because normal execution is disrupted when checkpoints are taken. Studies have shown that applications running at a large scale spend more than 50\% of their total time saving checkpoints, restarting and redoing lost work. Redundancy is another fault tolerance technique, which employs redundant processes performing the same task. If a process fails, a replica of it can take over its execution. Thus, redundant copies can decrease the overall failure rate. The downside of redundancy is that extra resources are required and there is an additional overhead on communication and synchronization. This work contributes a model and analyzes the benefit of C/R in coordination with redundancy at different degrees to minimize the total wallclock time and resources utilization of HPC applications. We further conduct experiments with an implementation of redundancy within the MPI layer on a cluster. Our experimental results confirm the benefit of dual and triple redundancy - but not for partial redundancy - and show a close fit to the model. At 80,000 processes, dual redundancy requires twice the number of processing resources for an application but allows two jobs of 128 hours wallclock time to finish within the time of just one job without redundancy. For narrow ranges of processor counts, partial redundancy results in the lowest time. Once the count exceeds 770, 000, triple redundancy has the lowest overall cost. Thus, redundancy allows one to trade-off additional resource requirements against wallclock time, which provides a tuning knob for users to adapt to resource availabilities.

Elliott, James↗

Traveling Wave Relays for Distribution Feeder Protection with High Penetrations of Distributed Energy Resources: Preprint

Increased penetration of power electronics interfaced Distributed Energy Resources (DER) like PV, electric vehicle and battery storage in the distribution system (both in numbers and sizes) may cause bi-directional power flows under normal operation. In addition, they contribute low fault current under short circuit conditions. These two changes can impact the proper operation of legacy protection systems. This can add additional challenges during weak grid and islanded operation. In this research, traveling wave (high frequency) signature based protection scheme is proposed for future distribution systems. Simulations are performed under different transient scenarios to provide insight into the high frequency signatures to show the traveling wave behavior. Finally, this paper discusses the importance of sensing and digital processing requirements for traveling-wave protection in distribution system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Traveling Wave Relays for Distribution Feeder Protection with High Penetrations of Distributed Energy Resources

Increased penetration of power electronics interfaced Distributed Energy Resources (DER) like PV, electric vehicle and battery storage in the distribution system (both in numbers and sizes) may cause bi-directional power flows under normal operation. In addition, they contribute low fault current under short circuit conditions. These two changes can impact the proper operation of legacy protection systems. This can add additional challenges during weak grid and islanded operation. In this research, traveling wave (high frequency) signature based protection scheme is proposed for future distribution systems. Simulations are performed under different transient scenarios to provide insight into the high frequency signatures to show the traveling wave behavior. Finally, this paper discusses the importance of sensing and digital processing requirements for traveling-wave protection in distribution system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

SIW21-95: Hybridizing Synchronous Condensers with Grid-Forming Battery Energy Storage Systems

One of the main challenges associated with deployment of high shares of inverter-based resources (IBRs) in power grid is not only reduced system inertia but also degrading system strength that may cause severe stability impacts. A minimum level of system strength is needed for the power system to remain stable under normal conditions and to return to a steady state condition following a system disturbance. Significant system strength reduction is expected in almost all planned areas for solar and wind generation deployment. Synchronous condensers (SC) have been considered as one main technology to address the system strength issues for the areas with high levels of IBRs. SCs can help improving reliability and resiliency of power system but they do not provide the full range of services needed by power systems for reliable and economic integration of high shares of inverter-coupled variable generation such as PV generation. Services related to active power controls cannot be provided by SCs due to lack of prime mover. Even for provision of reactive power SCs have certain constraints based on their thermal and stability limits. NREL has been conducting research on a hybridized concept that combines SCs with grid forming (GFM) battery energy storage systems (BESS). This super flexible AC transmission system (SuperFACTS) that combines these two technologies in a single plant under the same controller offers a unique scalable set of services to the power system at all levels (transmission, sub-transmission, distribution, islands and isolated microgrids). Depending on use cases, SuperFACTS can be controlled to provide fully dispatchable and flexible operation using energy storage component, provide a full range of existing and future ancillary and reliability services to the grid (similar or better than conventional sources), maintain adequate levels of grid strength and inertia, and provide fault current for proper operation of protection systems. Therefore, this economic and easy to commercialize solution has potential for significant impacts on certain segments of global energy sector. All types of gird services (market based, reliability and resiliency) can be provided by SuperFACTS plants. GFM BESS can act as a self-black start source for each SuperFACTS module, which in turn can act a black start resource for co-located PV and wind power plants, segments of transmission and distribution networks, for conventional power plants, etc. The issue of in-rush currents during black start is addressed by overcurrent capability of SCs. In this paper we describe the results of modeling for SuperFACTS concept.

grid forming↗

FLISR in the Presence of DERs ADMS Test Bed Use Case

Fault location, isolation, and restoration (FLISR) is one of the distribution automation applications that utilities are most interested in. It operates groups of switches on distribution feeders to improve the reliability of power delivery after localizing outages. FLISR is an essential function for enabling a self-healing grid, and it directly affects grid reliability and resilience. The presence of DERs brings both new opportunities and challenges for FLISR applications. For instance, some DERs can work as backup generation sources and help energize local networks so more switching options can be achieved with the coordination of FLISR operations; however, the existence of DERs also brings new challenges. The bidirectional power flow resulting from DERs might require dynamic changes to protective devices' fault current settings, and thus the FLISR application will need to dynamically adjust its operations in coordination with the dynamic protection settings. Also, some FLISR applications make their service restoration decisions and close tie-switches based on predefined rules; however, the presence of DERs and their impact on altering net loads on the local feeder network are not considered. For this use case, the project team is using the FLISR application of the Survalent ADMS operating on a real-time simulation of a feeder from Central Georgia EMC, a cooperative electric utility. The performance of the FLISR application is being evaluated for different locations and combinations of DERs, including grid-forming battery energy storage systems.

ADMS↗