Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical safety”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

AQUIFER Nano-Electrofuel Energy Economy and Powered Aircraft Operations

The Aqueous, QUick-charging battery Integration For Electric flight Research project is explained and the major subsystems are described, including nano-electric fluid, rim-driven motors, and integration concepts. The nano-electric fluid concept is a new type of aqueous flow battery that could reduce or retire the fire and explosion hazards of conventional batteries and fuel cells. The nano-electric fluid itself could enable energy storage and increased available energy per fuel weight ratios. The rim-driven motor is being developed to improve propulsion system safety and stability and to reduce noise. The rim-driven motor concept could enable motors that are more efficient both electrically and aerodynamically. The Energy Economy of the project concept is presented as a potential renewable or green energy sustainment for utilizing in-place infrastructure. The nano-electric fluid energy charge-use-recharge cycle is presented using renewable energy input from solar, wind, and hydroelectricity. Powered aircraft operations are presented, and the logistics of the new nano-electric fluid technology are explored. Powered aircraft operations topics include weight and balance, fueling, recharging, safety, and derivative considerations.

Lechniak, Jason A.↗

Potential Operating Orbits for the SAFE-400

Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp is greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.

Houts, Mike↗

Study of advanced fuel system concepts for commercial aircraft and engines

The impact on a commercial transport aircraft of using fuels which have relaxed property limits relative to current commercial jet fuel was assessed. The methodology of the study is outlined, fuel properties are discussed, and the effect of the relaxation of fuel properties analyzed. Advanced fuel system component designs that permit the satisfactory use of fuel with the candidate relaxed properties in the subject aircraft are described. The two fuel properties considered in detail are freezing point and thermal stability. Three candidate fuel system concepts were selected and evaluated in terms of performance, cost, weight, safety, and maintainability. A fuel system that incorporates insulation and electrical heating elements on fuel tank lower surfaces was found to be most cost effective for the long term.

Versaw, E. F.↗

NASA Lewis Wind Tunnel Model Systems Criteria

This report describes criteria for the design, analysis, quality assurance, and documentation of models or test articles that are to be tested in the aeropropulsion facilities at the NASA Lewis Research Center. The report presents three methods for computing model allowable stresses on the basis of the yield stress or ultimate stress, and it gives quality assurance criteria for models tested in Lewis' aeropropulsion facilities. Both customer-furnished model systems and in-house model systems are discussed. The functions of the facility manager, project engineer, operations engineer, research engineer, and facility electrical engineer are defined. The format for pretest meetings, prerun safety meetings, and the model criteria review are outlined Then, the format for the model systems report (a requirement for each model that is to be tested at NASA Lewis) is described, the engineers that are responsible for developing the model systems report are listed, and the time table for its delivery to the facility manager is given.

Soeder, Ronald H.↗

Modular Architecture for the Measurement of Space Radiation

A modular architecture has been conceived for the design of radiation-monitoring instruments used aboard spacecraft and in planetary-exploration settings. This architecture reflects lessons learned from experience with prior radiation-monitoring instruments. A prototype instrument that embodies the architecture has been developed as part of the Mars Advanced Radiation Acquisition (MARA) project. The architecture is also applicable on Earth for radiation-monitoring instruments in research of energetic electrically charged particles and instruments monitoring radiation for purposes of safety, military defense, and detection of hidden nuclear devices and materials.

Delaune, Paul↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A lowcost, portable, and end-to-end photovoltaic-system test appropriate for NASA's new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metalhalide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, highfidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility. At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendor's panellevel data and periodic inspection, the method ensures system integrity from Integration and Test (I&T) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

power systems↗

Low-cost, Risk-Reduction Testing of Class D Spacecraft Photovoltaic Systems

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A low-cost, portable, and end-to-end photovoltaic-system test appropriate for NASAs new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metal-halide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, high-fidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility.At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendors panel-level data and periodic inspection, the method ensures system integrity from Integration and Test (IT) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

photovoltaic↗

International Space Station Spacecraft Charging Hazards: Hazard Identification, Management, and Control Methodologies, with Possible Applications to Human Spaceflight Beyond LEO

In this paper, we present an overview of how the International Space Station (ISS) safety engineering methodology directed to controlling extravehicular activity (EVA) crew electrical shock hazards, caused by ISS spacecraft charging, has evolved over the past 25+ years. Long-term measurements of ISS charging severity and frequency-of-occurrence, combined with detailed probabilistic analysis of EVA electric shock- circuit completion, led to a change in hazard control methodology. The requirement for two-fault tolerant EVA shock hazard control during all EVAs was replaced with a less operationally burdensome and risky EVA shock hazard detection and warning process. The applicability of event probability-based detection-and- warning processes to human spaceflight charging hazard control beyond low-earth orbit (LEO) is also considered.

Koontz, Steve↗

Systems Health Management and Prognostics Approaches for Electric Aircrafts

As more and more electric vehicles emerge in our daily operation progressively, a very critical challenge lies in the prediction of remaining driving flying time/distance for the flying vehicles. This information is important, particularly in the case of auto vehicles, because such vehicles can become self-aware, autonomously compute its own capabilities, and identify how to best plan and successfully complete vehicular missions safely. In case of electric aircrafts, computing the remaining flying time is also safety-critical, since an aircraft that runs out of power (battery charge) while in the air will eventually lose control leading to catastrophe. To facilitate and solve the prediction problem, awareness of the current health state of the system is key, since it is necessary to perform condition-based predictions. To accurately predict the future state of any system, it is required to possess knowledge of its current health state and future operational conditions. Latest achievements of data-driven algorithms in regression of complex nonlinear functions and classification tasks have generated a growing interest in artificial intelligence for industrial applications. Complex multi-physics models as well as digital twins, once purely built on physics and corresponding simplified lumped parameter iterations, can now benefit from machine learning algorithms to mitigate the lack of understanding of some complex behavior. Given models of the current and future system behavior, a general approach of model-based prognostics can solve the prediction problem and further decision-making. A systematic prediction framework is implemented to identify all possible sources of uncertainty, quantify each of them individually, and mathematically estimate their combined effect on the system-level quantity of interest, in this case, the remaining flying time/distance of the unmanned aircraft. Note - This presentation contains all previously published information.

Systems Health Managent↗

Health Monitoring and Prognostics for Electric Aircrafts

As more and more electric vehicles emerge in our daily operation progressively, a very critical challenge lies in the prediction of remaining driving flying time/distance for the flying vehicles. This information is important, particularly in the case of auto vehicles, because such vehicles can become self-aware, autonomously compute its own capabilities, and identify how to best plan and successfully complete vehicular missions safely. In case of electric aircrafts, computing the remaining flying time is also safety-critical, since an aircraft that runs out of power (battery charge) while in the air will eventually lose control leading to catastrophe. To facilitate and solve the prediction problem, awareness of the current health state of the system is key, since it is necessary to perform condition-based predictions. To accurately predict the future state of any system, it is required to possess knowledge of its current health state and future operational conditions. Latest achievements of data-driven algorithms in regression of complex nonlinear functions and classification tasks have generated a growing interest in artificial intelligence for industrial applications. Complex multi-physics models as well as digital twins, once purely built on physics and corresponding simplified lumped parameter iterations, can now benefit from machine learning algorithms to mitigate the lack of understanding of some complex behavior. Given models of the current and future system behavior, a general approach of model-based prognostics can solve the prediction problem and further decision-making. A systematic prediction framework is implemented to identify all possible sources of uncertainty, quantify each of them individually, and mathematically estimate their combined effect on the system-level quantity of interest, in this case, the remaining flying time/distance of the unmanned aircraft. Note - This presentation contains all previously approved and published information.

Systems Health Managent↗

Nuclear electric propulsion: A better, safer, cheaper transportation system for human exploration of Mars

NASA has completed a preliminary mission and systems study of nuclear electric propulsion (NEP) systems for 'split-sprint' human exploration and related robotic cargo missions to Mars. This paper describes the study, the mission architecture selected, the NEP system and technology development needs, proposed development schedules, and estimated development costs. Since current administration policy makers have delayed funding for key technology development activities that could make Mars exploration missions a reality in the near future, NASA will have time to evaluate various alternate mission options, and it appears prudent to ensure that Mars mission plans focus on astronaut and mission safety, while reducing costs to acceptable levels. The split-sprint nuclear electric propulsion system offers trip times comparable to nuclear thermal propulsion (NTP) systems, while providing mission abort opportunities that are not possible with 'reference' mission architectures. Thus, NEP systems offer short transit times for the astronauts, reducing the exposure of the crew to intergalactic cosmic radiation. The high specific impulse of the NEP system, which leads to very low propellant requirements, results in significantly lower 'initial mass in low earth orbit' (IMLEO). Launch vehicle packaging studies show that the NEP system can be launched, assembled, and deployed, with about one less 240-metric-ton heavy lift launch vehicle (HLLV) per mission opportunity - a very Technology development cost of the nuclear reactor for an NEP system would be shared with the proposed nuclear surface power systems, since nuclear systems will be required to provide substantial electrical power on the surface of Mars. The NEP development project plan proposed includes evolutionary technology development for nuclear electric propulsion systems that expands upon SP-100 (Space Power - 100 kw(e)) technology that has been developed for lunar and Mars surface nuclear power, and small NEP systems for interplanetary probes. System upgrades are expected to evolve that will result in even shorter trip times, improved payload capabilities, and enhanced safety and reliability.

Clark, John S.↗

A Review of Unmanned Aerial Vehicle Technology in Power Line Inspection

The electric power industry is one of the heaviest adopters of Unmanned Aerial Vehicles (UAV) technology, utilizing their versatility to enhance power line maintenance programs. For reliable power grids, routine maintenance operations and rapid repair operations are required across substantial geographical distances. Both maintenance and repair decisions are driven by assessment operations, such as inspections of mechanical structures with visible-band sensors, inspections for the presence of high voltage coronas and hot spots with multispectral sensors, and surveying of equipment and adjacent features (particularly vegetation) with photogrammetric and Light Detection and Ranging (LiDAR) sensors. Assessment was historically accomplished with manned helicopter flights or foot patrols. Recently, this critical economic segment harnessed advances in Unmanned Aerial Systems (UAS)technology to accomplish assessment tasks with faster results, lower cost, and higher levels of safety than historical methods. Adoption of UAVs in high-voltage electric power transmission activities is well underway. Adoption of UAVs for low voltage distribution activities is still emerging, with the important exception of post-storm damage assessment following major hurricanes (Harvey and Maria in 2017 and Michael in 2018). This report reviews the broad UAS adoption in high-voltage electric power transmission operations and early attempts at adoption in distribution operations. The ability to fly beyond visual line of sight (BVLOS) may increase the advantages of UAV inspection over former options, and in the United States, regulators have approved two pilot projects to demonstrate BVLOS methods and their benefits in operating and maintaining the power grid.

UAV↗

Global Precipitation Measurement (GPM) Safety Inhibit Timeline Tool

The Global Precipitation Measurement (GPM) Observatory is a joint mission under the partnership by National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA), Japan. The NASA Goddard Space Flight Center (GSFC) has the lead management responsibility for NASA on GPM. The GPM program will measure precipitation on a global basis with sufficient quality, Earth coverage, and sampling to improve prediction of the Earth's climate, weather, and specific components of the global water cycle. As part of the development process, NASA built the spacecraft (built in-house at GSFC) and provided one instrument (GPM Microwave Imager (GMI) developed by Ball Aerospace) JAXA provided the launch vehicle (H2-A by MHI) and provided one instrument (Dual-Frequency Precipitation Radar (DPR) developed by NTSpace). Each instrument developer provided a safety assessment which was incorporated into the NASA GPM Safety Hazard Assessment. Inhibit design was reviewed for hazardous subsystems which included the High Gain Antenna System (HGAS) deployment, solar array deployment, transmitter turn on, propulsion system release, GMI deployment, and DPR radar turn on. The safety inhibits for these listed hazards are controlled by software. GPM developed a "pathfinder" approach for reviewing software that controls the electrical inhibits. This is one of the first GSFC in-house programs that extensively used software controls. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As part of this process a new tool "safety inhibit time line" was created for management of inhibits and their controls during spacecraft buildup and testing during 1& Tat GSFC and at the Range in Japan. In addition to understanding inhibits and controls during 1& T the tool allows the safety analyst to better communicate with others the changes in inhibit states with each phase of hardware and software testing. The tool was very useful for communicating compliance with safety requirements especially when working with a foreign partner.

Dion, Shirley↗

Current Status and Future Plans for Electric Motors and Drives at NASA

Our work advances propulsion for aircraft while reducing energy consumption, noise, emissions and the cost of air travel. We are committed to investigating the use of alternative energy sources and improving the safety and expediency of flight. Electrified Aircraft Propulsion (EAP) is the use of propulsors (propellers or fans) driven by electric motors to propel aircraft ranging from air taxis to subsonic transports. NASA is developing technology, aircraft concepts, test aircraft, and ground test facilities to turn this idea from science fiction to- reality. Specifically, motors and/or generators (Electric machines) are needed on all electrified aircraft. And NASA is sponsoring or performing work to achieve power densities 2-3 times the state of the art for machines in the MW or larger class. Three major machine types are being developed: permanent magnet, induction, and wound field. Power converters are also an essential component in most EAP aircraft concepts, as they are used to convert from ac to dc power, or vice versa. Silicon carbide and gallium nitride convertors are being developed with conventional cooling as well as a cryogenically cooled converter. Future plans include demonstrating integrated flight-ready systems in both ground and flight tests; collaborating with and leveraging ARPA-E EAP programs; and supporting FAA standards development for market acceptance and safety.

Aircraft↗

SEP solar array Shuttle flight experiment

An experiment to verify the operational performance of a full-scale Solar Electric Propulsion (SEP) solar array is described. Scheduled to fly on the Shuttle in 1983, the array will be deployed from the bay for ten orbits, with dynamic excitation to test the structural integrity being furnished by the Orbiter verniers; thermal, electrical, and sun orientation characteristics will be monitored, in addition to safety, reliability, and cost effective performance. The blanket, with aluminum and glass as solar cell mass simulators, is 4 by 32 m, with panels (each 0.38 by 4 m) hinged together; two live Si cell panels will be included. The panels are bonded to stiffened graphite-epoxy ribs and are storable in a box in the bay. The wing support structure is detailed, noting the option of releasing the wing into space by use of the Remote Manipulator System if the wing cannot be refolded. Procedures and equipment for monitoring the array behavior are outlined, and comprise both analog data and TV recording for later playback and analysis. The array wing experiment will also aid in developing measurement techniques for large structure dynamics in space.

Elms, R. V., Jr.↗

Electrical insulation design requirements and reliability goals

The solar cells in a photovoltaic module which must be electrically isolated from module exterior surfaces to satisfy a variety of safety and operating considerations are discussed. The performance and reliability of the insulation system are examined. Technical requirements involve the capability of withstanding the differential voltage from the solar cells to the module frame. The maximum system voltage includes consideration of maximum open circuit array voltages achieved under low-temperature, high-irradiance conditions, and transient overvoltages due to system feedback of lightning transients. The latter is bounded by the characteristics of incorporated voltage limiting devices such as MOVs.

Ross, R. G., Jr.↗

U.S. Space Station Freedom waste fluid disposal system with consideration of hydrazine waste gas injection thrusters

The results are reported of a study of various methods for propulsively disposing of waste gases. The options considered include hydrazine waste gas injection, resistojets, and eutectic salt phase change heat beds. An overview is given of the waste gas disposal system and how hydrozine waste gas injector thruster is implemented within it. Thruster performance for various gases are given and comparisons with currently available thruster models are made. The impact of disposal on station propellant requirements and electrical power usage are addressed. Contamination effects, reliability and maintainability assessments, safety issues, and operational scenarios of the waste gas thruster and disposal system are considered.

Winters, Brian A.↗

Space Tethers: Design Criteria

This document is prepared to provide a systematic process for the selection of tethers for space applications. Criteria arc provided for determining the strength requirement for tether missions and for mission success from tether severing due to micrometeoroids and orbital debris particle impacts. Background information of materials for use in space tethers is provided, including electricity-conducting tethers. Dynamic considerations for tether selection is also provided. Safety, quality, and reliability considerations are provided for a tether project.

Tomlin, D. D.↗