Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “directed assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Correlation Techniques as Applied to Pose Estimation in Space Station Docking

The telerobotic assembly of space-station components has become the method of choice for the International Space Station (ISS) because it offers a safe alternative to the more hazardous option of space walks. The disadvantage of telerobotic assembly is that it does not provide for direct arbitrary views of mating interfaces for the teleoperator. Unless cameras are present very close to the interface positions, such views must be generated graphically, based on calculated pose relationships derived from images. To assist in this photogrammetric pose estimation, circular targets, or spots, of high contrast have been affixed on each connecting module at carefully surveyed positions. The appearance of a subset of spots essentially must form a constellation of specific relative positions in the incoming digital image stream in order for the docking to proceed. Spot positions are expressed in terms of their apparent centroids in an image. The precision of centroid estimation is required to be as fine as 1I20th pixel, in some cases. This paper presents an approach to spot centroid estimation using cross correlation between spot images and synthetic spot models of precise centration. Techniques for obtaining sub-pixel accuracy and for shadow, obscuration and lighting irregularity compensation are discussed.

Rollins, J. Michael↗

Directional gear ratio transmissions

Epicyclic gear transmissions which transmit output at a gear ratio dependent only upon the input's direction are considered. A transmission housing envelops two epicyclic gear assemblies, and has shafts extending from it. One shaft is attached to a sun gear within the first epicyclic gear assembly. Planet gears are held symmetrically about the sun gear by a planet gear carrier and are in mesh with both the sun gear and a ring gear. Two unidirectional clutches restrict rotation of the first planet gear carrier and ring gear to one direction. A connecting shaft drives a second sun gear at the same speed and direction as the first planet gear carrier while a connecting portion drives a second planet gear carrier at the same speed and direction as the first ring gear. The transmission's output is then transmitted by the second ring gear to the second shaft. Input is transmitted at a higher gear ratio and lower speed for all inputs in the first direction than in the opposite direction.

Lafever, A. E.↗

Double window viewing chamber assembly

A viewing chamber which permits observation of a sample retained therein includes a pair of double window assemblies mounted in opposed openings in the walls thereof so that a light beam can directly enter and exit from the chamber. A flexible mounting arrangement for the outer windows of the window assemblies enables the windows to be brought into proper alignment. An electrical heating arrangement prevents fogging of the outer windows whereas desiccated air in the volume between the outer and inner windows prevents fogging of the latter.

Keller, V. W.↗

Joint Polar Satellite System (JPSS)-3 VIIRS Prelaunch Geometric Calibration and Characterization Status

The NASA/NOAA Visible Infrared Imaging Radiometer Suite (VIIRS) is a key instrument in the JPSS missions (SNPP, JPSS-1-4). Being part of the calibration and validation process, JPSS-3 VIIRS prelaunch geometric performance assessment focuses on the sensor’s spatial response, band-to-band co-registration (BBR), and pointing knowledge. In general, JPSS-3 VIIRS’ prelaunch geometric performance is very good, and consistent with SNPP and JPSS-1-2 VIIRS sensors. This paper highlights some specific key findings from the JPSS-3 VIIRS’ prelaunch tests. We first show that with timing adjustments, JPSS-3 VIIRS scan BBR error between VisNIR and S/M/LWIR bands has been reduced from 0.12/0.03 M sampling intervals to 0.005/0.002 M sampling intervals, respectively. Focal Plane Assembly (FPA) rotations have been changed from 0.1 degree to 0.04 degree in VisVIR, from 0.18 degree to 0.09 degree in S/MWIR, and 0.16 degree to 0.08 degree in LWIR. Another finding from the prelaunch test is that JPSS-3 VIIRS has relatively large band-to-band co-registration errors between VisNIR and S/M/LWIR bands in the track direction. This BBR mis-registration increases when aft‐optics assembly (AOA) temperature decreases. The BBR mis-registration is about 0.10 M sampling intervals between VisNIR and S/MWIR bands, and 0.08 M sampling intervals between VisNIR and LWIR bands. By comparison, the track BBR offset in JPSS-2 is less than 0.02 M sampling intervals between VisNIR and S/M/LWIR bands. We also notice that the unsymmetrical Day Night Band (DNB) scan-direction Line Spread Function (LSF) of JPSS-2 VIIRS at different gain stages and aggregation modes have been corrected in J3 VIIRS.

VIIRS↗

Assembly considerations for large reflectors

The technologies developed at LaRC in the area of erectable instructures are discussed. The information is of direct value to the Large Deployable Reflector (LDR) because an option for the LDR backup structure is to assemble it in space. The efforts in this area, which include development of joints, underwater assembly simulation tests, flight assembly/disassembly tests, and fabrication of 5-meter trusses, led to the use of the LaRC concept as the baseline configuration for the Space Station Structure. The Space Station joint is linear in the load and displacement range of interest to Space Station; the ability to manually assemble and disassemble a 45-foot truss structure was demonstrated by astronauts in space as part of the ACCESS Shuttle Flight Experiment. The structure was built in 26 minutes 46 seconds, and involved a total of 500 manipulations of untethered hardware. Also, the correlation of the space experience with the neutral buoyancy simulation was very good. Sections of the proposed 5-meter bay Space Station truss have been built on the ground. Activities at LaRC have included the development of mobile remote manipulator systems (which can traverse the Space Station 5-meter structure), preliminary LDR sun shield concepts, LDR construction scenarios, and activities in robotic assembly of truss-type structures.

Bush, H.↗

Chronology: MSFC Space Shuttle program development, assembly, and testing major events (1969 - April, 1981)

Listings of major events directly related to the Space Shuttle Program at Marshall Space Flight Center (MSFC) are presented. This information will provide the researcher with a means of following the chronological progression of the program. The products that the historians have prepared are intended to provide supportive research essential to the writing of formal narrative histories of Marshall's contributions to the Space Shuttle and Space Station.

Whalen, Jessie E.↗

Polarization aberration analysis of the Advanced X-ray Astrophysics Facility Telescope assembly

The Advanced X-ray Astrophysics Facility (AXAF) Telescope consists of six concentric paraboloid-hyperboloid pairs of mirrors that operate near grazing incidence. Because of the substantial polarization effects at large angles of incidence there has been concern regarding the feasibility of doing polarimetry near the telescope focal plane. The primary mirror is here shown to act as a tangentially directed half-wave linear retarder and almost completely to depolarize the linearly polarized component of the light. The secondary mirror introduces and additional half-wave of linear retardance. The two-mirror telescope assembly acts as a tangentially directed one-wave linear retarder. Each mirror depolarizes alone but together the two-mirror assembly preserves the polarization state. The net instrumental polarization effects are small and polarimetry is feasible with AXAF.

Chipman, Russell A.↗

Ion Thruster Support and Positioning System

A system for supporting and selectively positioning an ion thruster relative to a surface of a spacecraft includes three angularly spaced thruster support assemblies. Each thruster support assembly includes a frame which has a rotary actuator mounted thereon. The rotary actuator is connected to an actuator member which is rotatably connected to a thruster attachment member connected to a body of the thruster. A stabilizer member is rotatably mounted to the frame and to the thruster attachment member. The thruster is selectively movable in the pitch and yaw directions responsive to movement of the actuator members by the actuators on the thruster support assemblies. A failure of any one actuator on a thruster support assembly will generally still enable limited thruster positioning capability in two directions. In a retracted position the thruster attachment members are held in nested relation in saddles supported on the frames of the thruster support assemblies. The thruster is securely held in the retracted position during periods of high loading such as during launch of the spacecraft.

Haag, Thomas W.↗

Ion Thruster Support and Positioning System

A system for supporting and selectively positioning an ion thruster relative to a surface of a spacecraft includes three angularly spaced thruster support assemblies. Each thruster support assembly includes a frame which has a rotary actuator mounted thereon. The rotary actuator is connected to an actuator member which is rotatably connected to a thruster attachment member connected to a body of the thruster. A stabilizer member is rotatably mounted to the frame and to the thruster attachment member. The thruster is selectively movable in the pitch and yaw directions responsive to movement of the actuator members by the actuators on the thruster support assemblies. A failure of any one actuator on a thruster support assembly will generally still enable limited thruster positioning capability in two directions. In a retracted position the thruster attachment members are held in nested relation in saddles supported on the frames of the thruster support assemblies. The thruster is securely held in the retracted position during periods of high loading such as during launch of the spacecraft.

Haag, Thomas W.↗

Manned Lunar Missions: An Exercise in Propulsion Trades and Sensitivities

A recent study performed for the In-Space Propulsion Technology Office at the Marshall Space Flight Center investigated the effects of using different propellant types on the different stages required to perform a manned lunar mission. The original study included investigations into propellant type, propellant storage technology options and sensitivities to specific impulse variations for a lunar orbit rendezvous mission. The initial mission characteristics were based on previous work led by Langley Research Center. Outlined in this paper are the results of that study and the work that followed. A lunar direct return architecture was added to the analysis. Since both architectures required assembly of the various propulsive stages in low Earth orbit and multiple launches to deliver those stages, investigations of launch sequence and scheduling sensitivities were also included. Results show that lunar direct return architectures require more mass to complete missions when compared to lunar orbit rendezvous missions. Within the given architectures, trends in the results tended to be very similar with the architectures indicating very little sensitivity to launch sequence and specific impulse variations and indicating more sensitivity to the propellant choice made for each stage and the time between launches. Even though this study investigates a small subset of the possible lunar architecture trade space, it does begin to outline some of the issues that must be investigated and the characteristics of the mission and the mission elements that are of most importance to a full architecture assessment.

Percy, Thomas K.↗

A Simple Transient Thermal Test Assembly for Insulation Materials

A simple transient thermal test was developed for evaluating the thermal performance of high-temperature flexible insulation materials in atmospheric pressure air. The test setup was inspired by the test assembly used for evaluating the performance of fire shelters and fire protective clothing. The heating source used was a burner supplied with propane gas that can generate relatively uniform heating over a wide area. The ratio of the in-plane width to thickness of the insulation test sample in the test assembly was selected to be greater than ten so that the heat transfer in the center of the test assembly was nearly one-dimensional. A rigid, thin Inconel plate was used as the septum plate directly exposed to the flame to provide a relatively uniform, known-temperature boundary condition for the test assembly, and to prevent convective heat transfer through the test insulation from the burner. The test sample, flexible alumina paper insulation, was placed between the Inconel plate and a thin titanium witness plate. The overall assembly was further insulated using a combination of rigid and flexible ceramic insulations to minimize heat losses from the periphery of the test assembly. Thermocouples installed on the septum and witness plates and inside the insulation test sample provided temperature measurements at various locations. For the evaluation tests, the Inconel septum plate reached temperatures between 780°C and 850°C for tests with flame exposure durations of 120 sec to 300 sec. The measured temperatures for various tests with similar flame exposure times were repeatable. A one-dimensional numerical heat transfer model of the test assembly was developed. The close agreement between measured and predicted temperatures on the titanium witness plate and inside the insulation test sample indicated that this test may provide a one-dimensional thermal testing capability for evaluation of thermal performance of similar insulations.

Daryabeigi, Kamran↗

Nonlinear seismic analysis of a reactor structure impact between core components

The seismic analysis of the FFTF-PIOTA (Fast Flux Test Facility-Postirradiation Open Test Assembly), subjected to a horizontal DBE (Design Base Earthquake) is presented. The PIOTA is the first in a set of open test assemblies to be designed for the FFTF. Employing the direct method of transient analysis, the governing differential equations describing the motion of the system are set up directly and are implicitly integrated numerically in time. A simple lumped-nass beam model of the FFTF which includes small clearances between core components is used as a "driver" for a fine mesh model of the PIOTA. The nonlinear forces due to the impact of the core components and their effect on the PIOTA are computed.

Hill, R. G.↗

A research program in magnetogasdynamics utilizing hypervelocity coaxial plasma generators

A broadly-gauged research program in magnetogasdynamics utilizing hypervelocity coaxial plasma generators is presented. A complete hypervelocity coaxial plasma generator facility was assembled and tested. Significant progress was made in the direction of understanding the important processes in the interaction of hypervelocity MGD flow with transverse applied fields. It is now proposed to utilize the accumulated experimental capability and theoretical analysis in application to the analysis and design parameterization of pulsed magnetogasdynamic direct energy convertor configurations.

Spight, C.↗

Improved transformer-winding method

Proposed technique using special bobbin and fixture to wind copper wire directly on core eliminates need core cut prior to assembly. Application of technique could result in production of quieter core with increased permeability and no localized heating.

Mclyman, W. T.↗

Measurements of flow phenomena induced by suction through perforated and partially plugged surfaces

Efforts were directed towards completing construction of the windtunnel test section, assembling instrumentation, programming the data acquisition and reduction system, adjusting the streamwise pressure gradient of the test section, calibrating the hot-wire anemometer probe, and constructing and testing a smoke generator. The test section was installed in the wind tunnel and is completely operational. The streamwise pressure gradient was adjusted to be nominally zero at a free-stream velocity of 3.05 m/s (10 ft/s). This was accomplished by adjusting the upper wall of the test section to be slightly divergent. The change in static pressure between any two streamwise locations in the test section was less than one percent of the free-stream dynamic pressure. A suitable means was found for accurately calibrating the hot-wire probe which is used to measure boundary-layer velocity profiles and fluctuating velocities.

Wilkinson, S. P.↗

Horizontally mounted solar collector

Solar energy is collected by using a vertical deflector assembly, a stationary reflector and a horizontally mounted solar collector. The deflector assembly contains a plurality of vanes which change the direction of the solar energy to the vertical, while constantly keeping the same side of the deflector facing the sun. The vertical rays are then reflected off the stationary reflector and are then absorbed by the collector.

Black, D. H.↗

LaRC fabrication development

The results of in-house efforts in support of the Supersonic Cruise Research (SCR) Program to develop fabrication procedures for the manufacture of GR/PI wing panels for the NASA YF-12 airplane are reported. In addition, manufacturing procedures are outlined for the fabrication of structures in support of the CASTS Project. The results of studies directed toward the development of GR/PI prepreg manufacturing capability, assembly of structural elements from prepreg, final processing of GR/PI structural shapes, and techniques for verification of structural integrity are presented.

Baucom, R. M.↗

Investigation of articulated panel dynamics

An articulated panel dynamics experiment to evaluate present analysis and ground test methods as well as damping effectiveness is proposed. The experiment uses an existing panel design which was extensively analyzed and tested. These data provide a firm basis for evaluating the adequacy of panel analysis and ground test methodology. The key issues for future large space structure panel designs are addressed: the critical launch transient and vibroacoustic loading; the deployment analysis adequacy including air and gravitational effects; and the orbital resonant frequencies and mode shapes of deployed panel assemblies. By using an existing mature design that was thoroughly tested, the effort can focus on correlation of actual flight results with existing predictions. A second panel assembly incorporating passive damping is proposed to provide a direct measure of damped panel benefits that can be obtained. These benefits include: reduced launch loads and responses; and highly damped deployed modes. Existing space-qualified viscoelastic epoxy, in combination with composite materials or an alternate more effective damping material, will be used.

Stahle, C. V., Jr.↗