Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “clocks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Availability and redundancy design considerations for Electron-Ion Collider cooling water systems and components

The Electron-Ion Collider (EIC) is composed of several large-scale systems, which all require highly available cooling systems based on the Conceptual Design Report. Since the overall EIC availability goal is 85%, all the subsystems will contribute. Availability is defined by the time that a component or system is functional given a required or scheduled run time. The focus of the project was to determine if redundant or extra cooling water and deionized water pumps were needed in a subsystem to increase the overall EIC availability. The largest subsystem in the ring is the 10 o’clock cooling system, so this was used for redundancy analysis. Relationships between the components were defined as parallel, series, or m-out-of-n for the cooling towers, valves, pumps and heat exchangers to perform calculations. A comparison between an original system versus a redundant one was then done using component availability from industry standards. Cost analysis was also performed to see how much the availability and cost would decrease if the redundancy application was not chosen. The Collider-Accelerator Department (CAD) also has a calculation in place for the Relativistic-Heavy Ion Collider (RHIC), so cooling water failure data was collected from their operational log and analyzed for real-life component availability. A comparison of component availability from the CAD data to the industry standards was made through the 10 o’clock cooling system layout. The results showed that the subsystems need to have over a 98% availability for an 85% goal, and that the CAD data is very close to the industry component standards. The cost differential is miniscule compared to the potential availability increase. Therefore, redundant systems can increase the overall EIC availability by a sizable amount and are worth implementing.

43 PARTICLE ACCELERATORS↗

Preliminary Transverse Shielding Analysis for the 1010-C RF Building

EIC is planning to construct a new building on the outer ring berm at 10 o’clock which will provide RF power to cryogenically-cooled beam line components in the electron and hadron storage rings. The distance of the building from the RHIC Tunnel and the amount of soil shielding required are the focus of this report. Siting the building closer to the RHIC Tunnel is desirable from an RF operations viewpoint since the waveguide runs and RF power losses will be minimized, but this may require the use of higher density shield materials, e.g., concrete, in addition to soil shielding. The radiological source terms are the prompt radiation hazards from the Hadron Storage Ring (HSR) and Electron Storage Ring (ESR) beam losses in the 10 o’clock sector and the lateral dose rates propagated through the shields. See Figure 1 below.

43 PARTICLE ACCELERATORS↗

A possible origin of the 10~15% polarization loss observed in RHIC beyond 100 GeV

This Tech. Note summarizes the outcomes of numerical simulation of strong resonance crossing using RHIC lattice, collision optics. The regular RHIC snake configuration is used, i.e. 2 snakes at their 3 o’clock and 9 o’clock locations. The working point used is Qx/Qy=28.685/29.673. These numerical experiments are performed with, in mind, the 15% polarization loss observed (measured?) during the ramp between 100 GeV and 255 GeV, and the possibility for the present simulations to point to possible cause(s). As a matter of fact, it has been stressed in many occasions that it should be checked with simulations how much the vertical orbit would need to be in order to affect polarization. The question has been addressed with SPINK in the past, yet it has to be addressed again, following in particular changes on the signs of vertical BPM mechanical offsets which happened in January 2010. A summary of RHIC polarization data over the years is given below, for the record.

43 PARTICLE ACCELERATORS↗

SIREN: Scaling Ion-Traps by REquiring iNnovative Heterogenous Integration

The SIREN (Scaling Ion Traps by Requiring iNnovative heterogenous integration) project explores the feasibility of heterogeneous integration (HI) as a transformative approach to scaling ion traps, a critical technology for advancing quantum computers and atomic clocks. Traditional ion trap architectures face significant challenges in scalability due to limitations in optical access, fabrication techniques, and material constraints. SIREN addresses these challenges by leveraging HI, which combines different materials and fabrication processes to create more complex and efficient ion trap structures. HI integrated structures can be manufactured without compromising the process to maintain compatibility to ion traps. This project focuses on integrating a separately fabricated waveguide with a fully functional ion trap. The respective alignment between the pieces needs to be accurate to less than 2 µm to ensure that the light from the waveguide can overlap with the trapping region. The fine alignment must also be maintained through an ultra-high vacuum bake, a critical step in preparing an ion trap experiment. The project's outcomes suggest that heterogeneous integration is a promising pathway for overcoming current scalability barriers, paving the way for the next generation of quantum technologies. SIREN's findings contribute significantly to the field, offering a scalable solution that could accelerate the development of practical quantum computers and highly accurate atomic clocks.

42 ENGINEERING↗

TEAMER - Field Demonstration of MarineSitu’s Marine Energy Monitoring Tools - CRADA 664 (Abstract)

In order to effectively monitor for marine life around marine energy devices and thus minimize the risk of collision, multiple sensors working in coordination and augmented with around-the-clock automated monitoring algorithms need to be installed in challenging high-energy tidal and wave environments. Such systems are often too expensive for widespread adoption, or lack sufficient sensors or smarts to enable around-the-clock, real-time monitoring without human involvement. MarineSitu has been working to tackle this problem by developing a low-cost, combined sonar and stereo camera sensor array with connected real-time AI-based algorithms for automatically detecting marine life in these marine energy suitable environments. In this TEAMER project with Pacific Northwest National Lab (PNNL), MarineSitu will be testing this novel sensor system for the first time in the high-energy tidal channel environment at PNNL’s Marine and Coastal Research Lab. Throughout this deployment, MarineSitu will be monitoring their system and running analytics on the sensor’s data in real-time. Meanwhile, PNNL Data Scientists and Ocean Engineers, will be evaluating the system’s effectiveness and ease of use both as a tool for plug-and-play environmental monitoring and novel environmental monitoring research. In doing so, the team will improve MarineSitu’s system and software, produce insightful data products, and develop novel visualizations and AI algorithms for combining and analyzing the data produced by systems like MarineSitu’s.

16 TIDAL AND WAVE POWER↗

TEAMER – Field Demonstration of MarineSitu’s Marine Energy Monitoring (Abstract)

In order to effectively monitor for marine life around marine energy devices and thus minimize the risk of collision, multiple sensors working in coordination and augmented with around-the-clock automated monitoring algorithms need to be installed in challenging high-energy tidal and wave environments. Such systems are often too expensive for widespread adoption, or lack sufficient sensors or smarts to enable around-the-clock, real-time monitoring without human involvement. MarineSitu has been working to tackle this problem by developing a low-cost, combined sonar and stereo camera sensor array with connected real-time AI-based algorithms for automatically detecting marine life in these marine energy suitable environments. In this TEAMER project with Pacific Northwest National Lab (PNNL), MarineSitu will be testing this novel sensor system for the first time in the high-energy tidal channel environment at PNNL’s Marine and Coastal Research Lab. Throughout this deployment, MarineSitu will be monitoring their system and running analytics on the sensor’s data in real-time. Meanwhile, PNNL Data Scientists and Ocean Engineers, will be evaluating the system’s effectiveness and ease of use both as a tool for plug-and-play environmental monitoring and novel environmental monitoring research. In doing so, the team will improve MarineSitu’s system and software, produce insightful data products, and develop novel visualizations and AI algorithms for combining and analyzing the data produced by systems like MarineSitu’s.

16 TIDAL AND WAVE POWER↗

Center for Alternate Synchronization and Timing (CAST) PTP Network Monitoring Report

The Oak Ridge National Laboratory Center for Alternative Synchronization and Timing (CAST) performs research, development, testing, and evaluation of alternative terrestrial-based timing and synchronization infrastructure for the US power grid and other critical infrastructures. Alternative timing options reduce reliance on GPS and enhance the overall resilience of critical infrastructures. CAST infrastructure uses Precision Time Protocol (PTP) as the primary conduit for delivery of synchronization packets. CAST deploys PTP over long terrestrial links to synchronize a multitude of remote boundary clocks and downstream power grid components with the authoritative grand master clocks. Network traffic issues can severely degrade PTP accuracy. This report focuses on examining network traffic anomalies and their effects on PTP operation as well as the potential implications to CAST’s high-precision remote synchronization operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fermilab PIP-II Master Oscillator and Precision Reference Line Design and Construction

The phase averaging reference line system pro- vides the RF phase reference, LO and clock sig- nals to the LLRF and other accelerator sub- systems. The PIP-II linac has RF systems at three frequencies – 162.5 MHz, 325 MHz and 650 MHz. A temperature-stabilized, low-phase- noise oscillator is used as the master oscil- lator. Phase reference signals at 162.5 MHz, 325 MHz, and 650 MHz, along with LO signals at 182.5 MHz, 345 MHz, 670 MHz and LLRF clocks at 1320 MHz and 1300 MHz, are generated in temperature-controlled RF modules at each fre- quency section. A phase reference from each module travels to the next section, where it is doubled to produce required frequencies. The reference also travels alongside the accelerating cavities in the tunnel, allowing cavity probe and reference cables to temperature track and reduce measurement errors from temperature changes or phase drift.

Syed, Ahmed [Fermilab]↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

A multigigabit link layer protocol for single picosecond latency determinism using AMD ultrascale+ GTH and GTY transreceivers

recision timing distribution systems require determin istic and repeatable high speed serial data link latency. The EIC Timing Data Link will employ a specialized link layer protocol for deterministic multigigabit communication us ing AMD Ultrascale+ GTH and GTY transceivers. Link la tency must also be measurable to accurately compensate in real time for latency variations of the physical medium. The point-to-point link is full duplex and fully synchronous with a latency control algorithm to align the internal clocks of each system with picosecond resolution. Deterministic clock domain crossing between systems is ensured using static timing analysis of the elastic buffer control signals.

43 PARTICLE ACCELERATORS↗

Quantum Networks: A New Platform for Aerospace

The ability to distribute entanglement between quantum nodes may unlock new capabilities in the future that include teleporting information across multinode networks, higher resolution detection via entangled sensor arrays, and measurements beyond the quantum limit enabled by networked atomic clocks. These new quantum networks also hold promise for the Aerospace community in areas such as deep space exploration, improved satellite communication, and synchronizing drone swarms. Although exciting, these applications are a long way off from providing a “real-world” benefit, as they have only been theoretically explored or demonstrated in small-scale experiments. An outstanding challenge is to identify near-term use cases for quantum networks; this may be an intriguing new area of interest for the aerospace community, as the quantum networking field would benefit from more multidisciplinary collaborations. This paper introduces quantum networking, discusses the difficulties in distributing entanglement within these networks, highlights recent progress toward this endeavor, and features two current case studies on mobile quantum nodes and an entangled clock network, both of which are relevant to the aerospace community.

Engineering↗

PPI DataHub Project Data Package: S. elongatus PCC 7942 Circadian Control Bioproduction Transcriptomics (PB-DP3)

The purpose of this experiment was to evaluate how circadian clock regulation impacts carbon partitioning between storage, growth, and product synthesis in Synechococcus elongatus PCC 7942 in providing insights to strategies for enhanced bioproduction. Sample data was acquired using a Illumina HiSeq sequencer system and processed for RNA sequencing (RNA-Seq) expression analysis. Transcriptomic differential expression analysis revealed coordinated circadian clock-driven adjustment of the cell cycle and rewiring of energy and carbon metabolism. Processed RNA-Seq datasets are openly accessible from the PNNL DataHub project dataset download page and contain secondary processed RNA-seq results files and supporting metadata materials linked to relevant source code information supporting data transparency and reuse.

59 BASIC BIOLOGICAL SCIENCES↗

EARLY FLOWERING 3 and Photoperiod Sensing in Brachypodium distachyon

The proper timing of flowering, which is key to maximize reproductive success and yield, relies in many plant species on the coordination between environmental cues and endogenous developmental programs. The perception of changes in day length is one of the most reliable cues of seasonal change, and this involves the interplay between the sensing of light signals and the circadian clock. Here, we describe a Brachypodium distachyon mutant allele of the evening complex protein EARLY FLOWERING 3 (ELF3). We show that the elf3 mutant flowers more rapidly than wild type plants in short days as well as under longer photoperiods but, in very long (20 h) days, flowering is equally rapid in elf3 and wild type. Furthermore, flowering in the elf3 mutant is still sensitive to vernalization, but not to ambient temperature changes. Molecular analyses revealed that the expression of a short-day marker gene is suppressed in elf3 grown in short days, and the expression patterns of clock genes and flowering time regulators are altered. We also explored the mechanisms of photoperiodic perception in temperate grasses by exposing B. distachyon plants grown under a 12 h photoperiod to a daily night break consisting of a mixture of red and far-red light. We showed that 2 h breaks are sufficient to accelerate flowering in B. distachyon under non-inductive photoperiods and that this acceleration of flowering is mediated by red light. Finally, we discuss advances and perspectives for research on the perception of photoperiod in temperate grasses.

54 ENVIRONMENTAL SCIENCES↗

Infinite temperature at zero energy

We construct a family of static, geometrically local Hamiltonians that inherit eigenstate properties of periodically-driven (Floquet) systems. Our construction is a variation of the Feynman-Kitaev clock -- a well-known mapping between quantum circuits and local Hamiltonians -- where the clock register is given periodic boundary conditions. Assuming the eigenstate thermalization hypothesis (ETH) holds for the input circuit, our construction yields Hamiltonians whose eigenstates have properties characteristic of infinite temperature, like volume-law entanglement entropy, across the whole spectrum -- including the ground state. We then construct a family of exactly solvable Floquet quantum circuits whose eigenstates are shown to obey the ETH at infinite temperature. Combining the two constructions yields a new family of local Hamiltonians with provably volume-law-entangled ground states, and the first such construction where the volume law holds for all contiguous subsystems.

FOS: Physical sciences↗

Reliable voltage scaled links for compressed data

Systems, apparatuses, and methods for reliably transmitting data over voltage scaled links are disclosed. A computing system includes at least first and second devices connected via a link. In one implementation, if a data block can be compressed to less than or equal to half the original size of the data block, then the data block is compressed and sent on the link in a single clock cycle rather than two clock cycles. If the data block cannot be compressed to half the original size, but if the data block can be compressed enough to include error correction code (ECC) bits without exceeding the original size, then ECC bits are added to the compressed block which is sent on the link at a reduced voltage. The ECC bits help to correct for any errors that are generated as a result of operating the link at the reduced voltage.

42 ENGINEERING↗

Method and apparatus for asynchronous scheduling

A method and apparatus of asynchronous scheduling in a graphics device includes sending one or more instructions from an instruction scheduler to one or more instruction first-in/first-out (FIFO) devices. An instruction in the one or more FIFO devices is selected for execution by a single-instruction/multiple-data (SIMD) pipeline unit. It is determined whether all operands for the selected instruction are available for execution of the instruction, and if all the operands are available, the selected instruction is executed on the SIMD pipeline unit. The self-timed arithmetic pipeline unit (SIMD pipeline unit) is effectively encapsulated in a synchronous, (e.g., clocked by global clock), scheduler and register file environment.

Kalamatianos, John↗

System and method for ultra-high-resolution ranging using RFID

A radio-frequency method for range finding includes modulating a reference signal having an intermediate frequency to a downlink signal having a carrier frequency using a clock signal. The downlink signal is transmitted to a tag using a transceiver. An uplink signal backscattered from the tag is received and demodulated using the clock signal. The uplink signal has a frequency that is a harmonic of the carrier frequency. A distance between the tag and the transceiver is calculated based on a phase of the demodulated uplink signal. A system for range finding includes a transceiver and a processor. The transceiver modulates a reference signal to a downlink signal and transmits the downlink signal. The transceiver receives and demodulates an uplink signal. The processor is configured to receive the demodulated uplink signal and calculate a distance between the tag and the transceiver using a phase of the demodulated uplink signal.

Hui, Xiaonan↗