Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “center”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

LaRC 20-Year Center Revitalization Plan

LaRC has developed a 20-Year Center Revitalization Plan. The objective of this plan is to assure that the center infrastructure is sustainable for the long-term and that the center will have the essential facilities and laboratories to execute the future NASA mission. The plan was developed by a centerwide team, VITAL, and was approved by the Center Leadership Council (CLC) in March 2012. The revitalization plan will be implemented through the Center Master Planning process.

Mangum, Cathy H.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP↗

Johnson Space Center's Free Range Bicycle Program.- Fall 2015 Intern Report

NASA's Johnson Space Center is a big place, encompassing 1,620 acres and more than a hundred buildings. Furthermore, there are reportedly 15 thousand employees, all of which have somewhere to be. To facilitate the movement of all these people JSC has historically relied on human power. Pedaling their way towards deep space, bicycles have been the go to method. Currently there are about 200 Free Range Bicycles at JSC. Free Range Bicycles belong to nobody, except NASA, and are available for anybody to use. They are not to be locked or hidden (although frequently are) and the intention is that there will always be a bike to hop on to get where you're going (although it may not be the bike you rode in on). Although not without its own shortcomings, the Free Range Bicycle Program has continued to provide low cost, simple transportation for NASA's JSC. In addition to the approximately 200 Free Range Bicycles, various larger divisions (like engineering) will often buy a few dozen bikes for their team members to use or individuals will bring their own personal bike to either commute or use on site. When these bicycles fall into disrepair or are abandoned (from retirees etc) they become a problem at JSC. They are an eye sore, create a safety hazard and make it harder to find a working bike in a time of need. The Free Range Program hopes to address this first problem by "tagging out" abandoned or out of service bicycles. A bright orange "DO NOT OPERATE" tag is placed on the bike and given a serial number for tracking purposes. See picture to the right. If the bike has an active owner with intentions to repair the bike the bottom of the tag has instructions for how to claim the abandoned bicycle. After being tagged the owner of the bicycle has 30 days to claim the bicycle and either haul it off site or get it repaired (and labeled) in accordance with Johnson's Bicycle Policy. If the abandoned bicycle is not claimed within 30 days it becomes the property of the Government. The bicycle is then (in short) repaired, labeled, documented and converted to a free range bicycle. Bikes beyond repair are cannibalized of useable parts and then scrapped. That was nearly the first thing I did when arriving at work. After getting settled in and coordinating the purchase of 50 new bicycles (elaboration below); I started combing the Center. Bikes are hidden and tucked away in the oddest of places and it was my priority to root all of them out. I tagged 70 bikes on the center, setting a record. I tagged so many bikes I ran out tags and had to make more. Long ago it was discovered that the same harsh elements that wreak havoc on the bikes, destroy the tags before the 30 day timeframe. The tags are labeled with instructions on how to claim the bike and numbered, then these paper labels are laminated with packing tape. It sounds like a simple process but nothing fits right, everything has to be trimmed, put on straight and is generally a pain in the neck. So I made an assembly process and knocked out a few hundred to save having to do it again for a while. I walked the center and tagged bikes at every building hiding in nearly every nook and cranny. Thus, in conclusion, I've done many things here at JSC on my first term and had a blast doing it. I've learned a lot from my multi-faceted roles and continual challenges. In short I've done my best to get folks at JSC on bikes and keep folks at JSC on bikes and tended a flock of free range bicycles. Everything from turning the rusty bolts and oiling chains to coordinating a $20,000 deal on 50 new free range bicycles. I am proud of the bicycle shop I have built and am infinitely grateful to the people who lead, help, guide and support me. I have fixed a great number of bicycles and cleaned the center of unsightly and unsafe piles of bicycles. I am immensely thankful for this opportunity to learn and serve and appreciate the privilege of coming back for a second term. A second term, in which I will continue to develop this awesome program.

Lee-Stockton, Willem↗

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

Johnson, Jill W.↗

Performance of the Primary Mirror Center-of-curvature Optical Metrology System During Cryogenic Testing of the JWST Pathfinder Telescope

The James Webb Space Telescope (JWST) primary mirror (PM) is 6.6 m in diameter and consists of 18 hexagonal segments, each 1.5 m point-to-point. Each segment has a six degree-of-freedom hexapod actuation system and a radius-of-curvature (RoC) actuation system. The full telescope will be tested at its cryogenic operating temperature at Johnson Space Center. This testing will include center-of-curvature measurements of the PM, using the Center-of-Curvature Optical Assembly (COCOA) and the Absolute Distance Meter Assembly (ADMA). The COCOA includes an interferometer, a reflective null, an interferometer-null calibration system, coarse & fine alignment systems, and two displacement measuring interferometer systems. A multiple-wavelength interferometer (MWIF) is used for alignment & phasing of the PM segments. The ADMA is used to measure, and set, the spacing between the PM and the focus of the COCOA null (i.e. the PM center-of-curvature) for determination of the ROC. The performance of these metrology systems was assessed during two cryogenic tests at JSC. This testing was performed using the JWST Pathfinder telescope, consisting mostly of engineering development & spare hardware. The Pathfinder PM consists of two spare segments. These tests provided the opportunity to assess how well the center-of-curvature optical metrology hardware, along with the software & procedures, performed using real JWST telescope hardware. This paper will describe the test setup, the testing performed, and the resulting metrology system performance. The knowledge gained and the lessons learned during this testing will be of great benefit to the accurate & efficient cryogenic testing of the JWST flight telescope.

optical testing↗

A Multi-Center Space Data System Prototype Based on CCSDS Standards

Deep space missions beyond earth orbit will require new methods of data communications in order to compensate for increasing Radio Frequency (RF) propagation delay. The Consultative Committee for Space Data Systems (CCSDS) standard protocols Spacecraft Monitor & Control (SM&C), Asynchronous Message Service (AMS), and Delay/Disruption Tolerant Networking (DTN) provide such a method. However, the maturity level of this protocol stack is insufficient for mission inclusion at this time. This Space Data System prototype is intended to provide experience which will raise the Technical Readiness Level (TRL) of this protocol set. In order to reduce costs, future missions can take advantage of these standard protocols, which will result in increased interoperability between control centers. This prototype demonstrates these capabilities by implementing a realistic space data system in which telemetry is published to control center applications at the Jet Propulsion Lab (JPL), the Marshall Space Flight Center (MSFC), and the Johnson Space Center (JSC). Reverse publishing paths for commanding from each control center are also implemented. The target vehicle consists of realistic flight computer hardware running Core Flight Software (CFS) in the integrated Power, Avionics, and Power (iPAS) Pathfinder Lab at JSC. This prototype demonstrates a potential upgrade path for future Deep Space Network (DSN) modification, in which the automatic error recovery and communication gap compensation capabilities of DTN would be exploited. In addition, SM&C provides architectural flexibility by allowing new service providers and consumers to be added efficiently anywhere in the network using the common interface provided by SM&C's Message Abstraction Layer (MAL). In FY 2015, this space data system was enhanced by adding telerobotic operations capability provided by the Robot API Delegate (RAPID) family of protocols developed at NASA. RAPID is one of several candidates for consideration and inclusion in a new international standard being developed by the CCSDS Telerobotic Operations Working Group. Software gateways for the purpose of interfacing RAPID messages with the existing SM&C based infrastructure were developed. Telerobotic monitor, control, and bridge applications were written in the RAPID framework, which were then tailored to the NAO telerobotic test article hardware, a product of Aldebaran Robotics.

Rich, Thomas M.↗

Kennedy Space Center Five Year Sustainability Plan

The Federal Government is committed to following sustainable principles. At its heart, sustainability integrates environmental, societal and economic solutions for present needs without compromising the ability of future generations to meet their needs. Building upon its pledge towards environmental stewardship, the Administration generated a vision of sustainability spanning ten goals mandated within Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade. In November 2015, the National Aeronautics and Space Administration (NASA) responded to this EO by incorporating it into a new release of the NASA Strategic Sustainability Performance Plan (SSPP). The SSPP recognizes the importance of aligning environmental practices in a manner that preserves, enhances and strengthens NASA's ability to perform its mission indefinitely. The Kennedy Space Center (KSC) is following suit with KSC's Sustainability Plan (SP) by promoting, maintaining and pioneering green practices in all aspects of our mission. KSC's SP recognizes that the best sustainable solutions use an interdisciplinary, collaborative approach spanning civil servant and contractor personnel from across the Center. This approach relies on the participation of all employees to develop and implement sustainability endeavors connected with the following ten goals: Reduce greenhouse gas (GHG) emissions. Design, build and maintain sustainable buildings, facilities and infrastructure. Leverage clean and renewable energy. Increase water conservation. Improve fleet and vehicle efficiency and management. Purchase sustainable products and services. Minimize waste and prevent pollution. Implement performance contracts for Federal buildings. Manage electronic equipment and data centers responsibly. Pursue climate change resilience. The KSC SP details the strategies and actions that address the following objectives: Reduce Center costs. center dot Increase energy and water efficiencies. Promote smart buying practices. Increase reuse and recycling while decreasing waste. Benefit the community. Meet or exceed the EO and NASA SSPP sustainability goals.

Sustainability↗

Robotic Technology Efforts at the NASA/Johnson Space Center

The NASA/Johnson Space Center has been developing robotic systems in support of space exploration for more than two decades. The goal of the Center's Robotic Systems Technology Branch is to design and build hardware and software to assist astronauts in performing their mission. These systems include: rovers, humanoid robots, inspection devices and wearable robotics. Inspection systems provide external views of space vehicles to search for surface damage and also maneuver inside restricted areas to verify proper connections. New concepts in human and robotic rovers offer solutions for navigating difficult terrain expected in future planetary missions. An important objective for humanoid robots is to relieve the crew of "dull, dirty or dangerous" tasks allowing them more time to perform their important science and exploration missions. Wearable robotics one of the Center's newest development areas can provide crew with low mass exercise capability and also augment an astronaut's strength while wearing a space suit. This presentation will describe the robotic technology and prototypes developed at the Johnson Space Center that are the basis for future flight systems. An overview of inspection robots will show their operation on the ground and in-orbit. Rovers with independent wheel modules, crab steering, and active suspension are able to climb over large obstacles, and nimbly maneuver around others. Humanoid robots, including the First Humanoid Robot in Space: Robonaut 2, demonstrate capabilities that will lead to robotic caretakers for human habitats in space, and on Mars. The Center's Wearable Robotics Lab supports work in assistive and sensing devices, including exoskeletons, force measuring shoes, and grasp assist gloves.

Diftler, Ron↗

Robotic Technology Efforts at the NASA/Johnson Space Center

The NASA/Johnson Space Center has been developing robotic systems in support of space exploration for more than two decades. The goal of the Center’s Robotic Systems Technology Branch is to design and build hardware and software to assist astronauts in performing their mission. These systems include: rovers, humanoid robots, inspection devices and wearable robotics. Inspection systems provide external views of space vehicles to search for surface damage and also maneuver inside restricted areas to verify proper connections. New concepts in human and robotic rovers offer solutions for navigating difficult terrain expected in future planetary missions. An important objective for humanoid robots is to relieve the crew of “dull, dirty or dangerous” tasks allowing them more time to perform their important science and exploration missions. Wearable robotics one of the Center’s newest development areas can provide crew with low mass exercise capability and also augment an astronaut’s strength while wearing a space suit.This presentation will describe the robotic technology and prototypes developed at the Johnson Space Center that are the basis for future flight systems. An overview of inspection robots will show their operation on the ground and in-orbit. Rovers with independent wheel modules, crab steering, and active suspension are able to climb over large obstacles, and nimbly maneuver around others. Humanoid robots, including the First Humanoid Robot in Space: Robonaut 2, demonstrate capabilities that will lead to robotic caretakers for human habitats in space, and on Mars. The Center’s Wearable Robotics Lab supports work in assistive and sensing devices, including exoskeletons, force measuring shoes, and grasp assist gloves.

Diftler, Ron↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) supports planning, coordination and scheduling of science activities for the International Space Station (ISS) in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. With the achievement of supporting a fourth crew member aboard the ISS and an increasing amount of payload science activities, came the need for a dynamic, more efficient way of building timeline planning reports that could be readily updated as fast as payload science plans could change. This paper addresses software architecture considerations in the successful cross-center development of an automated planning tool with multiple data sources. It also discusses the practical implementation of a time-boxed, hybrid Agile Software Development (ASD) approach to deliver customer-driven value despite changing requirements with respect to low-Earth orbit operational planning activities. The goal of this paper is to open discussion with members of the international community and trade effective strategies for cross-center architectural and customer-developer driven collaborations, to support increasing utilization of planning and conducting science activities in space.

Pedoto, Ramon W.↗

A Heuristic Approach to Correlating ERAM Flight Data from Twenty Centers

Among its many other functions, the Federal Aviation Administration’s En Route Automation Modernization (ERAM) provides external systems with real-time air traffic data for flights in enroute airspace in the National Airspace System. It replaced the En Route Host computer and backup system used at 20 FAA Air Route Traffic Control Centers (Centers) nationwide. Among the new features of ERAM, its output data stream of flight plan and track data includes a unique identifier for a flight originating in any one of the 20 ERAM Centers. The unique identifier, called the Global Unique Flight Identifier (GUFI), is persistent across all the Centers that track the flight. However, certain factors make it difficult to correlate data using the GUFI. First, the value of the GUFI is only unique within a time window of seven days. Second, the GUFI is attached only to flight-plan related data messages. Finally, track positions reported by ERAM do not reference the GUFI. In order to correlate historical as well as real time flight-plan and position related ERAM data, an efficient, heuristic approach was developed, and a prototype was developed. The approach showed that the processing speed, through parallel processing, is sufficient to correlate ERAM data in real-time. As described in this paper, when there are multiple track positions reported from multiple Centers within a few seconds, each position is assigned with a weighted score to indicate the quality of the position relative to its last know position. The weighted score can be used to eliminate potentially duplicate track positions. The approach is database-agnostic, and can be implemented in a Big Data system such as an Apache Hadoop system, as well as in traditional database systems.

Correlating ERAM Flight Data↗

Evaluation of a Dynamic Weather-Avoidance Rerouting Tool in Adjacent-Center Arrival Metering

Dynamic Reroutes for Arrivals in Weather (DRAW) is a NASA-developed decision-support tool for Traffic Management Coordinators (TMCs) at the Federal Aviation Administration's Air Route Traffic Control Centers ("Centers"). DRAW proposes weather-avoidance reroutes for en route arrival flights subject to metering restrictions when transitioning into a busy terminal airspace. The prior DRAW study demonstrated that TMCs' use of DRAW promotes earlier reroutes of arrivals, and reduces the number of routes conflicting with weather in the Center. The present paper focuses on how DRAW benefits metering delivery accuracy when schedule freeze horizon distance was altered. A human-in-the-loop simulation was conducted at NASA Ames Research Center in October-November 2018, where retired TMCs and controllers performed simulated metering operations for southeast arrivals through the Atlanta and Jacksonville Centers to the Hartsfield-Jackson Atlanta International Airport during convective weather periods. Results demonstrated that DRAW use reduced the frequency of manual adjustments of Scheduled Times of Arrival and lowered TMC workload. DRAW use also made the metering accuracy, the number of reroute amendments after the freeze horizon, and the en route sector controller workload more robust to the effect of different freeze horizon distance.

Hayashi, Miwa↗

Evaluation of a Dynamic Weather-Avoidance Rerouting Tool in Adjacent-Center Arrival Metering

Dynamic Reroutes for Arrivals in Weather (DRAW) is a NASA-developed decision-support tool for Traffic Management Coordinators (TMCs) at the Federal Aviation Administration's Air Route Traffic Control Centers ("Centers"). DRAW proposes weather-avoidance reroutes for en route arrival flights subject to metering restrictions when transitioning into a busy terminal airspace. The prior DRAW study demonstrated that TMCs' use of DRAW promotes earlier reroutes of arrivals, and reduces the number of routes conflicting with weather in the Center. The present paper focuses on how DRAW benefits metering delivery accuracy when schedule freeze horizon distance was altered. A human-in-the-loop simulation was conducted at NASA Ames Research Center in October-November 2018, where retired TMCs and controllers performed simulated metering operations for southeast arrivals through the Atlanta and Jacksonville Centers to the Hartsfield-Jackson Atlanta International Airport during convective weather periods. Results demonstrated that DRAW use reduced the frequency of manual adjustments of Scheduled Times of Arrival and lowered TMC workload. DRAW use also made the metering accuracy, the number of reroute amendments after the freeze horizon, and the en route sector controller workload more robust to the effect of different freeze horizon distance.

Air Traffic Management (ATM)↗

On Doppler Shift and Its Center-To-Limb Variation in Active Regions in the Transition Region

A comprehensive understanding of the structure of Doppler motions in the transition region including the center-to-limb variation and its relationship with the magnetic field structure is vital for the understanding of mass and energy transfer in the solar atmosphere. In this paper, we have performed such a study in an active region using the Si IV 1394 Å emission line recorded by the Interface Region Imaging Spectrograph and the line-of-sight photospheric magnetic field obtained by the Helioseismic and Magnetic Imager onboard the Solar Dynamics Observatory. The active region has two opposite polarity strong field regions separated by a weak field corridor, which widened as the active region evolved. On average, the strong field regions (corridor) show(s) redshifts of 5–10 (3–9) km s(exp -1) (depending on the date of observation). There is, however, a narrow lane in the middle of the corridor with near-zero Doppler shifts at all disk positions, suggesting that any flows there are very slow. The Doppler velocity distributions in the corridor seem to have two components—a low velocity component centered near 0 km s(exp -1) and a high-velocity component centered near 10 km s(exp -1). The high-velocity component is similar to the velocity distributions in the strong field regions, which have just one component. Both exhibit a small center-to-limb variation and seem to come from the same population of flows. To explain these results, we suggest that the emission from the lower transition region comes primarily from warm type II spicules, and we introduce the idea of a “chromospheric wall”—associated with classical cold spicules—to account for a diminished center-to-limb variation.

Ghosh, Avyarthana↗

A Study of Lessons and Experiences of NASA Centers in the Use of Commercial Off the Shelf (COTS) Electronics

The NASA Engineering and Safety Center (NESC) sponsored a Technical Assessment relating to the utilization of commercial-off-the-shelf (COTS) electrical, electronic, and electromechanical (EEE) parts in spaceflight systems at NASA Centers. The assessment had two primary goals. The first was to capture each NASA Centers’ current practices, best practices, lessons learned and Center-proposed recommendations on the use of COTS EEE parts and assemblies in critical ground support equipment (GSE). The second was to provide recommendations on the use of COTS, including a set of current best practices based on the Centers’ current and best practices and the NESC team’s discussions. One key achievement made by the assessment team was the characterization of the term Industry Leading Parts Manufacturers (ILPMs) as parts manufacturer with high volume automatic production facilities and which can provide documented proof of the technology, process and product qualification, and its implementation of the best practices for “zero defects” for parts quality, reliability and workmanship. The assessment concluded with numerous findings, takeaways and recommendations that will be discussed during this presentation.

commercial↗

Scaling a Smart Sub-metered Electrical Data Solution for the Center

Currently, there is no single Center-level point solution that enables facility systems data to be collected and stored from buildings on-site, on-demand, and through a faceted search capability that would enable the cultivation of deeper insights into incipient facility-related issues that would otherwise be overlooked. Such insights would represent a powerful and very valuable tool to aid in data-driven decision making and informing actionable steps for remediation and resolution of these problems. Access to electrically sub-metered data via hardware upgrades is in the process of being restored for Building N232, Sustainability Base, but this is only the first step. The native software capabilities that were originally part of a proposed Agencywide Smart Center initiative project can unlock the ability to access actionable insights. This work would also nicely complement many initiatives that are actively being pursued, under consideration, or pending submission to this same call at the Center. This project is poised to support an NRSAA with Verdigris Technologies, as well as in support of an Agencywide Smart Center initiative. Monitoring electrical consumption usage at the most granular level in Bldg. N232 will be instrumental in accurately quantifying potential utility costs and investments, and monitoring usage trends, as it is being converted into hoteling spaces, to help. This will also help with determining how the capability can scale more broadly across the Center and Agency at large.

Rodney Alexander Martin↗

Scaling a Smart Sub-metered Electrical Data Solution for the Center

Currently, there is no single Center-level point solution that enables facility systems data to be collected and stored from buildings on-site, on-demand, and through a faceted search capability that would enable the cultivation of deeper insights into incipient facility-related issues that would otherwise be overlooked. Such insights would represent a powerful and very valuable tool to aid in data-driven decision making and informing actionable steps for remediation and resolution of these problems. Access to electrically sub-metered data via hardware upgrades is in the process of being restored for Building N232, Sustainability Base, but this is only the first step. The native software capabilities that were originally part of a proposed Agencywide Smart Center initiative project can unlock the ability to access actionable insights. This work would also nicely complement many initiatives that are actively being pursued, under consideration, or pending submission to this same call at the Center. This project is poised to support an NRSAA with Verdigris Technologies, as well as in support of an Agencywide Smart Center initiative. Monitoring electrical consumption usage at the most granular level in Bldg. N232 will be instrumental in accurately quantifying potential utility costs and investments, and monitoring usage trends, as it is being converted into hoteling spaces, to help. This will also help with determining how the capability can scale more broadly across the Center and Agency at large.

Rodney Alexander Martin↗