Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “brine”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Lithium extraction composite for recovery of lithium from brines, and process of using said composition

A lithium extraction composite comprising: (i) a porous support and (ii) particles of a lithium-selective sorbent material coated on at least one surface of the support, wherein the support has a planar membrane, fiber (or rod), or tubular shape. A method for extracting and recovering a lithium salt from an aqueous solution by use of the above-described composition is also described, the method comprising (a) flowing the aqueous source solution through a first zone or over a first surface of the lithium extraction composite to result in selective lithium intercalation in the lithium-selective sorbent material in the first zone or first surface; and (b) simultaneously recovering lithium salt extracted in step (a) from said lithium-selective sorbent material by flowing an aqueous stripping solution through a second zone or over a second surface of the lithium extraction composite in which lithium ions from the first zone or first surface diffuse.

Bhave, Ramesh R.↗

Mobilization of trace metals from caprock and formation rocks at the Illinois Basin – Decatur Project demonstration site under geological carbon dioxide sequestration conditions

One concern for geologic CO 2 sequestration is the potential leakage of CO 2 or CO 2 -saturated brine containing trace metals into overlying aquifers, which poses the risk of adversely affecting underground sources of drinking water. In this work, rock and brine samples collected in the Illinois Basin – Decatur Project (IBDP), a large-scale geological CO 2 sequestration demonstration project in Decatur, Illinois, USA, as well as synthetic brine samples were used to understand the mobilization of trace metals as a result of CO 2 –rock–brine interactions under IBDP-specific conditions (50 °C and 20.6 MPa). Rock sample characterization indicated that, at the IBDP site, trace metal concentrations were greatest in cap rock samples from the Eau Claire Formation, compared with those from formations above and below this Formation. The natural brine samples collected from the Mt. Simon Sandstone reservoir were highly reducing and saline, with trace metal concentrations up to 680 times greater than the U.S. Environmental Protection Agency-prescribed drinking water standards. Batch leaching experiments indicated that both trace metal mobilization from rock and immobilization from the brine occurred when high-pressure CO 2 was introduced into the rock-brine system. The amounts of metals mobilized from the rock generally accounted for <5% of the total metals in the rock, but for some metals, including Ni, Pb, and Tl, up to 63% of the metals in the rock were mobilized to the brine. Leaching of trace metals into synthetic brines was different from that into the natural brine. The results of this study provided current information on the trace element sources and will help in risk simulations and experimental design to further evaluate potential impact of leakage on groundwater quality, which is important for future GCS projects to consider for monitoring and containment assurance purposes.

58 GEOSCIENCES↗

An Innovative Zero-Liquid Discharge Intermediate-Cold-Liquid Eutectic-Freeze Desalination System

A novel freeze desalination technology is presented for purification of water produced from various industrial processes, including oil and gas extraction. The main innovative idea is introducing a water-immiscible intermediate-cold-liquid (ICL) medium which absorbs the cold from a refrigeration cycle and transfers it to a freezing chamber where it is mixed with brine. The cold ICL enters the freezing chamber at temperatures between -10°C to -30°C. Precooled brine in injected into the freezing chamber and pure water freezes out of the brine upon mixing with the ICL. The rate of freezing inside the chamber is controlled by adjusting the flow rate of the cold ICL relative to the inlet brine. Both eutectic freeze and non-eutectic freezing are possible by controlling the temperature of the freezing chamber. The solid-liquid slurry created in the freezing chamber flows to a filter separation unit after passing through a separation column. The ice crystals are separated from the liquid by a rotary filter device. The collected ice is rinsed by a centrifugal unit. The rinsed ice is melted to produce fresh water. The developed technology resolves the issues common to current freeze-desalination systems while offering superior heat transfer performance ascribed to direct-contact between the cooling medium and the brine in addition to producing solid salt and pure water. The system operates under atmospheric pressure. The low operation temperature minimizes the corrosion issues common in systems exposed to brine. Also, due to the low operating temperature, there are no concerns about evaporation of volatile organics from the produced water during the treatment. The developed technology effectively eliminates the use of chemicals for pretreatment of brine. The system can be constructed from commercially available components. Extensive testing using a lab-scale prototype by using synthetic brine and actual produced water with TDS values from 50,000 ppm to 300,000 ppm showed that freshwater could be achieved with relatively small dependency on the quality of the input brine. The quality of the treated water was found to be mainly a function of the duration of the centrifugal process. Treated water with TDS as low as 200 ppm could be achieved in the tests. Thermo-economic modeling coupled with system level thermochemical process model were developed for prediction of the LCOW. The LCOW was predicted to be $\$$0.50 to $\$$0.90 per barrel of produced water. The potential markets for deployment of the technology are the oil and gas, in-land thermoelectric powerplants, RO desalination plants, and mining industry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comparative geochemistry of flowback chemistry from the Utica/Point Pleasant and Marcellus formations

Flowback/Produced fluid samples were collected from several wells from two Utica/Point Pleasant (UPP) sites (UPPW and UPPS) in Ohio, and one Marcellus (Marcellus Shale Energy and Environment Laboratory (MSEEL)) site in West Virginia over a period of approximately two years. Although these formations have different ages, depositional environments, diagenetic histories, and geochemical and mineralogical compositions (i.e. the UPP is significantly more carbonate rich than the Marcellus which is more siliceous), analysis of trends in fluid species over time shows that, overall, the TDS and major solubilized elements (Na, Ca, Cl) in the UPP and Marcellus brines are remarkably similar. Total dissolved solutes (TDS) in these brines ranged from approximately 40 to 250 g/L salt, and in general, concentrations increased with time elapsed since natural gas well completion and stimulation. The behavior of Na, Br, and Cl suggests that the produced water signatures from these formations are largely derived from the native formational brines which display evidence of originating from evaporated seawater. There is a strong correlation between Cl and Br, indicating that both species behave conservatively, and the similarity among each of these brines suggests no appreciable contribution of salt from halite dissolution because Br is excluded from the halite structure. Cl/Br ratios in the brines range from ~80 to 120 (mg/L/mg/L). Other elements, such as K, which readily reacts between fluids and ion exchange sites on clays, generally exhibit conservative behavior for an individual site, but show significant variations among each of the different well pads. The concentrations of Sr and Ba vary dramatically among well sites, and increase with respect to Cl- over time, suggesting increasing solubilization, presumably from desorption from clay minerals or dissolution of carbonates or sulfates from the source formation(s). The UPPW well site has very low Ba due to high-sulfate input fluid, which resulted in precipitation of barite/celestite in the brines. In contrast the UPPS well site had elevated Sr (~ 3500 mg/L), presumably due to the use of Sr-rich recycled brine used in hydraulic fracturing. The Marcellus site had the highest Ba concentrations (up to 10 g/L) and highest Ba/Sr ratios in the fluids, due to the high concentration of barium in the Marcellus target (~ 1000 ppm, as compared to ~200 ppm in the UPP). These observations suggest that solutes in the FP fluids are derived from native brines, water-rock interactions that have occurred over geologic time scales, as well as some contribution from contemporaneous reactions in the subsurface. The results also show that the composition of the injected fluid can influence flowback fluid chemistry and possibly production efficiency.

58 GEOSCIENCES↗

DECOVALEX-2023: Task E Final Report

This is the Task E final report for DECOVALEX-2023. Task E is focused on understanding thermal, two-phase hydrological, and mechanical (TH2M) processes, especially related to predicting brine migration in the excavation damaged zone around a heated excavation in salt. Salt is attractive as a disposal medium for radioactive waste because it is self-healing and is essentially impermeable and essentially non-porous in the far field (away from excavations). Investigation of the short-term (days to years) near-field (centimeters to tens of meters) behavior of salt is important for radioactive waste disposal because this early period strongly controls the amount of brine in a salt repository. Brine leads to corrosion of waste forms and waste packages, and possible dissolution of radionuclides with brine transport being a potential transport vector to the accessible environment. The main test case used in Task E is the ongoing Brine Availability Test in Salt (BATS) heater test located underground at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, USA. The Task was divided into a series of Steps. Step 0 was an introduction to processes in salt, that included matching historical unheated brine inflow data from boreholes at WIPP and matching temperature observations during BATS heater test 1a. Step 1 included validation of models against a thermo-poroelastic analytical solution relevant to heated boreholes in salt, and two-phase flow around an excavation in salt. Step 2 required all the individual components covered in steps 0 and 1 to come together to match observed brine inflow behavior during the BATS 1a heater test. There were a range of approaches from the teams, from mechanistic to prescriptive. Given the uncertainties in the problem, some teams used one- or two-dimensional models of the processes, while other teams included more geometrical complexity in three-dimensional models. The key learning points from Task E have been: • Heat conduction through salt typically requires non-linear thermal conductivity (as a function of temperature), but most models do a good job matching observations, given appropriate adjustments to the applied power and some thermocouple locations. • Thermal pressurization requires coupled thermal-hydrological-mechanical (THM) responses that consider the thermal expansion of the fluid and solid phases. • Initialization of two-phase flow models around a borehole or excavation in salt are more realistically represented as “wetting up”, rather than “drying down” (i.e., the initial state after excavation is mostly dry, rather than mostly wet). • The BATS 1a heater test includes a significant release of brine after the end of heating, which requires a large increase in permeability to recreate. Task E has been a great learning experience for all the teams involved, and feedback from the modeling teams has led to changes in the design of follow-on BATS experiments, which are now ongoing underground at WIPP. There was a balance throughout the task between freedom to model phenomena how each team saw fit, and prescriptiveness in problem design to bring the modeling teams closer together to allow attribution of smaller differences between models to different modeling choices. The modeling approaches seem to go through two phases: an early phase of discovery or testing, and a later phase of refinement and improvement. In future modeling efforts, different field data could be used (e.g., BATS 2) and more time should be included in the processes for teams to make multiple model refinement or even significant changes to their conceptual model or setup, based on lessons learned from the modeling exercise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗