Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “acceptance sampling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Influence of sampling frequency and estimation method on phosphorus load uncertainty in the Western Lake Erie Basin, Ohio, USA

Accurate estimates of nutrient loads are necessary to identify critical source areas and quantify the impact of management practices on pollutant export. Previous studies have investigated nutrient load estimate uncertainty, but they often focus on nutrient loads estimated using an interpolation method for large-scale watersheds with short-term datasets. The study objective was to quantify uncertainty in soluble reactive phosphorus (SRP), total phosphorus (TP), and suspended solids (SS) load estimates from two small (<10 3 km 2 ) agricultural watersheds in the western Lake Erie Basin resulting from different sampling frequencies. Each watershed had high temporal resolution datasets of discharge (15 min) and nutrient concentration (1 to 3 samples per day) collected over a 30-year period (1990–2020). Firstly, SRP, TP, and SS loads were calculated using the high temporal resolution datasets, which was assumed as “true loads”. Secondly, the high temporal concentration data were decomposed to semiweekly, weekly, biweekly, and monthly sampling and annual loads were estimated using four common load estimation methods to assess the effect of sampling frequency and load estimation method on load estimate error. Across the four different methods, the composite method had the lowest relative root mean square and absolute bias, but the rectangular interpolation method was the most precise. Furthermore, even with semiweekly sampling, the composite method resulted in an unacceptable level of precision (average imprecision = 39 %), while the interpolation method resulted in an unacceptable bias (average absolute bias = 16 %). Because neither method could provide acceptable accuracy and precision at the lowest decrease in sampling (e.t. semiweekly sampling), continued daily sampling is recommended in these watersheds.

54 ENVIRONMENTAL SCIENCES↗

Results of the Supplementary Analyses of Salt Batch 10 and 11 Samples

Supplementary analyses of material from the Interim Salt Disposition Project (ISDP) Salt Batch (SB) 10 and Salt Batch 11 (SB11) samples were analyzed beyond what is described in previous reports. These additional analyses are required to verify these materials meet Salt Waste Processing Facility (SWPF) Waste Acceptance Criteria (WAC) feed requirements. The stored SB10 and SB11 samples have been analyzed without filtering and the results found to be very similar to the previous filtered analyses performed for SB10 and SB11. The only result of significant difference is the wt% insoluble solids result for the SB11 sample. It would appear the newer method of analyzing larger volumes gives more accurate measurements for solutions with low quantities of solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter 2012 Tank 50 WAC Slurry Sample: Chemical and Radionuclide Contaminants

This report details the chemical and radionuclide contaminant results for the characterization of the 2012 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC).1 Information from this characterization will be used by Waste Solidification Engineering (WSE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: The concentration of the reported chemical and radioactive contaminants were less than their respective WAC Limits and Targets, unless noted in this section. Norpar 13 and Isopar L have higher detection limits 5 compared with the Saltstone WAC 1 . The data provided in this report is based upon the concentrations in the sub-sample, and due to the limited solubility in aqueous solution, may not represent the concentrations of the analytes in Tank 50. Diisooctyl adipate (or diisooctyl hexanedioate) was measured at 1.30E+00 mg/L in one of two replicate measurements conducted on an at-depth sample. a The organic analysis of the at-depth sample was conducted at the request of SRR. 4 This analyte was below the detection limit in the surface sample. The low insoluble solids content increases the measurement uncertainty for insoluble species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the First, Second, and Third Quarter Calendar Year 2015 Tank 50H WAC slurry samples chemical and radionuclide contaminants

This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2015 First, Second, and Third Quarter sampling of Tank 50H for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering (D&S-FE) to support the transfer of low-level aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50H Waste Characterization System. Previous memoranda documenting the WAC analyses results have been issued for these three samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Elimination of the Characterization of DWPF Pour Stream Sample and the Glass Fabrication and Testing of the DWPF Sludge Batch Qualification Sample

A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupled operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In contrast, the variability study has significantly added value to the DWPF's qualification strategy. The variability study has evolved to become the primary aspect of the DWPF's compliance strategy as it has been shown to be versatile and capable of adapting to the DWPF's various and diverse waste streams and blending strategies. The variability study, which aims to ensure durability requirements and the PCT and chemical composition correlations are valid for the compositional region to be processed at the DWPF, must continue to be performed. Due to the importance of the variability study and its place in the DWPF's qualification strategy, it will also be discussed in this report. An analysis of historical data and Production Records indicated that the recommendation of the Six Sigma team to eliminate all characterization of pour stream glass samples and the glass fabrication and PCT performed with the qualification glass does not compromise the DWPF's current compliance plan. Furthermore, the DWPF should continue to produce an acceptable waste form following the remaining elements of the Glass Product Control Program; regardless of a sludge-only or coupled operations strategy. If the DWPF does decide to eliminate the characterization of pour stream samples, pour stream samples should continue to be collected for archival reasons, which would allow testing to be performed should any issues arise or new repository test methods be developed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interface for the rapid analysis of liquid samples by accelerator mass spectrometry

An interface for the analysis of liquid sample having carbon content by an accelerator mass spectrometer including a wire, defects on the wire, a system for moving the wire, a droplet maker for producing droplets of the liquid sample and placing the droplets of the liquid sample on the wire in the defects, a system that converts the carbon content of the droplets of the liquid sample to carbon dioxide gas in a helium stream, and a gas-accepting ion source connected to the accelerator mass spectrometer that receives the carbon dioxide gas of the sample in a helium stream and introduces the carbon dioxide gas of the sample into the accelerator mass spectrometer.

47 OTHER INSTRUMENTATION↗

Results For the Fourth Quarter 2013 Tank 50 WAC Slurry Sample: Chemical and Radionuclide Contaminants

This report details the chemical and radionuclide contaminant results for the characterization of the 2013 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: SRR WAC targets or limits were met for all analyzed chemical and radioactive contaminants unless noted in this section. 59 Ni, 94 Nb, 247 Cm, 249 Cf, and 251 Cf are above the requested SRR target concentrations. However, they are below the detection limits established by SRNL. Norpar 13 and Isopar L have higher detection limits compared with the Saltstone WAC. The data provided in this report is based upon the concentrations in the sub-sample, and due to the limited solubility of these materials in aqueous solution, may not represent the concentrations of the analytes in Tank 50. The low insoluble solids content increases the measurement uncertainty for insoluble species. The semivolatile organic analysis (SVOA) method employed in the measurement of Norpar 13 and tributyl phosphate (TBP) has resulted in the erroneous reporting of a variety of small chain alcohols, including 4-methyl-3-hexanol and 5-methyl-3-hexanol, in previous quarterly sample reports. It has now been determined that these alcohols are an artifact of the sample preparation. Further work is being conducted in SRNL to delineate the conditions that produce these alcohols, and these findings will be reported separately.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Third Quarter 2013 Tank 50 WAC Slurry Sample: Chemical and Radionuclide Contaminants

This report details the chemical and radionuclide contaminant results for the characterization of the 2013 Third Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. 1 Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: SRR WAC targets or limits were met for all analyzed chemical and radioactive contaminates unless noted in this section. 59 Ni, 94 Nb, 247 Cm, 249 Cf, and 251 Cf are above the requested SRR target concentrations. 2 However, they are below the detection limits established by SRNL. 3 Norpar 13 and Isopar L have higher detection limits4 compared with the Saltstone WAC. 1 The data provided in this report is based upon the concentrations in the sub-sample, and due to the limited solubility in aqueous solution, may not represent the concentrations of the analytes in Tank 50. Finally, the low insoluble solids content increases the measurement uncertainty for insoluble species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results For The First Quarter 2012 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminant Results

This report details the chemical and radionuclide contaminant results for the characterization of the 2012 First Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Waste Solidification Engineering (WSE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this memorandum: The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted; The reported detection limit for 94 Nb is above the requested limit but below the estimated limit; 247 Cm and 249 Cf are above the requested limits. However, they are below the limits established; The reported detection limit for Norpar 13 is greater than the limit from the WAC; The reported detection limit for Isopar L is greater than the limit from WAC; Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples; The values reported in this report are the concentrations in the sub-sample as detected by the instrument, however, the results may not accurately represent the concentrations of the analytes in Tank 50; The low insoluble solids content increases the measurement uncertainty for insoluble species.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results For The Fourth Quarter 2014 Tank 50 WAC Slurry Sample: Chemical And Radionuclide Contaminants

This report details the chemical and radionuclide contaminant results for the characterization of the Calendar Year (CY) 2014 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC) in effect at that time. Information from this characterization will be used by DWPF & Saltstone Facility Engineering (DSFE) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the 3410 Building Filtered Exhaust Stack Sampling Probe Location

Pacific Northwest National Laboratory performed several tests in the exhaust air discharge from the new 3410 Building Filtered Exhaust Stack to determine whether the air sampling probe for emissions monitoring for radionuclides is acceptable. The method followed involved adopting the results of a previously performed test series from a system with a similar configuration, followed by several tests on the actual system to verify the applicability of the previously performed tests. The qualification criteria for these types of stacks include metrics concerning 1) uniformity of air velocity, 2) sufficiently small flow angle with respect to the axis of the duct, 3) uniformity of tracer gas concentration, and 4) uniformity tracer particle concentration.

54 ENVIRONMENTAL SCIENCES↗

Assessment of the 3420 Building Filtered Exhaust Stack Sampling Probe Location

Pacific Northwest National Laboratory performed several tests in the exhaust air discharge from the new 3420 Building Filtered Exhaust Stack to determine whether the air sampling probe for emissions monitoring for radionuclides is acceptable. The method followed involved adopting the results of a previously performed test series from a system with a similar configuration, followed by several tests on the actual system to verify the applicability of the previously performed tests. The qualification criteria for these types of stacks include metrics concerning 1) uniformity of air velocity, 2) sufficiently small flow angle with respect to the axis of the duct, 3) uniformity of tracer gas concentration, and 4) uniformity tracer particle concentration.

54 ENVIRONMENTAL SCIENCES↗

RESULTS FOR THE FOURTH QUARTER 2010 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

This report details the chemical and radionuclide contaminant results for the characterization of the 2010 Fourth Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limits for {sup 94}Nb, {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 2. However, they are below the limits established in Reference 3. (3) There is an estimated concentration of trimethylbenzene (2.25 mg/L). This is not a WAC analyte, but it is the first time this organic compound has been detected in a quarterly WAC sample from Tank 50. (4) The reported detection limit for Norpar 13 is greater than the limit from Table 4 and Attachment 8.2 of the WAC. (5) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (6) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Respiratory motion sampling in 4DCT reconstruction for radiotherapy

Purpose: Phase-based and amplitude-based sorting techniques are commonly used in four-dimensional CT (4DCT) reconstruction. However, effect of these sorting techniques on 4D dose calculation has not been explored. In this study, the authors investigated a candidate 4DCT sorting technique by comparing its 4D dose calculation accuracy with that for phase-based and amplitude-based sorting techniques.Method: An optimization model was formed using organ motion probability density function (PDF) in the 4D dose convolution. The objective function for optimization was defined as the maximum difference between the expected 4D dose in organ of interest and the 4D dose calculated using a 4DCT sorted by a candidate sampling method. Sorting samples, as optimization variables, were selected on the respiratory motion PDF assessed during the CT scanning. Breathing curves obtained from patients' 4DCT scanning, as well as 3D dose distribution from treatment planning, were used in the study. Given the objective function, a residual error analysis was performed, and k-means clustering was found to be an effective sampling scheme to improve the 4D dose calculation accuracy and independent with the patient-specific dose distribution. Results: Patient data analysis demonstrated that the k-means sampling was superior to the conventional phase-based and amplitude-based sorting and comparable to the optimal sampling results. For phase-based sorting, the residual error in 4D dose calculations may not be further reduced to an acceptable accuracy after a certain number of phases, while for amplitude-based sorting, k-means sampling, and the optimal sampling, the residual error in 4D dose calculations decreased rapidly as the number of 4DCT phases increased to 6.Conclusion: An innovative phase sorting method (k-means method) is presented in this study. The method is dependent only on tumor motion PDF. It could provide a way to refine the phase sorting in 4DCT reconstruction and is effective for 4D dose accumulation. Optimized sorting techniques could achieve acceptable residuals (less than 0.5% of the prescription dose) using 6 sorting samples, which is much better than amplitude-based or phase-based sorting. Further increase in sorting phase number exceeding 6 or more may not be necessary when using the k-means sampling or optimal sampling points.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Learning from the past: Rare ε-Fe2O3 in the ancient black-glazed Jian (Tenmoku) wares

Ancient Jian wares are famous for their lustrous black glaze that exhibits unique colored patterns. Some striking examples include the brownish colored ‘‘Hare’s Fur’’ (HF) strips and the silvery ‘‘Oil Spot’’ (OS) patterns. Herein, we investigated the glaze surface of HF and OS samples using a variety of characterization methods. Contrary to the commonly accepted theory, we identified the presence of e-Fe2O3, a rare metastable polymorph of Fe2O3 with unique magnetic properties, in both HF and OS samples. We found that surface crystals of OS samples are up to several micrometers in size and exclusively made of e-Fe2O3. Interestingly, these e-Fe2O3 crystals on the OS sample surface are organized in a periodic two dimensional fashion. These results shed new lights on the actual mechanisms and kinetics of polymorphous transitions of Fe2O3. Deciphering technologies behind the fabrication of ancient Jian wares can thus potentially help researchers improve the e-Fe2O3 synthesis.

ARCHAEOMETRY↗

RESULTS FOR THE SECOND QUARTER 2010 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

This report details the chemical and radionuclide contaminant results for the characterization of the 2010 Second Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC).1 Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: (1) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (2) The reported detection limits for {sup 94}Nb and {sup 144}Ce are above both the established and requested limits from References 4 and 6. (3) The reported detection limits for {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 4. However, they are below the limits established in Reference 6. (4) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (5) A measurable concentration of Norpar 13 is present in the sample. The reported concentration is greater than the requested limit from Table 4 and Attachment 8.2 of the WAC. (6) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of the analytes in Tank 50. (7) The detection limit for isopropanol has been lowered from 0.5 mg/L to 0.25 mg/L{sup 7}. This revised limit now satisfies the limit in Table 4 of the WAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Testing of a High Level Waste Slurry Sampling Technique to Support Hanford Waste Processing - 17164

The Hanford Tank Operations Contractor must demonstrate the capability to adequately sample staged high-level waste feed. The sampler employed must have accuracy and precision performance that allow the Tank Operations Contractor (TOC) to meet the Waste Treatment and Immobilization Plant (WTP) Waste Acceptance Criteria Data Quality Objectives (DQO). A full-scale sampling loop was used at a test facility to develop and demonstrate sampler capability. This paper will discuss the modifications to a sampler configuration previously tested - modifications focused on the improvement of the accuracy of test results. This work targets one of the remaining technical issues with the high-level waste treatment mission at Hanford. The sampling method employed must support both Tank Operations and Waste Treatment and Immobilization Plant requirements. To facilitate information transfer between the two facilities the mixing and sampling demonstrations are led by the TOC's Chief Technology Office in conjunction with the One System Integrated Project Team. Results of the testing showed that performance of the Isolok{sup R} sampler, chosen for implementation, can be greatly improved by modifying the systems configuration to provide accurate, repeatable results for Hanford's simulated high level waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RESULTS FOR THE THIRD QUARTER 2010 TANK 50 WAC SLURRY SAMPLE: CHEMICAL AND RADIONUCLIDE CONTAMINANT RESULTS

This report details the chemical and radionuclide contaminant results for the characterization of the 2010 Third Quarter sampling of Tank 50 for the Saltstone Waste Acceptance Criteria (WAC). Information from this characterization will be used by Liquid Waste Operations (LWO) to support the transfer of low-level aqueous waste from Tank 50 to the Salt Feed Tank in the Saltstone Facility in Z-Area, where the waste will be immobilized. This information is also used to update the Tank 50 Waste Characterization System. The following conclusions are drawn from the analytical results provided in this report: (i) The concentrations of the reported chemical and radioactive contaminants were less than their respective WAC targets or limits unless noted in this section. (ii) The reported detection limits for {sup 94}Nb, {sup 247}Cm and {sup 249}Cf are above the requested limits from Reference 4. However, they are below the limits established in Reference 3. (iii) The reported detection limit for {sup 242m}Am is greater than the requested limit from Attachment 8.4 of the WAC. (iv) The reported detection limit for Isopar L is greater than the limit from Table 3 of the WAC. (v) The reported concentration of Isopropanol is greater than the limit from Table 4 of the WAC. (vi) Isopar L and Norpar 13 have limited solubility in aqueous solutions making it difficult to obtain consistent and reliable sub-samples. The values reported in this memo are the concentrations in the sub-sample as detected by the GC/MS; however, the results may not accurately represent the concentrations of the analytes in Tank 50.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗