Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Transmission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Structural characterization and gas reactions of small metal particles by high resolution in-situ TEM (Transmission Electron Microscopy) and TED (Transmission Electron Diffraction)

The detection and size analysis of small metal particles supported on amorphous substrates becomes increasingly difficult when the particle size approaches that of the phase contrast background structures of the support. An approach of digital image analysis, involving Fourier transformation of the original image, filtering, and image reconstruction was studied with respect to the likelihood of unambiguously detecting particles of less than 1 nm diameter on amorphous substrates from a single electron micrograph.

Heinemann, K.↗

Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no locations that intersect national trails. Source data did not indicate any planned transmission lines or pipelines in Hawaii. A map atlas provides more detailed mapping of the topics investigated in this study, and the accompanying GIS database provides the baseline information for further investigating locations of interest. In many cases the locations of proposed transmission lines are not accurately mapped (or a specific route may not yet be determined), and accordingly the specific crossing locations are speculative. However since both national trails and electrical transmission lines are long linear systems, the characteristics of the crossings reported in this study are expected to be similar to both observed characteristics of the existing infrastructure provided in this report, and of the new infrastructure if these proposed projects are built. More focused study of these siting challenges is expected to mitigate some of potential impacts by choosing routes that minimize or eliminate them. The current study primarily addresses a set of screening-level characterizations that provide insights into how the National Trail System may influence the siting of energy transport facilities in the states identified under Section 368(b) of the Energy Policy Act of 2005. As such, it initializes gathering and beginning analysis of the primary environmental and energy data, and maps the contextual relationships between an important national environmental asset and how this asset intersects with energy planning activities. Thus the current study sets the stage for more in-depth analyses and data development activities that begin to solve key transmission siting constraints. Our recommendations for future work incorporate two major areas: (1) database development and analytics and (2) modeling and scenario analysis for energy planning. These recommendations provide a path forward to address key issues originally developed under the Energy Policy Act of 2005 that are now being carried forward under the President’s Climate Action Plan.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of Transmission Warming Technologies at Various Ambient Conditions

This work details two approaches for evaluating transmission warming technology: experimental dynamometer testing and development of a simplified transmission efficiency model to quantify effects under varied real world ambient and driving conditions. Two vehicles were used for this investigation: a 2013 Ford Taurus and a 2011 Ford Fusion. The Taurus included a production transmission warming system and was tested over hot and cold ambient temperatures with the transmission warming system enabled and disabled. A robot driver was used to minimize driver variability and increase repeatability. Additionally the Fusion was tested cold and with the transmission pre-heated prior to completing the test cycles. These data were used to develop a simplified thermally responsive transmission model to estimate effects of transmission warming in real world conditions. For the Taurus, the fuel consumption variability within one standard deviation was shown to be under 0.5% for eight repeat Urban Dynamometer Driving Cycles (UDDS). These results were valid with the transmission warming system active or passive. Using the transmission warming system under 22 degrees C ambient temperature, fuel consumption reduction was shown to be 1.4%. For the Fusion, pre-warming the transmission reduced fuel consumption 2.5% for an urban drive cycle at -7 degrees C ambient temperature, with 1.5% of the 2.5% gain associated with the transmission, while consumption for the US06 test was shown to be reduced by 7% with 5.5% of the 7% gain associated with the transmission. It was found that engine warming due to conduction between the pre-heated transmission and the engine resulted in the remainder of the benefit. For +22 degrees C ambient tests, the pre-heated transmission was shown to reduce fuel consumption approximately 1% on an urban cycle, while no benefit was seen for the US06 cycle. The simplified modeling results showed gains in efficiency ranging from 0-1.5% depending on the ambient temperature and drive cycle.

33 ADVANCED PROPULSION SYSTEMS↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Detailed high-accuracy megavoltage transmission measurements: A sensitive experimental benchmark of EGSnrc

Purpose: There are three goals for this study: (a) to perform detailed megavoltage transmission measurements in order to identify the factors that affect the measurement accuracy, (b) to use the measured data as a benchmark for the EGSnrc system in order to identify the computational limiting factors, and (c) to provide data for others to benchmark Monte Carlo codes. Methods: Transmission measurements are performed at the National Research Council Canada on a research linac whose incident electron parameters are independently known. Automated transmission measurements are made on-axis, down to a transmission value of {approx}1.7%, for eight beams between 10 MV (the lowest stable MV beam on the linac) and 30 MV, using fully stopping Be, Al, and Pb bremsstrahlung targets and no fattening filters. To diversify energy differentiation, data are acquired for each beam using low-Z and high-Z attenuators (C and Pb) and Farmer chambers with low-Z and high-Z buildup caps. Experimental corrections are applied for beam drifts (2%), polarity (2.5% typical maximum, 6% extreme), ion recombination (0.2%), leakage (0.3%), and room scatter (0.8%)-the values in parentheses are the largest corrections applied. The experimental setup and the detectors are modeled using EGSnrc, with the newly added photonuclear attenuation included (up to a 5.6% effect). A detailed sensitivity analysis is carried out for the measured and calculated transmission data. Results: The developed experimental protocol allows for transmission measurements with 0.4% uncertainty on the smallest signals. Suggestions for accurate transmission measurements are provided. Measurements and EGSnrc calculations agree typically within 0.2% for the sensitivity of the transmission values to the detector details, to the bremsstrahlung target material, and to the incident electron energy. Direct comparison of the measured and calculated transmission data shows agreement better than 2% for C (3.4% for the 10 MV beam) and typically better than 1% for Pb. The differences can be explained by acceptable photon cross section changes of Less-Than-Or-Slanted-Equal-To 0.4%. Conclusions: Accurate transmission measurements require accounting for a number of influence quantities which, if ignored, can collectively introduce errors larger than 10%. Accurate transmission calculations require the use of the most accurate data and physics options available in EGSnrc, particularly the more accurate bremsstrahlung angular sampling option and the newly added modeling of photonuclear attenuation. Comparison between measurements and calculations implies that EGSnrc is accurate within 0.2% for relative ion chamber response calculations. Photon cross section uncertainties are the ultimate limiting factor for the accuracy of the calculated transmission data (Monte Carlo or analytical).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Laboratory Experiments Examining the Effect of Thermal and Mechanical Processes on Hydraulic Transmissivity Evolution

Using laboratory slide-hold-slide experiments, at temperatures from 22 to 200 degrees C, to examine effects of fracture reactivation and quasi-static loading on the evolution of fluid transport properties of simulated fractures in Westerly granite. At all temperatures, the in-plane hydraulic transmissivity consistently decays during hold periods resulting in an overall reduction in transmissivity. During the first three to fifteen hours of an experiment, transmissivity decreases rapidly due to the generation of wear products, development of a sliding surface, and compaction of the resulting gouge. Once the sliding surface has developed, the long-term transmissivity decay rate at 22 and 100 degrees C is significantly lower than the transmissivity decay rate during the initial 3-15 hours of the experiment. However, at 200 degrees C, the decay of hydraulic transmissivity remains high throughout the experiment. The long-term decay of hydraulic transmissivity can be fitted with a power law model with more rapid reduction of hydraulic transmissivity at higher temperature. Periods of sliding on the fracture surface result in transient increases in the transmissivity, due to shear dilation, as is expected for Coulomb materials. These transients are superimposed on the long-term decay. When sliding ceases and a new hold period commences, there is a rapid reduction in transmissivity and return to the long-term rate of transmissivity decay. The rate of decay of the transmissivity transients is inversely correlated with temperature, in contrast to the long-term decay and the expected behavior for processes like subcritical crack growth and indentation creep. The higher decay rates that are observed during the initial 3-15 hours of the tests and following sliding, are associated with times that the porosity of the gouge is expected to be high. The difference in decay rates suggests that when the gouge is driven far from equilibrium by active shearing, densification may be dominated by a different mechanism from long-term compaction.

15 GEOTHERMAL ENERGY↗

Multi-Speed Transmission For Commercial Delivery Medium Duty PEDVs

Successful completion of the proposed project will set a course for improving quality of life by overcoming key challenges in the gearbox for commercial-delivery, medium-duty, plug-in electric drive vehicles: It will reduce US dependency on foreign oil through the use of electric driven propulsion instead of fuel driven. It will reduce health risks by replacing tailpipe emissions in densely populated city centers. Finally, it will improve the performance-cost basis to meet or exceed the expectations of the targeted medium duty vehicle fleet owners and the independent customers. The proposed multi-speed transmission will narrow motor operation to the peak efficiency region, thereby increasing the electric powertrain efficiency to help close the range gap. Further, it will enhance customer satisfaction by improving vehicle acceleration, top speed and gradeability over the baseline. The project was conducted in three budget periods: In BP1: Technology Development, High-level vehicle powertrain models were used to optimize candidate transmission architectures and ratios along with a variety of traction motor characteristics for concept selection. The detailed driveline designs and component dynamics were investigated to meet medium-duty EV requirements; In BP2: Technology Development and Prototype Demonstration, The modeling and simulations with multi-speed transmissions were extended to other MD and HD EV platforms. Clean sheet design of a compact, lightweight, flexible, and modular, four-speed transmission was completed. Development of novel shifting and controls strategies were started and procurement of the prototype transmission and the controller hardware was begun; In BP3: Technology Integration, Testing, and Demonstration, Prototyping the four-speed automated mechanical transmission was completed. The transmission controls system and software development and preliminary gearbox dyno tests were done at Eaton. ORNL conducted integrated powertrain HIL tests. One of the prototype units was fully integrated into a Proterra BE35 demonstration electric bus. The shift control strategy was fine-tuned on the integrated vehicle at Eaton Marshall Proving Grounds. NREL tested the vehicle and validated the performance gains. Simulations predicted up to 20% increase in system energy efficiency depending on drive cycles, a top speed of greater than70 mph on flat road, 40% faster acceleration and a doubled gradeability with four-speed transmission as compared to the baseline EVs. Chassis Dyno Tests at NREL verified the simulation results of Eaton team and the HIL test results of ORNL team. The new four-speed EV transmission is efficient, reliable, modular, scalable, light weight, small size, and will be affordable. Furthermore, four-speed transmission enables downsizing of motor, battery and final drive, thereby reducing the total system cost.

33 ADVANCED PROPULSION SYSTEMS↗

Regional Transmission Planning: A review of practices following FERC Order Nos. 890 and 1000

Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 10001 established requirements that transmission planning regions must follow in regional transmission planning and allocating the costs of new transmission facilities. Order No. 890, issued in 2007, outlined general requirements for local as well as regional transmission planning practices and procedures. Order No. 1000, issued in 2011, laid out specific requirements for: (1) regional transmission planning; (2) consideration of transmission needs driven by public policy requirements; (3) non-incumbent transmission development; (4) interregional transmission coordination; and (5) cost allocation for transmission facilities that have been selected in a regional transmission plan for purposes of cost allocation. This report reviews how these FERC orders are being implemented by the 12 transmission planning regions recognized by FERC.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electricity Subsector Transmission Resilience Maturity Model (TRMM) User Guide

The electric transmission sector is facing a range of threats to its functionality that are either new, more severe than experienced in earlier years, or more well understood. Such threats include more frequent and more severe extreme weather events, wildfires, droughts, and human-caused physical and cyberattacks. They also include geological, electromagnetic, and biological events. The novelty or increasing severity of these threats creates a significant need for transmission owners to implement programs to prevent, prepare for, respond to, and recover from such incidents. The national and economic security of the United States depends on the reliable functioning of the Nation’s critical infrastructure in the face of such threats, and the transmission networks are essential components of that infrastructure. The Electricity Subsector Transmission Resilience Maturity Model (TRMM) is a tool that a transmission organization can use to objectively evaluate and benchmark its currently established transmission resilience strategies, programs, policies, and investments, in order to target and prioritize enhancements where needed. The TRMM was developed to address the unique characteristics of the transmission system. The model can enable users to: • evaluate and benchmark their organization’s resilience capabilities, effectively and consistently • prioritize actions and investments to improve the resilience of their systems • share transmission-related knowledge, best practices, and relevant references within their organization and with business partners as a means to improve resilience capabilities • contribute to increasing the overall resilience of the Nation’s transmission systems. The TRMM provides descriptive rather than prescriptive industry-focused guidance. The model content is presented at a high level of abstraction so that it can be interpreted by transmission organizations of various types, structures, and sizes. The model is designed to an be easy-to-use, self-assessment tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wireless Transmission of Monitoring Data out of the HADES Underground Laboratory - 12450

As part of the European 7. framework project MoDeRn, Nuclear Research and Consultancy Group (NRG) performed experiments in order to demonstrate the feasibility of wireless data transmission through the subsurface over larger distances by low frequency magnetic fields. The main objective of NRG's contribution is to characterize and optimize the energy use of this technique within the specific context of post-closure monitoring. For this, measurements have been performed in the HADES underground laboratory located at Mol, Belgium, at 225 m depth. The experimental set-up makes use of a loop antenna for the transmitter that has been matched into the existing infrastructure of the HADES. The experimental work of NRG is divided into several stages: in 2010, the necessary hardware has been designed and assembled and tested in the Netherlands. Site-specific magnetic background noise in Mol and frequency-dependent signal attenuation by the geologic medium has been measured. Signal transmission has been demonstrated and several transmission channels around 1 kHz have been identified. In 2011, additional measures and experiments have been performed in order to characterize and test relevant element of the transmission chain and to optimize the energy use of the set-up. A mathematical model description has been developed that includes the most relevant characteristics of the transmitter, receiver and transmission path and was used to analyse possible options to optimize the set-up. In 2012, experiments are planned in order to test several data transmission options. Results so far have shown that signal transmission over larger distances through the subsurface is feasible. However, to make quantitative conclusions on the energy need per bit of transmitted data, additional experiments planned in 2012 are necessary. The experimental and theoretical results gained by NRG, as part of the European 7. framework project MoDeRn, so far demonstrated that signal transmission through 225 m of a geological medium is feasible, even in case of a 'good conductor' as present in Mol. At this particular site the transmission distance through the different layers of clay and sandy aquifers is larger than the skin depth and clearly extends the near-field. The step from signal to data transmission will be made in 2012 and is essential to be able to make quantitative statements of the energy use per transmitted data bit. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A charge-transfer resistance model and Arrhenius activation analysis for hydrogen ion transmission across single-layer graphene

Transmission rates for protons and deuterons across single-layer graphene embedded in Nafion | graphene | Nafion sandwich structures are measured as a function of temperature in electrochemical hydrogen pump cells. Rates of ion transmission through graphene are obtained in the form of area-normalized ion-transfer resistances, and are interpreted in terms of ion-exchange current densities and standard heterogeneous ion-transfer rate constants. An encounter pre-equilibrium model for the ion-transfer step is then used to provide rate constants for the fundamental microscopic step of ion (proton or deuteron) transmission across graphene. Application of this rate model to interpret variable-temperature data on proton and deuteron transmission rates provides values for the activation energy and pre-exponential factor for the fundamental ion transmission step across graphene. Activation energies obtained from the Arrhenius plots for proton and deuteron transmission are as follows; for proton, E act = 48 ± 2 kJ/mole (0.50 ± 0.02 eV) and for deuteron, E act = 53 ± 5 kJ/mole (0.55 ± 0.05 eV). The difference between these two values of approximately 5 kJ/mole is in good agreement with the expected difference in vibrational zero-point energies for O—H and O-D bonds, albeit with some uncertainty given the uncertainties in the activation energy values. Pre-exponential frequency factor values of 8.3 ± 0.4 × 10 13 s -1 and is 4.7 ± 0.5 × 10 13 s -1 were obtained for proton and deuteron transmission respectively across graphene. These pre-factor values are both quite large, on the order of the values predicted from the Eyring – Polanyi equation with a transmission coefficient near one. The ratio of 1.8 for the rate pre-factors (H/D) is in reasonable agreement with the value of 1.3 for the ratio of bond vibrational frequencies for O—H and O-D stretching, respectively. Taken together, these data support a model in which proton and deuteron transmission across graphene are largely adiabatic processes for which the differences in transmission rate at room temperature are due largely to differences in activation energies.

2D materials↗

Atlantic Offshore Wind Transmission Study

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗

Atlantic Offshore Wind Transmission Study: Executive Summary

The Atlantic Offshore Wind Transmission Study (AOSWTS) is part of the U.S. Department of Energy's (DOE) efforts to understand and facilitate the transmission of electricity from wind in the Atlantic Ocean. It was informed by the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis (Bothwell et al. 2021) and the convening workshops hosted in 2022-2023 by DOE and the U.S. Department of the Interior's Bureau of Ocean Energy Management. The study results help to inform An Action Plan for Offshore Wind Transmission Development in the U.S. Atlantic Region (Baker et al. 2023). DOE's Wind Energy Technologies Office funded AOSWTS. The AOSWTS identifies and evaluates pathways to enable offshore wind energy deployment in the Atlantic Ocean through coordinated offshore transmission solutions in the near term (by 2030) and long term (by 2050). The study fills gaps in prior analyses by providing a multiregional planning perspective that evaluates offshore wind generation development with transmission planning. It incorporates environmental, ocean co-use, and other siting considerations into defining potential offshore transmission routes. The study also compares different multiregional offshore transmission topologies and their associated costs (using potential cable routes) and benefits (in terms of production cost savings and enhanced resource adequacy). In addition, the AOSWTS analyzes reliability impacts from a multiregional perspective. The study provides guidance for policymakers and transmission stakeholders on possible outcomes resulting from a proactive, coordinated, and interregional approach to transmission planning for offshore wind energy development in the Atlantic. While this study presents possibilities, additional work following system operator methods and procedures can help build on this analysis.

17 WIND ENERGY↗