Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Terrain Relative Navigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

190 records · Page 11

Training the Powered-Lift Evaluation Pilot

This poster describes a project to prepare pilots for a study assessing novel aircraft automation concepts for electric Vertical Takeoff and Landing (eVTOL) aircraft using NASA’s Vertical Motion Simulator (VMS). By exploring the operational and learning challenges related to transitioning between forward flight and vertical landing, we seek to establish baselines of pilot workload and aircraft handling qualities across varying atmospheric conditions and automation states. The simulated eVTOL design differentiates flight control allocations as a function of airspeed across four speed ranges as the vehicle transitions between fully thrust-borne lift and wing-borne lift. As speed increases, side stick controls command: translational ground speeds, vertical and lateral acceleration, vertical rate, vertical flight path angle, and bank angle. This novel approach to flight control allocation creates a significant learning challenge for pilots. Since initial eVTOL aircraft may have limitations on hover capabilities, automation and flight guidance cues also vary with airspeed to provide efficient landing profiles while still providing cues suitable for cruise flight. The NASA team prepared the study pilots to follow these flight guidance cues along curved Required Navigation Performance (RNP) approaches and along 6o and 12o glide paths to energy-efficient assistive-hover landing and goarounds. The pre-VMS preparation sought to prepare pilots from diverse levels of experience and background. To do this, NASA researchers designed and developed a fixed-based, large field-ofview simulator with terrain, structures, and air traffic. With one day of combined classroom learning and skill development in the fixedbase simulator, pilots were largely able to fly the simulated eVTOL in the VMS with sufficient mastery to provide handling quality assessments using the Cooper-Harper Handling Qualities Rating and workload assessments through the Bedford Workload Scale.

AAM↗

Facilitating Analysis of Multiple Partial Data Streams

Robotic Operations Automation: Mechanisms, Imaging, Navigation report Generation (ROAMING) is a set of computer programs that facilitates and accelerates both tactical and strategic analysis of time-sampled data especially the disparate and often incomplete streams of Mars Explorer Rover (MER) telemetry data described in the immediately preceding article. As used here, tactical refers to the activities over a relatively short time (one Martian day in the original MER application) and strategic refers to a longer time (the entire multi-year MER missions in the original application). Prior to installation, ROAMING must be configured with the types of data of interest, and parsers must be modified to understand the format of the input data (many example parsers are provided, including for general CSV files). Thereafter, new data from multiple disparate sources are automatically resampled into a single common annotated spreadsheet stored in a readable space-separated format, and these data can be processed or plotted at any time scale. Such processing or plotting makes it possible to study not only the details of a particular activity spanning only a few seconds, but also longer-term trends. ROAMING makes it possible to generate mission-wide plots of multiple engineering quantities [e.g., vehicle tilt as in Figure 1(a), motor current, numbers of images] that, heretofore could be found only in thousands of separate files. ROAMING also supports automatic annotation of both images and graphs. In the MER application, labels given to terrain features by rover scientists and engineers are automatically plotted in all received images based on their associated camera models (see Figure 2), times measured in seconds are mapped to Mars local time, and command names or arbitrary time-labeled events can be used to label engineering plots, as in Figure 1(b).

Maimone, Mark W.↗

The Utility and Validity of Kinematic GPS Positioning for the Geosar Airborne Terrain Mapping Radar System

GeoSAR is an airborne, interferometric Synthetic Aperture Radar (IFSAR) system for terrain mapping, currently under development by a consortium including NASA's Jet Propulsion Laboratory (JPL), Calgis, Inc., a California mapping sciences company, and the California Department of Conservation (CaIDOC), with funding provided by the U.S. Army Corps of Engineers Topographic Engineering Center (TEC) and the U.S. Defense Advanced Research Projects Agency (DARPA). IFSAR data processing requires high-accuracy platform position and attitude knowledge. On 9 GeoSAR, these are provided by one or two Honeywell Embedded GPS Inertial Navigation Units (EGI) and an Ashtech Z12 GPS receiver. The EGIs provide real-time high-accuracy attitude and moderate-accuracy position data, while the Ashtech data, post-processed differentially with data from a nearby ground station using Ashtech PNAV software, provide high-accuracy differential GPS positions. These data are optimally combined using a Kalman filter within the GeoSAR motion measurement software, and the resultant position and orientation information are used to process the dual frequency (X-band and P-band) radar data to generate high-accuracy, high -resolution terrain imagery and digital elevation models (DEMs). GeoSAR requirements specify sub-meter level planimetric and vertical accuracies for the resultant DEMS. To achieve this, platform positioning errors well below one meter are needed. The goal of GeoSAR is to obtain 25 cm or better 3-D positions from the GPS systems on board the aircraft. By imaging a set of known point target corner-cube reflectors, the GeoSAR system can be calibrated. This calibration process yields the true position of the aircraft with an uncertainty of 20- 50 cm. This process thus allows an independent assessment of the accuracy of our GPS-based positioning systems. We will present an overview of the GeoSAR motion measurement system, focusing on the use of GPS and the blending of position data from the various systems. We will present the results of our calibration studies that relate to the accuracy the GPS positioning. We will discuss the effects these positioning, errors have on the resultant DEM products and imagery.

Freedman, Adam↗

NIAC Phase 1 Final Study Report on Titan Aerial Daughtercraft

Saturns giant moon Titan has become one of the most fascinating bodies in the Solar System. Even though it is a billion miles from Earth, data from the Cassini mission reveals that Titan has a very diverse, Earth-like surface, with mountains, fluvial channels, lakes, evaporite basins, plains, dunes, and seas [Lopes 2010] (Figure 1). But unlike Earth, Titans surface likely is composed of organic chemistry products derived from complex atmospheric photochemistry [Lorenz 2008]. In addition, Titan has an active meteorological system with observed storms and precipitation-induced surface darkening suggesting a hydrocarbon cycle analogous to Earths water cycle [Turtle 2011].Titan is the richest laboratory in the solar system for studying prebiotic chemistry, which makes studying its chemistry from the surface and in the atmosphere one of the most important objectives in planetary science [Decadal 2011]. The diversity of surface features on Titan related to organic solids and liquids makes long-range mobility with surface access important [Decadal 2011]. This has not been possible to date, because mission concepts have had either no mobility (landers), no surface access (balloons and airplanes), or low maturity, high risk, and/or high development costs for this environment (e,g. large, self-sufficient, long-duration helicopters). Enabling in situ mobility could revolutionize Titan exploration, similarly to the way rovers revolutionized Mars exploration. Recent progress on several fronts has suggested that small-scale rotorcraft deployed as daughtercraft from a lander or balloon mothercraft may be an effective, affordable approach to expanding Titan surface access. This includes rapid progress on autonomous navigation capabilities of such aircraft for terrestrial applications and on miniaturization, driven by the consumer mobile electronics market, of high performance of sensors, processors, and other avionics components needed for such aircraft. Chemical analysis, for example with a mass spectrometer, will be important to any Titan surface mission. Anticipating that it may be more practical to host chemical analysis instruments on a mothership than a daughtercraft, we defined system and mission concepts that deploy a small rotorcraft, termed a Titan Aerial Daughtercraft (TAD), from a lander or balloon to perform high-resolution imaging and mapping, potentially land to acquire microscopic images or other in situ measurements, and acquire samples to return to analytical instruments on the mothership. In principle, the ability to recharge batteries in TAD from a radioisotope or other long-lived power source on the mothership could enable multiple sorties. For a lander-based mission, a variety of landing sites is conceivable, including near lake margins, in dry lake beds, or in regions of plains, dunes, or putative cryovolanic or impact melt features. Such missions may require landing with greater precision than in previous missions (Huygens) and mission studies; this could also enhance the ability of TAD to reach interesting terrain from the landing site. Precision descent may also benefit balloon missions, with or without a daughtercraft, by increasing the probability that the balloon will drift over desired terrain early in its mission. Given these potential benefits, the overall concept studied here includes brief consideration of precision descent for landing or balloon deployment, followed by one or more sorties by a rotorcraft deployed from the mothership, with the ability to return to the mothership.

Saturn↗

Calibration of the Geosar Dual Frequency Interferometric SAR

GeoSAR is an airborne, interferometric Synthetic Aperture Radar (INSAR) system for terrain mapping, currently under development by a consortium including NASA's Jet Propulsion Laboratory (JPL), Calgis, Inc., and the California Department of Conservation (CalDOC) with funding provided by the Topographic Engineering Center (TEC) of the U.S. Army Corps of Engineers and the Defense Advanced Research Projects Agency (DARPA). The radar simultaneously maps swaths on both sides of the aircraft at two frequencies, X-Band and P-Band. For the P-Band system, data is collected for two across track interferometric baselines and at the crossed polarization. The aircraft position and attitude are measured using two Honeywell Embedded GPS Inertial Navigation Units (EGI) and an Ashtech Z12 GPS receiver. The mechanical orientation and position of the antennas are actively measured using a Laser Baseline Metrology System (LBMS). In the GeoSAR motion measurement software, these data are optimally combined with data from a nearby ground station using Ashtech PNAV software to produce the position, orientation, and baseline information are used to process the dual frequency radar data. Proper calibration of the GeoSAR system is essential to obtaining digital elevation models (DEMS) with the required sub-meter level planimetric and vertical accuracies. Calibration begins with the determination of the yaw and pitch biases for the two EGI units. Common range delays are determined for each mode, along with differential time and phase delays between channels. Because the antennas are measured by the LBMS, baseline calibration consists primarily of measuring a constant offset between mechanical center and the electrical phase center of the antennas. A phase screen, an offset to the interferometric phase difference which is a function of absolute phase, is applied to the interferometric data to compensate for multipath and leakage. Calibration parameters are calculated for each of the ten processing modes, each of the operational bandwidths (80 and 160 MHZ), and each aircraft altitude. In this talk we will discuss the layout calibration sites, the synthesis of data from multiple flights to improve the calibration, methods for determining time and phase delays, and techniques for determining radiometric and polarimetric quantities. We will describe how calibration quantities are incorporated into the processor and pre-processor. We will demonstrate our techniques applied to GeoSar data and assess the stability and accuracy of the calibration. This will be compared to the modeled performance determined from calibrating the output of a point target simulator. The details of baseline determination and phase screen calculation are covered in related talks.

Chapine, Elaine↗

The Lunar Regolith Terrain (LRT) Field: A New Lunar Surface Planetary Analog Facility at NASA Marshall Space Flight Center (MSFC)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

Marshall Space Flight Center: Lunar Regolith Terrain (LRT)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

Marshall Space Flight Center: Lunar Regolith Terrain (LRT)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

The Athena Mars Rover Science Payload

The Mars Surveyor missions that will be launched in April of 2001 will include a highly capable rover that is a successor to the Mars Pathfinder mission's Sojourner rover. The design goals for this rover are a total traverse distance of at least 10 km and a total lifetime of at least one Earth year. The rover's job will be to explore a site in Mars' ancient terrain, searching for materials likely to preserve a record of ancient martian water, climate, and possibly biology. The rover will collect rock and soil samples, and will store them for return to Earth by a subsequent Mars Surveyor mission in 2005. The Athena Mars rover science payload is the suite of scientific instruments and sample collection tools that will be used to perform this job. The specific science objectives that NASA has identified for the '01 rover payload are to: (1) Provide color stereo imaging of martian surface environments, and remotely-sensed point discrimination of mineralogical composition. (2) Determine the elemental and mineralogical composition of martian surface materials. (3) Determine the fine-scale textural properties of these materials. (4) Collect and store samples. The Athena payload has been designed to meet these objectives. The focus of the design is on field operations: making sure the rover can locate, characterize, and collect scientifically important samples in a dusty, dirty, real-world environment. The topography, morphology, and mineralogy of the scene around the rover will be revealed by Pancam/Mini-TES, an integrated imager and IR spectrometer. Pancam views the surface around the rover in stereo and color. It uses two high-resolution cameras that are identical in most respects to the rover's navigation cameras. The detectors are low-power, low-mass active pixel sensors with on-chip 12-bit analog-to-digital conversion. Filters provide 8-12 color spectral bandpasses over the spectral region from 0.4 to 1.1 micron Narrow-angle optics provide an angular resolution of 0.28 mrad/pixel, nearly a factor of four higher than that of the Mars Pathfinder and Mars Surveyor '98 cameras. Image compression will be performed using a wavelet compression algorithm. The Mini-Thermal Emission Spectrometer (Mini-TES) is a point spectrometer operating in -the thermal IR. It produces high spectral resolution (5 /cm) image cubes with a wavelength range of 5-40 gm, a nominal signal/noise ratio of 500:1, and a maximum angular resolution of 7 mrad (7 cm at a distance of 10 in). The wavelength region over which it operates samples the diagnostic fundamental absorption features of rockforming minerals, and also provides some capability to see through dust coatings that could tend to obscure spectral features. The mineralogical information that Mini-TES provides will be used to select from a distance the rocks and soils that will be investigated in more detail and ultimately sampled. Mini-TES is derived from the MO/MGS TES instrument, but is significantly smaller and simpler. The instrument uses an 8-cm Cassegrain telescope, a Michelson interferometer, and uncooled pyroelectric detectors. Along with its mineralogical capabilities, Mini-TES can provide information on the thermophysical properties of rocks and soils. Viewing upward, it can also provide temperature profiles through the martian atmospheric boundary layer. Elemental and Mineralogical Composition: Once promising samples have been identified from a distance using Pancam/Mini-TES, they will be studied in detail using up to three compositional sensors that can be placed directly against them by an Instrument Arm. The two compositional sensors, presently on the payload are an Alpha-Proton-X-Ray Spectrometer (APXS), and a Mossbauer Spectrometer. The APXS is derived closely from the instrument that flew on Mars Pathfinder. Radioactive alpha sources and three detection modes (alpha, proton, and x-ray) provide elemental abundances of rocks and soils to complement and constrain mineralogical data. The Athena APXS will have a revised mechanical design that will cut down significantly on backscattering of alpha particles from martian atmospheric carbon. It will also include a target of known elemental composition that will be used for calibration purposes. The Athena Mossbauer Spectrometer is a diagnostic instrument for the mineralogy and oxidation state of Fe-bearing phases, which are particularly important on Mars. The instrument measures the resonant absorption of gamma rays produced by a Co-57 source to determine splitting of nuclear energy levels in Fe atoms that is related to the electronic environment surrounding them. It has been under development for space flight for many years at the Technical University of Darmstadt. The Mossbauer Spectrometer (and the other arm instruments) will be able to view a small permanent magnet array that will attract magnetic particles in the martian soil. The payload may also include a Raman Spectrometer. If included, the Raman Spectrometer will provide precise identification of major and minor mineral phases. It requires no sample preparation, and is also sensitive to organics. Fine-Scale Texture: The Instrument Arm a also carries a Microscopic Imager that will obtain high-resolution monochromatic images of the same materials for which compositional data will be obtained. Its spatial resolution is 20 micron/pixel over a 1 cm depth of field, and 40 micron/pixel over a 1-cm depth of field. Like Pancam, it uses the same active pixel sensor detectors and electronics as the rover's navigation cameras. The Instrument Arm is a three degree-of-freedom arm that uses designs and components from the Mars Pathfinder and Mars Surveyor '98 projects. Its primary function is instrument positioning. Along with the instruments noted above, it also carries a brush that can be used to remove dust and other loose coatings from rocks. Sample Collection and Storage: Martian rock and soil samples will be collected using a low-power rotary coring drill called the Mini-Corer. An important characteristic of this device is that it can obtain intact samples of rock from up to 5 cm within strong boulders and bedrock, Nominal core dimensions are 8xl7 mm. The Mini-Corer drills a core to the commanded depth in a rock, shears it off, retains it, and extracts it. It can also acquire samples of loose soil, using soil sample cups that are pressed downward into loose material. The Mini-Corer can drill at angles from vertical to 45' off vertical. It has six interchangeable bits for long life. Mechanical damage to the sample during drilling is minimal, and heating is negligible. After acquisition, the sample may be viewed by the arm instruments, and/or placed in one of 104 compartments in the Sample Container. A subset of the acquired samples may be replaced with other samples obtained later if desired. The Sample Container has no moving parts, and is mounted external to the rover for easy removal by the Mars Surveyor 2005 flight system. Operation of the rover will make extensive use of automated onboard navigation and hazard avoidance capabilities. Otherwise, use of onboard autonomy is minimal. Data downlink capability is about 40 Mbit/sol, and the use of the Mars Surveyor '01 orbiter for data relay imposes a limit of at most two command cycles per sol. Because of the significant amount of time available between command cycles, all payload elements will be operated sequentially, rather than in parallel.; this approach also significantly simplifies operations and minimizes peak power usage. The landing site for the '01 rover has not been selected yet. Site selection will make as full use as possible of Mars Global Surveyor data, and will involve substantial input from the broad Mars science community. Summary: The following table describes the mass, power, providers, and key scientific objectives of all the major elements of the Athena payload. Additional Athena payload information may be found at: http://astrosun.tn.cornell.edu/athena/index.html. Additional information contained in the original.

Squyes, S. W.↗

Selection and Assessment of Predictions of the Mars Pathfinder Landing Site

The successful landing of the Mars Pathfinder spacecraft on Mars allows the review of the process of selecting the landing site and assessing predictions made for the site based on Viking and Earth-based data. Selection of the landing site for Mars Pathfinder was a two-phase process. The first phase took place from October 1993 to June 1994 and involved: initial identification of engineering constraints, definition of environmental conditions at the site for spacecraft design, and evaluation of the scientific potential of different landing sites. This phase culminated with the first "Mars Pathfinder Landing Site Workshop", held at the Lunar and Planetary Institute in Houston, Texas on April 18-19, 1994, in which suggested approaches and landing sites were solicited from the entire scientific community. A preliminary site was selected by the project for design purposes in June 1994. The second phase took place from July 1994 to March 1996 and involved: developing criteria for evaluating site safety using images and remote sensing data, testing of the spacecraft and landing subsystems (with design improvements) to establish quantitative engineering constraints on landing site characteristics, evaluating all potential landing sites on Mars, and certification of the site by the project. This phase included a second open workshop, "Mars Pathfinder Landing Site Workshop II: Characteristics of the Ares Vallis Region and Field Trips in the Channeled Scabland, Washington" held in Spokane and Moses Lake September 24-30, 1995 and formal acceptance of the site by NASA Headquarters. Engineering constraints on Pathfinder landing sites were developed from the initial design of the spacecraft and the entry, descent and landing scenario. The site must be within 5 degrees of the subsolar latitude at the time of landing (15N for maximum solar power and flexible communications with Earth. It also must be below 0 km elevation to enable enough time for the parachute to bring the lander to the proper terminal velocity for landing. The entire landing ellipse, which is 70 km by 200 km due to navigational, ephemeris and atmospheric uncertainties, must be free of steep slopes, scarps and obvious hazards in Viking orbiter images, have acceptable radar reflectivity, moderate rock abundances and have little or no dust. Scientific considerations of the Mars Pathfinder payload and mission indicate that analyses of "grab bag" samples at the mouths of outflow channels can offer a first order assessment of a variety of rock types on Mars. Highland sites offer the advantage of in situ analysis of ancient rocks on Mars that record crustal differentiation and the nature of the early environment. Dark gray sites offer the potential of analyzing unweathered and unoxidized materials. Following a general assessment of the safety of different sites, a preliminary selection of a "grab bag" site was made. This site, Ares Vallis, is near the mouth of an outflow channel that may contain ancient Noachian terrain, Hesperian ridged plains, and reworked channel materials. All potential landing sites on Mars that met basic safety criteria were analyzed in detail. Sites (100 by 200 km target ellipses) were considered safe if they were below 0 km elevation, were free of obvious hazards (high relief surface features) in high-resolution (< 50 m/pixel) Viking orbiter images and had acceptable reflectivity and roughness at radar wavelengths, high thermal inertia, moderate rock abundance, low red to violet ratio, and low albedo. Only 4 sites on Mars met all the above criteria, which included 1995 opposition 3.5 cm delay-Doppler radar data. Complete data were evaluated for 7 sites and the Viking landing sites for comparison for all the above criteria as well as crater abundance, hill and mesa abundance, slopes over meter to kilometer scales, low altitude winds (from global circulation models and slopes), the size-frequency distribution of large rocks, as well as rover trafficability and science potential. Discussion of potential hazards at Ares Vallis using a variety of data sets (including radar) at a second open workshop, indicated this site cannot be shown to be any more hazardous than the Viking landing sites. Field trips to the Channeled Scabland and the Ephrata Fan, analogs for Ares Vallis and the landing site, respectively, provided valuable insight into possible geologic processes and potential surface characteristics. Three sites met all the data requirements and safety criteria for landing Pathfinder. Ares Vallis was selected by the project because it appeared acceptably safe (although it appeared to have greater rock abundances than other sites, its elevation was likely the best known) and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which would enable addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early martian environment and its subsequent evolution. The selection was reviewed by an external board at a number of meetings and accepted, and the site was approved by NASA Headquarters. Data gathered by the Pathfinder lander' and rover provides the opportunity to test the predictions made for the site in the selection process based on remote observations from Earth, orbit, and the surface. The discussion below is taken from Golombek et al. to which the reader is referred for a more complete discussion and a complete list of references, which are omitted here for brevity. Many characteristics of the landing site are consistent with its being shaped and deposited by the Ares and Tiu catastrophic floods. The rocky surface is consistent a depositional plain comprising semi-rounded pebbles, cobbles and tabular boulders (some of which appear imbricated and/or inclined in the direction of flow) that appear similar to depositional plains in terrestrial catastrophic floods. The Twin Peaks appear to be streamlined hills in lander images, which is consistent with interpretations of larger hills in Viking orbiter images of the region that suggest the lander is on the flank of a broad, gentle ridge trending northeast from Twin Peaks. This ridge, which is the rise to the north of the lander, is aligned in the downstream direction from the Ares and Tiu Valles floods, and may be a debris tail deposited in the wake of the Twin Peaks. Channels visible throughout the scene may be a result of late stage drainage. As predicted by delay-Doppler radar measurements and tracking results, the average elevation of the center of the site was about the same as Viking Lander I relative to the 6.1 mbar geoid. The Doppler tracking and two-way ranging estimate for the elevation of the spacecraft is only 45 in lower than the Viking I Lander and within 100 in of that expected, which is within the uncertainties of the measurements. After landing, surface pressures and winds (5-10 m/s) were found to be similar to expectations based on Viking data, although temperatures were about 10 K warmer. The temperature profile below 50 km was also roughly 20 K warmer. As a result, predicted densities were 5% higher near the surface and up to 40% lower at 50 km but within the entry, descent and landing design margins. The populations of craters and small hills and the slopes of the hills measured in high-resolution (38 m/pixel) Viking orbiter images and the radar derived slopes of the landing site are all consistent with observations of these properties in the lander images. A rocky surface was expected from Viking Infra-Red Thermal Mapper (IRTM) observations and comparisons with the Viking landing sites. The observed cumulative fraction of area covered by rocks with diameters greater than 3 cm and heights greater than 0.5 in (potentially hazardous to landing) at Ares is similar to that predicted by IRTM observations and models of Viking lander and Earth analog rock size-frequency distributions. The IRTM prediction postulated an effective thermal inertia of 30 (10(exp -3) cgs units - cal/cubic cm/s(exp 0.5)/K) for the rock population, but we obtain a slightly different effective thermal inertia for the actual rock population. The validity of interpretations of radar echoes prior to landing are supported by a simple radar echo model, an estimate of the reflectivity of the soil from its bulk density, and the fraction of area covered by rocks. In the calculations, the soil produces the quasi-specular echo and the rocks produce the diffuse echo. The derived quasispecular cross section is comparable to the cross-sections and reflectivities reported for 3.5-cm wavelength observations. The model yields a diffuse echo that is modestly larger than the polarized diffuse echo reported for 3.5-cm wavelength observations. At 12.5-cm wavelength, similar rock populations at Ares and the Viking I site were expected because the diffuse echoes are comparable, but the large normal reflectivities suggests that bulk densities of the soils at depth are greater than those at the surface. We also obtain a fine-component inertia near 8.4 which agrees with the fine-component inertia of 8.7 (in 10(exp -3) cgs units) estimated from thermal observations from orbit by the IRTM; for this estimate, we used a bulk thermal inertia of 10.4 for the landing site, an effective thermal inertia near 40 (10(exp -3) cgs units) for the rock population, and a graphical representation of Kieffer's model. Color and albedo data for Ares suggested surfaces of materials at Ares Vallis would be relatively dust free or unweathered prior to landing compared with the materials at the Viking landing sites. This suggestion is supported by the abundance of relatively dark-gray rocks at Ares and their relative rarity at the Viking landing sites, where rocks are commonly coated with bright red dust. Finally, the 40 km long Ephrata Fan of the Channeled Scabland in Washington state, which was deposited where c

Golombek, M. P.↗