Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TERMINAL FACILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Oak Ridge 25URC Tandem Accelerator 2007 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species 80Ge and 17,18F accounted for 763 of these hours. This included an experiment using 17F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich 81Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. The majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes. This ion source uses a quartz tube in the transfer line between the production target and the ion source to selectively slow down some elements such as rubidium and cesium.

43 PARTICLE ACCELERATORS↗

Oak Ridge 25URC Tandem Accelerator 2008 SNEAP Lab Report

During FY 2008, the 25URC operated for slightly over 3,000 research hours. The radioactive species {sup 80}Ge and {sup 17,18}F accounted for 763 of these hours. This included an experiment using {sup 17}F which was only possible due to an improvement of a factor of 50 in beam intensity over our previous facility record. Twenty stable beam species were provided this year. Operation for the experimental program was at terminal potentials from 2.02 to 23.8 MV. Approximately 200 hours of conditioning were done to return the machine to operation after tank openings. There were six tank openings during the year: three scheduled for general maintenance and three unscheduled. Two of the unscheduled openings were required to correct shorting rod issues and the other was to reestablish communication with one of the major dead sections. On July 28, an event happened that caused all accelerators at the Holifield Radioactive Ion Beam Facility (HRIBF) to suspend operation. At approximately 8 AM on that Monday, during operations with approximately 12 {micro}A of 50-MeV protons on a uranium carbide target, delivering neutron-rich {sup 81}Zn beam to the new Low-energy Radioactive Ion Beam Spectroscopy Station (LeRIBSS), a radiological control technician (RCT) reported higher than normal radiation levels just outside the shield door to the IRIS1 vault (the room in which RIBs are produced at HRIBF). The measured dose rate equivalent was 4 mrem/hr. The presence of radiological contamination on the floor just outside the shield door was subsequently noted, as was the possible presence of airborne radioactivity. These observations were reported to facility management. Accelerators were put in standby immediately and the building evacuated. The event was subsequently declared a laboratory operational emergency. Parts of the building were cleared for reentry to collect belongings on Monday afternoon. The entire building was cleared for reoccupation on Tuesday morning after a detailed radiological survey found no contamination outside the shielded vaults. No decontamination was required. No individual received any detectable radiological dose as a result of this event. The 25URC tandem accelerator was given permission to resume operation with stable beams in early September, but radioactive ion production is still not allowed. Subsequent analysis indicated a release that consisted entirely of noble gasses (Xe and Kr isotopes). We believe we have identified two unrelated failures, one associated with the HVAC system and the other with the roughing system exhaust which accounts for both the escape of noble gasses into the IRIS1 vault and their migration outside the vault. An investigation team report is expected by October 24. At that time, corrective actions will be determined and the path to future radioactive ion beam production will be known. The break from operations allowed a few upgrades to be implemented. The most notable was the installation and commissioning of a SNICS ion source purchased from National Electrostatics Corporation (NEC). The SNICS replaced the old Alton/Aarhus source that we have used for many years. An ANU style gas cathode holder was purchased also but has not yet been implemented. The first beams have been produced by the source and the biggest problem encountered was reducing the beam for very low current experiments. A new power supply for the injection magnet was installed during this period also. Radioactive ion beam (RIB) development at the High Power Target Laboratory (HPTL) has been delayed this year while installing the platforms, conduits and equipment for the second Injector for Radioactive Ion Species (IRIS2) which is co-located with the HPTL facility. Therefore, the majority of development activities have been performed at the two off-line ion source test facilities (ISTF1 and ISTF2) and the On-Line Test Facility (OLTF). Both test facilities have been developing systems which will eventually be used with IRIS2. Two new tunable Ti:Sapphire lasers have been ordered for continuing development of an ion source based on laser ionization using all solid-state lasers. When these are delivered, we will have a complete laser system. The other ion source test facility is continuing development of a negative-ion cooler for beam purification using photodetachment. This process has been demonstrated to work well in three systems so far (removing Co from Ni, removing S from Cl, and removing O from F). The original ion cooler has been modified to allow for use on the IRIS2 platform. Testing of this modified device is starting now. The OLTF has been used to test new types of uranium carbide targets for the electron beam plasma source (which are used for neutron-rich RIB campaigns) and to test a novel ion source which may result in purified beams of radioactive strontium isotopes.

43 PARTICLE ACCELERATORS↗

Characterization of the Transient Response of the ILS with One Module Installed to Heatup Changes in Power Level and Cooldown

This report provides documentation of the initial startup and testing of the first electrolysis module in the Idaho National Laboratory (INL) High Temperature Steam Electrolysis Integrated Laboratory Scale (ILS) facility. Initial shakedown testing of the INL ILS experimental facility commenced on August 22, 2007. This fulfilled a DOE Level 2 milestone. Heatup of the first ILS module started at approximately 4:10 PM on September 24, 2007. Initial module testing continued for 420 hours. The test average H2 production rate was approximately 1.3 Nm3/hr (0.116 kg H2/hr), with a peak measured value of over 2 Nm3/hr (0.179 kg H2/hr). Significant module performance degradation was observed over the first 250 hours, after which no further degradation was noted for the remainder of the test. Once all test objectives had been successfully met, the test was terminated in a controlled fashion. Discussion is included concerning several modifications that will be incorporated into the facility components to improve reliability and ease of operation for future long term testing.

08 HYDROGEN↗

An Historic Perspective of NPDES Individual Permit for Storm Water Discharges from Solid Waste Management Units at Los Alamos National Laboratory - 18667

The Los Alamos National Laboratory (LANL) and the associated communities of Los Alamos and White Rock are located in Los Alamos County in north-central New Mexico approximately 60 mi north-northeast of Albuquerque and 25 mi northwest of Santa Fe. The 36-mi{sup 2} facility is situated on the Pajarito Plateau, which consists of a series of fingerlike mesas separated by deep east-to-west oriented canyons cut by predominately ephemeral and intermittent streams. The mesa tops range in elevation from approximately 7800 ft. on the flanks of the Jemez Mountains to about 6200 ft. at their eastern termination above the Rio Grande Canyon. The land surrounding the Laboratory is largely undeveloped. Public access to much of the facility is limited for safety and security reasons. Large tracts of surrounding land are held by the U.S. Forest Service (Santa Fe National Forest), the Bureau of Land Management (Bandelier National Monument), the General Services Administration and San Ildefonso Pueblo. Storm water discharges from Solid Waste Management Units (SWMUs) have been regulated at the LANL since the early 1990's and have evolved into an Individual Stormwater Permit (IP) that may be one of the most complex in the nation. Historically, storm water discharges from SWMUs at LANL were regulated under a nationwide general permit using a watershed based approach requiring a Storm Water Pollution Prevention Plan (SWPPP), monitoring at sub-watershed scale 'USGS like' gage stations, and inspection and maintenance of erosion controls. In 2001, the Cerro Grande Fire destroyed many Laboratory structures, residential homes and over 80,000 acres of forested lands in the upper watershed above Los Alamos that significantly changed the local hydrology. Several years later, a Federal Facilities Compliance Agreement (FFCA) was issued by U.S. Environmental Protection Agency (USEPA) that was followed by a Clean Water Act lawsuit filed by concerned citizens, the result of which required more focus on stormwater discharges from individual SWMUs and an IP covering over 400 Sites. The IP contains non-numeric technology-based effluent limitations, coupled with a comprehensive, coordinated inspection and monitoring program, to minimize pollutants in LANL's storm water discharges associated with historical industrial activities from specified Sites. Non-numeric technology-based effluent limitations include minimizing pollutants in discharges through erosion and sedimentation controls, management of run-on and runoff, employee training, inspection and maintenance of controls, annual reporting and public involvement. The IP establishes Target Action Levels (TALs) that are equivalent to New Mexico State water-quality criteria. These TALs are used as benchmarks to determine the effectiveness of control measures implemented under the IP. That is, storm water quality sample results from SWMU discharges are compared with applicable TALs. If one or more sample results exceed a TAL, LANL must take additional corrective action. The TAL results are also confounded by high levels of naturally occurring constituents such as aluminum and gross alpha, and urban constituents such as copper, zinc and PCBs which may not be a source from the regulated SWMU. Due to the remote rugged terrain, security access issues, number of monitoring locations, stringent TALs, reporting requirements and public involvement requirements, this permit is likely one of the most stringent and complex in the country. The Laboratory has implemented this permit in a compliant manner for the past seven years and is anticipating the issuance of a new permit in the next few months. This paper will cover permit requirements related to control measure installations, monitoring, reporting and public involvement as well as process improvements and remaining water quality initiatives such as developing studies to address issues such as discriminating between natural background levels and LANL-related contaminants during the execution of this unique permit. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fault Dataset Development for VAV Terminal Units: Damper and Airflow Sensor Faults

This report analyzes field data to understand the impact of faults in variable air volume (VAV) terminal units on building indoor conditions and heating, ventilation, and air-conditioning (HVAC) system operations. The Oak Ridge National Laboratory (ORNL) team conducted field tests at the commercial building test facility known as ORNL’s Flexible Research Platform (FRP) building. Two specific faults-damper malfunctions and airflow sensor inaccuracies- were implemented, as these are common faults in VAV terminal units and can significantly impact HVAC system performance by increasing energy consumption, causing occupant discomfort, and raising operational costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Port Authority of New York and New Jersey Sustainable Aviation Fuel Logistics and Production Study

The Port Authority of New York and New Jersey (PANYNJ) sustainability commitment is to meet the goals set by the Paris Agreement, with an interim greenhouse gas reduction target of 35% by 2025 and 80% by 2050. PANYNJ is seeking sustainable solutions to reduce carbon emissions for all public forms of transportation, including aviation. Similarly, the global aviation industry adopted the Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA), which seeks to cap net carbon dioxide (CO 2 ) aviation emissions at 2020 levels through 2035. Industry has also set a goal of reducing CO 2 emissions by 50% compared to 2005 levels by 2050. Sustainable aviation fuel (SAF), made from non-petroleum feedstocks, is a near-term alternative fuel that reduces emissions from air transportation. The National Renewable Energy Laboratory (NREL) conducted a resource assessment and a techno-economic analysis to identify the potential for production in the port district. Although SAF could be sourced from other areas of the United States or imported, an evaluation of local production was conducted due to the potential positive impacts of a circular economy by converting local waste feedstocks into SAF for use at nearby airports. The study found that the highest volumes of feedstock nearby were municipal solid waste and woody biomass. SAF must be blended with Jet A up to certain percent determined by ASTM International fuel quality standards prior to use in aircraft. SAF from a stand-alone facility could be delivered by barge, rail, or truck to a Linden, New Jersey based terminal for blending with Jet A or it could be blended in the Gulf region and shipped via the Colonial pipeline to one of the terminals. The investment will take place at the terminal(s) to accommodate SAF/Jet A blends and it will be business as usual for the airports in how they receive fuel and distribute it to aircraft.

09 BIOMASS FUELS↗

Sigma 2 Graphic Display Software Program Description

A general purpose, user oriented graphic support package was implemented. A comprehensive description of the two software components comprising this package is given: Display Librarian and Display Controller. These programs have been implemented in FORTRAN on the XDS Sigma 2 Computer Facility. This facility consists of an XDS Sigma 2 general purpose computer coupled to a Computek Display Terminal.

Johnson, B. T.↗

Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

Source record↗

The design and implementation of CRT displays in the TCV real-time simulation

The design and application of computer graphics to the Terminal Configured Vehicle (TCV) program were described. A Boeing 737-100 series aircraft was modified with a second flight deck and several computers installed in the passenger cabin. One of the elements in support of the TCV program is a sophisticated simulation system developed to duplicate the operation of the aft flight deck. This facility consists of an aft flight deck simulator, equipped with realistic flight instrumentation, a CDC 6600 computer, and an Adage graphics terminal; this terminal presents to the simulator pilot displays similar to those used on the aircraft with equivalent man-machine interactions. These two displays form the primary flight instrumentation for the pilot and are dynamic images depicting critical flight information. The graphics terminal is a high speed interactive refresh-type graphics system. To support the cockpit display, two remote CRT's were wired in parallel with two of the Adage scopes.

Leavitt, J. B.↗

A unique integrated flight testing facility for advanced control/display research

NASA is engaged in programs aimed at developing avionic concepts and systems technology for air transportation systems of the 1980's and beyond. A part of these programs is related to the development of advanced concepts and avionics technology for integrated displays and controls. In support of these efforts an interactive Flight Display Research System (FDRS) has been developed as an integral part of integrated flight test facilities which have been used in evaluation studies of integrated display and control concepts in support of a VTOL Approach and Landing Technology (VALT) program and current Terminal Configured Vehicle (TCV) program. A description is provided of several of the advanced integrated display and control concepts that have evolved within the VALT, TCV, and general aviation programs, as well as the integrated flight test facilities.

Batson, V. M.↗

Three-dimensional photonic crystal fluorinated tin oxide (FTO) electrodes : synthesis and optical and electrical properties.

Photovoltaic (PV) schemes often encounter a pair of fundamentally opposing requirements on the thickness of semiconductor layer: a thicker PV semiconductor layer provides enhanced optical density, but inevitably increases the charge transport path length. An effective approach to solve this dilemma is to enhance the interface area between the terminal electrode, i.e., transparent conducting oxide (TCO) and the semiconductor layer. As such, we report a facile, template-assisted, and solution chemistry-based synthesis of 3-dimensional inverse opal fluorinated tin oxide (IO-FTO) electrodes. Synergistically, the photonic crystal structure possessed in the IO-FTO exhibits strong light trapping capability. Furthermore, the electrical properties of the IO-FTO electrodes are studied by Hall effect and sheet resistance measurement. Using atomic layer deposition method, an ultrathin TiO{sub 2} layer is coated on all surfaces of the IO-FTO electrodes. Cyclic voltammetry study indicates that the resulting TiO{sub 2}-coated IO-FTO shows excellent potentials as electrodes for electrolyte-based photoelectrochemical solar cells.

14 SOLAR ENERGY↗

In vitro reconstitution of sortase-catalyzed pilus polymerization reveals structural elements involved in pilin cross-linking

Covalently cross-linked pilus polymers displayed on the cell surface of Gram-positive bacteria are assembled by class C sortase enzymes. These pilus-specific transpeptidases located on the bacterial membrane catalyze a two-step protein ligation reaction, first cleaving the LPXTG motif of one pilin protomer to form an acyl-enzyme intermediate and then joining the terminal Thr to the nucleophilic Lys residue residing within the pilin motif of another pilin protomer. To date, the determinants of class C enzymes that uniquely enable them to construct pili remain unknown. Here, informed by high-resolution crystal structures of corynebacterial pilus-specific sortase (SrtA) and utilizing a structural variant of the enzyme (SrtA 2M ), whose catalytic pocket has been unmasked by activating mutations, we successfully reconstituted in vitro polymerization of the cognate major pilin (SpaA). Further, mass spectrometry, electron microscopy, and biochemical experiments authenticated that SrtA 2M synthesizes pilus fibers with correct Lys–Thr isopeptide bonds linking individual pilins via a thioacyl intermediate. Structural modeling of the SpaA–SrtA–SpaA polymerization intermediate depicts SrtA 2M sandwiched between the N- and C-terminal domains of SpaA harboring the reactive pilin and LPXTG motifs, respectively. Remarkably, the model uncovered a conserved TP(Y/L)XIN(S/T)H signature sequence following the catalytic Cys, in which the alanine substitutions abrogated cross-linking activity but not cleavage of LPXTG. These insights and our evidence that SrtA 2M can terminate pilus polymerization by joining the terminal pilin SpaB to SpaA and catalyze ligation of isolated SpaA domains in vitro provide a facile and versatile platform for protein engineering and bio-conjugation that has major implications for biotechnology.

59 BASIC BIOLOGICAL SCIENCES↗

Range Safety Systems

The high kinetic and potential energy of a launch vehicle mandates there be a mechanism to minimize possible damage to provide adequate safety for the launch facilities, range, and, most importantly, the general public. The Range Safety System, sometimes called the Flight Termination System or Flight Safety System, provides the required level of safety. The Range Safety System section of the Avionics chapter will attempt to describe how adequate safety is provided, the system's design, operation, and it's interface with the rest of the launch vehicle.

Schrock, Kenneth W.↗

Annual report of monitoring at Morrill, Kansas, in 2010.

Carbon tetrachloride contamination in groundwater at Morrill, Kansas, was initially identified in 1985 during statewide testing of public water supply wells for volatile organic compounds (VOCs). High levels of nitrate were also present in the wells. The city of Morrill is located in Brown County in the northeastern corner of the state, about 7 mi east of Sabetha. The population of Morrill as of the 2000 census was approximately 277. All residents of Morrill now obtain their drinking water from the Sabetha municipal water system via a pipeline constructed in 1991. Starting in 1922, eight different public wells formerly served the Morrill municipal system at some time. Because of poor water quality, including high nitrate levels attributed to numerous animal feeding operations in the vicinity and application of fertilizer on agricultural lands, use of the local groundwater from any public well for municipal supply purposes was terminated in 1991 in favor of obtaining water from the Sabetha municipal water system. Investigations of the carbon tetrachloride and nitrate contamination by the Kansas Department of Health and Environment (KDHE) in 1989, 1994, and 1996 (KDHE 1989; GeoCore 1994a-e, 1996) identified a localized plume of carbon tetrachloride in groundwater extending downgradient from a grain storage facility located in the northwestern section of Morrill. The facility was formerly operated by the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), from 1950 to 1971. Since termination of the CCC/USDA grain storage operations in 1971, the property and existing grain bins have been used for private grain storage up to the present time. Prior to 1986, commercial grain fumigants were commonly used by the CCC/USDA, as well as private and commercial grain storage operations, to preserve grain. Because the identified carbon tetrachloride contamination could in part be linked to historical use of carbon tetrachloride-based fumigants at its former facility, in 2003 the CCC/USDA assumed responsibility for the site investigation of the carbon tetrachloride contamination. The CCC/USDA involvement began with development and implementation of a work plan for a Phase I expedited site characterization (Argonne 2003). That investigation and subsequent investigations (Argonne 2004, 2005a) were performed by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne continues to provide technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The initial investigation by the CCC/USDA in 2003 determined that soils at the former facility have not been impacted by grain fumigation activities. Neither carbon tetrachloride nor chloroform was detected in near-surface soils or in subsurface soils collected to bedrock or to a depth of 15 ft below ground level (BGL). Therefore, no identifiable human health risk is associated with either carbon tetrachloride or chloroform in shallow soils, which additionally pose no further threat of contamination to groundwater. High carbon tetrachloride concentrations in groundwater (maximum 390 {micro}g/L in a sample collected from monitoring well MW3S - located on the former CCC/USDA property - in 1995) have declined significantly during long-term monitoring by the KDHE and currently by the CCC/USDA. Maximum levels within the plume of < 50 {micro}g/L at present confirm that no continuing soil source remains at the former CCC/USDA facility. Nevertheless, carbon tetrachloride concentrations exceeding the KDHE Tier 2 risk-based screening level of 5.0 {micro}g/L remain. In September 2005, the CCC/USDA initiated periodic sampling of groundwater at Morrill, in accord with a monitoring program approved by the state (KDHE 2005), to monitor carbon tetrachloride concentrations in the groundwater. Under the KDHE-approved monitoring plan (Argonne 2005b), groundwater was initially sampled twice yearly for a period of two years. The samples were analyzed for VOCs, as well as for selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The data have been inconclusive overall, possibly because of the relatively low contaminant concentrations in the plume. Nevertheless, consistently low levels of dissolved oxygen (DO) and oxidation-reduction potential (ORP) at monitoring well MW1D (in the deepest portion of the contaminated aquifer) and the presence of chloroform (the primary degradation product of carbon tetrachloride) suggest that some degree of reductive dechlorination is occurring.

54 ENVIRONMENTAL SCIENCES↗

Consolidated decommissioning guidance: Financial assurance, recordkeeping, and timeliness. Volume 3

The U.S. Nuclear Regulatory Commission (NRC) consolidated and updated numerous decommissioning guidance documents into this three volume NUREG. Specifically, the three volumes address the following topics: (1) "Decommissioning Process for Materials Licensees"; (2) "Characterization, Survey, and Determination of Radiological Criteria"; and (3) "Financial Assurance, Recordkeeping, and Timeliness." This three-volume NUREG series replaces NUREG-1727 ("NMSS Decommissioning Standard Review Plan," issued September 2000) and NUREG/BR-0241 ("NMSS Handbook for Decommissioning Fuel Cycle and Materials Licensees," issued March 1997). This NUREG series is intended for use by NRC staff, licensees, and others. Volume 3 of this NUREG series provides guidance on the technical aspects of compliance with requirements for timeliness in decommissioning of materials facilities, the requirements for financial assurance for decommissioning, and the recordkeeping requirements related to eventual decommissioning. Licensees should use this guidance in preparing decommissioning plans, license termination plans, final status surveys, and other technical decommissioning reports for submittal to the NRC. The NRC staff will use this guidance in reviewing these documents and related license amendment requests. Volume 3 is intended to apply only to the decommissioning of materials facilities licensed under Title 10 of the Code of Federal Regulations (10 CFR) Parts 30, 40, 70, and 72.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Role of LiCoO 2 Surface Terminations in Oxygen Reduction and Evolution Kinetics

Oxygen reduction reaction (ORR) and oxygen evolution reaction (OER) activities of LiCoO 2 nanorods with sizes in the range from 9 to 40 nm were studied in alkaline solution. The sides of these nanorods were terminated with low-index surfaces such as (003) while the tips were terminated largely with high-index surfaces such as (104) as revealed by high-resolution transmission electron microscopy. Electron energy loss spectroscopy demonstrated that low-spin Co 3+ prevailed on the sides, while the tips exhibited predominantly high- or intermediate-spin Co 3+ . We correlated the electronic and atomic structure to higher specific ORR and OER activities at the tips as compared to the sides, which was accompanied by more facile redox of Co 2+/3+ and higher charge transferred per unit area. These findings highlight the critical role of surface terminations and electronic structures of transition metal oxides on the ORR and OER activity.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Decommissioning the Fuel Process Building, a Shift in Paradigm for Terminating Safeguards on Process Holdup

INMM Abstract 51st Annual Meeting Decommissioning the Fuel Process Building, a Shift in Paradigm for Terminating Safeguards on Process Holdup The Fuel Process Building at the Idaho Nuclear Technology and Engineering Center (INTEC) is being decommissioned after nearly four decades of recovering high enriched uranium from various government owned spent nuclear fuels. The separations process began with fuel dissolution in one of multiple head-ends, followed by three cycles of uranium solvent extraction, and ending with denitration of uranyl nitrate product. The entire process was very complex, and the associated equipment formed an extensive maze of vessels, pumps, piping, and instrumentation within several layers of operating corridors and process cells. Despite formal flushing and cleanout procedures, an accurate accounting for the residual uranium held up in process equipment over extended years of operation, presented a daunting safeguards challenge. Upon cessation of domestic reprocessing, the holdup remained inaccessible and was exempt from measurement during ensuing physical inventories. In decommissioning the Fuel Process Building, the Idaho Cleanup Project, which operates the INTEC, deviated from the established requirements that all nuclear material holdup be measured and credited to the accountability books and that all nuclear materials, except attractiveness level E residual holdup, be transferred to another facility. Instead, the decommissioning involved grouting the process equipment in place, rather than measuring and removing the contained holdup for subsequent transfer. The grouting made the potentially attractiveness level C and D holdup even more inaccessible, thereby effectually converting the holdup to attractiveness level E and allowing for termination of safeguards controls. Prior to grouting the facility, the residual holdup was estimated by limited sampling and destructive analysis of solutions in process lines and by acceptable knowledge based upon the separations process, plant layout, and operating history. The use of engineering estimates, in lieu of approved measurement methods, was justified by the estimated small quantity of holdup remaining, the infeasibility of measuring the holdup in a highly radioactive background, and the perceived hazards to personnel. The alternate approach to quantifying and terminating safeguards on process holdup was approved by deviation.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗