Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TEAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Bob Geyer: Coaching wrestling or clearing waste, he puts his team first

When Bob’s team started the project of clearing drums out of the PF-4 basement, there were 1,800 drums inside. Now, there are less than 500. It’s no coincidence that Bob Geyer leads a team that goes by the acronym of MVP — move, validate and prepare — more commonly recognized as “most valuable player.” Bob and the MVP team manage waste drums after they’ve been packaged. Their job is to constantly work a puzzle of drums and locations based on the contents of the drums, where they came from and where they’re headed. All the while, they’re ensuring there’s enough floor space in the Plutonium Facility for the waste materials that come out of daily production operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Our teams design high-resolution MeV x-ray radiography systems for National security missions [Poster]

The NNSS has been at the forefront of custom high-fidelity x-ray/gamma radiographic imaging solutions that serve our national security for over five decades. Our radiography team utilizes expertise in physics modeling and analysis, along with optical, mechanical, and electrical design, in close collaboration with our customers, to develop imaging methods and capabilities that go beyond their needs. Conceptual designs are developed through R&D efforts to provide solutions for the specific problem at hand. Field systems are designed and built in-house, then qualified utilizing a range of facilities across the National Security Enterprise. Radiographic imaging systems are deployed by our team in the most challenging environments. The NNSS has a strong math and programming team that provides novel on-site image analysis methods that extract crucial information from data returned in field tests.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

LLE Diagnostic Resource Team for Innovative Fusion Concepts (Final Report)

The LLE Diagnostic Resource Team for Innovative Fusion Concepts provided travelling neutron diagnostics, consultancy on neutron diagnostics, and consultancy on tritium handling to fusion companies. An existing neutron detector was recalibrated for low yields and two detectors were built based on designs proven on the Omega Laser Facility. The three detectors allow measurements over a wide range of yields (from 10 to 1E7 incident neutrons). The detectors were calibrated for DD neutrons on a dedicated OMEGA shot day. Neutron detectors from the company MIFTI were also calibrated on OMEGA. MIFTI is currently using their detectors and two of our detectors on staged Z-pinch experiments at UCSD. The Team acted as consultants for the development of a liquid scintillator array to detect neutrons from muon induced fusion by NK Labs. Segments of NK Labs’ detector were tested at the LLE using radioactive sources and a DD neutron generator. The Team also acted as consultants for the design of a tritium handling system for NK Labs. A new type of neutron spectrometer was designed and built, and has completed preliminary testing.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Data Steward Team Wall-to-Wall Inventory Status Update October - December 2023 [Slides]

7 Wall-to-wall inventories were completed between October 2 – December 11, 2023. The team viewed 12 technical areas. A total of 280 containers were verified against current WCATS data. We worked with WMCs team to schedule for all waste throughout WFO FOD. WMCs are doing an incredible job with keeping up with all their locations; The team only found one discrepancy that was resolved the same day, and The WMC also took the time to explain their process on how containers are labeled with closure days and why it was labeled as such.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Steward Team Wall-To-Wall Inventory Status Update July - September 2023 [Slides]

8 Wall-to-wall inventories were completed between July 3rd – September 20th, 2023. The scheduling was broken down by FODs, and the team completed UI and IF. The team viewed 12 sites across 7 technical areas. A total of 249 containers were verified against current WCATS data. 2 containers were unable to be verified due to lack of WMC response. We worked with WMCs and Environmental Stewardship teams this quarter to schedule the wall-to-wall inventories. Discrepancies that were found were fixed by the WMCs in a timely manner. Most of the discrepancies were Labeling issues which were resolved the day of the walk down or within a week.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tough Errors Are no Match (TEAM): Optimizing the Quantum Compiler for Noise Resilience

This report summarizes research performed under the Tough Errors Are no Match (TEAM) project. The primary focus of TEAM has been to research and develop a compilation toolbox leveraging techniques from quantum characterization and control, probabilistic programming, and approximate computing. Our goal was to develop robust protocols that can be integrated into quantum compilers to optimize and enhance the robustness of noisy computation. Here, we provide a summary of TEAM work focused on characterization and control of quantum systems.

97 MATHEMATICS AND COMPUTING↗

Fermilab 2025 Summer Internship Skills Learned from Working with Mu2e Tracker Team

As part of a DOE RENEW Grant, the undergraduate authors interned at Fermilab. They spent nine weeks over summer 2025 working on the tracker team for the Mu2e experiment. They gained practical experience in a multitude of new skills including electronics installation, testing, and repairs. Their work particularly increased productivity by helping repair the high voltage and calibration pre-amplifiers, over 20,000 of which are needed in the tracker. These components are very fragile and often break during the installation process. The experience also taught them several soft skills such as the importance of thoughtful data storage, record- keeping, and problem-solving skills. They learned the demands of a large, international collaboration and how to work in a team. The authors would like to acknowledge their advisor and PI of the grant, Dr. Christopher G. Fasano, and the Mu2e team lead by co- spokesperson Dr. Bob Bernstein and tracker L2 manager Dr. Brendan Kiburg.

de Zwart, Brontë↗

A Simulation Resource Team for Innovative Fusion Concepts

This project created a shared simulation resource for innovative fusion concepts at the University of Rochester, built around the FLASH, TriForce, OSIRIS, and OSHUN codes. Many promising fusion approaches are too complex to evaluate by experiment alone yet building a custom simulation capability from scratch for each new concept is expensive and slow. The BETHE Simulation Resource Team addressed this problem by developing and validating a flexible set of numerical tools, which were then applied across three major concept areas: plasma-jet-driven magneto-inertial fusion, staged Z pinches, and field-reversed configurations. The team assisted three concept teams and carried out independent analyses of all three concepts.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Photopolarimetry team outer planets mission definition phase

The work is reported of the Photopolarimetry Team in identifying scientific objectives for photometer/polarimeter experiments for outer planet flyby missions. A discussion of the scientific objectives which can be attained with a photometer/polarimeter experiment, and summaries of the special studies which were performed for the Photopolarimetry Team are presented along with a description of the photometer/polarimeter design which was developed for the Meteoroid Detection Team.

Source record↗

NASA Application Team Program: Application of aerospace technology in biology and medicine

The results of the medically related activities of the NASA Application Team Program in technology application for the reporting period September 1, 1972, to August 31, 1973 are reported. The accomplishments of the application team during the reporting period are as follows: The team has identified 39 new problems for investigation, has accomplished 7 technology applications, 4 potential technology applications, 2 impacts, has closed 38 old problems, and has a total of 59 problems under active investigation.

Source record↗

Exploring team avionics systems by simulation

Configurations of software and hardware in a no-critical-element team architecture are under study for future general aviation aircraft avionics. The team integrated avionics system, based on microprocessors, can monitor and partially interpret all flight instrument data, engine parameters, and navigation information faster than a human pilot. Simulation programs based on an event-oriented simulation language are being used to design team architectures.

Brent, G. A.↗

A model for the submarine depthkeeping team

The most difficult task the depthkeeping team must face occurs during periscope-depth operations during which they may be required to maintain a submarine several hundred feet long within a foot of ordered depth and within one-half degree of ordered pitch. The difficulty is compounded by the facts that wave generated forces are extremely high, depth and pitch signals are very noisy and submarine speed is such that overall dynamics are slow. A mathematical simulation of the depthkeeping team based on the optimal control models is described. A solution of the optimal team control problem with an output control restriction (limited display to each controller) is presented.

Ware, J. R.↗

Report on the findings of the Japanese Investigative Team on US Space Station Design (Keidanren)

The objectives, itinerary and results of the Japanese Investigative Team on U.S. Space Station Design (Keidanren), consisting of members of the Space Development Promotion Council and representatives of Japanese industries involved in Japan's space station development effort are presented. This team visited NASA facilities in February, 1985. The objectives of the study team are to gather information on preliminary design efforts toward space station planning in Japan and the promotion of Japanese space related industries, as well as the evaluation of the present status of space environment exploitation in the U.S. This report is intended to be a basic reference for government agencies and industry in addressing the course of action to be taken in the future development of Japan's space station participation.

Source record↗

Research activities on Antarctic middle atmosphere by JARE 25th team

The Antarctic Middle Atmosphere (AMA)-Japan research project was set about by the JARE (Japan Antarctic Research Expedition) 23rd team in 1982, and since then the JARE-24th and JARE-25th teams have been continuing reseach on the Antarctic Middle Atmosphere. Results gained by JARE-25th team members who are now working at Syowa Station (69.99 deg S, 39.35 deg E), Antarctica are presented. In their activities satellite measurements (Exos-C) and rocket soundings are used. Three rockets of the S310 type were launched at Syowa Station (Geomagnetic Latitude = 69.9 deg S) for the purpose of directly observing the electron density, ionospheric temperature, auroral patterns and luminosity in situ. Vertical profiles of electron density and auroral emission 4278A measured by three rockets are compared.

Hirasawa, T.↗

Environmental control medical support team

The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.

Crump, William J.↗

Asteroid team

The purpose of this task is to support asteroid research and the operation of an Asteroid Team within the Earth and Space Sciences Division at the Jet Propulsion Laboratory (JPL). The Asteroid Team carries out original research on asteroids in order to discover, better characterize and define asteroid properties. This information is needed for the planning and design of NASA asteroid flyby and rendezvous missions. The asteroid Team also provides scientific and technical advice to NASA and JPL on asteroid related programs. Work on asteroid classification continued and the discovery of two Earth-approaching M asteroids was published. In the asteroid photometry program researchers obtained N or Q photometry for more than 50 asteroids, including the two M-earth-crossers. Compositional analysis of infrared spectra (0.8 to 2.6 micrometer) of asteroids is continuing. Over the next year the work on asteroid classification and composition will continue with the analysis of the 60 reduced infrared spectra which we now have at hand. The radiometry program will continue with the reduction of the N and Q bandpass data for the 57 asteroids in order to obtain albedos and diameters. This year the emphasis will shift to IRAS follow-up observations; which includes objects not observed by IRAS and objects with poor or peculiar IRAS data. As in previous year, we plan to give top priority to any opportunities for observing near-Earth asteroids and the support (through radiometric lightcurve observations from the IRTF) of any stellar occultations by asteroids for which occultation observation expeditions are fielded. Support of preparing of IRAS data for publication and of D. Matson for his participation in the NASA Planetary Astronomy Management and Operations Working Group will continue.

Matson, D. L.↗

STS-27R OV-104 Orbiter TPS damage review team, volume 1

Following the return to earth on December 2, 1988, of Orbiter OV-104, Atlantis, it was observed that there was substantial Thermal Protection System (TPS) tile damage present on the lower right fuselage and wing. Damage sites were more numerous than on previous flights and conversely, there was almost no damage present on Atlantis' left side. A review team investigated the cause beginning with a detailed inspection of the Atlantis TPS damage, and a review of related inspection reports to establish an indepth anomaly definition. An exhaustive data review followed. A fault tree and several failure scenarios were developed. Finally, the failure scenarios were categorized as either not possible, possible but not probable, or probable. This and other information gained during the review formed the basis for the team's findings and recommendations. The team concluded that the most probable cause of the severe STS-27R Orbiter tile damage is that the ablative insulating material covering the RH SRB Nose Cap dislodged and struck the Orbiter tile near 85 seconds into flight and possibly that debris from other sources, including repaired insulation and missing joint cork, caused minor tile damage. Findings are presented, and recommendations that are believed pertinent to minimizing the potential for inflight debris are described.

Thomas, John W.↗

The first year of teaming - A progress report

The National AeroSpace Plane (NASP) national contractor team began formal operations on January 31, 1991, and made considerable progress toward demonstrating the feasibility of the X-30 and the technology readiness to enter a full-scale development program. Two cycles of conceptual design are complete, preliminary design is initiated, and many of the major configuration and structural arrangement decisions are complete. Results of work in supporting technology areas for a variety of the propulsion system technologies are mentioned, including the low-speed oxidizer system, the production of slush hydrogen, and the use of external burning. Results of tests currently being performed on structural demonstration articles are satisfactory. Each of these demonstration articles is representative of structures and materials to be incorporated into the team's X-30 design. An operating team is outlined that encompasses not only the five principal contractors and their subcontractors, but also government and university laboratories through an innovative arrangement that brings this work into the mainstream of the program.

Waldman, Barry J.↗