Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Strategic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2021 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPRs ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar - to - diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the caverns drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns .

02 PETROLEUM↗

Strategic Petroleum Reserve Cavern Leaching Monitoring CY20

The U.S. Strategic Petroleum Reserve is a crude oil storage system run by the U.S. Department of Energy. The reserve consists of 60 active storage caverns spread across four sites in Louisiana and Texas, near the Gulf of Mexico. Beginning in 2016, the SPR began executing U.S. congressionally mandated oil sales. The configuration of the reserve, with a total capacity of greater than 700 MMB, requires raw water to be used instead of saturated brine for oil withdrawals such as for sales. All sales will produce leaching within the caverns used for oil delivery. Twenty-five caverns had a combined total of over 39 MMB of water injected in CY 20 as part of the Exchange for Storage program; oil was withdrawn in the same manner as for congressionally mandated sales. Leaching effects were monitored in these caverns to understand how the oil withdrawals may impact the long-term integrity of the caverns. While frequent sonars are the best way to monitor changes in cavern shape, they can be resource intensive for the number of caverns involved in sales and exchanges. An intermediate option is to model the leaching effects and see if any concerning features develop. The leaching effects were modeled here using the Sandia Solution Mining Code (SANSMIC) . The results indicate that leaching induced features are not of concern in the majority of the caverns, 19 of 25. Six caverns, BH-107, BH-113, BH-114, BM-4, BM-106, and WH-114 have features that may grow with additional leaching and should be monitored as leaching continues in those caverns. Ten caverns had post sale sonars that were compared with SANSMIC results. SANSMIC was able to capture the leaching well , particularly the formation of shelves and flares. A deviation in the SANSMIC and sonar cavern shapes was observed near the cavern floor in caverns with significant floor rise, a process not captured by SANSMIC. These results suggest SANSMIC is a useful tool for monitoring changes in cavern shape due to leaching effects related to sales and exchanges.

02 PETROLEUM↗

Revisions to the Strategic Petroleum Reserve Well Grading System

This report presents revisions to the Strategic Petroleum Reserve (SPR) well grading framework. The well grading framework is composed of multiple components and was developed as a guide in application of well remediation and monitoring resources. The revisions were applied to enhance the efficiency and consistency of the well grading process across the four SPR sites. Documentation of the revisions and any significant impact from these revisions are also discussed. The current general workflow for the application and updating of the well grades is also provided.

02 PETROLEUM↗

China and Multi-Domain Strategic Stability (Annotated Bibliography)

Brief summaries of literature relating to four areas: China's Approach to Multi-Domain Complexity, China's Approach to Multi-Domain Strategic Stability, A Cooperative Management Approach, and Risk Mitigation in the Absence of Cooperative Approaches.

97 MATHEMATICS AND COMPUTING↗

Strategic Weapons in the 21st Century The U.S. Nuclear Deterrent in 2030 and Beyond: Fit for Purpose?

The 13th annual Strategic Weapons in the 21st Century (SW21) workshop brought together a mixture of senior officials from the laboratory, policy, military, and expert communities to promote a high-level focus and well-informed discussion on key deterrence challenges for the U.S. nuclear deterrent over the coming decade and beyond. It brought together interested stakeholders from the national security laboratories, federal government, military, think tank, and academic communities, as well as allied counterparts, to share perspectives in an unclassified setting.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Strategic Petroleum Reserve Enhanced Monitoring Compendium - FY 2021

The Strategic Petroleum (SPR) is the world’s largest supply of crude oil. The reserve consists of fours sites in Louisiana and Texas. Each site stores crude in deep, underground salt caverns. It is the mission of the SPR’s Enhanced Monitoring Program to examine all available data to inform our understanding of each site. This report discusses the data, processes and results for each of the four sites.

02 PETROLEUM↗

Automation of Plot Generation for Strategic Petroleum Reserve Cavern Leaching Monitoring

Monitoring cavern leaching after each calendar year of oil sales is necessary to support cavern stability efforts and long-term availability for oil drawdowns in the U.S. Strategic Petroleum Reserve. Modeling results from the SANSMIC code and recent sonars are compared to show projected changes in the cavern’s geometry due to leaching from raw-water injections. This report aims to give background on the importance of monitoring cavern leaching and provide a detailed explanation of the process used to create the leaching plots used to monitor cavern leaching. In the past, generating leaching plots for each cavern in a given leaching year was done manually, and every cavern had to be processed individually. A Python script, compatible with Earth Volumetric Studio, was created to automate most of the process. The script makes a total of 26 plots per cavern to show leaching history, axisymmetric representation of leaching, and SANSMIC modeling of future leaching. The current run time for the script is one hour, replacing 40-50 hours of the monitoring cavern leaching process.

02 PETROLEUM↗

Global Security & Strategic Partnerships Programs

Serving the Nation: Our Missions include Providing the Nuclear Deterrent for our Nation and Allies; Leading Nuclear Nonproliferation and Counterterrorism / Counterproliferation efforts to make the world a safer place; Supplying Enriched Uranium Material for Reactors – Naval Propulsion, Army, NASA, Universities, Isotope Production Reactors; Providing High Explosives for the Stockpile and Strategic Partners; Delivering Solutions – Solve emerging national security challenges

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pit Production Strategic Analysis Tool

The LANL Pit Production Strategic Analysis tool is an executive-level decision support tool for planning related to the demand and production of pits. The spreadsheet-based tool includes decision factors for stockpile program demand combined with production and infrastructure planning at PF-4, Savanna River, and future production options. The tool graphically compares supply and demand under different scenarios. The tool is based on NNSA planning documents and process analyses.

97 MATHEMATICS AND COMPUTING↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2022 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of a vailable drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the s tructural integrity with more detail using geomechanical models. Finite - element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns.

02 PETROLEUM↗

Strategic Energy Management Program Persistence and Cost Effectiveness An Analysis of the SEM Program Landscape

This study examines the relationship between strategic energy management (SEM) programs and their persistence and cost effectiveness, with analysis based on interview data from 24 SEM program administrators, SEM program evaluations, and other reports. The 80 interview questions focused on the topics of program design, energy savings, energy savings persistence, cost effectiveness, and customer SEM persistence. The generosity of interview respondents provided a wealth of data, resulting in a report of sufficient length to warrant inclusion of this brief guide of the report structure. The major sections are listed below with brief descriptions. Individual sections of this report are mainly stand-alone and do not require reading of other sections. As a result, there is some duplication between sections, but with differing levels of detail. Executive Summary: Presents three key conclusions of this work with a short description of potential actions to advance the understanding of each key finding. Brief Observations: Lists a large number of bulleted observations resulting from this research, arranged by the five major topic areas included in the interviews. Analysis details are provided in the Analysis of Interview Results section. Foundations for this Research: Provides an overview of SEM, SEM frameworks, SEM programs, the topics of persistence and cost effectiveness, and the focus of this research. Methodology: Details the approach and strategy of this research, providing background information relevant to the formulation of interview questions and the identification of which SEM programs to interview. Observations from Compiled Evaluations and Other Reports: Reports observations from the collection and analysis of program evaluations, annual reports, utility planning documents, and SEM-related white papers. This section, presented in bullet form, highlights challenges in data collection and ultimately a comparison of program practices as they pertain to persistence and cost effectiveness. Analysis of Interview Results: Presents detailed analysis of responses from SEM program administrators, arranged by the five major categories examined: program design, energy savings, energy savings persistence, cost effectiveness, and customer SEM persistence. Interview questions are generally grouped together into subsections when it makes sense to examine them together. SEM Programs Challenge Traditional Cost-Effectiveness Metrics: Details an analysis based on five key factors showing that applying traditional cost-effectiveness metrics to SEM programs is not straightforward. This invites the opportunity to consider whether traditional cost-effectiveness metrics are applicable to SEM programs, either individually or at large. Resolution of Research Hypotheses: Tabulates a set of hypotheses that were developed to address the fundamental nature of the research at hand. Analysis of responses to multiple questions informs an understanding of each hypothesis and can be used to better understand the SEM program environment at large.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Smart Manufacturing Strategic Plan: To Facilitate More Rapid Development, Deployment and Adoption of Smart Manufacturing Technologies

Smart manufacturing technologies provide real-time data and insight to improve the productivity, efficiency, and competitiveness of U.S. manufacturing, creating the potential for new jobs in the manufacturing sector. These technologies can support U.S. manufacturers’ ability to increase throughput and energy efficiency, and decrease waste, defects, and costs. A wide range of manufacturing and industrial subsectors, particularly energy-intensive and energy-dependent industries, have the potential to benefit from smart manufacturing technologies. There are technical improvements still needed to reduce the costs and barriers (trained workforce and upskilling, software-hardware integration, cost, and technical barriers to deployment of advanced sensors, computing, and communication technologies for existing manufacturing assets) to the adoption of smart manufacturing technologies, especially to small and medium-sized manufacturers, and subsequently, increase the overall adoption rate of smart manufacturing technologies. This report outlines the Department of Energy’s (DOE) strategic plan to accelerate the development and implementation of smart manufacturing technologies in the United States and the actions DOE has taken to use these technologies in smart manufacturing for the United States. DOE’s plan to facilitate more rapid development, deployment and widespread adoption of smart manufacturing technologies derive from the 2018 Strategy for American Leadership in Advanced Manufacturing. The strategy outlines a vision for America’s leadership in advanced manufacturing including the development of intelligent manufacturing systems to optimize manufacturing facilities and support the manufacturing of transformative materials. DOE’s Clean Energy Smart Manufacturing Innovation Institute (CESMII), a Manufacturing USA Institute, focuses on accelerating the development and adoption of advanced sensors, controls, platforms, and models needed for smart manufacturing. The objective is to enhance U.S. manufacturing productivity and global competitiveness through the research and development of these technologies. Smart manufacturing has the potential to improve the overall performance, energy productivity, and efficiency of manufacturing, fostering the economic competitiveness of the manufacturing sector.

99 GENERAL AND MISCELLANEOUS↗

Strategic Petroleum Reserve Cavern Leaching Monitoring CY21

Th e U.S. Strategic Petroleum Reserve (SPR) is a crude oil storage system administered by the U.S. Department of Energy. The reserve consists of 60 active storage caverns located in underground salt domes spread across four sites in Louisiana and Texas, near the Gulf of Mexico. Beginning in 2016, the SPR started executing C ongressionally mandated oil sales. The configuration of the reserve, with a total capacity of greater than 700 million barrels ( MMB ) , re quires that unsaturated water (referred to herein as ?raw? water) is injected into the storage caverns to displace oil for sales , exchanges, and drawdowns . As such, oil sales will produce cavern growth to the extent that raw water contacts the salt cavern walls and dissolves (leaches) the surrounding salt before reaching brine saturation. SPR injected a total of over 45 MMB of raw water into twenty - six caverns as part of oil sales in CY21 . Leaching effects were monitored in these caverns to understand how the sales operations may impact the long - term integrity of the caverns. While frequent sonars are the most direct means to monitor changes in cavern shape, they can be resource intensive for the number of caverns involved in sales and exchanges. An interm ediate option is to model the leaching effects and see if any concerning features develop. The leaching effects were modeled here using the Sandia Solution Mining Code , SANSMIC . The modeling results indicate that leaching - induced features do not raise co ncern for the majority of the caverns, 15 of 26. Eleven caverns, BH - 107, BH - 110, BH - 112, BH - 113, BM - 109, WH - 11, WH - 112, WH - 114, BC - 17, BC - 18, and BC - 19 have features that may grow with additional leaching and should be monitored as leaching continues in th ose caverns. Additionally, BH - 114, BM - 4, and BM - 106 were identified in previous leaching reports for recommendation of monitoring. Nine caverns had pre - and post - leach sonars that were compared with SANSMIC results. Overall, SANSMIC was able to capture the leaching well. A deviation in the SANSMIC and sonar cavern shapes was observed near the cavern floor in caverns with significant floor rise, a process not captured by SANSMIC. These results validate that SANSMIC continues to serve as a useful tool for mon itoring changes in cavern shape due to leaching effects related to sales and exchanges.

02 PETROLEUM↗

Strategic Petroleum Reserve Enhanced Monitoring Compendium (FY 2022)

The Strategic Petroleum Reserve (SPR) is the world's largest supply of emergency crude oil. The reserve consists of four sites in Louisiana and Texas. Each site stores crude in deep, underground salt caverns. It is the mission of the SPR's Enhanced Monitoring Program to examine all available data to inform our understanding of each site. This report discusses the monitoring data, processes, and results for each of the four sites for fiscal year 2022.

02 PETROLEUM↗

2023 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

DOE maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns at the U.S. Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR’s ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. This report covers impacts on drawdown availability due to SPR operations during Calendar Year 2022. A cavern has an available drawdown if, after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a pillar-to-diameter ratio of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for oil sales, purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern’s drawdown capacity may be continued. A methodology for assessing and tracking the available drawdowns for each cavern is reiterated. This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditures. A total of 222 million barrels of oil were released in calendar-year 2022. A nearly-equal amount of raw water was injected, resulting in an estimated 34 million barrels of cavern leaching. Twenty caverns have now expended a full drawdown. Cavern BC 18 has expended all its baseline available drawdowns, and has no drawdowns remaining. Cavern BM 103 has expended one of its two baseline drawdowns, and is now a single-drawdown cavern. All other caverns with an expenditure went from at-least-5 to at-least-4 remaining drawdowns.

02 PETROLEUM↗

Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

DOE maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns at the U.S. Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR’s ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern.

02 PETROLEUM↗

Strategic Petroleum Reserve Enhanced Monitoring Compendium (FY23)

The Strategic Petroleum Reserve (SPR) is the world’s largest supply of emergency crude oil. The reserve consists of four sites in Louisiana and Texas. Each site stores crude in deep, underground salt caverns. It is the mission of the SPR’s Enhanced Monitoring Program to examine available sensing data to inform our understanding of each site. This report discusses the monitoring data, processes, and results for each of the four sites for fiscal year 2023.

02 PETROLEUM↗

Strategic Petroleum Reserve Cavern Leaching Monitoring CY22

The U.S. Strategic Petroleum Reserve (SPR) is a crude oil storage system administered by the U.S. Department of Energy. SPR injected a total of over 230 MMB of raw water into 48 caverns as part of oil sales in CY22. Leaching effects were monitored in these caverns to understand how the sales operations may impact the long-term integrity of the caverns. The leaching effects were modeled here using the Sandia Solution Mining Code, SANSMIC. The modeling results indicate that leaching-induced features do not raise concern for the majority of the caverns. In addition to 12 caverns identified in previous leaching reports, seven caverns have been identified for further monitoring based on the results of this report. Twenty-two caverns had pre- and post-leach sonars that were compared with SANSMIC results. Overall, SANSMIC was able to capture the leaching well.

02 PETROLEUM↗