Regulation of thermal sweating in EVA space suits
Sweat cooling experiments for thermoregulation of extravehicular space suits
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Sweat cooling experiments for thermoregulation of extravehicular space suits
Sensible heat exchange from Gemini and Apollo space suits determined in environmental test facilities, presenting data for heat flux distributions
Fluidic temperature control system for liquid cooled space suits
A lightweight and inexpensive coverlayer developed for space suits is described. Material selection, procurement, and testing, pattern design, and prototype fabrication are discussed. By using the minimum required cross section necessary for earth orbital mission, by utilizing the lightest weight materials possible, and by decreasing the use of weight costly taping a lightweight and economical thermal micrometeroid garment was developed. Simplification of manufacturing techniques and use of off-the-shelf materials helped to reduce costs.
For use in hard space suits and the like, a joint between the torso covering and the upper arm covering (i.e., shoulder) or between the torso covering and upper leg covering (i.e., hip) is disclosed. Each joint has an outer covering and a inner covering. The outer covering has plural perferably truncated toroidal sections decreasing in size proceeding outwardly. In one embodiment at each joint there are two bearings, the first larger than the second. The outer race of the larger bearing is attached to the outer edge of the smaller end of each section and the inner race of the larger bearing is attached to the end wall. The inner race of the smaller bearing is attached to the end wall. The outer race of the smaller bearing is attached to the larger end of the next section. Each bearing hask appropriate seals. Between each section is a rubber ring for the comfort of the wearer. Such rubber rings have radial flanges attached to the inner races of two adjacent bearings. Matching semicircular grooves are formed in the abutting overlapping surfaces. Bellows-like inner walls are also provided for each section fixed at one end to an inner cylindrical flange and, at the opposite end, to an end wall. Each outer section may rotate 360 deg relative to the next outer section, whereas the bellows sections do not rotate, but rather expand or contract locally as the rigid sections rotate relative to each other.
For planetary applications, the space suit insulation has unique requirements because it must perform in a dynamic mode to protect humans in the harsh dust, pressure and temperature environments. Since the presence of a gaseous planetary atmosphere adds significant thermal conductance to the suit insulation, the current multi-layer flexible insulation designed for vacuum applications is not suitable in reduced pressure planetary environments such as that of Mars. Therefore a feasibility study has been conducted at NASA to identify the most promising insulation concepts that can be developed to provide an acceptable suit insulation. Insulation concepts surveyed include foams, microspheres, microfibers, and vacuum jackets. The feasibility study includes a literature survey of potential concepts, an evaluation of test results for initial insulation concepts, and a development philosophy to be pursued as a result of the initial testing and conceptual surveys. The recommended focus is on microfibers due to the versatility of fiber structure configurations, the wide choice of fiber materials available, the maturity of the fiber processing industry, and past experience with fibers in insulation applications
For the first time in more than 30 years, an advanced space suit Portable Life Support System (PLSS) design was operated inside a vacuum chamber representative of the flight operating environment. The test article, PLSS 2.0, was the second system-level integrated prototype of the advanced PLSS design, following the PLSS 1.0 Breadboard that was developed and tested throughout 2011. Whereas PLSS 1.0 included five technology development components with the balance the system simulated using commercial-off-the-shelf items, PLSS 2.0 featured first generation or later prototypes for all components less instrumentation, tubing and fittings. Developed throughout 2012, PLSS 2.0 was the first attempt to package the system into a flight-like representative volume. PLSS 2.0 testing included an extensive functional evaluation known as Pre-Installation Acceptance (PIA) testing, Human-in-the-Loop testing in which the PLSS 2.0 prototype was integrated via umbilicals to a manned prototype space suit for 19 two-hour simulated EVAs, and unmanned vacuum environment testing. Unmanned vacuum environment testing took place from 1/9/15-7/9/15 with PLSS 2.0 located inside a vacuum chamber. Test sequences included performance mapping of several components, carbon dioxide removal evaluations at simulated intravehicular activity (IVA) conditions, a regulator pressure schedule assessment, and culminated with 25 simulated extravehicular activities (EVAs). During the unmanned vacuum environment test series, PLSS 2.0 accumulated 378 hours of integrated testing including 291 hours of operation in a vacuum environment and 199 hours of simulated EVA time. The PLSS prototype performed nominally throughout the test series, with two notable exceptions including a pump failure and a Spacesuit Water Membrane Evaporator (SWME) leak, for which post-test failure investigations were performed. In addition to generating an extensive database of PLSS 2.0 performance data, achievements included requirements and operational concepts verification, as well as demonstration of vehicular interfaces, consumables sizing and recharge, and water quality control.
This paper presents both near-term and long-term NASA Advanced Extra-vehicular Activity (EVA) Pressure Garment development efforts. The near-term plan discusses the development of pressure garment components for the first design iteration of the International Space Station exploration space suit demonstration configuration, termed the xEMU Demo. The xEMU Demo effort is targeting a 2023-2025 flight demonstration timeframe. The Fiscal Year 2018 (FY18) tasks focus on either the initiation or maturation of component design, depending on the state of development of the components, and the assembly of a suit configuration, termed Z-2.5, that will be used to evaluate changes to the upper torso geometry in a Neutral Buoyancy Laboratory (NBL) test series. The geometry changes, which are being driven by the need to reduce the front-to-back dimension of the advanced extravehicular mobility unit, diverge from a proven shape, such as that of the Mark III Space Suit Technology Demonstrator. The 2018 efforts culminate in the Z-2.5 NBL test. The lessons learned from the Z-2.5 NBL test will inform the xEMU Demo design as the effort moves toward design verification testing and preliminary and critical design reviews. The long-term development plan looks to surface exploration and operations. Technology and knowledge gaps exist between the xEMU Demo configuration; a lunar surface capability, xEMU; and Mars surface suit, mEMU. The development plan takes into account both the priority and the anticipated development duration for each particular technology. The long-term development plan will be updated as risks are mitigated and gaps are closed, but its overarching structure will remain intact.
Antenna configurations and mounting schemes for Apollo astronaut space suit communication system
As NASA plans to send people beyond low Earth orbit, it is important to educate and inspire the next generation of astronauts, engineers, scientist, and general public. This is so important to NASA future that it is one of the agencies strategic goals. The Space Suits and Crew Survival Systems Branch at Johnson Space Center (JSC) is actively involved in helping to achieve this goal by sharing our hardware and technical experts with students, educators, and the general public and educating them about the challenges of human space flight, with Education and Public Outreach (EPO). This paper summarizes the Space Suit and Crew Survival Systems Branch EPO efforts throughout fiscal year 2012.
As NASA plans to send people beyond low Earth orbit, it is important to educate and inspire the next generation of astronauts, engineers, scientists, and the general public. This is so important to NASA s future that it is one of the agency s strategic goals. The Space Suits and Crew Survival Systems Branch at Johnson Space Center (JSC) is actively involved in achieving this goal by sharing our hardware and technical experts with students, educators, and the general public and educating them about the challenges of human space flight, with Education and Public Outreach (EPO). This paper summarizes the Space Suit and Crew Survival Systems Branch EPO efforts throughout fiscal year 2012.
The particles that make up moon dust and Mars soil can be hazardous to an astronaut s health if not handled properly. In the near future, while exploring outer space, astronauts plan to wander the surfaces of unknown planets. During these explorations, dust and soil will cling to their space suits and become imbedded in the fabric. The astronauts will track moon dust and mars soil back into their living quarters. This not only will create a mess with millions of tiny air-born particles floating around, but will also be dangerous in the case that the fine particles are breathed in and become trapped in an astronaut s lungs. research center are investigating ways to remove these particles from space suits. This problem is very difficult due to the nature of the particles: They are extremely small and have jagged edges which can easily latch onto the fibers of the fabric. For the past summer, I have been involved in researching the potential problems, investigating ways to remove the particles, and conducting experiments to validate the techniques. The current technique under investigation uses piezoelectric ceramics imbedded in the fabric that vibrate and shake the particles free. The particles will be left on the planet s surface or collected a vacuum to be disposed of later. The ceramics vibrate when connected to an AC voltage supply and create a small scale motion similar to what people use at the beach to shake sand off of a beach towel. Because the particles are so small, similar to volcanic ash, caution must be taken to make sure that this technique does not further inbed them in the fabric and make removal more difficult. Only a very precise range of frequency and voltage will produce a suitable vibration. My summer project involved many experiments to determine the correct range. Analysis involved hands on experience with oscilloscopes, amplifiers, piezoelectrics, a high speed camera, microscopes and computers. perfect this technology. Someday, vibration to remove dust may a vital component to the space exploration program. In order to mitigate this problem, engineers and scientists at the NASA-Glenn Further research and experiments are planned to better understand and ultimately
An elbow or knee joint for a hard space suit or similar usage is formed of three serially connected rigid sections which have truncated spherical configurations. The ends of each section form solid geometric angles, and the sections are interconnected by hermetically sealed ball bearings. The outer two sections are fixed together for rotation in a direction opposite to rotation of the center section. A preferred means to make the outer sections track each other in rotation comprises a rotatable continuous bead chain which engages sockets circumferentially spaced on the facing sides of the outer races of the bearings. The joint has a single pivot point and the bearing axes are always contained in a single plane for any articulation of the joint. Thus flexure of the joint simulates the coplanar flexure of the knee or elbow and is not susceptible to lockup.
Leakage of microorganisms from pressurized Gemini space suit into ambient temperature microbiotank
Thermal insulation for extravehicular space suits
Evaluation of metabolic cost of locomotion in Apollo space suit
In order to accurately test the AX-5 space suit, a complex series of motions needed to be performed which provided a unique opportunity for mechanism design. The cycle life machine design showed how 3-D computer images can enhance mechanical design as well as help in visualizing mechanisms before manufacturing them. In the early stages of the design, potential problems in the motion of the joint and in the four bar linkage system were resolved using CAD. Since these problems would have been very difficult and tedious to solve on a drawing board, they would probably not have been addressed prior to fabrication, thus limiting the final design or requiring design modification after fabrication.
The xEMU is the Exploration Mobility Unity or space suit designed for microgravity (cislunar and low earth orbit (LEO)) and lunar surface operations. This suit design allows crewmembers to perform extravehicular exploration, science, construction, maintenance, and contingency operations while unattached to a vehicle for life support in pressure and thermal environments that exceed human capability. The xEMU provides life support, environmental protection, and communications capabilities to the EVA crewmember while allowing sufficient mobility and visibility to perform dexterous EVA tasks. The effort documented in this paper, addressed the design, analysis, manufacturing, full-scale test article testing and validation for a Composite Hard Upper Torso(CHUT)unit. Design and analysis of the CHUT was based on measured B-basis properties of the selected S-glass/epoxy composite, and established final geometry, composite layup and interface details that met requirements. A complete manufacturing and assembly protocol was established for the CHUT starting from composite layup in the tool, to final assembly of all interface metal hardware prior to delivery to NASA for suit integration. Full-scale CHUT test articles underwent static and fatigue pressure testing (2 lifetimes), impact testing at critical stress locations for tool drop/microgravity scenarios, followed by post-impact fatigue testing. Effect of manufacturing defects was evaluated by manufacturing a full-scale CHUT with 0.375”/0.5” defects at critical stress locations, followed by static and life-cycle fatigue testing. In all cases, the CHUT design met or exceeded mass, structural, interface and functional requirements. Two (2) complete CHUT articles were delivered to NASA for full-scale suit integration and testing.