Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planetary Protection Bioburden Analysis Program

This program is a Microsoft Access program that performed statistical analysis of the colony counts from assays performed on the Mars Science Laboratory (MSL) spacecraft to determine the bioburden density, 3-sigma biodensity, and the total bioburdens required for the MSL prelaunch reports. It also contains numerous tools that report the data in various ways to simplify the reports required. The program performs all the calculations directly in the MS Access program. Prior to this development, the data was exported to large Excel files that had to be cut and pasted to provide the desired results. The program contains a main menu and a number of submenus. Analyses can be performed by using either all the assays, or only the accountable assays that will be used in the final analysis. There are three options on the first menu: either calculate using (1) the old MER (Mars Exploration Rover) statistics, (2) the MSL statistics for all the assays, or This software implements penetration limit equations for common micrometeoroid and orbital debris (MMOD) shield configurations, windows, and thermal protection systems. Allowable MMOD risk is formulated in terms of the probability of penetration (PNP) of the spacecraft pressure hull. For calculating the risk, spacecraft geometry models, mission profiles, debris environment models, and penetration limit equations for installed shielding configurations are required. Risk assessment software such as NASA's BUMPERII is used to calculate mission PNP; however, they are unsuitable for use in shield design and preliminary analysis studies. The software defines a single equation for the design and performance evaluation of common MMOD shielding configurations, windows, and thermal protection systems, along with a description of their validity range and guidelines for their application. Recommendations are based on preliminary reviews of fundamental assumptions, and accuracy in predicting experimental impact test results. The software is programmed in Visual Basic for Applications for installation as a simple add-in for Microsoft Excel. The user is directed to a graphical user interface (GUI) that requires user inputs and provides solutions directly in Microsoft Excel workbooks. This work was done by Shannon Ryan of the USRA Lunar and Planetary Institute for Johnson Space Center. Further information is contained in a TSP (see page 1). MSC- 24582-1 Micrometeoroid and Orbital Debris (MMOD) Shield Ballistic Limit Analysis Program Lyndon B. Johnson Space Center, Houston, Texas Commercially, because it is so generic, Enigma can be used for almost any project that requires engineering visualization, model building, or animation. Models in Enigma can be exported to many other formats for use in other applications as well. Educationally, Enigma is being used to allow university students to visualize robotic algorithms in a simulation mode before using them with actual hardware. This work was done by David Shores and Sharon P. Goza of Johnson Space Center; Cheyenne McKeegan, Rick Easley, Janet Way, and Shonn Everett of MEI Technologies; Mark Manning of PTI; and Mark Guerra, Ray Kraesig, and William Leu of Tietronix Software, Inc. For further information, contact the JSC Innovation Partnerships Office at (281) 483-3809. MSC-24211-1 Spitzer Telemetry Processing System NASA's Jet Propulsion Laboratory, Pasadena, California The Spitzer Telemetry Processing System (SirtfTlmProc) was designed to address objectives of JPL's Multi-mission Image Processing Lab (MIPL) in processing spacecraft telemetry and distributing the resulting data to the science community. To minimize costs and maximize operability, the software design focused on automated error recovery, performance, and information management. The system processes telemetry from the Spitzer spacecraft and delivers Level 0 products to the Spitzer Science Center. SirtfTlmProc is a unique system with automated error notification and recovery, with a real-time continuous service that can go quiescent after periods of inactivity. The software can process 2 GB of telemetry and deliver Level 0 science products to the end user in four hours. It provides analysis tools so the operator can manage the system and troubleshoot problems. It automates telemetry processing in order to reduce staffing costs. This work was done by Alice Stanboli, Elmain M. Martinez, and James M. McAuley of Caltech for NASA's Jet Propulsion Laboratory. For more information, contact iaoffice @jpl.nasa.gov. This software is available for commercial licensing. Please contact Dan Broderick at Daniel.F. Broderick@jpl.nasa.gov. Refer to NPO-47803. NASA Tech Briefs, September 2013 29 This rapid response computer program predicts Orbiter Wing Leading Edge (WLE) damage caused by ice or foam impact during a Space Shuttle launch (Program "IMPACT2"). The program was developed after the Columbia accident in order to assess quickly WLE damage due to ice, foam, or metal impact (if any) during a Shuttle launch. IMPACT2 simulates an impact event in a few minutes for foam impactors, and in seconds for ice and metal impactors. The damage criterion is derived from results obtained from one sophisticated commercial program, which requires hours to carry out simulations of the same impact events. The program was designed to run much faster than the commercial program with prediction of projectile threshold velocities within 10 to 15% of commercial-program values. The mathematical model involves coupling of Orbiter wing normal modes of vibration to nonlinear or linear springmass models. IMPACT2 solves nonlinear or linear impact problems using classical normal modes of vibration of a target, and nonlinear/ linear time-domain equations for the projectile. Impact loads and stresses developed in the target are computed as functions of time. This model is novel because of its speed of execution. A typical model of foam, or other projectile characterized by material nonlinearities, impacting an RCC panel is executed in minutes instead of hours needed by the commercial programs. Target damage due to impact can be assessed quickly, provided that target vibration modes and allowable stress are known. This work was done by Robert Clark, Jr., Paul Cotter, and Constantine Michalopoulos of The Boeing Company for Johnson Space Center. For further information, contact the JSC Innovation Partnerships Office at (281) 483-3809. MSC-24988-1 Wing Leading Edge RCC Rapid Response Damage Prediction Tool (IMPACT2) Lyndon B. Johnson Space Center, Houston, Texas (3) the MSL statistics for only the accountable assays. Other options on the main menu include a data editing form and utility programs that produce various reports requested by the microbiologists and the project, and tools to generate the groupings for the final analyses. The analyses can be carried out in three ways: Each assay can be treated separately, the assays can be collectively treated for the whole zone as a group, or the assays can be collected in groups designated by the JPL Planetary Protection Manager. The latter approach was used to generate the final report because assays on the same equipment or similar equipment can be assumed to have been exposed to the same environment and cleaning. Thus, the statistics are improved by having a larger population, thereby reducing the standard deviation by the square root of N. For each method mentioned above, three reports are available. The first is a detailed report including all the data. This version was very useful in verifying the calculations. The second is a brief report that is similar to the full detailed report, but does not print out the data. The third is a grand total and summary report in which each assay requires only one line. For the first and second reports, most of the calculations are performed in the report section itself. For the third, all the calculations are performed directly in the query bound to the report. All the numerical results were verified by comparing them with Excel templates, then exporting the data from the Planetary Protection Analysis program to Excel.

Beaudet, Robert A.↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying the impact of climate change on erosion - 20397

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha (3,338-ac) site located approximately 48 km (30 mi) south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (metric tons, or 705 short tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Erosion can play an important role in the fate and transport of waste at sites where disposal of long-lived waste is anticipated. The statistical characterization of key processes related to erosion is essential to the understanding of site stability through time. One of the key processes governing erosion is extreme precipitation and it is critical that trends in the distribution of extreme precipitation events through time be represented. The evidence of climate change is increasingly well documented and projected impacts on extreme precipitation events should be incorporated in performance assessment studies when relevant. Not evaluating future climate states in a performance assessment is contradictory to good modeling practice. Specifically, excluding climate change limits development of modeling information that could aid in effective decision making. The current climate literature provides both observational evidence and climate model projections of climate trends and/or climate change in the late 20. and early 21. centuries for North America and the northeast United States. In this work, this information was used to assess the impacts of potential changes in climate on erosion processes. The goal was to understand how projections of future climate relate to the performance of the WNYNSC through time. In the first stage of this work multi-temporal historical aerial images were analyzed in conjunction with orthophotography and Lidar data to develop probability distributions for variables representing important erosion processes. The information from these analyses was then used in conjunction with simulated data from the West Valley Erosion Working Group (EWG). Analysis of EWG simulations provides estimates for the change in erosion rates through time that is driven by changes in climate. The time-varying rates of erosion change were applied to the historical aerial imagery data in order to inform time-varying rates of erosion that are driven by changes in climate. Ultimately, this process resulted in the identification of locations for features like gully heads using both the Lidar dataset and projection of the estimated location from the historical aerial photo under consideration back to the Lidar dataset. The distance between the estimate of the location from the historical image and that of the Lidar dataset was the estimated distance the feature has moved. This distance was then divided by the number of years between the Lidar dataset and the year of the historical aerial image of interest to get a rate of movement through time. This was done for several dozen points on each historical aerial image. The analyses from the EWG were used to characterize the relative impact of climate change on the erosion rates. This relative impact was quantified by comparing the LEM based estimates of erosion that were derived using historical climate data with LEM based estimates of erosion that were derived using projections of future climate. The relative increase in the erosion rates was then applied to the historical estimates of erosion derived from the analysis of the historical aerial imagery. This approach was used since the LEM-based estimated of the historical erosion rates from the past century have a bias towards underestimating erosion. This underestimation is hypothesized to be a consequence of an inability of the LEMs to account for the impacts of land-use change (i.e. deforestation) which had been shown to significantly increase erosion in similar Northern hardwood forest ecosystems. In summary, gully head retreat rate and gully widening rate were characterized using statistical probability distributions from the historical aerial image analysis. Simulated data from the EWG was used to estimate the climatically-driven changes in erosion rates through time. The changes through time from the EWG were applied to the gully head retreat rate and gully widening rate characterized using the historical aerial image analysis. This information can be used to inform PPA models to project future risks from a given site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗