Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Informed Decision Making”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

RADAMS: Resilient and adaptive alert and attention management strategy against Informational Denial-of-Service (IDoS) attacks

Attacks exploiting human attentional vulnerability have posed severe threats to cybersecurity. In this work, we identify and formally define a new type of proactive attentional attacks called Informational Denial-of-Service (IDoS) attacks that generate a large volume of feint attacks to overload human operators and hide real attacks among feints. Here, we incorporate human factors (e.g., levels of expertise, stress, and efficiency) and empirical psychological results (e.g., the Yerkes-Dodson law and the sunk cost fallacy) to model the operators’ attention dynamics and their decision-making processes along with the real-time alert monitoring and inspection. To assist human operators in dismissing the feints and escalating the real attacks timely and accurately, we develop a Resilient and Adaptive Data-driven alert and Attention Management Strategy (RADAMS) that de-emphasizes alerts selectively based on the abstracted category labels of the alerts. RADAMS uses reinforcement learning to achieve a customized and transferable design for various human operators and evolving IDoS attacks. The integrated modeling and theoretical analysis lead to the Product Principle of Attention (PPoA), fundamental limits, and the tradeoff among crucial human and economic factors. Experimental results corroborate that the proposed strategy outperforms the default strategy and can reduce the IDoS risk by as much as 20%. Besides, the strategy is resilient to large variations of costs, attack frequencies, and human attention capacities. We have recognized interesting phenomena such as attentional risk equivalency, attacker’s dilemma, and the half-truth optimal attack strategy.

97 MATHEMATICS AND COMPUTING↗

Anomaly Detection in Electronic Health Records Across Hospital Networks: Integrating Machine Learning With Graph Algorithms

In a large hospital system, a network of hospitals relies on electronic health records (EHRs) to make informed decisions regarding their patients in various clinical domains. Consequently, the dependability of the health information technology (HIT) systems responsible for collecting EHR data is of utmost importance for patient safety. Recently, novel methods and tools aimed at identifying anomalies in EHR data to bolster the reliability of HIT systems have been introduced. However, these existing methods and tools primarily concentrate on individual hospitals, which limits our understanding of system-wide anomalous events and their potential impact on patient safety across multiple hospitals. In this article, we introduce a new approach to detecting anomalies in EHR data within a network of hospitals. This is achieved by combining advanced machine learning techniques with graph algorithms to create a tool capable of swiftly identifying and responding to deviations. Our proposed approach employs a combination of five machine learning models, harnessing the unique strengths of each model to provide a more robust detection system. The detected anomalies are then represented as graphs, allowing us to recognize patterns across the hospital network. This aids in identifying anomalies that span multiple medical facilities, potentially indicating broader system-level risks. Extensive real-world testing of our approach demonstrated its ability to offer actionable insights compared to existing methods. Additionally, its scalable design ensures seamless integration into existing HIT infrastructures.

Niu, Haoran [Oak Ridge National Laboratory (ORNL),↗

Use of a controlled experiment and computational models to measure the impact of sequential peer exposures on decision making

It is widely believed that one’s peers influence product adoption behaviors. This relationship has been linked to the number of signals a decision-maker receives in a social network. But it is unclear if these same principles hold when the “pattern” by which it receives these signals vary and when peer influence is directed towards choices which are not optimal. To investigate that, we manipulate social signal exposure in an online controlled experiment using a game with human participants. Each participant in the game decides among choices with differing utilities. We observe the following: (1) even in the presence of monetary risks and previously acquired knowledge of the choices, decision-makers tend to deviate from the obvious optimal decision when their peers make a similar decision which we call the influence decision, (2) when the quantity of social signals vary over time, the forwarding probability of the influence decision and therefore being responsive to social influence does not necessarily correlate proportionally to the absolute quantity of signals. To better understand how these rules of peer influence could be used in modeling applications of real world diffusion and in networked environments, we use our behavioral findings to simulate spreading dynamics in real world case studies. We specifically try to see how cumulative influence plays out in the presence of user uncertainty and measure its outcome on rumor diffusion, which we model as an example of sub-optimal choice diffusion. Together, our simulation results indicate that sequential peer effects from the influence decision overcomes individual uncertainty to guide faster rumor diffusion over time. However, when the rate of diffusion is slow in the beginning, user uncertainty can have a substantial role compared to peer influence in deciding the adoption trajectory of a piece of questionable information.

97 MATHEMATICS AND COMPUTING↗

DeepLynx Ecosystem 2025

Poor data integration and governance continue to plague complex engineering projects, resulting in missed cost, schedule, and performance targets. Departments operate in isolated systems with manual data exchange, creating fragmented information that compounds errors and leads to significant delays and cost overruns. The DeepLynx ecosystem addresses these challenges through an open-source, modular data management platform that transforms fragmented project data into an integrated digital thread. Built on a federated microservice architecture, the ecosystem comprises seven specialized tools centered around DeepLynx Nexus, a unified data catalog with hierarchical organization and graph-based navigation capabilities. The ecosystem includes: DeepLynx Stream for real-time timeseries data ingestion from industrial sources; DeepLynx Ingest for governed data uploads with formal review workflows; DeepLynx Lattice for ontology-based entity and relationship extraction; DeepLynx Run for workflow orchestration and secure AI/ML compute; DeepLynx Visualize for 3D digital twin visualization; and DeepLynx Insight for AI-assisted document analysis with traceable, grounded responses. Deployable in cloud, on-premise, or hybrid environments using containerized Docker applications and Helm charts, the DeepLynx ecosystem provides flexible infrastructure that adapts to organizational requirements. By consolidating project data into a unified data lake with role-based access controls and OAuth2 authentication, DeepLynx enables digital thread and digital twin capabilities that improve decision-making, reduce risk, and support complex engineering workflows throughout the project lifecycle.

42 - ENGINEERING↗

Building a framework to genetically characterize “feather spots” and understand demographic impacts of solar energy sites on migratory bird populations

The lack of data on the impact of utility-scale solar facilities on avian species and populations adds to the cost of siting and operation. As much as 32 percent of the avian biological material (feathers and carcasses) recovered from solar facilities remain unidentified, because they often take the form of “feather spots”. Feather spots are remains of impacted animals that can be separated into two broad categories: 1) those remains that may be visually identified to a species, or 2) those that cannot be visually identified to a species due to degradation from the environment and/or scavenger activity (listed as “unknown”). Even when feather spots can be identified to species, they cannot be visually assigned to particular breeding populations. In some cases, it is unknown whether multiple feather spots represent single or multiple individuals. This project’s objectives were to: 1. Use a developed, genetic-based technique to identify and determine the species, population of origin, and number of individuals found in feather spots recovered from solar facilities. 2. Implement collected data and resulting analyses to develop a publicly accessible web-based decision-making tool that can be used by the solar industry, regulators and other stakeholders to inform siting, mitigation, and conservation management efforts. 3. Establish a not-for-profit fee-for-service center at UCLA to ensure collection and identification of feather spots continue after the project period of performance. During the Project Period, we proposed to establish a pipeline for collecting, transporting, and storing of avian biological material collected at solar facilities and the collection and identification of feather spots to species and individual. We proposed the development of a genetic-based framework that would recover viable DNA from feather spots, amplify this DNA (i.e., make millions of copies of the original DNA), and use it to match the resulting sequences to a national database of known species of birds. The result would be the identification of feathers spots that were previously unidentified, and the incorporation of these samples into a larger database that included all samples recovered from solar facilities. The resulting report (below) details the result of this work and its alignment with proposed activities. We proposed the use of the data collected to assess the comparative risk to specific species or populations of species from solar facilities. For some species, we have already identified genomic markers of specific breeding populations and developed “genoscapes,” maps of unique genetic variation across the full breeding range of a species. We used these (previously and newly developed) genoscapes to probabilistically link a feather spot to the specific breeding populations from which it originated (assignment probabilities range from 75%-100% depending on species and population groups). For those species without genoscapes, we developed a vulnerability and susceptibility estimate that determines the relative local and regional risk to populations that are in geographic proximity to solar facilities, using citizen science data (Breeding Bird Survey (BBS) and eBird). These two feather spot processing pipelines (see Figure 1 below) provide quantitative estimates as to the numbers of individuals from a given population of origin that are affected by solar facilities, and ultimately can reduce costs to the consumer by reducing the industry costs associated with mitigation and siting strategies for future solar energy development.

14 SOLAR ENERGY↗

A PROVEN APPROACH FOR EFFECTIVE COMPUTER SECURITY SELF-ASSESSMENTS AT NUCLEAR FACILITIES

A proven method for conducting cybersecurity self-assessments at nuclear power plants is now available for international use. This method was originally developed by Pacific Northwest National Laboratory, under the sponsorship of the U.S. Nuclear Regulatory Commission (NRC), for use at U.S. nuclear power plants. The “Method,” described in NUREG/CR-6847 “Cyber Security Self-Assessment Method for U.S. Nuclear Power Plants,” was originally a limited release document that was withheld from public disclosure but is now publicly available. The Method provides a systematic, phased, and risk-informed approach to help decision makers and security specialists understand their relative cybersecurity posture. Completed Method assessments may be used to support or validate selection of computer security controls to mitigate cyber threats as well as demonstrate compliance with regulations or statutes enacted by competent authorities. The Method assesses the cybersecurity posture of key systems at a nuclear facility with a focus on protection of design base functions. It considers both physical and digital elements of system vulnerabilities and the resulting potential consequences from exploitation. It is well-suited for addressing blended cyberattacks. A semi-quantitative analytical approach is used in the evaluation of potential vulnerabilities, consequences, and risks and provides a technical basis for the selection of security controls to mitigate cyberattacks. The Method’s application at U.S. nuclear power plants has been very encouraging. The only nuclear plant in the United States that did not have adverse findings during its initial NRC computer security inspection prepared for inspection through the diligent application of this self-assessment method and the implementation of recommendations that came out of that self-assessment. Nuclear facilities around the world might find application of the Method extremely helpful for making cost-effective, risk-based decisions regarding computer security and for preparing to pass computer security inspections by their competent authorities.

Cyber security, Nuclear security, Self-assessment↗

LCC-based framework for building envelope and structure co-design considering energy efficiency and natural hazard performance

Herein, this paper presents a life-cycle cost (LCC) informed co-design framework for building structures and envelope systems, holistically considering the influences of energy and natural hazard performance. The proposed method is consisted of a two-stage design and decision-making process, aiming to provide a quantitative guideline for building's structural and envelope co-design based on the its geographic locations. First, the building's structural configuration and envelope type are selected based on the life cycle cost. Then, the long-term cost effectiveness of various energy-saving building envelope options (e.g., high-performance glazing and insulation) is evaluated to refine the envelope design. The proposed co-design framework was demonstrated through the case study of a medium-size office building archetype in three locations with distinct climate conditions and seismic activities (i.e., Los Angeles, Memphis, and Boston). The results highlighted the interplay between building's structural (seismic) performance and the cost-effectiveness of energy-saving design options – e.g., for buildings located in high-seismic regions, seismic enhancing designs greatly reduce the paybak period of high performance building envelope by reducing the seismic loss; whereas for buildings located in regions with cold climate and low seismic risk such as Boston, spatial frame with high insulation building envelope shows the lowest LCC.

42 ENGINEERING↗

A genoscape–network model for conservation prioritization in a migratory bird

Migratory animals are declining worldwide and coordinated conservation efforts are needed to reverse current trends. We devised a novel genoscape-network model that combines genetic analyses with species distribution modeling and demographic data to overcome challenges with conceptualizing alternative risk factors in migratory species across their full annual cycle. We applied our method to the long distance, Neotropical migratory bird, Wilson's Warbler (Cardellina pusilla). Despite a lack of data from some wintering locations, we demonstrated how the results can be used to help prioritize conservation of breeding and wintering areas. For example, we showed that when genetic, demographic, and network modeling results were considered together it became clear that conservation recommendations will differ depending on whether the goal is to preserve unique genetic lineages or the largest number of birds per unit area. More specifically, if preservation of genetic lineages is the goal, then limited resources should be focused on preserving habitat in the California Sierra, Basin Rockies, or Coastal California, where the 3 most vulnerable genetic lineages breed, or in western Mexico, where 2 of the 3 most vulnerable lineages overwinter. Alternatively, if preservation of the largest number of individuals per unit area is the goal, then limited conservation dollars should be placed in the Pacific Northwest or Central America, where densities are estimated to be the highest. Overall, our results demonstrated the utility of adopting a genetically based network model for integrating multiple types of data across vast geographic scales and better inform conservation decision-making for migratory animals.

60 APPLIED LIFE SCIENCES↗

A nomogram for prediction of stage III/IV gastric cancer outcome after surgery: A multicenter population‐based study

Abstract Most patients with gastric cancer (GC) are first diagnosed at stage III‐IV and surgery resection remains the primary therapeutic modality for these patients. However, clinical staging used for prediction of those patients provides limited information. We collected clinicopathological data and disease‐progression information from 508 patients with stage III‐IV GC at three Chinese hospitals and 1298 patients from the Surveillance, Epidemiology, and End Results database. Based on the stepwise multivariate regression model, we constructed a novel nomogram to predict overall survival (OS). The performance of discrimination for this model was measured using Harrell's concordance index (C‐index) and receiver‐operating characteristic curve (ROC), and was validated using calibration plots. Multivariate Cox regression analyses showed that tumor size, age at diagnosis, N stage, tumor grade, and distant metastases were outstanding independent prognostic factors of stage III‐IV GC. We developed a nomogram based on these five prognostic predictors. In the training set, the C‐index of the nomogram was 0.645 (95% CI: 0.611‐0.679), which was higher than that of the American Joint Committee on Cancer TNM system alone (sixth TNM: 0.544; seventh TNM: 0.575; eighth TNM: 0.568). Similar results were observed in validation cohort. Moreover, calibration blots demonstrated good consistency between the actual and predicted OS probabilities. According to the nomogram, GC individuals could be classified into three groups (low‐, middle‐, and high‐risk) ( P < .001). Our nomogram complements the current staging system for prediction of individual prognosis with stage III‐IV GC, and may be helpful for making individualized treatment decisions.

Gao, Zhiying↗

A machine learning approach for identifying variables associated with risk of developing neutralizing antidrug antibodies to factor VIII

A key unmet need in the management of hemophilia A (HA) is the lack of clinically validated markers that are associated with the development of neutralizing antibodies to Factor VIII (FVIII) (commonly referred to as inhibitors). This study aimed to identify relevant biomarkers for FVIII inhibition using Machine Learning (ML) and Explainable AI (XAI) using the My Life Our Future (MLOF) research repository. The dataset includes biologically relevant variables such as age, race, sex, ethnicity, and the variants in the F8 gene. In addition, we previously carried out Human Leukocyte Antigen Class II (HLA-II) typing on samples obtained from the MLOF repository. Using this information, we derived other patient-specific biologically and genetically important variables. These included identifying the number of foreign FVIII derived peptides, based on the alignment of the endogenous FVIII and infused drug sequences, and the foreign-peptide HLA-II molecule binding affinity calculated using NetMHCIIpan. The data were processed and trained with multiple ML classification models to identify the top performing models. The top performing model was then chosen to apply XAI via SHAP, (SHapley Additive exPlanations) to identify the variables critical for the prediction of FVIII inhibitor development in a hemophilia A patient. Using XAI we provide a robust and ranked identification of variables that could be predictive for developing inhibitors to FVIII drugs in hemophilia A patients. These variables could be validated as biomarkers and used in making clinical decisions and during drug development. The top five variables for predicting inhibitor development based on SHAP values are: (i) the baseline activity of the FVIII protein, (ii) mean affinity of all foreign peptides for HLA DRB 3, 4, & 5 alleles, (iii) mean affinity of all foreign peptides for HLA DRB1 alleles), (iv) the minimum affinity among all foreign peptides for HLA DRB1 alleles, and (v) F8 mutation type.

60 APPLIED LIFE SCIENCES↗

Cyber-Informed Engineering Implementation Guide

This Implementation Guide describes the principles of Cyber-Informed Engineering (CIE) and outlines questions that engineering teams should consider during each phase of a system’s lifecycle to effectively employ these principles. It describes what it means to engineer systems in a cyber-informed way, rather than offering a comprehensive, step-by-step process or procedure for CIE implementation. This guide complements—but does not replace—the application of cybersecurity standards or practices currently in place within an organization. Engineers and technicians that design critical energy infrastructure installations can use this Implementation Guide to integrate the 12 principles of CIE into each phase of the engineering lifecycle, from concept to retirement. The guide is aimed at system or design engineers, rather than software engineers or operational cybersecurity practitioners. The engineers who design, build, operate, and maintain the physical infrastructure are best positioned to leverage a system’s engineering design to diminish the severity of cyber attacks or digital technology failures. CIE expands cybersecurity decisions into the engineering space, not by asking engineers to become cyber experts, but by calling on engineers to apply engineering tools and make engineering decisions that improve cybersecurity outcomes. CIE examines the engineering consequences that a sophisticated cyber attacker could achieve and drives engineering changes that may provide deterministic mitigations to limit or eliminate those consequences.

42 ENGINEERING↗

Inferred inflow forecast horizons guiding reservoir release decisions across the United States

Abstract. Medium- to long-range forecasts often guide reservoir release decisions to support water management objectives, including mitigating flood and drought risks. While there is a burgeoning field of science targeted at improving forecast products and associated decision support models, data describing how and when forecasts are applied in practice remain undeveloped. This lack of knowledge may prevent hydrological modelers from developing accurate reservoir release schemes for large-scale, distributed hydrology models that are increasingly used to assess the vulnerabilities of large regions to hydrological stress. We address this issue by estimating seasonally varying, regulated inflow forecast horizons used in the operations of more than 300 dams throughout the conterminous United States (CONUS). For each dam, we take actual forward observed inflows (perfect foresight) as a proxy for forecasted flows available to the operator and then identify for each week of the year the forward horizon that best explains the release decisions taken. Resulting “horizon curves” specify for each dam the inferred inflow forecast horizon as a function of the week of the water year. These curves are analyzed for strength of evidence for contribution of medium- to long-range forecasts in decision making. We use random forest classification to estimate that approximately 80 % of large dams and reservoirs in the US (1553±50 out of 1927 dams with at least 10 Mm3 storage capacity) adopt medium- to long-range inflow forecasts to inform release decisions during at least part of the water year. Long-range forecast horizons (more than 6 weeks ahead) are detected in the operations of reservoirs located in high-elevation regions of the western US, where snowpack information likely guides the release. A simulation exercise conducted on four key western US reservoirs indicates that forecast-informed models of reservoir operations may outperform models that neglect the horizon curve – including during flood and drought conditions.

54 ENVIRONMENTAL SCIENCES↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Comprehensive Land Use and Environmental Stewardship

Comprehensive Land Use and Environmental Stewardship (CLUES) Report serves as a summary document of the land use and environmental stewardship activities occurring on the Idaho National Laboratory (INL) Site (Desert) and the Research and Education Campus (REC) within Idaho Falls. Land and facility use planning and decisions at the INL Site are guided by a comprehensive planning process in accordance with the United States (U.S.) Department of Energy (DOE) Order 430.1C, “Real Property Asset Management,” which states "Establish a data-driven, risk-informed, performance-based approach to the life-cycle management of real property assets that aligns the real property portfolio with DOE mission needs; acquire, manage, positively account for, and dispose of real property assets in a safe, secure, cost-effective, and sustainable manner; and ensure the real property portfolio is appropriately sized, aligned, and in the proper condition to support efficient mission execution." Land use planning, like Campus Master Planning and 5-Year Facility Planning, provides a means for better, more sustainable use of the INL Site in a coordinated effort to ensure current and future mission needs are met, including acquisition, recapitalization, maintenance, disposition, real property utilization and long-term stewardship. This document and all functions of INL are guided by the DOE Vision for INL and the INL Mission and builds on the baseline established in the FY 2015 CLUES Report. However, it delivers a revised structure with focus on new resource management zones, which provide organization of key management considerations and access restrictions to optimize land use and environmental stewardship. A new set of thematic Guiding Principles presented in this report provide the intent and sustainable management direction to protect the INL Site natural environment. They demonstrate that the mission and vision of DOE and INL can be realized with inclusion of first of a kind technology, private sector development, and globally recognized testing and demonstration. This CLUES Report encourages comprehensive management decision-making with additional resource discussions for sustainability, the built environment, and the ecological landscape at the INL Site. Enhanced resource considerations and trends emphasize the importance of air, land use, environmental, subsurface, and cultural resources. The INL Site supports exceptional and interdependent resources. A diversity of bat species are accommodated by culturally significant caves distributed around the Site. Big game species like elk, deer, and moose seek vegetation communities which are protected by long-term stewardship and monitoring programs.

99 GENERAL AND MISCELLANEOUS↗

Ethical, legal and social implications of human genome studies in radiation research: a workshop report for studies on atomic bomb survivors at the Radiation Effects Research Foundation

The Radiation Effects Research Foundation (RERF) is the primary organization in Japan dedicated to studying the health consequences of the Hiroshima and Nagasaki atomic bombings in World War II. In December 2020, RERF held a virtual international workshop on the ethical, legal and social implications (ELSI) of genome studies. In this workshop, the ELSI considerations of future human genome studies on radiation research including atomic bomb survivors and their families were discussed. Since genome sequencing (GS) is now practical and affordable, RERF now plans GS of parents/child trios to examine genetic effects of atomic bomb radiation. As such studies may engender some novel risks and benefits, ethics review and engagement with families (including consent) need to be considered. These include protection of individual privacy, use of samples from deceased prior participants, return of results to the participants, public sharing of genome data and advance science and social welfare. Specifically with regard to social welfare, the results of such studies may have implications for public and government decision-making regarding social benefits of victims and other important questions. Based on these broad-ranging discussions we have developed the following concepts to guide this work: “trust,” “compromise” and “relationship building,” inclusive of the concerned stakeholders, scientific aims and Japanese society at large. We conclude that in order to realize, establish and maintain these concepts, it is essential to put procedures into place to ensure the successful, consensus-based implementation of the RERF studies.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Advancing spatiotemporal forecasts of CO 2 plume migration using deep learning networks with transfer learning and interpretation analysis

Accurate and timely forecasts of CO 2 plume distribution throughout the injection and post-injection phases are crucial for detecting plume migration, assessing leakage risks, and supporting operational decisions in geologic carbon storage (GCS). Current convolutional neural network-based approaches primarily focus on spatial information and overlook temporal dependencies in plume distributions, thus limiting their ability to capture dynamic movement effects and provide accurate predictions of plume migration. In this work, we propose two deep learning models, Auto-Encoder (AE)-LSTM and Encoder-Decoder (ED)-ConvLSTM, each uniquely designed to capture both spatial and temporal features. We apply the proposed methods to forecast the dynamic distribution of CO 2 plumes based on 108 reservoir simulations over a 30-year injection and a 30-year post-injection period. The results indicate that the ED-ConvLSTM model outperforms the AE-LSTM model in accurately predicting the spatiotemporal dynamics of CO 2 plume migration, achieving R 2 values above 0.99. To provide a deeper understanding of these model predictions, we employ a gradient-based explanation method on the trained models. This approach provides insights into the influence of input variables on plume migration forecasts and uncovers the underlying prediction mechanisms of the proposed models. Furthermore, we introduce a transfer learning technique, enabling fast and accurate plume migration forecasting in the post-injection phase by leveraging the trained model during the injection phase. This reduces the necessity for extensive data collection or re-training. In conclusion, the methods proposed in our work enhances the performance and interpretability of CO 2 plume migration forecasts, thereby facilitating informed decision-making throughout the entire lifecycle of GCS applications.

58 GEOSCIENCES↗

A Fusion of Geothermal and InSAR Data with Machine Learning for Enhanced Deformation Forecasting at the Geysers

The Geysers geothermal field in California is experiencing land subsidence due to the seismic and geothermal activities taking place. This poses a risk not only to the underlying infrastructure but also to the groundwater level which would reduce the water availability for the local community. Because of this, it is crucial to monitor and assess the surface deformation occurring and adjust geothermal operations accordingly. In this study, we examine the correlation between the geothermal injection and production rates as well as the seismic activity in the area, and we show the high correlation between the injection rate and the number of earthquakes. This motivates the use of this data in a machine learning model that would predict future deformation maps. First, we build a model that uses interferometric synthetic aperture radar (InSAR) images that have been processed and turned into a deformation time series using LiCSBAS, an open-source InSAR time series package, and evaluate the performance against a linear baseline model. The model includes both convolutional neural network (CNN) layers as well as long short-term memory (LSTM) layers and is able to improve upon the baseline model based on a mean squared error metric. Then, after getting preprocessed, we incorporate the geothermal data by adding them as additional inputs to the model. This new model was able to outperform both the baseline and the previous version of the model that uses only InSAR data, motivating the use of machine learning models as well as geothermal data in assessing and predicting future deformation at The Geysers as part of hazard mitigation models which would then be used as fundamental tools for informed decision making when it comes to adjusting geothermal operations.

Yazbeck, Joe (ORCID:0000000302235260)↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗