Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Operations mission planner beyond the baseline

The scheduling of Space Station Freedom must satisfy four major requirements. It must ensure efficient housekeeping operations, maximize the collection of science, respond to changes in tasking and available resources, and accommodate the above changes in a manner that minimizes disruption of the ongoing operations of the station. While meeting these requirements the scheduler must cope with the complexity, scope, and flexibility of SSF operations. This requires the scheduler to deal with an astronomical number of possible schedules. The Operations Mission Planner (OMP) is centered around minimally disruptive replanning and the use of heuristics limit search in scheduling. OMP has already shown several artificial intelligence based scheduling techniques such as Interleaved Iterative Refinement and Bottleneck Identification using Process Chronologies.

Biefeld, Eric↗

Autonomous space processor for orbital debris

The development of an Autonomous Space Processor for Orbital Debris (ASPOD) was the goal. The nature of this craft, which will process, in situ, orbital debris using resources available in low Earth orbit (LEO) is explained. The serious problem of orbital debris is briefly described and the nature of the large debris population is outlined. The focus was on the development of a versatile robotic manipulator to augment an existing robotic arm, the incorporation of remote operation of the robotic arms, and the formulation of optimal (time and energy) trajectory planning algorithms for coordinated robotic arms. The mechanical design of the new arm is described in detail. The work envelope is explained showing the flexibility of the new design. Several telemetry communication systems are described which will enable the remote operation of the robotic arms. The trajectory planning algorithms are fully developed for both the time optimal and energy optimal problems. The time optimal problem is solved using phase plane techniques while the energy optimal problem is solved using dynamic programming.

Ramohalli, Kumar↗

Planning and scheduling research at NASA Ames Research Center

Planning and scheduling is the area of artificial intelligence research that focuses on the determination of a series of operations to achieve some set of (possibly) interacting goals and the placement of those operations in a timeline that allows them to be accomplished given available resources. Work in this area at the NASA Ames Research Center ranging from basic research in constrain-based reasoning and machine learning, to the development of efficient scheduling tools, to the application of such tools to complex agency problems is described.

Friedland, Peter↗

Research in NASA history: A guide to the NASA history program

This report describes the research opportunities and accomplishments of NASA's agency wide history program. It also offers a concise guide to the historical documentary resources available at NASA Headquarters in Washington D.C., at NASA facilities located around the country, and through the federal records system. In addition, this report contains expanded contributions by Lee D. Saegessor and other members of the NASA Headquarters History Division and by those responsible for historical documents and records at some NASA centers.

Source record↗

Assessment of potential benefits from lunar/Mars propellant production for support of human exploration of the moon and Mars

This paper describes an assessment of potential benefits offered through use of lunar/Mars in situ propellant production to support manned missions to the moon and Mars. Resources available at each location and processing options for their extraction are discussed. Key infrastructure and support systems needed to sustain the propellant production operation and to deliver the propellants from their point of origin to the point of application are defined. The analysis focuses on reductions of earth launched mass over the course of multiple missions to assess the potential savings offered. Initial results show the impact of requirements for sustaining in situ propellant production systems on benefits offered during steady-state operation.

Jacobs, Mark K.↗

A decomposition method for optimization of large-system reliability

This paper considers a decomposition approach for optimization of the reliability of a large system with a general network structure. A 3-level methodology is developed for optimal allocation of available resources among subsystems in order to ensure maximization of system-reliability. The decentralized nature of this methodology greatly reduces the complexity of the large problem and facilitates seeking the optimal solution. Two examples show that the complexity of a large system can be greatly reduced by solving several smaller-dimensional sub-problems iteratively. Sub-problems whose dimensions are small can be efficiently solved by any existing nonlinear programming method. Another important feature of this approach is the possible simplification of the objective function during the solution. This leads in some cases to an analytic solution for the lower-level optimization problems in a 3-level decomposition solution.

Li, Duan↗

The engine design engine. A clustered computer platform for the aerodynamic inverse design and analysis of a full engine

An application for parallel computation on a combined cluster of powerful workstations and supercomputers was developed. A Parallel Virtual Machine (PVM) is used as message passage language on a macro-tasking parallelization of the Aerodynamic Inverse Design and Analysis for a Full Engine computer code. The heterogeneous nature of the cluster is perfectly handled by the controlling host machine. Communication is established via Ethernet with the TCP/IP protocol over an open network. A reasonable overhead is imposed for internode communication, rendering an efficient utilization of the engaged processors. Perhaps one of the most interesting features of the system is its versatile nature, that permits the usage of the computational resources available that are experiencing less use at a given point in time.

Sanz, J.↗

The National Space Science Data Center: An operational perspective

The National Space Science Data Center (NSSDC) manages over 110,000 data tapes with over 4,000 data sets. The size of the digital archive is approximately 6,000 GBytes and is expected to grow to more than 28,000 GBytes by 1995. The NSSDC is involved in several initiatives to better serve the scientific community and improve the management of current and future data holdings. These initiatives address the need to manage data to ensure ready access by the user and manage the media to ensure continuing accessibility and integrity of the data. This paper will present an operational view of the NSSDC, outlining current policies and procedures that were implemented to ensure the effective use of available resources to support service and mission goals, and maintain compliance with prescribed data management directives.

Blitstein, Ronald↗

The National Space Science Data Center: An operational perspective

The National Space Science Data Center (NSSDC) manages over 110,000 data tapes with over 4,000 data sets. The size of the digital archive is approximately 6,000 GBytes and is expected to grow to more than 28,000 GBytes by 1995. The NSSDC is involved in several initiatives to better serve the scientific community and improve the management of current and future data holdings. These initiatives address the need to manage data to ensure ready access by the user and manage the media to ensure continuing accessibility and integrity of the data. An operational view of the NSSDC, outlining current policies and procedures that have been implemented to ensure the effective use of available resources to support service and mission goals, and maintain compliance with prescribed data management directives is presented.

Blitstein, Ronald↗

Space Station Freedom user's guide

This guide is intended to inform prospective users of the accommodations and resources provided by the Space Station Freedom program. Using this information, they can determine if Space Station Freedom is an appropriate laboratory or facility for their research objectives. The steps that users must follow to fly a payload on Freedom are described. This guide covers the accommodations and resources available on the Space Station during the Man-Tended Capability (MTC) period, scheduled to begin the end of 1996, and a Permanently Manned Capability (PMC) beginning in late 1999.

Source record↗

A classification procedure for the effective management of changes during the maintenance process

During software operation, maintainers are often faced with numerous change requests. Given available resources such as effort and calendar time, changes, if approved, have to be planned to fit within budget and schedule constraints. In this paper, we address the issue of assessing the difficulty of a change based on known or predictable data. This paper should be considered as a first step towards the construction of customized economic models for maintainers. In it, we propose a modeling approach, based on regular statistical techniques, that can be used in a variety of software maintenance environments. The approach can be easily automated, and is simple for people with limited statistical experience to use. Moreover, it deals effectively with the uncertainty usually associated with both model inputs and outputs. The modeling approach is validated on a data set provided by NASA/GSFC which shows it was effective in classifying changes with respect to the effort involved in implementing them. Other advantages of the approach are discussed along with additional steps to improve the results.

Briand, Lionel C.↗

Use of non-spherical gravity harmonics for relative motion GN/C (category 2)

Detailed analysis of the Automatic Rendezvous and Capture problem indicate a need for three different regions of mathematical description for the GN&C algorithms: (1) multi-vehicle orbital mechanics to the rendezvous interface point, i.e., within 100 nm; (2) relative motion solutions (such as Clohessy-Wiltshire type) from the far-field to the near-field interface, i.e., within 1 nm and; (3) close proximity motion - the near-field motion where the relative differences in the gravitational and orbit inertial accelerations can be neglected from the equations of motion. Limit boundaries to these regions can be precisely defined by further analysis and will be functions of the tracking measurement accuracies and the computer resources available for the solution of the algorithms. This paper analyzes the relative motion in Regions 2 and 3 above and present the derivation and discussion of the general case of non-spherical gravitational perturbed relative motion. Mathematical deviations from the numerically integrated spherical gravity case and solutions from the Clohessy-Wiltshire equations are presented in the analysis. Based upon this preliminary analysis, it is recommended that further efforts be used to assess the relative position and velocity differences in Region 2 due to non-spherical gravity harmonics and that viable GN&C algorithms be developed to include these gravity perturbations (especially the effects of the first gravity harmonic, J2).

Henderson, David M.↗

Near-Earth asteroids: Observer alert network and physical observations

This project strives to obtain physical observations on newly discovered Near-Earth Objects (NEO's) in order to provide fundamental data needed to assess the resources available in the population. The goal is acquiring data on all objects brighter than magnitude V= 17.0. To accomplish this, an electronic mail alert and observer information service that informs observers around the world as to the status of physical observations on currently observable NEO's was established. Such data is also acquired ourselves through a cooperative program with European colleagues that uses telescopes on La Palma to obtain spectra of NEO's and through observations made from a local telescope on Tumamoc Hill. This latter telescope has the advantage that large amounts of observing time are available, so that whenever a new NEO's discovered, we can be assured of getting time to observe it.

Davis, Donald R.↗

Distributed Virtual System (DIVIRS) Project

As outlined in our continuation proposal 92-ISI-50R (revised) on contract NCC 2-539, we are (1) developing software, including a system manager and a job manager, that will manage available resources and that will enable programmers to program parallel applications in terms of a virtual configuration of processors, hiding the mapping to physical nodes; (2) developing communications routines that support the abstractions implemented in item one; (3) continuing the development of file and information systems based on the virtual system model; and (4) incorporating appropriate security measures to allow the mechanisms developed in items 1 through 3 to be used on an open network. The goal throughout our work is to provide a uniform model that can be applied to both parallel and distributed systems. We believe that multiprocessor systems should exist in the context of distributed systems, allowing them to be more easily shared by those that need them. Our work provides the mechanisms through which nodes on multiprocessors are allocated to jobs running within the distributed system and the mechanisms through which files needed by those jobs can be located and accessed.

Schorr, Herbert↗

Advanced design for orbital debris removal in support of solar system exploration

The development of an Autonomous Space Processor for Orbital Debris (ASPOD) is the ultimate goal. The craft will process, in situ, orbital debris using resources available in low Earth orbit (LEO). The serious problem of orbital debris is briefly described and the nature of the large debris population is outlined. This year, focus was on development of a versatile robotic manipulator to augment an existing robotic arm; incorporation of remote operation of robotic arms; and formulation of optimal (time and energy) trajectory planning algorithms for coordinating robotic arms. The mechanical design of the new arm is described in detail. The versatile work envelope is explained showing the flexibility of the new design. Several telemetry communication systems are described which will enable the remote operation of the robotic arms. The trajectory planning algorithms are fully developed for both the time-optimal and energy-optimal problem. The optimal problem is solved using phase plane techniques while the energy optimal problem is solved using dynamics programming.

Source record↗

Performance analysis of a large-grain dataflow scheduling paradigm

A paradigm for scheduling computations on a network of multiprocessors using large-grain data flow scheduling at run time is described and analyzed. The computations to be scheduled must follow a static flow graph, while the schedule itself will be dynamic (i.e., determined at run time). Many applications characterized by static flow exist, and they include real-time control and digital signal processing. With the advent of computer-aided software engineering (CASE) tools for capturing software designs in dataflow-like structures, macro-dataflow scheduling becomes increasingly attractive, if not necessary. For parallel implementations, using the macro-dataflow method allows the scheduling to be insulated from the application designer and enables the maximum utilization of available resources. Further, by allowing multitasking, processor utilizations can approach 100 percent while they maintain maximum speedup. Extensive simulation studies are performed on 4-, 8-, and 16-processor architectures that reflect the effects of communication delays, scheduling delays, algorithm class, and multitasking on performance and speedup gains.

Young, Steven D.↗

Propulsion system design trade-offs for space stations

The primary function of the propulsion system of a space station in LEO is to provide altitude maintenance to compensate for the effects of atmospheric drag. The paper investigates the trade-offs in the propulsion system design as a function of the propulsion system performance measured in terms of the on-orbit resources available to the propulsion system. Five low-thrust propulsion systems were analyzed, ranging from those that can use on-board waste products to state-of-the-art high-performance electric propulsion systems (mixed waste gas resistojet, water resistojet, hydrogen oxygen thruster, hydrazine arc-jet, and plasma thruster). The results of the analysis indicate that the average optimal altitude strategy decreases with increasing specific impulse of the propulsion system and increases with increasing costs of propellant resupply.

Jones, Jeffrey D.↗

Use of wind data in global modelling

The European Centre for Medium Range Weather Forecasts (ECMWF) is producing operational global analyses every 6 hours and operational global forecasts every day from the 12Z analysis. How the wind data are used in the ECMWF golbal analysis is described. For each current wind observing system, its ability to provide initial conditions for the forecast model is discussed as well as its weaknesses. An assessment of the impact of each individual system on the quality of the analysis and the forecast is given each time it is possible. Sometimes the deficiencies which are pointed out are related not only to the observing system itself but also to the optimum interpolation (OI) analysis scheme; then some improvements are generally possible through ad hoc modifications of the analysis scheme and especially tunings of the structure functions. Examples are given. The future observing network over the North Atlantic is examined. Several countries, coordinated by WMO, are working to set up an 'Operational WWW System Evaluation' (OWSE), in order to evaluate the operational aspects of the deployment of new systems (ASDAR, ASAP). Most of the new systems are expected to be deployed before January 1987, and in order to make the best use of the available resources during the deployment phase, some network studies are carried out at the present time, by using simulated data for ASDAR and ASAP systems. They are summarized.

Pailleux, J.↗