Success of the Melton Valley Watershed Remediation at the ORNL - 12351

The source remediation of the Melton Valley (MV) Watershed at the U.S. Department of Energy's (DOE's) Oak Ridge National Laboratory was completed 5 years ago (September 2006). Historic operations at the laboratory had resulted in chemical and radionuclide contaminant releases and potential risks or hazards within 175 contaminated units scattered across an area of 430 hectares (1062 acres) within the watershed. Contaminated areas included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pit/trenches, hydrofracture wells, leak and spill spites, inactive surface structures, and contaminated soil and sediments. The remediation of the watershed was detailed in the MV Interim Action Record of Decision (ROD) and included a combination of actions encompassing containment, isolation, stabilization, removal, and treatment of sources within the watershed and established the monitoring and land use controls that would result in protection of human health. The actions would take place over 5 years with an expenditure of over $340 M. The MV remedial actions left hazardous wastes in-place (e.g., buried wastes beneath hydraulic isolation caps) and cleanup at levels that do not allow for unrestricted access and unlimited exposure. The cleanup with the resultant land use would result in a comprehensive monitoring plan for groundwater, surface water, and biological media, as well as the tracking of the land use controls to assure their completion. This paper includes an overview of select performance measures and monitoring results, as detailed in the annual Remediation Effectiveness Report and the Five-Year Report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Progress of the High-Risk 618-10 Burial Ground at Hanford 12427

The 618-10 Burial Ground was in operation from 1954 to 1963 and consists of 94 vertical pipe disposal units (VPUs) and 12 solid waste disposal trenches. Remediation of the trenches began in March of 2011 under the River Corridor Closure Contract (RCCC)a. This work was considered to be high risk because the trenches are known to contain a large radiological inventory and have the potential to release airborne contaminants. Remediation is being performed without a containment structure by using a combination of engineering controls and monitoring equipment. The engineering controls include storing material below grade using a surge trench, the application of soil fixatives, and applying material storage limits. The use of radiological and chemical monitoring equipment is also used to provide near real-time information to guide remediation activities and limit contact of waste until risks can be evaluated. Remediation of the trenches is progressing without any significant personnel or environmental issues. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned: Tribal Community Engagement, Remediation and Restoration of a Uranium Mine Tailings Site, Navajo Nation - 12484

In May, 2011 New World Environmental Inc. was awarded a contract by the Navajo Nation Environmental Protection Agency to remediate an illegal radioactive waste disposal site located in the Navajo Nation. The initial scope included the excavation and shipment of an estimated 3,000 cubic yards of Uranium mine tailings and associated industrial waste. In this instance Stakeholders were supportive of the project, remediation and restoration, yet the movement of residual radioactive materials through tribal communities was a controversial issue. Other Stakeholder issues included site security, water sources for remediation activities, local residents' temporary re-location and care of livestock, right of way permissions and local workforce development. This presentation recaps the technical and non-technical issues encountered in the remediation and restoration the seven acre site and the outreach to surrounding communities. Cultural and equity issues resulting from historical problems associated with this and other sites in the immediate area and education and training. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Addressing Technical and Policy Challenges for Remediation of Metals and Radionuclides within Complex Deep Vadose Zone Environments - 17028

Deep vadose zone contamination is a significant issue in many regions of the world. Although remediation of deep vadose zone contamination is important, direct contact with the contamination does not threaten human health or the environment due to its depth in the vadose zone. Yet, movement of contamination from the deep vadose zone to the groundwater creates the potential for exposure and risk to receptors. Therefore, the challenge of deep vadose zone remediation is to maintain a minimal rate of contaminant transport such that flux from the contaminated vadose zone is limited to protect groundwater resources and down-gradient receptors. We herein review major processes for viable remediation of deep vadose zone metal and radionuclides that form the practical constraints on remedial actions and provide an overview of how these principles are being practiced to address key contaminants at the U.S. Department of Energy Hanford Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - 17456

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining Ra-226 from pitchblende ore, later transitioning to the refining of uranium ore. Within the community of Town of Port Hope, surveys are being conducted at approximately 5000 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Of the 5000 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. The design phase for remediation of the first group of 44 residential properties to be included in the small scale sites program and the various challenges associated with working in a well-established community are presented. In developing the design packages for individual properties it is important to understand that this remedial phase represent the final and most intrusive aspect of the PHAI for those homeowners affected. As such, the success of the program is dependent on how well the needs and desires of the community and individual property owners are incorporated into the remedial designs and how well those designs are implemented to remove LLRW and restore properties to their original (or better) condition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a groundwater transport simulation tool for remedial process optimization - 15316

The groundwater remedy for hexavalent chromium at the Hanford Site includes operation of five large pump-and-treat systems along the Columbia River. The systems at the 100-HR-3 and 100-KR-4 groundwater operable units treat a total of about 9,840 liters per minute (2,600 gallons per minute) of groundwater to remove hexavalent chromium, and cover an area of nearly 26 square kilometers (10 square miles). The pump-and-treat systems result in large scale manipulation of groundwater flow direction, velocities, and most importantly, the contaminant plumes. Tracking of the plumes and predicting needed system modifications is part of the remedial process optimization, and is a continual process with the goal of reducing costs and shortening the time frame to achieve the cleanup goals. While most of the initial system evaluations are conducted by assessing performance (e.g., reduction in contaminant concentration in groundwater and changes in inferred plume size), changes to the well field are often recommended. To determine the placement for new wells, well realignments, and modifications to pumping rates, it is important to be able to predict resultant plume changes. In smaller systems, it may be effective to make small scale changes periodically and adjust modifications based on groundwater monitoring results. Due to the expansive nature of the remediation systems at Hanford, however, additional tools were needed to predict the plume reactions to system changes. A computer simulation tool (the Pumping Optimization Model, or POM) was developed to support pumping rate recommendations for optimization of large pump-and-treat groundwater remedy systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation and Application of Phyto-remediation at FUSRAP Projects - 16275

The Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs) occupy approximately 607 hectares (1,500 acres) of the original 3,035-hectare (7,500-acre) Lake Ontario Ordnance Works (LOOW). The NFSS was used to store radioactive materials, residues and waste from uranium ore processing between 1944 and 1952. A field-study is currently underway to evaluate the potential use of hybridized trees to stabilize radionuclides, mainly uranium, and chlorinated solvents derived from trichloroethylene degradation in groundwater at the NFSS. The purpose of this effort is to support the USACE-Buffalo District in the evaluation and implementation of phyto-remediation approaches to contain groundwater impacts on the site. This demonstration project is considered a site maintenance action and will have relevance to the Formerly Utilized Sites Remedial Action Program (FUSRAP) mission. The demonstration is designed to determine the ability of trees to withstand and uptake Uranium (U), and to a lesser extent Trichloroethylenes (TCEs), and hydraulically control groundwater where historical practices produced a series of disconnect plumes. Although the groundwater at the NFSS is naturally high in total dissolved solids that preclude untreated consumption, the groundwater contaminant levels are very high in some areas and may limit the options for future site re-use. Active groundwater remediation is impractical due to the clayey site soils and low risk of transport. The phyto-remediative approach is a passive action to lessen the groundwater impacts during the project's life cycle and property re-use planning. The target contaminant sources and plumes occur near the property boundaries, along legacy sanitary sewer lines, and near on-site surface-water courses. The demonstration includes soil characteristic determinations, the testing of optimal hybrid tree species, field implementation at target sites, and soil moisture and groundwater monitoring during the long-term evaluation phase. The final disposition of the trees will be included in future site decision and maintenance documents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Strategy for Former PChP Uranium Production Site in Ukraine - 18217

The paper describes current status and results of the investigation carried out at the one of the largest Uranium production facilities in the former Soviet Union (SU) located in Ukraine, 'Pridneprovsky Chemical Plant' (PChP). A large volume of new site specific contamination data and parameters needed for safety assessment, prioritization and environment remediation planning have been received during different phases of the site characterization and hazards investigation, carried out in the frame of State remediation programs and also with financial support of the EC projects during 2009-2017. Specific features of this site are significant amount of sludge materials, containing high activity concentration of {sup 230}Th and also number of the buildings, which were used for Uranium production in past and now containing large amount of spilled and dispersed U-residues with very high activity concentration of {sup 226}Ra, {sup 230}Th - as well as other radionuclides of {sup 238}U decay series, which also remain in many locations at this site. This site is still used for industrial purposes, which are not related to the Uranium production, and therefore many people are visiting this site daily, posing potential high risks for them to be exposed. The paper presents the understanding about the identified hazards and the priority between number of many other objects, which are required for the remediation, and also describes the problems faced during remediation planning because lack of safety management, experience and technical capabilities as well as funds available in Ukraine, which are needed to bring PChP site in safe conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

96 Park Way Vicinity Property Remediation Challenges at the FUSRAP Maywood Superfund Site, Maywood, New Jersey - 19216

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS), 'the Project,' was transferred to the US Army Corps of Engineers (USACE) in 1997. Shortly thereafter, USACE initiated FUSRAP remediation efforts on 24 commercial and residential properties and, in addition, the Project team evaluated properties previously addressed at the FMSS. One of those properties was located at 96 Park Way in Rochelle Park, New Jersey. The property history included removal of contaminated soil in 1985 by the US Department of Energy (US DOE). Soil sampling performed after removal of contaminated soil indicated the cleanup met applicable guidelines in place at the time. A Five-Year Review of the FMSS conducted by the US Environmental Protection Agency (USEPA) in 2009 found that 96 Park Way did not meet the current residential cleanup levels for the site and recommended additional study and remediation, if warranted. The current levels are established in the approved cleanup plan for the FMSS (known as the Record of Decision [ROD]) issued in 2003. Based on USEPA's recommendation, USACE carefully reviewed all available records for the property. The review considered the differences between the soil cleanup standards used in the 1980's and the 2003 ROD standards, which are slightly more restrictive for deeper soils. The USACE conducted detailed field studies at 96 Park Way in 2014-15 to address the USEPA findings. This work included gamma walkover surveys and soil sampling to depths of approximately 3.5 meters. The results identified three discrete areas at depth that did not meet the ROD residential soil cleanup standard: two areas bordering an adjacent highway (New Jersey Route 17) and one along railroad property adjacent to the site. To address these areas, soil removal actions were conducted in 2016-17. The principal challenge with construction, engineering, and community relations was the property housed two sensitive facilities: a long-term assisted care living facility and a short-term post-surgery rehabilitation center. The operations at these facilities could not be interrupted in any way during FUSRAP activities. The three FUSRAP-impacted areas were addressed and restored in coordination with the USEPA, property management, and local officials. Site restoration presented a particular challenge well after the remedial action was completed, as the property owner and the government disagreed on the level of restoration. Those negotiations are ongoing as of this writing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 116: Waste Management from Remediation of Legacy Sites or Unplanned Releases

Past experiences have shown that there is often a disconnect between Indigenous societies and Western society. This disconnect can be attributed to different value systems between these two group and is not limited to the USA and Canada but also extends into Australia, New Zealand, and the Central Asia Republics (the 'five Stans'). The intent of this Panel Session to give voice to representatives from Indigenous communities, the challenges presented in remediation processes, and potential solutions. Standard risk assessment assumptions developed for Western societies often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. This panel focused on the perspectives of Indigenous societies (e.g., Indian Tribes (US), First Nations (Canada)) related to risk assessment of environmental remediation challenges, including deep geological disposal of HLW and ILW, near-surface disposal of LLW and in-situ entombment of nuclear reactor components, and environmental remediation of abandoned uranium mines and historic wastes. Standard risk assessment assumptions often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. Factoring those into a risk assessment that still meets regulatory requirements and policies such as reasonably anticipated land use at US EPA CERCLA sites can be challenging but has the potential to lead to a site or facility approach that is more accepted. Panelists with presentations: The U.S. Nuclear Regulatory Commission Regulatory Process - A Path for Indigenous Knowledge? (Francis Cameron); Local Community Perceptions and Remediation Projects (Michelle Roberts); Indigenous Perspectives on Risk Assessment (Bob Watts); Navajo Superfund Program: Fundamental Law and Traditional Ecological Knowledge (Dariel Yazzie); Risk Assessment: Two Indigenous Approaches (Whitney Fraser)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Remediation Options for a Perched-Water Unit at the Hanford Site - 20378

At the U.S. Department of Energy's Hanford Site, liquid-phase waste was discharged using surface disposal features such as ponds, trenches, and cribs. These practices distributed contaminants in the subsurface, some of which are currently in the vadose zone above the groundwater. At the 200-DV-1 operable unit (OU) at the Hanford Site, a key feature is a perched-water zone. This perched-water zone contains several million liters of water contaminated with high concentrations of uranium, technetium-99 (Tc-99), and nitrate that serves as a continuing source of contamination to the underlying aquifer. Currently, a pumping system is used to remove contaminant mass from the perched-water zone. However, water extraction will become more challenging as the perched unit dewaters. As a result, residual contaminants remaining after pumping is no longer effective needs to be addressed with post-extraction mitigation approaches, appropriate monitoring, and selection of suitable remediation endpoints. Thus, a remedy evaluation needs to include the unique conditions of this perched-water zone. As part of the initial evaluation, a set of technologies have been preliminarily identified as potentially applicable to the perched-water zone, including in situ remediation technologies to sequester uranium and Tc-99 and to degrade nitrate. While there is sufficient information available for direct consideration of some of the reviewed technologies in a feasibility study, five in situ remediation technologies were identified as needing additional information on their effectiveness under the geochemical and contaminant conditions of the perched-water zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an In-Situ Leaching Technology for Extracting Residual Uranium from Remediated Soil - 20099

Site-specific chemical solutions for extracting uranium were developed and evaluated for treating previously remediated soil at a former thorium mill tailings site, known as the Former Rare Earths Facility (REF), in West Chicago, Illinois. Prior remediation efforts had resulted in residual sand and gravel aggregate that met the soil cleanup standards. The target soil contains residual levels of uranium, which continues to leach into the site groundwater at levels exceeding groundwater protection standards (GWPS). A series of bench-scale tests were conducted to evaluate the efficacy and viability of in-situ leaching (ISL) technology to treat the target soil for the purposes of attaining uranium GWPS at the REF. Specific objectives of the bench-scale tests entailed identification and selection of optimal leaching, quantification of the extent and rate of uranium released as a function of chemical composition, chemical concentrations, chemical residence times, and obtaining critical data to estimate treatment costs. A combination of sodium bicarbonate and sodium carbonate reagent was the most effective leaching solution. In general, leaching solutions containing a higher concentration of sodium carbonate demonstrated superior uranium leaching capabilities. Removal of 50% of the uranium mass from the soil matrix was adequate for achieving compliance with the site-specific GWPS. After six to seven pore volume flushes (PVFs), the uranium leaching effectiveness of all leaching solutions was similar. The amount of initial uranium removed with each subsequent PVF was minimal, suggesting limited solubility of the remaining mass of uranium. The effects of leaching duration were significant and persisted through at least the first five consecutive PVFs. Leaching of uranium also resulted in leaching of several non-uranium constituents, many of which exceeded applicable National Pollutant Discharge Elimination System (NPDES) standards. Given historical operations and waste disposal practices at the site, leaching of non-uranium constituents was expected. Hydrochloric acid was used to stabilize treated soil. Savings of approximately $148 million in direct and indirect remediation costs are expected with an ISL alternative compared to the excavation and landfill disposal remediation option. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of an Unrefined Humate Solution as a Possible Attenuation-based Remedy for Uranium Contamination in Acidic Groundwater - 20351

The Savannah River Site (SRS), joined the environmental cleanup program in 1981 after the Cold War, and was designated as a hazardous waste management facility. About 1.8 billion gallons of acid wastes were disposed into the F/H Area Seepage Basin that included many radionuclides and dissolved metals, resulting in highly contaminated groundwater plumes with pH of 3 - 5.5. The acidity of the plumes contributes to the mobility of several constituents of concern (COC) such as H-3, U-238, I-129, and Sr-90 for the F-Area plume and H-3, Sr-90 and mercury for the H-Area plume. An active treatment (pump-and-treat and re-injection) system was constructed and put in place in 1997 to address the removal of metals and radionuclides from the contaminated groundwater. As remediation projects advanced, active treatments were transitioned to more passive or enhanced-passive approaches such as the subsurface barrier with base injection system, which has been controlling the mobility of contaminants. However, new and more efficient attenuation-based remedies are always sought. Several studies have proposed that humic substances can be used to remediate sites contaminated with heavy metals by creating a permeable reactive barrier. Humic substances (HS) are major components of soil organic matter. HS are polyfunctional organic macromolecules formed by the chemo-microbiological decomposition of biomass or dead organic matter. These substances are usually divided into three main fractions: humin (insoluble at all pH values), humic acid (soluble at pH greater than 3.5), and fulvic acid (soluble at all pH values). Humic substances are major components of the soil at SRS and, in addition, are also helpful in the removal process of uranium. This research focuses on uranium (VI), which is a key contaminant of concern in the F-Area groundwater plume. The interaction of uranium with sediment in the presence or absence of humic substances involves complex mechanisms that are not yet well understood. The interaction of U(VI) with humic substances can affect the adsorption of U on sediment, altering its mobility in the subsurface. The objective of this study is to study the mobility of uranium in the presence of humic acid and to determine if sediments amended by humic acid can enhance the sorption of heavy metals onto sediments. In this research, experiments were conducted using background (clean) F-Area aquifer sediments to understand and predict uranium mobility. A blended material, humate, containing both humic and fulvic acids and a chemically modified humate (KW15 modified humic or mod-HA) was studied as a possible amendment for uranium remediation in SRS groundwater. Batch experiments were conducted in triplicates using 20 ml of aqueous suspension in DI water containing SRS sediment and mod-HA and studied the effect of pH, kinetics of humate sorption onto SRS sediment and also studied the sorption of uranium onto mod-HA amended SRS sediment. Results indicate that mod-HA amended sediment increases uranium removal significantly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗