Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Progress Report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jul. 2018 through Dec. 2018

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2018. This report extends the data analysis through the end of 2018. The data period focus of this report is July 2018-December 2018. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2019 through Jun. 2019 [Slides]

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2018. This report extends the data analysis through June 2019. The data period focus of this report is January 2019-June 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Battery Electric Bus Progress Report (Jul-Dec 2019)

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2019. This report extends the data analysis through December 2019. The data period focus of this report is July 2019–December 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report. Data Period Focus: Jan. 2020 through June 2020

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2019. This report extends the data analysis through June 2020. The data period focus of this report is January 2020-June 2020. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2017 through Dec. 2017

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2016. This report extends the data analysis through December 2017. NREL plans to publish progress reports on the Foothill Transit fleet every six months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Environmental ISR (Quarterly Progress Report Q3 FY19 April-June 2019)

Progress have been good on both projects. On the subsurface radionuclide project, graduate student, Emily Tran, submitted our first joint manuscript resulting from this collaboration to Water Resources. The manuscript covers batch and flow through experiments using radionuclides with and without bentonite colloids through a naturally fractured chalk rock. Solutions used were collected from a field site in Israel with high ionic strength and filtered prior to using in the experiment. Results show that the bentonite colloids are unstable under these high ionic strengths in carbonate rock in Israel. The U is not significantly eluted with or without bentonite colloids and cerium precipitates as a mobile colloid in the absence of colloids.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Nimbus - A progress report.

Flight accomplishments of Nimbus satellites and progress in meteorological spacecraft observatory systems since program initiation

Huston, W. B.↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

A progress report - Induction plasma simulation of the GCNR.

Significant progress has been made in the design, construction and operation of induction coupled devices which simulate the open cycle Gas Core Nuclear Rocket. These devices incorporate solid feed of the plasma forming material (uranium and uranium simulating materials), permeable walls, seeding of the propellant, and transpiration cooled, choked flow nozzles. Operating parameters and performance data of devices employing these design features are discussed. A uranium plasma experiment is included. In addition, operating data of several devices which compare theoretical and actual performance at a variety of powers, pressures, frequencies, and sizes are discussed.

Vogel, C. E.↗

Use of graphics in decision aids for telerobotic control: (Parts 5-8 of an 8-part MIT progress report)

Four separate projects recently completed or in progress at the MIT Man-Machine Systems Laboratory are summarized. They are: a decision aid for retrieving a tumbling satellite in space; kinematic control and graphic display of redundant teleoperators; real time terrain/object generation: a quad-tree approach; and two dimensional control for three dimensional obstacle avoidance.

Sheridan, Thomas B.↗

The 1990 progress report and future plans

This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.

Friedland, Peter↗

A progress report on grazing incidence optics fabrication and evaluation

The progress being made on a mirror array telescope for high energies (MARTHE) project is reported. As a first step, small mirror flats and full-size Wolter I mirrors are produced that are lacquer coated (mandrels) and then coated with gold or palladium. The up-to-date results of fabricating and testing these mirrors are presented. Currently, results can be provided on the micro-roughness, marco-figure, X-ray scattering, and reflectivity up to 8 keV from flats and Wolter I mirrors as well as optical measurements of the flats.

Teague, Peter F.↗