Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Perseverance Rover”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

NASA Capture, Containment, and Return System: Bringing Mars Samples to Earth

The Capture, Containment, and Return System (CCRS) project is NASA’s last step in bringing back Mars samples. CCRS will close a decades-long multi-mission and multi-agency effort to bring Mars surface samples back to Earth for scientific studies. CCRS will launch in 2027 on the European Earth Return Orbiter (ERO) spacecraft, which will provide communications relay for the Mars Sample Return ground missions, Perseverance rover and the Sample Retrieval Lander (SRL) (to be launched in 2028). The main mission for CCRS begins when the first-ever orbital planetary capture operation occurs with CCRS catching and securing the Orbiting Sample (OS)in low Mars orbit. From this point, the system will perform additional "firsts": it will autonomously contain the OS with heat-shrink-fit, sterilize the outside surface, and assemble the Earth entry capsule, named Earth Entry System (EES), in orbit around Mars using a gantry mechanism. At approximately 2.8 Lunar distances from Earth, or 3-days from entry into Earth’s atmosphere, CCRS will open its micrometeoroid shield and release the EES on a ballistic trajectory to Earth. The EES is designed to be a fully passive system that will enter the atmosphere and land without parachute at the Utah Test and Training Range (UTTR).

Mars mission, Sample return, Mission design↗

Optical Design of the Mastcam-Z Lenses

The rover Perseverance includes two Mastcam-Z cameras that use the first zoom lenses to be placed on an outer planet. We discuss the design of these zoom lenses. We explain their features and imaging capability.

Maki, Justin N.↗

Reconstructed Flight Performance of the Powered Descent Guidance and Control System for the Mars 2020 Perseverance Mission

On February 18th, 2021, the Mars 2020 mission successfully landed the “Perseverance” rover at Jezero crater on Mars. The Powered Descent Guidance and Control (PDGC) system was inherited from the Mars Science Laboratory mission and its parameters were tuned to support Terrain Relative Navigation for the Mars 2020 mission. The PDGC system architecture consists of a trajectory and an attitude commander, six feedback control loops and thruster allocation logic. The PDGC commands eight throttleable Mars Lander Engines to actively guide and control the vehicle during each powered flight phase. This paper describes the design and the as-flown performance of the PDGC system.

Way, David W.↗

Maneuver Design Implementation and Verification for the Mars 2020 Mission

On February 18, 2021, the Perseverance rover landed in Jezero Crater on Mars, transported by the Mars 2020 spacecraft on a nearly seven-month journey to the Red Planet. The execution of three propulsive maneuvers during the interplanetary cruise phase was required to remove the launch-injection bias and deliver the spacecraft to the Mars atmospheric entry point. This paper focuses on the maneuver implementation and verification process between the navigation and spacecraft teams. Additionally, this paper discusses the execution error models that were used to determine maneuver performance and delivery accuracy at the atmospheric entry interface point.

Kruizinga, Gerhard↗

Mars 2020 Perseverance Entry Descent and Landing Simulation Statistical Analysis and Operations

On February 18, 2021, the Perseverance rover and Ingenuity helicopter demonstra- tion landed at Jezero Crater. The Entry, Descent, and Landing (EDL) architecture, largely the same used to land Curiosity at Gale Crater on August 6, 2012, required high-fidelity flight dynamics simulation with two independent tools to verify per- formance. The process for creating the EDL simulation using the Dynamics Sim- ulator for Entry, Descent and Surface landing (DSENDS) tool will be discussed, along with its use for for independent verification of the EDL statistical analy- sis results and reference trajectory simulation. Analysis and usage details both in development and cruise, along with post-landing assessment of the prediction performance of the simulation, will also be discussed.

"O'Farrell, Clara"↗

Low Temperature Brazing: A Candidate Method for Preventing Interplanetary Contamination During the Mars Sample Return Mission

NASA and the European Space Agency are planning a joint Mars Sample Return campaign, scheduled to launch in 2026, with a very specific objective: return to Earth the rock and regolith samples that have been collected on Mars by NASA’s Perseverance rover. This is a very complex, multi-step process intended to culminate in the safe return of Mars samples to Earth. The term “safe return” implies use of a robust containment vessel designed to prevent any uncontained or unsterilized material from Mars from being returned to Earth. Hence, any technology chosen for sealing this vessel has to meet stringent contamination requirements, but also to withstand impact forces upon landing. This paper describes the development of a primary candidate for the sealing approach: brazing.

Schein, Mike↗

Mars 2020 Trajectory Correction Maneuver Design

The Mars 2020 mission launched on 30 July 2020 and arrived at Mars on 18 February 2021. Delivering the mission’s Perseverance rover to Jezero Crater required adjusting the postlaunch trajectory to remove the launch injection bias and to target the atmospheric entry conditions, while also satisfying requirements on the propellant usage and non-nominal impact probability at Mars. The Mars 2020 maneuver design team achieved these goals by designing and executing three propulsive maneuvers in flight. The accurate on-board execution of those maneuvers delivered the spacecraft into the Martian atmosphere in a state that allowed for a successful entry, descent, and landing on the surface. This paper details the maneuver design process and describes the design and execution of the three in-flight propulsive maneuvers.

Kruizinga, Gerhard↗

Mars 2020 Navigation Performance

On February 18, 2021, the Perseverance rover and Ingenuity helicopter demonstration landed at Jezero Crater. The Entry, Descent, and Landing (EDL) architecture, largely the same used to land Curiosity at Gale Crater on August 6, 2012, required high-fidelity flight dynamics simulation with two independent tools to verify performance. The process for creating the EDL simulation using the Dynamics Simulator for Entry, Descent and Surface landing (DSENDS) tool will be discussed, along with its use for for independent verification of the EDL statistical analysis results and reference trajectory simulation. Analysis and usage details both in development and cruise, along with post-landing assessment of the prediction performance of the simulation, will also be discussed.

Wagner, Sean↗

Post-flight Analysis of Atmospheric Properties from Mars 2020 Entry, Descent, and Landing

The Mars 2020 spacecraft landed the Perseverance rover and Ingenuity helicopter successfully in Jezero crater on Feb. 18, 2021. The entry, descent, and landing (EDL) sequence of the spacecraft largely leveraged the previous 2012 Mars Science Laboratory (MSL) mission. The atmospheric modeling approach for Mars 2020 was also borrowed from MSL. It consisted of two mesoscale atmospheric models of the target site during the Martian season of landing, and a statistical model of the pressure, density, temperature, and winds based on the mesoscale model data. This paper briefly describes the pre-flight atmospheric models used for Mars 2020, but focuses on the post-flight assessment of these models and comparison to near-landing day orbiter sounder and other onboard atmospheric measurements. Observations from post-flight analysis showed that density was under-predicted in the upper atmosphere, but within the altitudes covered by the mesoscale models, the pre-flight modeling matched post-flight results, including for quantities like wind velocities. Potential improvements to address the upper atmosphere and other deficiencies of the Mars 2020 pre-flight model are also discussed.

Villar, Gregorio↗

Analysis of Mars 2020 Perseverance Entry, Descent, and Landing Attitude Initialization Performance

The Mars 2020 Perseverance rover successfully landed at Jezero Crater on February 18, 2021. To perform this feat, the entry, descent, and landing navigation filter must be initialized with an estimate of the spacecraft state, which includes attitude from the cruise attitude control subsystem. Accuracy of this initial attitude estimate has an impact on important metrics such as touchdown velocity. This paper presents a post-landing reconstruction of the attitude initialization error budget, showing that the requirement of 0.15 deg ($3\sigma$, per axis) was met. Each error source is described and analyzed, including flight telemetry where possible. Analysis of the error budget shows that it is driven by systematic sun sensor errors, star-scanner-to-sun-sensor alignment stability, and inertial-measurement-unit-to-sun-sensor alignment stability. Finally, a contingency plan to initialize the navigation filter in the event of a star scanner failure is presented. While this plan was not needed in flight, results indicate that the attitude initialization requirement could have still been met in this off-nominal scenario.

Lo, Kevin D.↗

Test Facilities for SHERLOC Laser Development

The Scanning Habitable Environments with Raman and Luminescence for Organics and Chemicals (SHERLOC) instrument is a deep UV laser based spectrometer that is part of NASA’s Mars Perseverance rover. The laser is a pulsed 248.6 nm NeCu hollow cathode gas discharge laser. The design, development, and testing of lasers and laser power supplies (LPS) were performed by scientists and engineers at the Jet Propulsion Laboratory (JPL) and Photon Systems Inc. (PSI). While these lasers had been used previously in extreme terrestrial environments, before they had to be qualified for operation and functionality over the expected range of environmental situations (temperature cycling, vibration, mechanical shock, low pressure corona emission testing) over the course of mission life time. The SHERLOC laser/LPS testing facilities consisted of custom-tailored environmental test chambers with metrology/control electronics. A custom LabVIEW software package was developed to autonomously operate all test facilities using a multi-threaded, object-oriented programming architecture, tasked with interfacing with many instruments simultaneously for operation and data acquisition.

Houck, Andrew↗

The Containment Assurance Risk Framework of the Mars Sample Return Program

The Mars Sample Return campaign aims at bringing rock and atmospheric samples from Mars to Earth through a series of robotic missions. These missions would collect the samples being cached and deposited on Martian soil by the Perseverance rover, place them in a container, and launch them into Martian orbit for subsequent capture by an orbiter that would bring them back. Given there exists a non-zero probability that the samples contain biological material, precautions are being taken to design systems that would break the chain of contact between Mars and Earth. These include techniques such as sterilization of Martian particles, redundant containment vessels, and a robust reentry capsule capable of accurate landings without a parachute. Requirements exist that the probability of containment not assured of Martian-contaminated material into Earth’s biosphere be less than one in a million. To demonstrate compliance with this strict requirement, a statistical framework was developed to assess the likelihood of containment loss during each sample return phase and make a statement about the total combined mission probability of containment not assured. The work presented here describes this framework, which considers failure modes or fault conditions that can initiate failure sequences ultimately leading to containment not assured. Reliability estimates are generated from databases, design heritage, component specifications, or expert opinion in the form of probability density functions or point estimates and provided as inputs to the mathematical models that simulate the different failure sequences. The probabilistic outputs are then combined following the logic of several fault trees to compute the ultimate probability of containment not assured. Given the multidisciplinary nature of the problem and the different types of mathematical models used, the statistical tools needed for analysis are required to be computationally efficient. While standard Monte Carlo approaches are used for fast models, a multi-fidelity approach to rare event probabilities is proposed for expensive models. In this paradigm, inexpensive low-fidelity models are developed for computational acceleration purposes while the expensive high-fidelity model is kept in the loop to retain accuracy in the results. This work presents an example of end-to-end application of this framework highlighting the computational benefits of a multi-fidelity approach.

Giuseppe Cataldo↗

Testing Mars 2020 Flight Software and Hardware in the Surface System Development Environment

The Mars 2020 (M2020) Perseverance Rover is NASA's most advanced planetary rover mission to date. It includes a novel Sample Caching Subsystem (SCS) which will collect rock cores for possible future return to Earth, as well as an improved mobility system with enhanced autonomous navigation which will enable it to traverse faster and farther than prior rovers. The development of both systems required extensive flight software and flight hardware testing. To support this testing, we developed the Surface System Development Environment (SSDEV) and used it for a wide variety of testing. SSDEV is a bundled subset of M2020 Flight Software which runs on commercially available Linux computers and can be combined with multiple backend options for simulation and hardware control. The SSDEV architecture enabled our teams to perform much more testing of flight software and flight hardware than would have otherwise been possible. As a secondary benefit, the SSDEV-based test campaigns also helped our teams enter the operations phase of the mission with greater readiness of operations products and tools. In this paper, we summarize the motivation for SSDEV, provide an overview of the SSDEV architecture, list several examples of how SSDEV was used, and summarize lessons learned. SSDEV is not a substitute for integrated testing with flight-like avionics, but it enabled substantially more testing than would have otherwise been possible and also provided some unique benefits. We recommend architectures like SSDEV to future projects that need to perform extensive hardware and software testing using a limited set of flight-like avionics.

Wai, Dennis↗

Mars 2020 Entry, Descent, and Landing System Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Docking the Mars 2020 Perseverance Robotic Arm

The Mars 2020 Perseverance Rover includes an innovative Sample Caching Subsystem (SCS). Two key features of SCS are the ability to collect and process rock and regolith samples for possible future return to Earth and the ability to switch between different types of drill bits for coring rocks, abrading rocks, and collecting regolith. These capabilities are enabled by a Corer mounted on the end of a Robotic Arm and a Bit Carousel mounted on the front of the rover body. Beneath the Bit Carousel, a smaller Sample Handling Arm can insert and remove sample tubes from sampling bits in the carousel. For the Corer to interface with the Bit Carousel so that it can exchange drill bits and hand off rock samples, the Robotic Arm must maneuver the Corer to dock with the Bit Carousel. Docking serves two primary purposes: it precisely aligns the Corer with the hardware inside the Bit Carousel, and it applies enough preload between the Corer and the Bit Carousel to make them stay aligned through the process of bit exchange.The docking assembly consists of four concave alignment cones mounted on a large rotating ring, through the center of which the drill can exchange bits and samples with the Bit Carousel. The coring drill includes four alignment posts which mate with the four cones on the dock. Docking uses an algorithm we call “Force-Corrected Docking”, which means it iteratively reads the force/moments reported by the FTS, performs a small motion to reduce sideload and moments while increasing preload, and repeats until reaching a deadband around the target preload. Because docking is a critical function for SCS, the dock hardware and algorithm have been tested thousands of times over 7 years in various stages of development. The culmination of this work is a reliable docking system which has been demonstrated and used in flight.

Warner, Antonia↗

Mars 2020 Entry, Descent, and Landing Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. In addition to performing the critical function of landing the rover on the Martian surface, the EDL timeline behavior must co-exist in a non-partitioned software and system environment with other high-level functions that accomplish the goals for the rest of the mission. Due to the criticality of EDL, the potential for loss of mission, and a need for complete system autonomy, the standard for how the EDL Timeline interacts with other functions in the system is highly constrained. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Mars 2020 Lander Vision System Flight Performance 1

The Mars 2020 Entry Descent and Landing (EDL) system delivered the Perseverance rover to the surface of Mars on February 18th, 2021. A large fraction of the Jezero Crater landing site was covered with landing hazards including cliffs, inescapable dune fields and rocks. These hazards were identified or inferred using orbital imagery before launch so that they could be avoided using Terrain Relative Navigation (TRN) which was composed of two parts: the Lander Vision System (LVS) and Safe Target Selection (STS). During EDL, the LVS successfully estimated map relative position by fusing landmarks matched between descent imagery and a map of the landing site with Inertial Measurement Unit (IMU) data. This position estimate was used by STS to identify the safest target for landing that was also reachable given fuel and other constraints. The EDL system then used the powered descent phase to retarget to this location and land safely. The overall error between the targeted location and actual landing location was 5m which was an order of magnitude less than the 60m touchdown error requirement. This paper will describe the final tests of the LVS before launch, the checkout of the LVS during operations and the LVS performance during EDL.

Zheng, Jason↗

Validation of the Mars 2020 Fault Protection Design: Navigating the Infinity of the Off-Nominal

On July 30th 2020, the Mars 2020 mission successfully launched out of Cape Canaveral, Florida, passed through the Earth’s shadow, and began its short cruise to Mars. Less than seven months later, the Perseverance rover touched down safely in Jezero Crater to begin its ambitious mission that includes looking for signs of ancient life and collecting samples for future return to Earth. Getting to the successful landing, or “Tango Delta Nominal,” could not have been achieved without also considering the off-nominal. One of the teams supporting this ambitious mission is the fault protection (FP) team. This team is tasked with assessing the various failures, or faults, that could prevent mission success and with ensuring that the autonomous behaviors built into the software and hardware can detect faults and recover the vehicle to a safe state. As part of its charter, the FP team designed a test campaign to provide confidence in the system’s robustness to off-nominal scenarios across all of Mars 2020’s mission phases. The greatest challenge associated with designing such a validation campaign was reducing the infinite number of anomalous scenarios into a finite test suite. In addition, the tests needed to be executed efficiently in order to utilize the team’s limited test venue access, but still needed to maintain a level of rigor that guaranteed confidence in the test outcomes. Given that each test scenario generated massive amounts of data, the team also developed methods for quickly ascertaining whether the autonomous fault protection behaviors maintained vehicle safety in the presence of an anomaly. This paper summarizes the processes that the Mars 2020 fault protection team employed to execute its off-nominal validation campaign. It captures both the methods of generating a suite of off-nominal tests, as well as reducing it to a subset that can be realistically executed within schedule and resource constraints. It also describes the various processes and philosophies that the team utilized to execute the tests efficiently, including creating a standardized procedure template, keeping the test cases modular so that they could be easily interchanged, and capturing common fault injections in a change-controlled database. Finally, it will describe the tools and processes for assessing the test data, focusing in particular on a tool that evaluated vehicle state using “secondary” sources of data to validate that the software had truly configured the spacecraft to the expected safe state.

Morantz, Chaz↗