Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Path Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Review of the National Ignition Campaign 2009-2012

The National Ignition Campaign (NIC) was a multi-institution effort established under the National Nuclear Security Administration of DOE in 2005, prior to the completion of the National Ignition Facility (NIF) in 2009. The scope of the NIC was the planning and preparation for and the execution of the first 3 yr of ignition experiments (through the end of September 2012) as well as the development, fielding, qualification, and integration of the wide range of capabilities required for ignition. Besides the operation and optimization of the use of NIF, these capabilities included over 50 optical, x-ray, and nuclear diagnostic systems, target fabrication facilities, experimental platforms, and a wide range of NIF facility infrastructure. The goal of ignition experiments on the NIF is to achieve, for the first time, ignition and thermonuclear burn in the laboratory via inertial confinement fusion and to develop a platform for ignition and high energy density applications on the NIF. The goal of the NIC was to develop and integrate all of the capabilities required for a precision ignition campaign and, if possible, to demonstrate ignition and gain by the end of FY12. The goal of achieving ignition can be divided into three main challenges. The first challenge is defining specifications for the target, laser, and diagnostics with the understanding that not all ignition physics is fully understood and not all material properties are known. The second challenge is designing experiments to systematically remove these uncertainties. The third challenge is translating these experimental results into metrics designed to determine how well the experimental implosions have performed relative to expectations and requirements and to advance those metrics toward the conditions required for ignition. This paper summarizes the approach taken to address these challenges, along with the progress achieved to date and the challenges that remain. At project completion in 2009, NIF lacked almost all the diagnostics and infrastructure required for ignition experiments. About half of the 3 yr period covered in this review was taken up by the effort required to install and performance qualify the equipment and experimental platforms needed for ignition experiments. Ignition on the NIF is a grand challenge undertaking and the results presented here represent a snapshot in time on the path toward that goal. The path forward presented at the end of this review summarizes plans for the Ignition Campaign on the NIF, which were adopted at the end of 2012, as well as some of the key results obtained since the end of the NIC.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Evidence That MR Diffusion Tensor Imaging (Tractography) Predicts the Natural History of Regional Progression in Patients Irradiated Conformally for Primary Brain Tumors

Purpose: Stereotactic radiotherapy (SRT) is fast becoming the method of choice for treatment of nonsuperficial brain lesions. SRT treatment plans of malignant brain tumors typically incorporate a 20-mm isotropic margin to account for microscopic tumor spread; however, distant or progressive tumors occur outside this margin. Our hypothesis is that paths of elevated water diffusion may provide a preferred route for transport or migration of cancer cells. If our hypothesis is correct, then future SRT treatment volumes could be modified to provide elongated treatment margins along the paths of elevated water diffusion, thereby creating a biologically better treatment plan that may reduce the incidence of progression. Methods and Materials: Magnetic resonance diffusion tensor imaging (DTI) datasets were acquired on patient subjects before the appearance of >5 mm diameter progressive lesions or secondary tumors. DTI was performed using an echo-planar imaging sequence on a 1.5T clinical General Electric scanner with voxel dimensions of 0.98 x 0.98 x 6 mm. After SRT, patients were given repeated magnetic resonance imaging follow-ups at regular intervals to identify early tumor progression. When progressive disease was detected, DTIstudio and FMRIB Software Library software was used to compute paths of preferred water diffusion through the primary tumor site and the site of progression. Results: Our preliminary results on 14 patient datasets suggest a strong relationship between routes of elevated water diffusion from the primary tumor and the location of tumor progression. Conclusions: Further investigation is therefore warranted. Future work will employ more sophisticated fiber analysis in a prospective study.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The scoping, design, and plasma physics optimization of the Eos neutron source stellarator

On the path to a fusion pilot plant, Thea Energy plans to build Eos, a sub-breakeven, deuterium-deuterium, beam-target fusion, stellarator neutron source facility for producing tritium and other valuable radioisotopes. In this paper, a set of 1D plasma physics models are coupled and used to design the operating point of the facility and predict performance. At this foundational stage of the design, analytic and approximate models are sufficient to capture the leading-order effects, and fast enough to run in the inner loop of an optimizer. Higher-fidelity analyses will follow. Models of 1D profile-dependent neutral beam stopping, ion beam slowing down, beam-target fusion, electron-ion classical heat transfer, energy confinement (ISS04), beam pressure, beam heating of ions and electrons, beam-beam fusion fraction, and neutral beam injection and gyrotron heating electrical efficiencies are included. A numerical optimizer is used to determine the minimum required facility electric power to generate tritium at a given rate. A potentially advantageous regime is described in which modern precisely-quasisymmetric stellarators, new high-temperature superconductors, ITER-derived neutral beam injection, and new high-frequency gyrotrons enable a suitible target plasma with hot electrons, cold ions, peaked density and temperature profiles, and high beam-injected ion density. It appears possible at this time for a facility with a medium-scale and medium-strength stellarator whose required facility electric power is less than 40 MW to produce $2.5\times 10^{17}$ neutrons s -1 for the production of radioisotopes. With the addition of a tritium breeding blanket, such a facility could produce 0.2 grams d -1 or 70 grams yr -1 of tritium.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

TH-A-BRE-01: The Status of Intensity Modulated Proton and Ion Therapy

IMRT with photons has become a radiation therapy standard of care for many cancer treatment sites. The situation is quite different with intensity modulated particle (protons and ion) radiation therapy (IMPT). With the rapid development of beam scanning techniques and many of the newer proton facilities exclusively offering active beam scanning as their radiation delivery technique, it is timely to give an update on the status and challenges of IMPT. The leading principle in IMPT is to aim at the target from several, not necessarily coplanar, directions with multiple pencil beams that are modulated in their intensity and adjusted in their energy such that a desired dose distribution or, more generally, a desired bio-effective dose distribution is achieved. Different from low-LET photons, the varying relative biological effectiveness (RBE) along the beam path adds an additional dimension to the treatment planning process and will require biophysical modeling at least for carbon ion therapy. IMPT involves computationally challenging tasks, yet it needs to be very fast in order to be clinically relevant. To make IMPT computationally tractable, robust and efficient optimization methods are required. Lastly, IMPT planning is very sensitive to accurate knowledge of relative stopping and scattering powers of the intervening tissues as well as intra- and inter-fraction motion. Robust planning methods are being developed in order to obtain IMPT plans that are less sensitive against such uncertainties. This therapy symposium will present an update on the current status and emerging developments of IMPT from the medical physics perspective. Learning Objectives: Become familiar with current delivery techniques for IMPT and their limitations. Understand the basics of dose calculational algorithms and commissioning of IMPT. Learn how to assess the accuracy of planning and delivery of IMPT treatments. Get an overview of currently used and emerging optimization techniques. Learn about the pro or contra arguments for using IMPT for moving targets.

07 ISOTOPE AND RADIATION SOURCES↗

Validation of an in-vivo proton beam range check method in an anthropomorphic pelvic phantom using dose measurements

Purpose: In-vivo dosimetry and beam range verification in proton therapy could play significant role in proton treatment validation and improvements. In-vivo beam range verification, in particular, could enable new treatment techniques one of which could be the use of anterior fields for prostate treatment instead of opposed lateral fields as in current practice. This paper reports validation study of an in-vivo range verification method which can reduce the range uncertainty to submillimeter levels and potentially allow for in-vivo dosimetry. Methods: An anthropomorphic pelvic phantom is used to validate the clinical potential of the time-resolved dose method for range verification in the case of prostrate treatment using range modulated anterior proton beams. The method uses a 3 × 4 matrix of 1 mm diodes mounted in water balloon which are read by an ADC system at 100 kHz. The method is first validated against beam range measurements by dose extinction measurements. The validation is first completed in water phantom and then in pelvic phantom for both open field and treatment field configurations. Later, the beam range results are compared with the water equivalent path length (WEPL) values computed from the treatment planning system XIO. Results: Beam range measurements from both time-resolved dose method and the dose extinction method agree with submillimeter precision in water phantom. For the pelvic phantom, when discarding two of the diodes that show sign of significant range mixing, the two methods agree with ±1 mm. Only a dose of 7 mGy is sufficient to achieve this result. The comparison to the computed WEPL by the treatment planning system (XIO) shows that XIO underestimates the protons beam range. Quantifying the exact XIO range underestimation depends on the strategy used to evaluate the WEPL results. To our best evaluation, XIO underestimates the treatment beam range between a minimum of 1.7% and maximum of 4.1%. Conclusions: Time-resolved dose measurement method satisfies the two basic requirements, WEPL accuracy and minimum dose, necessary for clinical use, thus, its potential for in-vivo protons range verification. Further development is needed, namely, devising a workflow that takes into account the limits imposed by proton range mixing and the susceptibility of the comparison of measured and expected WEPLs to errors on the detector positions. The methods may also be used for in-vivo dosimetry and could benefit various proton therapy treatments.

60 APPLIED LIFE SCIENCES↗

Tribal Renewable Energy: Bishop Paiute Tribe Youth Solar Job Training Development (Final Report)

This Project provided workshops and hands on opportunities for young tribal adults to gain education,training,and employment in the solar industry; including 1 youth to meet the eligibility requirements for the NABCEP Solar Installer Exam. 10 tribal youth, ages 16-24, attended workshops focused on learning solar fundamentals and then applied those learned skills to hands on training, installing solar on 2 tribal homes. GRID provided certificates authenticating their volunteer hours and skills learned. This program of youth training really excited the tribal leadership as well as the tribal youth. This opportunity was in alignment with the tribe’s Strategic Energy Plan, and supported tribal self-sufficiency, a path to economic development and for the youth it also represented the environmental stewardship the tribe believes in.

14 SOLAR ENERGY↗

Ultrasonic Jet Bat Deterrent System Advancement

General Electric Renewable Energy (GE) and the Department of Energy (DOE) worked to develop a project with an objective to increase confidence in acoustic ultrasonic bat deterrent technologies in wind turbines, by mitigating stakeholder investment risks that currently hinder the adoption of deterrent technologies. Many wind turbine sites utilize a bat conservation plan that curtail wind turbines and stop energy production. Curtailment is a known bat impact mitigation solution that has an history of environmental regulatory acceptance. To help support a solution that allows for simultaneous bat conservation and energy production with regulatory acceptance of acoustic bat deterrents, GE proposed a study to compare four treatments: control (no curtailment or deterrent), deterrent only, deterrent plus curtailment, and curtailment only. The concept was to provide a direct comparison of bat deterrent and curtailment effectiveness within the same wind farm and bat migration season. This comparison was intended to advocate for the adoption of bat deterrents with a large-scale field study by addressing customer concerns on regulatory acceptance of deterrents. The study was to be hosted at a forested habitat site during a bat migration season, by Stony Creek Energy, LLC (SCE), the owner of the Orangeville Wind Farm (OWF) in the state of New York. Included was a behavioral study plan with two turbines to monitor bat flight paths with thermal imaging cameras.

17 WIND ENERGY↗

Hanford's Double-Shell Tank AY-102 Recovery Project - 17416

Since at least August 2012, Hanford Tank 241-AY-102 (AY-102) has been leaking from its primary tank into its secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued Administrative Order No. 10618 requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The three parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addresses the remaining requirements and implements enforceable milestone dates, including initiation of waste retrieval by March 4, 2016 and completion of waste retrieval operations by March 4, 2017. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. A significant number of obstructions and in-tank equipment limit accessibility to the high source term AY-102 waste and the location of the selected receiver tank required installation of an extensive, heavily-shielded above-ground transfer line. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and the first phase of operations within a highly compressed, aggressive schedule. Waste retrieval operations in AY-102 commenced on March 3, 2016 and the initial operating phase concluded on April 30. Additional sluicing capability was required to complete the mission and four Extended Reach Sluicers were installed to support the second operating phase, which began on December 8, 2016. As of December 31, 2016, approximately 97% of the original waste volume had been removed, resulting in an estimated remaining waste volume of about 75,000 liters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Performance Teams Enable Mission Success for SRNL - 16363

The accomplishment of the DOE EM mission of cleaning up the radioactive waste generated as a byproduct of the development and maintenance of nuclear materials over the last 60 years is a daunting task. SRNL specializes in working directly with the 'owners' of the cleanup challenges to identify the desired outcome and develop a solution that can be put into practice. 'We put science to work' is not just a 'tag line' rather it is a concise statement of our values and approach to applying science and engineering to the cleanup objectives. The management of radioactive waste poses multi-decade challenges to DOE EM and the Nation. The ability to harness the depth of knowledge, experience, expertise and passion for safely and effectively solving the technical challenges has reached a critical junction. Perhaps too late to be a natural and organic transition the industry finds itself critically devoid of resources to effectively and efficiently keep focused on the highest order task: cleanup. When project managers plan the resources necessary to perform the planned scope they typically are focused on financial, human, and industrial resources that would be beneficial to project execution. The critical shortage we will be evaluating is experienced and skilled leaders, mentors and coaches in the workforce. The production of educated scientists and engineers is a primary focus at all levels of educational institutions with Science Technology Engineering and Mathematics (STEM) focused curricula beginning in elementary school. The need for leaders who are skilled in inspiring organizational creativity, adept in harnessing and focusing individual energy while effectively communicating to the work force and the clientele equally compelling messages, has never been greater, or their absence in the workforce more ominous. Managers trained in the classical management theory (insert references here) are aging out of the workforce. In many cases these managers have not retained close connection to advancements in their primary field of study but rather have succumbed to the administrivia burdens that typify highly regulated work. The current technically trained workforce while interested in the 'perks' of management (i.e. visibility, pay increases, advancing status) are driven to keep close connection to their technical 'roots' as a fall-back plan should they need to change their career path either by choice or necessity. The challenge is how to achieve the productive hum of a finely tuned organizational model that blends executive vision and drive with technical leadership and excellence in execution. If any of these three tenets of a high performance team falters the ability to recover erodes the performance of the team and begins to weaken the cultural foundation essential to sustaining high performance work teams. At SRNL, recognition of the need to adapt the management dynamics and the business model and to harness the energy of the workforce to sustain - and in fact increase - the level of performance is a driving force in the transformation of the organization. Examples of changes in organizations structure, business systems and employee engagement are discussed as they relate to the impact on accomplishing the cleanup mission and fostering the next generation of great leaders and innovators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Retrieval and Inspection Operations in Hanford Tank 241-AY-102 - 18234

In August 2012, a periodic annulus inspection of tank 241-AY-102 (AY-102) identified a leak from the primary tank into the secondary containment. A pumping plan was developed in 2013 to provide a path forward for recommended remediation actions to be implemented as part of the AY-102 Recovery Project. On March 21, 2014, the Washington State Department of Ecology issued an Administrative Order requiring Washington River Protection Solutions and the United States Department of Energy to conduct actions related to and including the removal of waste from AY-102. The parties agreed to resolve the appeal of the Administrative Order through a Settlement Agreement which addressed the remaining requirements and implemented enforceable milestone dates, including completion of waste removal operations, and performance of an inspection aimed at determining the cause of the leak. The AY-102 Recovery Project was developed to address the Settlement Agreement requirements. While retrieval of waste from Single-Shell Tanks has been performed at Hanford for decades, retrieval from Double-Shell Tank AY-102 required adaptation of the existing technologies to a new environment on a larger scale than previously encountered. Despite countless challenges and obstacles encountered throughout, the project successfully completed system design, fabrication, installation, testing, and retrieval operations within a highly compressed, aggressive schedule. Waste removal activities in AY-102 completed in February 2017. Subsequent inspection activities were completed as part of a multi-step process aimed at determining the likely cause of failure and assessing the feasibility of repair. A variety of input data were used in evaluating the likely failure mechanism, such as video examinations that revealed numerous through-floor penetrations and significant degradation across the visible surface area. Based on the operational history of the tank, corrosion testing and analysis, and the visual appearance of the confirmed leak sites, service-induced pitting corrosion due to the historic waste composition and operating conditions appears to be the primary degradation mechanism leading to failure of the tank. The inspection data has demonstrated that repairing and returning AY-102 to service would likely introduce substantial technical, logistical, and financial challenges due to the extent of bottom-plate damage. As a result, tank AY-102 will ultimately be closed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sodium and Lithium Hydride Shields At the Department of Energy's Oak Ridge Reservation - 18412

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense and energy programs for more than 40 years. DOE is seeking the safest, most environmentally protective and fiscally responsible treatment for its large inventory of radioactive-contaminated metals known as 'shields'. The 66 sodium and lithium shields were constructed for use in experiments at the Tower Shielding Facility (TSF), Oak Ridge National Laboratory (ORNL). The TSF operated from 1954 to 1992 and was designed and built for radiation-shielding studies. The shield containers are constructed of aluminum or stainless steel of varying sizes and shapes that were then filled with either sodium metal or lithium hydride material. The historical records indicate the sodium shields were constructed at the Molten Salt Reactor for use in experiments in the 1971 time frame, while the lithium shields were constructed at the Y-12 site and were used in experiments as early as 1961. A subset of the sodium and lithium shields contain depleted uranium. The sodium and lithium shields were initially used at the TSF to perform in-depth measurements of the neutron transport through the shield materials. Based on process knowledge, the shields are managed as radiologically contaminated containers. Efforts have been made over the last fifteen years to find recycle markets for both the sodium and lithium hydride shields. This includes an onsite operation that was initiated at the East Tennessee Technology Park (ETTP) in 2004. After an operational exothermic reaction incident occurred soon after startup, the onsite ETTP recycling action was discontinued and a search for offsite recycling facilities was initiated. In 2016, the Y-12 National Security Complex was contacted regarding recycle/repurpose of the lithium shields; however, the lithium was determined to not be acceptable for their current repurpose process. To date, no offsite recycling outlets have been identified. Recent progress on the waste disposal actions, a shipment of 22 small sodium shields have been shipped and treated offsite. Therefore, the current shield inventory consists of 29 sodium shields located at ETTP and 15 sodium and lithium hydride shields staged at ORNL. The time period needed to reasonably identify safe disposition or recycling outlets for the shields was expected to exceed the one-year Land Disposal Restrictions storage time limit; therefore, approval was received to add the shields to the Site Treatment Plan (STP) in March, 2017. Until a disposition path is found, the shields will continue to be stored in a safe configuration that is protective of human health and the environment. This engineering evaluation identifies and screens the alternatives for dispositioning the shields at the Oak Ridge(ORR). Four alternatives were evaluated including; (1) macro-encapsulation, (2) deactivation, (3) recycle and (4) leave-in-place. An initial screening was performed, and the alternative passing the initial screening are then evaluated in more detail. The evaluation criteria used included environmental risk, technical feasibility, administrative feasibility, worker safety, nuclear safety, transportation safety, and cost. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the EarthSHAB Stratospheric Solar Hot Air Balloon Flight Prediction Model Using Balloon Trajectory Data

Abstract The heliotrope is a solar balloon design which is constructed out of painter’s plastic, and the exterior is coated in charcoal powder. Darkening the plastic gives the balloon a high solar absorptance, which allows it to ascend into the lower stratosphere and float for hours at a time. The balloons have previously been used to lift scientific instruments into the stratosphere to study chemical explosions, earthquakes, and stratospheric aerosols. They have also been proposed as a platform for planetary exploration. Flight predictions are crucial to preflight planning to reduce safety risks and meet flight objectives. However, there exists a wide range of possible flight paths due to varying environmental conditions and solar balloon configurations. EarthSHAB is one such software that was designed to support flight planning using the weather forecasts and balloon properties to predict the flight path of a solar balloon. We compare EarthSHAB-simulated flight paths to a set of observed flight paths for the 3.5-m diameter heliotrope design called the “Cloudskimmer.” Using the criteria that the modeled paths must fall within 5% of the observations to be considered successful, we found that EarthSHAB successfully predicted the Cloudskimmer ascent rate and average float altitude 10% and 90% of the time, respectively. We also found that the average difference in the observed and predicted landing locations was 97 km and landing times were 54 ± 38 min. Significant deviations between the observed and predicted ascent rates and excursions at float were found to be associated with heavy payloads and convective cloud development, respectively. Significance Statement Solar balloons are used to lift scientific instruments into the lower stratosphere for hours at a time to study chemical explosions, earthquakes, stratospheric aerosols, and more. The flight paths of solar balloons can be difficult to predict due to variability in their design and surrounding environment. We evaluate the accuracy of EarthSHAB, a software that predicts the altitude profile and horizontal trajectory of a solar balloon using inputs such as the weather, balloon size, and balloon mass. Our results suggest that for the balloon design used in this study, EarthSHAB is best suited for modeling the behavior of balloons with lightweight payloads that do not fly within or directly above clouds.

Lien, Jessica M. [Sandia National Laboratories, Al↗

Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Wide-Field Astronomical Surveys in the Next Decade

Wide-angle surveys have been an engine for new discoveries throughout the modern history of astronomy, and have been among the most highly cited and scientifically productive observing facilities in recent years. This trend is likely to continue over the next decade, as many of the most important questions in astrophysics are best tackled with massive surveys, often in synergy with each other and in tandem with the more traditional observatories. We argue that these surveys are most productive and have the greatest impact when the data from the surveys are made public in a timely manner. The rise of the 'survey astronomer' is a substantial change in the demographics of our field; one of the most important challenges of the next decade is to find ways to recognize the intellectual contributions of those who work on the infrastructure of surveys (hardware, software, survey planning and operations, and databases/data distribution), and to make career paths to allow them to thrive.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

SU-E-T-413: Experience-Based VMAT Plan Quality Database

Purpose: To quantify VMAT plan quality using a retrospective study of over 200 clinical treated VMAT plans created using the Eclipse Treatment Planning System to create benchmarks of plan quality for a few categories of treatment sites. Methods: Using a controlled phantom geometry, various dosimetric indices were investigated to quantify dosimetric plan quality as a function of isocenter displacement from center of mass, average path length, number of arcs and PTV proximity to critical structures. Beginning with published dosimetry indices from SRS and SBRT evaluations, UDI (Unified Dosimetry Index) and modified UDI were tested before creating a new factor VMAT-DI. VMAT-DI was developed within boundaries of this project and it includes renormalized factors of conformity index, coverage index, modified gradient index and homogeneity index as well as indices based on routine clinical practice such as absolute dose max index. The plans were then evaluated using the VMAT-DI such that benchmarks for planning could be created. Results: The majority of the plans evaluated could be assigned VMAT-DI values within a range for each treatment site. However, the outliers were results of difficult planning parameters such as very irregular targets, inhomogeneities or difficult to achieve critical structure constraints. To effectively use VMAT-DI for guidance, especially for prediction of the plan quality for body sites new to the practice, VMATDI database needs to be subdivided by target complexity and by body site index/average path length factor. Conclusion: An experienced-based VMAT-DI database can be used to help analyze plans before evaluation by the physician to show that it adheres to the clinical standards of previously treated VMAT plans which will make a guideline for concluding the optimization. The introduction of institution-wide clinical planning protocols, standardizing OAR naming and constraints will make it possible to incorporate a cumulative critical structure dosimetry index such as NTCP.

07 ISOTOPE AND RADIATION SOURCES↗

System and method to facilitate a search for a hybrid-manufacturing process plan

One embodiment of the present disclosure provides a system and method for facilitating a search for a hybrid-manufacturing process plan for manufacturing an object. During operation, the system can obtain a set of partial order constraints constraining the order in which a set of at least two manufacturing actions, corresponding to addition or removal of predefined regions of space, appear in a process plan. The system can constrain, based on the set of partial order constraints, a search space. The search space can correspond to a tree in which the nodes represent the object's state and the edges represent available actions at each node. The system can then determine a set of optimized process plans represented by orderings of the actions, corresponding to paths on the search tree, that produce the desired final state in a cost-effective manner.

Crawford, Lara S.↗

SU-E-T-762: Toward Volume-Based Independent Dose Verification as Secondary Check

Purpose: Lung SBRT plan has been shifted to volume prescription technique. However, point dose agreement is still verified using independent dose verification at the secondary check. The volume dose verification is more affected by inhomogeneous correction rather than point dose verification currently used as the check. A feasibility study for volume dose verification was conducted in lung SBRT plan. Methods: Six SBRT plans were collected in our institute. Two dose distributions with / without inhomogeneous correction were generated using Adaptive Convolve (AC) in Pinnacle3. Simple MU Analysis (SMU, Triangle Product, Ishikawa, JP) was used as the independent dose verification software program, in which a modified Clarkson-based algorithm was implemented and radiological path length was computed using CT images independently to the treatment planning system. The agreement in point dose and mean dose between the AC with / without the correction and the SMU were assessed. Results: In the point dose evaluation for the center of the GTV, the difference shows the systematic shift (4.5% ± 1.9 %) in comparison of the AC with the inhomogeneous correction, on the other hands, there was good agreement of 0.2 ± 0.9% between the SMU and the AC without the correction. In the volume evaluation, there were significant differences in mean dose for not only PTV (14.2 ± 5.1 %) but also GTV (8.0 ± 5.1 %) compared to the AC with the correction. Without the correction, the SMU showed good agreement for GTV (1.5 ± 0.9%) as well as PTV (0.9% ± 1.0%). Conclusion: The volume evaluation for secondary check may be possible in homogenous region. However, the volume including the inhomogeneous media would make larger discrepancy. Dose calculation algorithm for independent verification needs to be modified to take into account the inhomogeneous correction.

60 APPLIED LIFE SCIENCES↗

Wide-Field Astronomical Surveys in the Next Decade

Wide-angle surveys have been an engine for new discoveries throughout the modern history of astronomy, and have been among the most highly cited and scientifically productive observing facilities in recent years. This trend is likely to continue over the next decade, as many of the most important questions in astrophysics are best tackled with massive surveys, often in synergy with each other and in tandem with the more traditional observatories. We argue that these surveys are most productive and have the greatest impact when the data from the surveys are made public in a timely manner. The rise of the 'survey astronomer' is a substantial change in the demographics of our field; one of the most important challenges of the next decade is to find ways to recognize the intellectual contributions of those who work on the infrastructure of surveys (hardware, software, survey planning and operations, and databases/data distribution), and to make career paths to allow them to thrive.

79 ASTRONOMY AND ASTROPHYSICS↗