Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

A vision system planner for increasing the autonomy of the Extravehicular Activity Helper/Retriever

The Extravehicular Activity Retriever (EVAR) is a robotic device currently being developed by the Automation and Robotics Division at the NASA Johnson Space Center to support activities in the neighborhood of the Space Shuttle or Space Station Freedom. As the name implies, the Retriever's primary function will be to provide the capability to retrieve tools and equipment or other objects which have become detached from the spacecraft, but it will also be able to rescue a crew member who may have become inadvertently de-tethered. Later goals will include cooperative operations between a crew member and the Retriever such as fetching a tool that is required for servicing or maintenance operations. This paper documents a preliminary design for a Vision System Planner (VSP) for the EVAR that is capable of achieving visual objectives provided to it by a high level task planner. Typical commands which the task planner might issue to the VSP relate to object recognition, object location determination, and obstacle detection. Upon receiving a command from the task planner, the VSP then plans a sequence of actions to achieve the specified objective using a model-based reasoning approach. This sequence may involve choosing an appropriate sensor, selecting an algorithm to process the data, reorienting the sensor, adjusting the effective resolution of the image using lens zooming capability, and/or requesting the task planner to reposition the EVAR to obtain a different view of the object. An initial version of the Vision System Planner which realizes the above capabilities using simulated images has been implemented and tested. The remaining sections describe the architecture and capabilities of the VSP and its relationship to the high level task planner. In addition, typical plans that are generated to achieve visual goals for various scenarios are discussed. Specific topics to be addressed will include object search strategies, repositioning of the EVAR to improve the quality of information obtained from the sensors, and complementary usage of the sensors and redundant capabilities.

Magee, Michael↗

Hypergol Maintenance Facility North SWMU 090 Year 2 Air Sparge System Performance Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from August 2021 to August 2022.

Christopher Hook↗

Hardware Design Improvements to the Major Constituent Analyzer

The Major Constituent Analyzer (MCA) onboard the International Space Station (ISS) is designed to monitor the major constituents of the ISS's internal atmosphere. This mass spectrometer based system is an integral part of the Environmental Control and Life Support System (ECLSS) and is a primary tool for the management of ISS atmosphere composition. As a part of NASA Change Request CR10773A, several alterations to the hardware have been made to accommodate improved MCA logistics. First, the ORU 08 verification gas assembly has been modified to allow the verification gas cylinder to be installed on orbit. The verification gas is an essential MCA consumable that requires periodic replenishment. Designing the cylinder for subassembly transport reduces the size and weight of the maintained item for launch. The redesign of the ORU 08 assembly includes a redesigned housing, cylinder mounting apparatus, and pneumatic connection. The second hardware change is a redesigned wiring harness for the ORU 02 analyzer. The ORU 02 electrical connector interface was damaged in a previous on-orbit installation, and this necessitated the development of a temporary fix while a more permanent solution was developed. The new wiring harness design includes flexible cable as well as indexing fasteners and guide-pins, and provides better accessibility during the on-orbit maintenance operation. This presentation will describe the hardware improvements being implemented for MCA as well as the expected improvement to logistics and maintenance.

Combs, Scott↗

Development of a Human Systems Integration Plan

NASA defines Human Systems Integration (HSI) as part of the overall systems engineering and acquisition strategy for space systems. The HSI Plan defines how HSI activities will be implemented across the lifecycle of the mission, as required by NPR 7123.1C, NASA Systems Engineering Processes and Requirements, and NPR 8705.2C Human-Rating Requirements for Space Systems. The goal of this presentation is to share with government and industry how an HSI Plan can be implemented. The presentation will cover HSI implementation for flight systems, vehicle processing, and interfaces. These are divided into six NASA HSI Domains: human factors engineering, operations resources, safety, training, maintainability and supportability, habitability and environment. HSI activities go across the mission’s lifecycle from pre-formulation and acquisition through design, development, operations, maintenance, and decommissioning. The HSI Plan includes a description of the HSI activities and products that are essential for human rating, operability, maintainability, supportability, and affordability of the mission systems. It also describes the role of the HSI Team required as part of the Human Rating process. The HSI Plan utilizes the operational expertise within NASA to ensure designs and testing are successful, leading to acceptable human spaceflight vehicles.

Jackelynne Silva-Martinez↗

Early-Stage Radiation Safety Analysis for the Spallation Neutron Source Second Target Station Bunker Operations

The Second Target Station project at Oak Ridge National Laboratory will develop a cold neutron source to meet growing experimental needs. This paper describes calculations of the residual dose rates associated with the monolith shield plug and the beamline bunker, two key conventional operations and radiation safety features. While neutron production is active, the instrument hall outside the bunker must be generally accessible with dose rates of less than 0.25 mrem/h. When neutron production is halted, the bunker must be accessible for hands-on maintenance operations. Further, these two requirements form the cause for the assessments reported herein of residual dose rates caused by the monolith shield plug and residual dose rates in the bunker. The monolith shield plug was shown to not produce significant dose rates inside the bunker after a 20-year lifetime, and the residual dose rates inside the bunker for the case of an operating beamline were shown to reasonably allow for hands-on maintenance. These calculations are based on preliminary design models of the relevant systems. Additionally, an example showing the significance of considering neutron supermirror physics in transport calculations that track nuclide production and destruction rates to produce gamma sources for residual dose rate calculations is included. The example shows that if neutron supermirror physics is not considered, dose rate fields may be significantly underpredicted.

61 RADIATION PROTECTION AND DOSIMETRY↗

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants (3 rd Annual Report)

Nuclear power plants collect and store large volumes of heterogeneous data from various components and systems. With recent advances in machine learning (ML) techniques, these data can be leveraged to develop diagnostic and short-term forecasting models to better predict future equipment condition. Maintenance operations can then be planned in advance whenever degraded performance is predicted, thus resulting in fewer unplanned outages and the optimization of maintenance activities. This enables lower maintenance costs and improves the overall economics of nuclear power. This report primarily focuses on developing a short-term forecasting process that leverages a feature selection process to distill large volumes of heterogeneous data and predict specific equipment parameters. A variety of feature selection methods, including Shapley Additive Explanations (SHAP) and variance inflation factor (VIF), were used to select the optimal features as inputs for three ML methods: long short-term memory (LSTM) networks, support vector regression (SVR), and random forest (RF). Each combination of model and input features was used to predict a pump bearing temperature both 1 and 24 hours in advance, based on actual plant system data. The optimal inputs for the LSTM and SVR were selected using the SHAP values, while the optimal input for the RF consisted solely of the response variable itself. Each model produced similar 1-hour-ahead predictions, with root mean square errors (RMSEs) of roughly 0.006. For the 24-hour-ahead predictions, differences could be seen between LSTM, SVR, and RF, as reflected by model performances of 0.036 ± 0.014, 0.0026 ± 0, and 0.063 ± 0.004 RMSE, respectively. As big data and continuous online monitoring become more widely available, the proposed feature selection process can be used for many applications beyond the prediction of process parameters within nuclear infrastructure. This report summarizes the Fiscal Year 2021 research progress encompassing the (1) data cleaning and feature selection necessary for ML applications; (2) development of short-term forecasting models to predict future plant process parameters for both single and multiple time steps ahead; and (3) validation of the feature selection methods and short-term forecasting models given new data from different systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of Short-Term Forecasting Models Using Plant Asset Data and Feature Selection

Nuclear power plants collect and store large volumes of heterogeneous data from various components and systems. With recent advances in machine learning (ML) techniques, these data can be leveraged to develop diagnostic and short-term forecasting models to better predict future equipment condition. Maintenance operations can then be planned in advance whenever degraded performance is predicted, thus resulting in fewer unplanned outages and the optimization of maintenance activities. This enables lower maintenance costs and improves the overall economics of nuclear power. This paper focuses on developing a short-term forecasting process that leverages a feature selection process to distill large volumes of heterogeneous data and predict specific equipment parameters. A variety of feature selection methods, including Shapley Additive Explanations (SHAP) and variance inflation factor (VIF), were used to select the optimal features as inputs for three ML methods: long short-term memory (LSTM) networks, support vector regression (SVR), and random forest (RF). Each combination of model and input features was used to predict a pump bearing temperature both 1 and 24 hours in advance, based on actual plant system data. The optimal inputs for the LSTM and SVR were selected using the SHAP values, while the optimal input for the RF consisted solely of the response variable itself. Each model produced similar 1-hour-ahead predictions, with root mean square errors (RMSEs) of roughly 0.006. For the 24-hour-ahead predictions, differences could be seen between LSTM, SVR, and RF, as reflected by model performances of 0.036 +- 0.014, 0.0026 +- 0, and 0.063 +- 0.004 RMSE, respectively. As big data and continuous online monitoring become more widely available, the proposed feature selection process can be used for many applications beyond the prediction of process parameters within nuclear infrastructure.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Equipment Self-Assessment Guide Checklist

This Equipment Self-Assessment Checklist is designed for asset owners and operators (AOOs) responsible for the deployment, operation, maintenance, or cybersecurity oversight of grid systems and digital energy technologies. It provides a structured inspection checklist for evaluating the security, integrity, and operational trustworthiness of equipment across substations, generation sites, distributed energy resources (DERs), and control environments.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Lower payload costs through refurbishment and module replacement.

Payload benefits to be derived from refurbishment can be related to individual spacecraft programs directly and for planning purposes to the entire shuttle mission model. In the case of the large space telescope program, cost savings obtained through the use of the shuttle for maintenance operations have been estimated to be in the range from 30 to 40%. This saving is realized over an operational lifetime of 15 years by reducing, through refurbishment on orbit, the number of flight units along with 'optimized' reliability goals commensurate with periodic maintenance revisits at one-year intervals. Shuttle-era payload implications are discussed together with a pressurized on-orbit maintenance configuration, an earth observation satellite, and some typical teleoperator-serviced spacecraft.

Murphy, J. T.↗

CEDAR/TIMED: Thermospheric Vertical Wind Observations from Three Sites in the Northern Auroral Zone

The objective of this project was to operate ground based Fabry-Perot Interferometers at several points under the auroral zone to analyze and quantify the vertical wind in the thermosphere. These measurements were made in conjunction with TIMED, especially GUVI data, to relate the observed wind to the resulting mixing and compositional changes in the thermosphere. The ground based wind measurements were obtained from a scanning Doppler imager (SDI) in Poker Flat, and a vertically aligned Fabry Perot Imager (FPI) in Inuvik. A third FPI at Eagle, Alaska, was operated for a brief overlapping period as well. The SDI at Poker Flat had been in operation for several years, and was continued to run with little support from this grant. The much more expensive operation, maintenance, and data acquisition of the remote Inuvik FPI was made possible with funds from this project. During the 2003/2004 and 2004/2005 seasons, we operated the Inuvik FPI from September to April during hours of darkness. Two trips to service the instrument were required per year, and a local caretaker was funded to help keep the instrument going during the winter seasons. The data were transfered via modem and phone line to Poker Flat and were then analyzed to obtain wind and temperature at the altitude of the auroral green line OI(557.7 nm). The final data product was archived and transferred to the GEDDS system at Poker Flat were it is available on the web: http://gedds.pfrr.alaska.edu/. The data set is also available from the CEDAR data base: http://cedarweb.hao.ucar.edu/.

Lummerzheim, D.↗

Hypergol Maintenance Facility North, SWMU 090, Air Sparge System Construction Completion and Performance Monitoring Report, Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion and Performance Monitoring Report (CC-PMR) presents field implementation activities, as well as Year 1 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. The timeframe for activities included in this report extends from December 2019 to August 2021.

Christopher A Hook↗

NASA work unit system file maintenance manual

The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

Source record↗

Workspace visualization and time-delay telerobotic operations

The paper examines the performance of telerobotic tasks where the operator and robot are physically separated, and a comunication time delay of up to several seconds between them exists. This situation is applicable to space robotic servicing-assembly-maintenance operations on low earth or geosynchronous orbits with a ground-based command station. Attention is given to two developments which address advanced time-delay teleoperations for unstructured tasks: (1) the 'phantom robot', a real-time predictive graphics simulator developed to allow teleoperator eye-to-hand coordination or robot free-space kinematics under a time delay of several seconds; and (2) shared compliance control, a modified form of automatic electromechanical impedance control employed in parallel with manual position control to permit soft contact and grasp compliance with workpiece geometry under a time delay of several seconds.

Schenker, P. S.↗

The real world and lunar base activation scenarios

A lunar base or a network of lunar bases may have highly desirable support functions in a national or international program to explore and settle Mars. In addition, He-3 exported from the Moon could be the basis for providing much of the energy needs of humankind in the twenty-first century. Both technical and managerial issues must be addressed when considering the establishment of a lunar base that can serve the needs of human civilization in space. Many of the technical issues become evident in the consideration of hypothetical scenarios for the activation of a network of lunar bases. Specific and realistic assumptions must be made about the conduct of various types of activities in addition to the general assumptions given above. These activities include landings, crew consumables, power production, crew selection, risk management, habitation, science station placement, base planning, science, agriculture, resource evaluation, readaptation, plant activation and test, storage module landings, resource transport module landings, integrated operations, maintenance, Base 2 activation, and management. The development of scenarios for the activation of a lunar base or network of bases will require close attention to the 'real world' of space operations. That world is defined by the natural environment, available technology, realistic objectives, and common sense.

Schmitt, Harrison H.↗

High resolution Fouier transform spectrometer Serial No. 091002: Instruction manual

A description of the spectrometer and procedures for its operation, maintenance, alignments, adjustments, and control functions are presented. The interferometer spectrometer is a modified Model 296 capable of 0.5/cm resolution over the spectral region of 5 to 15 microns configured for operation with the optical head at a temperature of approximately 80 K. Details are given on the optical system and the electronic circuits. The detector used with the optical head is mercury doped germanium kept at a temperature of about 4 K by means of liquid helium. Electronic schematics, and instruction manuals for handling the liquid helium dewars, tape recorder for analog outputs, and playback console are included.

Source record↗

Constraint and Flight Rule Management for Space Mission Operations

The exploration of space is one of the most fascinating domains to study from a human factors perspective. Like other complex work domains such as aviation (Pritchett and Kim, 2008), air traffic management (Durso and Manning, 2008), health care (Morrow, North, and Wickens, 2006), homeland security (Cooke and Winner, 2008), and vehicle control (Lee, 2006), space exploration is a large-scale sociotechnical work domain characterized by complexity, dynamism, uncertainty, and risk in real-time operational contexts (Perrow, 1999; Woods et al, 1994). Nearly the entire gamut of human factors issues - for example, human-automation interaction (Sheridan and Parasuraman, 2006), telerobotics, display and control design (Smith, Bennett, and Stone, 2006), usability, anthropometry (Chaffin, 2008), biomechanics (Marras and Radwin, 2006), safety engineering, emergency operations, maintenance human factors, situation awareness (Tenney and Pew, 2006), crew resource management (Salas et al., 2006), methods for cognitive work analysis (Bisantz and Roth, 2008) and the like -- are applicable to astronauts, mission control, operational medicine, Space Shuttle manufacturing and assembly operations, and space suit designers as they are in other work domains (e.g., Bloomberg, 2003; Bos et al, 2006; Brooks and Ince, 1992; Casler and Cook, 1999; Jones, 1994; McCurdy et al, 2006; Neerincx et aI., 2006; Olofinboba and Dorneich, 2005; Patterson, Watts-Perotti and Woods, 1999; Patterson and Woods, 2001; Seagull et ai, 2007; Sierhuis, Clancey and Sims, 2002). The human exploration of space also has unique challenges of particular interest to human factors research and practice. This chapter provides an overview of those issues and reports on some of the latest research results as well as the latest challenges still facing the field.

Barreiro, J.↗

Human Factors in Space Exploration

The exploration of space is one of the most fascinating domains to study from a human factors perspective. Like other complex work domains such as aviation (Pritchett and Kim, 2008), air traffic management (Durso and Manning, 2008), health care (Morrow, North, and Wickens, 2006), homeland security (Cooke and Winner, 2008), and vehicle control (Lee, 2006), space exploration is a large-scale sociotechnical work domain characterized by complexity, dynamism, uncertainty, and risk in real-time operational contexts (Perrow, 1999; Woods et ai, 1994). Nearly the entire gamut of human factors issues - for example, human-automation interaction (Sheridan and Parasuraman, 2006), telerobotics, display and control design (Smith, Bennett, and Stone, 2006), usability, anthropometry (Chaffin, 2008), biomechanics (Marras and Radwin, 2006), safety engineering, emergency operations, maintenance human factors, situation awareness (Tenney and Pew, 2006), crew resource management (Salas et aI., 2006), methods for cognitive work analysis (Bisantz and Roth, 2008) and the like -- are applicable to astronauts, mission control, operational medicine, Space Shuttle manufacturing and assembly operations, and space suit designers as they are in other work domains (e.g., Bloomberg, 2003; Bos et al, 2006; Brooks and Ince, 1992; Casler and Cook, 1999; Jones, 1994; McCurdy et ai, 2006; Neerincx et aI., 2006; Olofinboba and Dorneich, 2005; Patterson, Watts-Perotti and Woods, 1999; Patterson and Woods, 2001; Seagull et ai, 2007; Sierhuis, Clancey and Sims, 2002). The human exploration of space also has unique challenges of particular interest to human factors research and practice. This chapter provides an overview of those issues and reports on sorne of the latest research results as well as the latest challenges still facing the field.

FROM↗

Recommended techniques for effective maintainability. A continuous improvement initiative of the NASA Reliability and Maintainability Steering Committee

This manual presents a series of recommended techniques that can increase overall operational effectiveness of both flight and ground based NASA systems. It provides a set of tools that minimizes risk associated with: (1) restoring failed functions (both ground and flight based); (2) conducting complex and highly visible maintenance operations; and (3) sustaining a technical capability to support the NASA mission using aging equipment or facilities. It considers (1) program management - key elements of an effective maintainability effort; (2) design and development - techniques that have benefited previous programs; (3) analysis and test - quantitative and qualitative analysis processes and testing techniques; and (4) operations and operational design techniques that address NASA field experience. This document is a valuable resource for continuous improvement ideas in executing the systems development process in accordance with the NASA 'better, faster, smaller, and cheaper' goal without compromising safety.

Source record↗