Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operation Reserve”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

GPU Direct I/O with HDF5

Exascale HPC systems are being designed with accelerators, such as GPUs, to accelerate parts of applications. In machine learning workloads as well as large-scale simulations that use GPUs as accelerators, the CPU (or host) memory is currently used as a buffer for data transfers between GPU (or device) memory and the file system. If the CPU does not need to operate on the data, then this is sub-optimal because it wastes host memory by reserving space for duplicated data. Furthermore, this “bounce buffer” approach wastes CPU cycles spent on transferring data. A new technique, NVIDIA GPUDirect Storage (GDS), can eliminate the need to use the host memory as a bounce buffer. Thereby, it becomes possible to transfer data directly between the device memory and the file system. This direct data path shortens latency by omitting the extra copy and enables higher-bandwidth. To take full advantage of GDS in existing applications, it is necessary to provide support with existing I/O libraries, such as HDF5 and MPI-IO, which are heavily used in applications. In this paper, we describe our effort of integrating GDS with HDF5, the top I/O library at NERSC and at DOE leadership computing facilities. We design and implement this integration using a HDF5 Virtual File Driver (VFD). The GDS VFD provides a file system abstraction to the application that allows HDF5 applications to perform I/O without the need to move data between CPUs and GPUs explicitly. We compare performance of the HDF5 GDS VFD with explicit data movement approaches and demonstrate superior performance with the GDS method.

Ravi, J↗

Consequences of cardiovascular adaptation to spaceflight: implications for the use of pharmacological countermeasures

There is little evidence obtained from space flight to support the notion that occurrence of cardiac dysrhythmias, impaired cardiac and vascular function, and manifestation of asymptomatic cardiovascular disease represent serious risks during space flight. Therefore, the development of orthostatic hypotension and instability immediately after return from spaceflight probably reflect the most significant operational risks associated with the cardiovascular system of astronauts. Significant reductions in stroke volume and lower reserve for increasing peripheral vascular resistance contribute to ineffective maintenance of systemic arterial blood pressure during standing after spaceflight despite compensatory elevations in heart rate. The primary mechanism underlying reduced stroke volume appears to be a reduction in preload associated with less circulating blood volume while inadequate peripheral vasoconstriction may be caused partly by hyporeactivity of receptors that control arterial smooth muscle function. A focus for development of future countermeasures for hemodynamic responses to central hypovolemia includes the potential application of pharmacological agents that specifically target and restore blood volume (e.g., fludrocortisone, electrolyte-containing beverages) and reserve for vasoconstriction (e.g., midodrine, vasopressin). Based on systematic evaluations, acute physical exercise designed to elicit maximal effort or inspiratory resistance have shown promise as successful countermeasures that provide protection against development of orthostatic hypotension and intolerance without potential risks and side effects associated with specific pharmacological interventions.

Non-NASA Center↗

RODeO (Revenue Operation and Device Optimization Model) [SWR 20-67]

The Revenue, Operation, and Device Optimization (RODeO) model explores optimal system design and operation considering different levels of grid integration, equipment cost, operating limitations, financing, and credits and incentives. RODeO is a price-taker model formulated as a mixed-integer linear programming (MILP) model in the GAMS modeling platform. The objective is to maximizes the net revenue for a collection of equipment at a given site. The equipment includes generators (e.g., gas turbine, steam turbine, solar, wind, hydro, fuel cells, etc.), storage systems (batteries, pumped hydro, gas-fired compressed air energy storage, long-duration systems, hydrogen), and flexible loads (e.g., electric vehicles, electrolyzers, flexible building loads). The input data required by RODeO can be classified into three bins: 1) utility service data, which refers to retail utility rate information (meter cost, energy and demand charges), 2) electricity market data, which include energy and reserve prices, 3) other inputs, which refer to additional electrical demand, product output demand, technological assumptions, financial properties, and operational parameters.

Guerra Fernandez, Omar Jose↗

Permanent-File-Validation Utility Computer Program

Errors in files detected and corrected during operation. Permanent File Validation (PFVAL) utility computer program provides CDC CYBER NOS sites with mechanism to verify integrity of permanent file base. Locates and identifies permanent file errors in Mass Storage Table (MST) and Track Reservation Table (TRT), in permanent file catalog entries (PFC's) in permit sectors, and in disk sector linkage. All detected errors written to listing file and system and job day files. Program operates by reading system tables , catalog track, permit sectors, and disk linkage bytes to vaidate expected and actual file linkages. Used extensively to identify and locate errors in permanent files and enable online correction, reducing computer-system downtime.

Derry, Stephen D.↗

Optimized Dispatch of Distributed Energy Resources for Resiliency and Power Quality Improvements at the Grid-Edge

Distributed Energy Resources (DERs) installed on low-voltage distribution systems, both utility-owned and nonutility owned may be employed to make improvements to system resiliency and power quality, in addition to simply serving load demand. By selectively dispatching active and reactive power from these existing DERs, improvements in voltage profiles and service availability during adverse events may be achieved. Further benefits can be gained by optimally choosing which DERs to dispatch power from, and the distribution of power from those DERs. For a given operating condition, using Linear Programming methods, optimal power dispatch values for individual DERs can be determined, while considering variables such as voltage gains, losses in the lines and the DERs, and DER reserve capacities. One such optimization technique is developed in this paper, and results from a real-time simulation study on a modified IEEE 13-bus distribution system with three DERs, are being presented. The operation of the optimized DER selection and dispatch algorithm is shown during normal operation of the transmission system when the DERs operate in grid-connected mode. Similar analyses can drive decision making during transmission system failure when the DERs operate in grid-forming or islanded mode.

Chowdhury, Prithwiraj Roy↗

Highball: A high speed, reserved-access, wide area network

A network architecture called Highball and a preliminary design for a prototype, wide-area data network designed to operate at speeds of 1 Gbps and beyond are described. It is intended for applications requiring high speed burst transmissions where some latency between requesting a transmission and granting the request can be anticipated and tolerated. Examples include real-time video and disk-disk transfers, national filestore access, remote sensing, and similar applications. The network nodes include an intelligent crossbar switch, but have no buffering capabilities; thus, data must be queued at the end nodes. There are no restrictions on the network topology, link speeds, or end-end protocols. The end system, nodes, and links can operate at any speed up to the limits imposed by the physical facilities. An overview of an initial design approach is presented and is intended as a benchmark upon which a detailed design can be developed. It describes the network architecture and proposed access protocols, as well as functional descriptions of the hardware and software components that could be used in a prototype implementation. It concludes with a discussion of additional issues to be resolved in continuing stages of this project.

Mills, David L.↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sensing Small Uncrewed Aerial Vehicles with Distributed Radars for Advanced Air Mobility Surveillance

In the context of Advanced and Urban Air Mobility major attention is being reserved to the development of sensing strategies for small Uncrewed Aerial Vehicles (sUAVs) to enable their safe operations in and around urban areas. Such strategies should rely on non-cooperative distributed sensors to strengthen the surveillance solution towards the unreliability of Global Navigation Satellite System (GNSS) positioning information, which is typical for low-altitude-flying platforms in urban regions, and increase the monitored airspace volume. To this aim, this paper proposes a fusion solution for a network of distributed ground-based radars, which can be exploited to not only increase the coverage over large airspace volumes but also improve the overall detectability and traceability of sUAVs by leveraging on multiple views over the same area. The solution exploits a centralized fusion scheme in which measurements collected by each radar are shared with a Fusion Center where Kalman Filtering is exploited to build a unique, fused track. Tests conducted on experimental data collected using two sUAVs as flying targets and three distributed radars showed that the proposed solution can produce an increase in coverage from about 20 % (single radar configuration) to about 80 % of the targets’ flight path, as well as a finer accuracy yielding meter and meter-per-second root mean square error values on position and velocity components.

Federica Vitiello↗

An Analysis of PNM's Renewable Reserve Requirements to Meet New Mexico's Decarbonization Goals

Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.

14 SOLAR ENERGY↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service. Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations. The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-tostation handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an inorbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

Uncertainty Quantification for Capacity Expansion Planning

This report quantifies the uncertainty in output decisions from a Capacity Expansion Planning (CEP) model. The need to understand how uncertainties within CEP models and modeling assumptions affect Quantities of Interest (QoIs) such as expansion and operating costs, as well as expansion decisions remains an ongoing challenge in scientific research and industrial operations. This area of research is particularly important for models which seek to capture how large networks will evolve and operate under increased sources of variable generation, i.e., higher penetration of renewable technologies such as solar and wind generators. Uncertainty quantification (UQ) of CEP models which estimate expansion costs and decisions, and production cost models which estimate operating costs and dispatch decisions, is a key focus of research at NREL. The Regional Energy Deployment System (ReEDS) represents a state-of-the-art CEP model and considers a range of possible grid evolutions in an attempt to identify key drivers, ramifications, and decisions which contribute to better informed investment and policy decisions. However, research to quantify how uncertainties and model assumptions, such as unit commitment (UC), within ReEDS may be affecting its outputs remains challenging due to to size and complexity of the model

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Report for ARPA-E NODES "Real-Time Optimization and Control of Next-Generation Distribution Infrastructure" Project

The project examined next-generation power distribution systems with high levels of power- electronics-interfaced distributed energy resources (DERs) that include: renewable energy systems (RESs), energy-storage devices, electric vehicles, fuel cells, small-scale diesel generators, and controllable loads. The project developed a comprehensive distribution- network management framework that unifies real-time voltage and frequency control with network-wide energy management under an integrated framework. The aim of the project was to: i) systematically optimize network-wide operation and congruently regulate voltages and frequency in the face of high volatility induced by rapidly varying RES and uncontrolled loads; ii) facilitate high renewable integration beyond 50% on an energy basis; iii) meet power-quality requirements and operational constraints; and, iv) respect response, ramp- time, and hold-time requirements for synthetic frequency and regulating reserves via fast- and longer-term dynamic energy management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deployment of Community Scale Solar Photovoltaic Energy Systems in Forest County Potawatomi Community

FCPC is a federally recognized tribe with a membership of more than 1400. The Tribe has a reservation in Forest County, Wisconsin, and tribal trust lands in Milwaukee County, Wisconsin, with significant governmental and business operations in both areas. Until relatively recently, FCPC was one of the poorest tribes in the Midwest. Due to its successful gaming operations, it now has improved its financial situation and is using its resources to benefit both its members and the general public through environmental and other community efforts, many of which are long-delayed because of the extended period of abject poverty. The Tribe has developed the long-term goal of becoming energy independent using renewable resources. In order to meet this goal, the Tribe has taken several important steps. As an interim step, FCPC is purchasing nearly 55 million kilowatt hours of renewable energy certificates (“RECs”) annually from certified renewable energy facilities in the United States. These RECs offset more than 100% of the present electricity use at all of the Tribe’s facilities. The Tribe is currently ranked number 11 on the Environmental Protection Agency’s (EPA) Top 20 Local Government list of green power purchasers and is a member of the EPA’s Green Power Partnership. The original project suggested small scale installations on tribal homes and certain government buildings. The Tribe suggested that the project would result in 730 kw installed. By revising the project, the Tribe was able to install 938 kw and owns the largest installation in Northern Wisconsin with the 800 kW installation at the Potawatomi Carter Casino Hotel (“PCCH”). The PCCH installation, in summer months, can provide near 90% of the use during daylight hours. Although tracking was not immediately available FCPC has since confirmed significant production with certain quarterly savings nearing $210,000. These installations provide a reduction in facility costs providing more revenue for Tribal services including cultural, health, sustainable food sources, environmental preservation and other Tribal initiatives. Further, the installations have resulted in positive steps towards the Tribe’s goals of energy sovereignty and the use of 100% renewable clean energy. Finally, the PCCH project, specifically, has had the additional benefit of providing a likely area for a microgrid. The size of the installation and offset achieved have pushed the Tribe toward planning for storage and a microgrid system that would both further the Tribe’s energy goals and provide a safe haven for the Community during times of need.

14 SOLAR ENERGY↗

Coal supply for California

The potential sources and qualities of coals available for major utility and industrial consumers in California are examined and analyzed with respect to those factors that would affect the reliability of supplies. Other considerations, such as the requirements and assurances needed by the coal producers to enter into long-term contracts and dedicate large reserves of coal to these contracts are also discussed. Present and potential future mining contraints on coal mine operators are identified and analyzed with respect to their effect on availability of supply.

Yancik, J. J.↗

International Space Station Microgravity Analytical Model Correlation And Update

The acceleration environment aboard the completed International Space Station (ISS) is a key resource for scientific and technological endeavors. Hardware verification activIties and early measurements indicate that the ISS is well on the way of meeting these "Assembly Complete" "microgravity" provisions, however, the simulation models that compute these accelerations have, to date, lacked the high degree of empirical validation typical of standard aerospace industry practices. Assembly stage, on-orbit measurements are used to address this shortcoming and to develop higher confidence in the simulation models. The Phase I correlation results show the analyses to be consistently conservative, producing higher than measured levels. The 25 to 30% greater quasi-steady computations are deemed acceptable for verification. Updates are made to localized structural dynamic and vibroacoustic parameters that reduce responses in selected one-third octave bands by almost 50%. These models are then used for the Assembly Complete verification analysis which concludes that the ISS vehicle meets the ISS microgravity requirements with minor reservations. Two of the sixteen rack are marginally non-compliant in the quasi-steady regime, and operational constraints are needed on the U. S. Lab and ESA APM vacuum resource vents, and the Russian Resistive Exercise Device in the structural dynamic regime.

DelBasso, Steve↗

Remaining Flying Time Prediction Implementing Battery Prognostics Framework for Electric UAV's

In this paper the problem of building trust in the online safety prediction of an fixed wing small electric unmanned aerial vehicles (e-UAV) for remaining flying time is addressed. A series of flight tests are described to verify the performance of the remaining flying time prediction algorithm. The estimate of remaining flying time is used to activate an alarm when the predicted remaining time falls below a threshold of two minutes. This updates the pilot to transition to the landing sequence of the flight profile. A second alarm is activated when the battery state of charge (SOC) falls below a specified safety limit threshold. This SOC threshold is the point at which the battery energy reserve would no longer safely support enough aborted landing attempts. During the test flights, the motor system is operated with the same predefined timed airspeed profile for each test. To test the robustness of the developed prediction algorithm, partial tests were performed with and remaining were performed without a simulated power train fault. To simulate a partial power train fault in the e-UAV the pilot engages a resistor bank at a specified time during the test flight. The flying time prediction system is agnostic of the pilot's activation of the fault and must adapt to the vehicle's state. The time at which the limit threshold on battery SOC is reached, it is then used to measure the accuracy of the remaining flying time predictions. This is demonstrated through comparing results from two battery models being developed. Accuracy requirements for the alarms are considered and the results discussed.

Kulkarni, Chetan↗

Experimental Investigation of Inhibitive Drilling Fluids Performance: Case Studies from United States Shale Basins

Shale formations are attractive prospects due to their potential in oil and gas production. Some of the largest shale formations in the mainland US, such as the Tuscaloosa Marine Shale (TMS), have reserves estimated to be around 7 billion barrels. Despite their huge potential, shale formations present major concerns for drilling operators. These prospects have unique challenges because of all their alteration and incompatibility issues with drilling and completion fluids. Most shale formations undergo numerous chemical and physical alterations, making their interaction with the drilling and completion fluid systems very complex to understand. In this study, a high-pressure, high-temperature (HPHT) drilling simulator was used to mimic real time drilling operations to investigate the performance of inhibitive drilling fluid systems in two major shale formations (Eagle Ford Shale and Tuscaloosa Marine Shale). A series of drilling experiments using the drilling simulator and clay swelling tests were conducted to evaluate the drilling performance of the KCl drilling fluid and cesium formate brine systems and their effectiveness in minimizing drilling concerns. Cylindrical cores were used to mimic vertical wellbores. It was found that the inhibitive muds systems (KCl and cesium formate) provided improved drilling performance compared to conventional fluid systems. Among the inhibitive systems, the cesium formate brine showed the best drilling performances due to its low swelling rate and improved drilling performance.

04 OIL SHALES AND TAR SANDS↗

Compound cycle engine for helicopter application

The Compound Cycle Engine (CCE) is a highly turbocharged, power compounded, ultra-high power density, light-weight diesel engine. The turbomachinery is similar to a moderate pressure ratio, free power turbine engine and the diesel core is high speed and a low compression ratio. This engine is considered a potential candidate for future military light helicopter applications. This executive summary presents cycle thermodynamic (SFC) and engine weight analyses performed to establish general engine operating parameters and configuration. An extensive performance and weight analysis based on a typical two hour helicopter (+30 minute reserve) mission determined final conceptual engine design. With this mission, CCE performance was compared to that of a T-800 class gas turbine engine. The CCE had a 31% lower-fuel consumption and resulted in a 16% reduction in engine plus fuel and fuel tank weight. Design SFC of the CCE is 0.33 lb-HP-HR and installed wet weight is 0.43 lbs/HP. The major technology development areas required for the CCE are identified and briefly discussed.

Castor, Jere G.↗