Measuring the Relative Performance of LINAC Beam Outages with L-CAPE Anomaly Detection (Gaussian Mixture Methods & Hierarchical Agglomerative Clustering) [Slides]
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Aristotle’s equity principle: allocate resources proportional to pre-existing claims or some rights to the resources.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Not provided.
Explore the source record for details and available documents.
The HCOR will be used onboard the ISS to record digital data during Ku-band Loss of Signal (LOS) periods. This recorded data will be played back to the ground during Ku-band Acquisition of Signal (AOS) periods. The Data Management (DM) Team at the Payload Operations and Integration Center is the primary operator of this complex recorder. The record and playback capabilities - along with the memory management functions - are presented in this paper. To illustrate how the DM Team plans to manage the record, playback and memory management tasks of operating the HCOR, an operational scenario for a ninety-minute orbit is presented.
The Unitary Plan Wind Tunnel consists of the 11 x 11- Foot Transonic Wind Tunnel and the 9 x 7 foot Supersonic Wind Tunnel. The four 65,000hp electric motors that drive the wind tunnel compressors require periodic maintenance. In order to inspect the motors without the removal of drive shaft components, the stator must be shifted away from the motor. This process is referred to as "Stator Shift". Video is mp4 formatted with runtime of 2 mins 54 secs.
Abstract Not Provided
Abstract Not Provided
A decision support system is provided for utility operations to assist with crew dispatch and restoration activities following the occurrence of a disturbance in a multiphase power distribution network, by providing a real-time visualization of possible location(s). The system covers faults that occur on fuse-protected laterals. The system uses real-time data from intelligent electronics devices coupled with other data sources such as static feeder maps to provide a complete picture of the disturbance event, guiding the utility crew to the most probable location(s). This information is provided in real-time, reducing restoration time and avoiding more costly and laborious fault location finding practices.
Explore the source record for details and available documents.
A disruption in CrowdStrike’s Falcon cybersecurity platform on July 19th, 2024, caused worldwide chaos. This event highlights the imperative need for cloud security measures for networks that are critically reliant on cloud technology. This incident negatively impacted air travel, government networks, and critical infrastructure sectors such as hospitals and financial institutions. While no electric utilities had a physical impact, and few had an IT impact, there were issues created by loss of cloud services, and other interrelated industries. For utilities and energy distribution organizations, understanding and mitigating these risks is essential. The Cirrus tool offers a strategic solution engineered to weave cloud integration seamlessly into the fabric of operational management, thereby enhancing resilience and streamlining efficiency in the face of digital challenges.