Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEPA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Chefornak Mini-grid Business Case

A business case analysis was performed for the Village of Chefornak. The business case analysis evaluated the optimal case from the technical analysis performed by the National Renewable Energy using HOMER. The optimal case adds an 800 kW wind plant with 650 kW of electric thermal stoves and a 300 kW battery. The project cost 5.8 million. The direct cost of electricity would likely decline from 0.41/kWh to 0.30/kWh. The direct costs don’t include administrative and distribution costs. The addition of the renewable resources and thermal electric stoves reduced total fuel consumption by more almost 80% or approximately 103,000 gallons. The reduction in cost provides an opportunity for Chefornak’s utility, the Naterkaq Light Plant, to obtain financing through grants and loans to install renewable energy and reduce overall fuel consumption to the community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ionic‐Liquid Free and Flexible Transistors Made of 2D Material Inks

The development of thin-film transistors (TFTs) using 2D materials is crucial for enabling scalable, low-cost, and flexible electronics. Currently, 2D TFTs with the highest performance have been achieved by using ionic-liquid gating (ILG), a technique suited for proof-of-concept studies. However, ILG suffers from slow switching speeds, temperature sensitivity, poor long-term stability, and integration challenges, making it unsuitable for practical use. Moreover, typical fabrication methods for 2D TFTs involve harsh conditions such as strong acids or high temperatures (>300 °C), limiting integration with flexible substrates. This work provides the first demonstration of an ILG-free, all-2D-material TFT fabricated onto a flexible substrate. Water-based graphene and hexagonal boron nitride (h-BN) inks are printed to deposit the electrodes and dielectric layers, respectively. The MoS 2 channel is produced via supramolecular interfacial self-assembly, yielding uniform, monolayer-rich films transferable to rigid and flexible substrates. The resulting TFTs operate below 3 V, exhibit negligible leakage current, and achieve field-effect mobilities up to 0.46 cm 2 V −1 s −1 (rising to 2.47 cm 2 V −1 s −1 with silver electrodes) measured under ambient conditions, while maintaining excellent mechanical flexibility. This work establishes a low-cost and scalable solution-processable platform for flexible electronics based on 2D materials that match requirements for practical applications.

2D materials↗

Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects

This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges.

15 GEOTHERMAL ENERGY↗

GeoVision - Barriers Taskforce

This submission includes papers, presentations, and data developed during the multi-year GeoVision Barriers Taskforce effort. Developers have identified many non-technical barriers to geothermal power development, including land access, permitting, and market barriers. Included in this submission are three papers submitted to the Geothermal Resources Council (GRC) which detail how land access, permitting, and market barriers delay geothermal project development. Also included is the GeoVision Barriers Analysis Summary report, which projects and quantifies the future electric and nonelectric deployment potentials of geothermal technologies within a range of scenarios in addition to their impacts on U.S. jobs, the economy, and environment.

15 GEOTHERMAL ENERGY↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

Pacific Northwest National Laboratory Site Environmental Report for Calendar Year 2011

The PNNL Site Environmental Report for Calendar Year 2011 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2011 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental managemePacific Northwest National Laboratory (PNNL), one of 10 national laboratories supporting the U.S. Department of Energy (DOE) Office of Science, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. DOE’s Pacific Northwest Site Office (PNSO) is responsible for PNNL oversight in Richland, Washington, as well as facilities in Sequim, Seattle, and North Bonneville, Washington, and Portland, Oregon. This site environmental report provides a synopsis of ongoing environmental management performance and compliance activities conducted during 2011. The report addresses the operations occurring on PNNL’s Richland campus, which includes PNSO’s PNNL Site facilities and Battelle-owned and -leased facilities. The report includes a description of the PNSO Site and setting; addresses compliance with all applicable DOE, federal, state, and local regulations; documents environmental monitoring efforts and status; presents potential radiation doses to staff and the public in the surrounding area; and data quality assurance methodsnt performance.

air quality↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2012

The PNNL Annual Site Environmental Report for Calendar Year 2012 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2012 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

air quality↗

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

National Environmental Policy Act Hazards Assessment for the TREAT Alternative

This document provides an assessment of hazards as required by the National Environmental Policy Act for the alternative of restarting the reactor at the Transient Reactor Test (TREAT) facility by the Resumption of Transient Testing Program. Potential hazards have been identified and screening level calculations have been conducted to provide estimates of unmitigated dose consequences that could be incurred through this alternative. Consequences considered include those related to use of the TREAT Reactor, experiment assembly handling, and combined events involving both the reactor and experiments. In addition, potential safety structures, systems, and components for processes associated with operating TREAT and onsite handling of nuclear fuels and experiments are listed. If this alternative is selected, a safety basis will be prepared in accordance with 10 CFR 830, “Nuclear Safety Management,” Subpart B, “Safety Basis Requirements.”

99 GENERAL AND MISCELLANEOUS↗

Impacts Analyses Supporting the National Environmental Policy Act Environmental Assessment for the Resumption of Transient Testing Program

This document contains the analysis details and summary of analyses conducted to evaluate the environmental impacts for the Resumption of Transient Fuel and Materials Testing Program. It provides an assessment of the impacts for the two action alternatives being evaluated in the environmental assessment. These alternatives are (1) resumption of transient testing using the Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) and (2) conducting transient testing using the Annular Core Research Reactor (ACRR) at Sandia National Laboratory in New Mexico (SNL/NM). Analyses are provided for radiologic emissions, other air emissions, soil contamination, and groundwater contamination that could occur (1) during normal operations, (2) as a result of accidents in one of the facilities, and (3) during transport. It does not include an assessment of the biotic, cultural resources, waste generation, or other impacts that could result from the resumption of transient testing. Analyses were conducted by technical professionals at INL and SNL/NM as noted throughout this report. The analyses are based on bounding radionuclide inventories, with the same inventories used for test materials by both alternatives and different inventories for the TREAT Reactor and ACRR. An upper value on the number of tests was assumed, with a test frequency determined by the realistic turn-around times required between experiments. The estimates provided for impacts during normal operations are based on historical emission rates and projected usage rates; therefore, they are bounding. Estimated doses for members of the public, collocated workers, and facility workers that could be incurred as a result of an accident are very conservative. They do not credit safety systems or administrative procedures (such as evacuation plans or use of personal protective equipment) that could be used to limit worker doses. Doses estimated for transportation are conservative and are based on transport of the bounding radiologic inventory that will be contained in any given test. The transportation analysis assumes all transports will contain the bounding inventory.

99 GENERAL AND MISCELLANEOUS↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Performance Report 2014. NREL (National Renewable Energy Laboratory)

The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have affected or could adversely affect the health, safety, and security of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report and has been prepared in accordance with the DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

54 ENVIRONMENTAL SCIENCES↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗