Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Mirror fusion propulsion system: A performance comparison with alternate propulsion systems for the manned Mars Mission

The performance characteristics of several propulsion technologies applied to piloted Mars missions are compared. The characteristics that are compared are Initial Mass in Low Earth Orbit (IMLEO), mission flexibility, and flight times. The propulsion systems being compared are both demonstrated and envisioned: Chemical (or Cryogenic), Nuclear Thermal Rocket (NTR) solid core, NTR gas core, Nuclear Electric Propulsion (NEP), and a mirror fusion space propulsion system. The proposed magnetic mirror fusion reactor, known as the Mirror Fusion Propulsion System (MFPS), is described. The description is an overview of a design study that was conducted to convert a mirror reactor experiment at Lawrence Livermore National Lab (LLNL) into a viable space propulsion system. Design principles geared towards minimizing mass and maximizing power available for thrust are identified and applied to the LLNL reactor design, resulting in the MFPS. The MFPS' design evolution, reactor and fuel choices, and system configuration are described. Results of the performance comparison shows that the MFPS minimizes flight time to 60 to 90 days for flights to Mars while allowing continuous return-home capability while at Mars. Total MFPS IMLEO including propellant and payloads is kept to about 1,000 metric tons.

Schulze, Norman R.↗

Manned Mars mission schedule report

The schedules for hardware for the initial manned Mars mission are provided. The mission is determined to be a 1999 opposition mission and the vehicle hardware configuration for the mission is depicted.

Ferguson, W.↗

Aerobrake construction concepts for the Mars mission

This paper describes a new aerobrake construction concept for the Mars mission, based on the NASA design, which utilizes a truss structure for supporting hexagonally shaped panels used for thermal protection system. Compared to previous designs, the aerobrake geometry in the new concept is modified to include a more accurate doubly-curved structure, and the analysis includes more realistic aerodynamic loads. The structural weight of the aerobrake is reduced by using variable truss and panel cross sections.

Klang, Eric↗

Mary Poppin's Approach to Human Mars Mission Entry, Descent and Landing

This is a talk on Human Mars Mission Challenges and the effort that is on-going at NASA ARC. The presentation will be used as part of the talk I will give at Purdue University on 8th April, 2016. This talk is based on the Director's colloquium I gave in 2014 at Ames, as part of the Center Director's Colloquium Series of the 75th Anniversary of Ames. Few additional charts have been added and these were from presentation made by Brandon Smith at the IEEE Aerospace Sciences 2016 meeting in Big Sky Montana, March, 2016.

Deploayble↗

Assessment of the advantages and feasibility of a nuclear rocket for a manned Mars mission

The feasibility of rebuilding and testing a nuclear thermal rocket (NTR) for the Mars mission was investigted. Calculations indicate that an NTR would substantially reduce the Earth-orbit assemble mass compared to LOX/LH2 systems. The mass savings were 36 and 65% for the cases of total aerobraking and of total propulsive braking respectively. Consequently, the cost savings for a single mission of using an NTR, if aerobraking is feasible, are probably insufficient to warrant the NTR development. If multiple missions are planned or if propulsive braking is desired at Mars and/or at Earth, then the savings of about $7 billion will easily pay for the NTR. Estimates of the cost of rebuilding a NTR were based on the previous NERVA program's budget plus additional costs to develop a flight ready engine. The total cost to build the engine would be between $4 to 5 billion. The concept of developing a full-power test stand at Johnston Atoll in the Pacific appears very feasible. The added expense of building facilities on the island should be less than $1.4 billion.

Howe, Steven D.↗

Dust Storm Impacts on Human Mars Mission Equipment and Operations

Although it is tempting to use dust impacts on Apollo lunar exploration mission equipment and operations as an analog for human Mars exploration, there are a number of important differences to consider. Apollo missions were about a week long; a human Mars mission will start at least two years before crew depart from Earth, when cargo is pre-deployed, and crewed mission duration may be over 800 days. Each Apollo mission landed at a different site; although no decisions have been made, NASA is investigating multiple human missions to a single Mars landing site, building up capability over time and lowering costs by re-using surface infrastructure. Apollo missions used two, single-use spacecraft; a human Mars mission may require as many as six craft for different phases of the mission, most of which would be re-used by subsequent crews. Apollo crews never ventured more than a few kilometers from their lander; Mars crews may take "camping trips" a hundred kilo-meters or more from their landing site, utilizing pressurized rovers to explore far from their base. Apollo mission designers weren't constrained by human for-ward contamination of the Moon; if we plan to search for evidence of life on Mars we'll have to be more careful. These differences all impact how we will mitigate and manage dust on our human Mars mission equipment and operations.

Rucker, M. A.↗

Mars missions and bases - A recent look

This paper discusses some of the key options for Mars programs, missions, bases, elements, and systems. Program and mission options include Mars flyby, orbiting, and landing missions; they include near-term 'sortie' missions, and later, longer-duration Mars-base missions. Key program and mission parameters include the mix of manned/unmanned elements, the number and types of space vehicles used, types of science done, trajectory options and implications launch timing and schedules, etc. The key mission parameters strongly affect the nature, sizing, and quantity of earth-to-orbit (ETO) vehicles. On-orbit assembly of space vehicles (SVs) is also an important related consideration. The potential degree of utilization of the Space Station (SS) and other then-existing elements is a key question, and several possibilities are discussed in this paper. Several configurations of SVs are provided. Several options are identified for the Mars base infra-structure, and parametric data is shown for buildup of bases as a function of mission and vehicle type. Technologies required for the missions are also discussed.

Butler, J. M., Jr.↗

Space Station accommodation of life sciences in support of a manned Mars mission

Results of a life science impact analysis for accommodation to the Space Station of a manned Mars mission are discussed. In addition to addressing such issues as on-orbit vehicle assembly and checkout, the study also assessed the impact of a life science research program on the station. A better understanding of the effects on the crew of long duration exposure to the hostile space environment and to develop controls for adverse effects was the objective. Elements and products of the life science accommodation include: the identification of critical research areas; the outline of a research program consistent with the mission timeframe; the quantification of resource requirements; the allocation of functions to station facilities; and a determination of the impact on the Space Station program and of the baseline configuration. Results indicate the need at the Space Station for two dedicated life science lab modules; a pocket lab to support a 4-meter centrifuge; a quarantine module for the Mars Sample Return Mission; 3.9 man-years of average crew time; and 20 kilowatts of electrical power.

Meredith, Barry D.↗

Use of Web 2.0 Technologies for Public Outreach on a Simulated Mars Mission

Recent advances in social media and internet communications have revolutionized the ways people interact and disseminate information. Astronauts are already taking advantage of these tools by blogging and tweeting from space, and almost all NASA missions now have presences on the major social networking sites. One priotity for future human explorers on Mars will be communicating their experiences to the people back on Earth. During July 2009, a 6-member crew of volunteers carried out a simulated Mars mission at the Flashline Mars Arctic Research Station (FMARS). The Mars Society built the mock Mars habitat in 2000-01 to help develop key knowledge and inspire the public for human Mars exploration. It is located on Devon island about 1600 km from the North Pole within the Arctic Circle. The structure is situated on the rim of Haughton Crater in an environment geologically and biologically analogous to Mars. Living in a habitat, conducting EVAs wearing spacesuits, and observing communication delays with "Earth,"the crew endured restrictions similar to those that will be faced by future human Mars explorers. Throughout the expedition, crewmembers posted daily blog entries, reports, photos, videos, and updates to their website and social media outlets Twitter, Facebook, YouTube, and Picasa Web Albums. During the sixteen EVAs of thier field science research campaign, FMARS crewmembers collected GPS track information and took geotagged photos using GPS-enabled cameras. They combined their traverse GPS tracks with photo location information into KML/KMZ files that website visitors can view in Google Earth.

Ferrone, Kristine↗

Radiation exposure predictions for short-duration stay Mars missions

The human radiation environment for several short-duration stay manned Mars missions is predicted using the Mission Radiation Calculation program, which was developed at NASA Langley Research Center. This program provides dose estimates for Galactic cosmic rays (GCR) and large and ordinary solar proton flare events for various amounts of effective spacecraft shielding and a given time history of the spacecraft's heliocentric position. The results of this study show that most of the missions can survive the most recent large flares if a 25 g/sq cm storm shelter is assumed. The dose predictions show that missions during solar minima are not necessarily the minimum dose cases, due to increased GCR contribution during this time period. The direct transfer mission studied has slightly lower doses than the outbound Venus swingby mission, with the greatest dose differences for the assumed worst case scenario. The GCR dose for a mission can be reduced by having the crew spend some fraction of its day nominally in the storm shelter.

Striepe, Scott A.↗

Effect of parking orbit period on aerocapture for manned Mars missions

Aerocapture has previously been identified as a critical technology for manned Mars missions. A wide range of parking orbits is available into which an aerobraking vehicle could be captured, and earlier authors have advocated different target orbits for various reasons. The choice of the parking orbit impacts the amount of energy which must be dissipated during the atmospheric trajectory. The effect of this choice on the entry corridor width, the required vehicle L/D, and the aerothermal environment are explored in this paper.

Lyne, James E.↗

Power generation technology options for a Mars mission

The power requirements and resultant power system performances of an aggressive Mars mission are characterized. The power system technologies discussed will support both cargo and piloted space transport vehicles as well as a six-person crew on the Martian surface for 600 days. The mission uses materials transported by cargo vehicles and materials produced using in-situ planetary feed stock to establish a life-support cache and infrastructure for the follow-on piloted lander. Numerous power system technical options are sized to meet the mission power requirements using conventional and solar, nuclear, and wireless power transmission technologies for stationary, mobile surface, and space applications. Technology selections will depend on key criteria such as mass, volume, area, maturity, and application flexibility.

Bozek, John M.↗

Piloted Mars missions using cryogenic and storable propellants

The paper presents an analyses of piloted long-duration stay Mars missions using a chemical or nuclear thermal propulsion Earth-departure stage, storable propellant Mars arrival and departure stages (to avoid propellant boiloff), and an Earth entry vehicle, conducted for three-year segments from 2000 to 2020. The study initially determines the minimum initial mass in low-Earth orbit (IMLEO) missions and then investigates their radiation exposure levels and Mars parking orbit selection. The impact of reducing the outbound (Earth-Mars) transfer time on IMLEO and predicted radiation exposure levels is included. The results indicate that a vehicle using an advanced chemical propulsion system (Isp = 480 s) for Earth departure is feasible throughout 2000-2020 with an IMLEO less than 640 metric tons, while an Earth departure stage using a nuclear thermal propulsion (NTP) system with Isp of 925 s is even more appealing with IMLEO's less than 405 tons. Vehicles with 875 and 825 s specific impulse Earth departure stages have only slightly higher IMLEO's than the advanced NTP system (10 and 20 tons higher, respectively). Reducing the time spent in space may not always result in a significantly reduced level of radiation exposure, especially if the mission encounter dates are changed to a less favorable period of the solar cycle.

Striepe, Scott A.↗

Aerothermodynamics of manned Mars missions

The aerothermodynamic problems associated with the aerobraking of the spacecraft proposed for the manned Mars mission are studied. The propulsive Delta V necessary at departure from earth and Mars and the velocities of the atmospheric entries into the two planets are deduced. It is shown that the propulsive Delta V can be reduced by increasing the entry velocities and that entry velocities up to about 15 km/sec are appropriate at both earth and Mars. L/D values of 0.8 and 2.0 are found to be necessary at earth and Mars, respectively. Density, pressure, and stagnation-point convective-heat-transfer rates are calculated for the typical aerobraking flights. Assuming the shock layer flow to be in equilibrium, the stagnation-point radiative-heat-transfer rates are calculated to be larger than the convective-heat-transfer rates. The possible impact of ablation, turbulence, and nonequilibrium are discussed.

Park, Chul↗

Manned Mars mission health maintenance facility

The Health Maintenance Facility (HMF) requirements which enable/enhance manned Mars missions (MMMs) are addressed. It does not attempt to resolve any issues that may affect the feasibility of any given element in the HMF. Reference is made to current work being conducted in the design of the space station HMF. The HMF requirements are discussed within the context of two distinctly different scenarios: HMF as part of the Mars surface infrastructure, and HMF as part of the nine months translation from low Earth orbit to Mars orbit. Requirements for an HMF are provided, and a concept of HMF is shown.

Degioanni, Joseph C.↗