Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars campaign”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

In Situ Geologic Context Mapping Transect on the Floor of Jezero Crater From Mars 2020 Perseverance Rover Observations

In situ geologic context mapping based on rover and helicopter observations provides documentation of a nearly continuous record of geology and exposed surface structure over a 120 m-wide corridor along the traverse of the Mars 2020/Perseverance rover. The results record the geologic context of Mars 2020 campaign sites and sample sites, including the local extent of bedrock outcrops, stratigraphy, attitude, and structure from imaging and rover-based remote sensing, and outcrop lithology based on in situ proximity science. Mapping identifies a sequence of igneous lithologies including (a) early mafic, possibly intrusive, rocks; (b) pervasively fractured and deeply altered massive bedrock of undetermined protolith; (c) buried and exhumed lava flows with pahoehoe and aa textures; (d) several varieties of regolith; and (e) small impact craters.

Mars 2020↗

Launch and Assembly Reliability Analysis for Human Space Exploration Missions

NASA's future human space exploration strategy includes single and multi-launch missions to various destinations including cis-lunar space, near Earth objects such as asteroids, and ultimately Mars. Each campaign is being defined by Design Reference Missions (DRMs). Many of these missions are complex, requiring multiple launches and assembly of vehicles in orbit. Certain missions also have constrained departure windows to the destination. These factors raise concerns regarding the reliability of launching and assembling all required elements in time to support planned departure. This paper describes an integrated methodology for analyzing launch and assembly reliability in any single DRM or set of DRMs starting with flight hardware manufacturing and ending with final departure to the destination. A discrete event simulation is built for each DRM that includes the pertinent risk factors including, but not limited to: manufacturing completion; ground transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to trans-destination-injection. Each reliability factor can be selectively activated or deactivated so that the most critical risk factors can be identified. This enables NASA to prioritize mitigation actions so as to improve mission success.

Cates, Grant↗

End-to-End Trajectory for Conjunction Class Mars Missions Using Hybrid Solar-Electric/Chemical Transportation System

NASA's Human Spaceflight Architecture Team is developing a reusable hybrid transportation architecture in which both chemical and solar-electric propulsion systems are used to deliver crew and cargo to exploration destinations. By combining chemical and solar-electric propulsion into a single spacecraft and applying each where it is most effective, the hybrid architecture enables a series of Mars trajectories that are more fuel efficient than an all chemical propulsion architecture without significant increases to trip time. The architecture calls for the aggregation of exploration assets in cislunar space prior to departure for Mars and utilizes high energy lunar-distant high Earth orbits for the final staging prior to departure. This paper presents the detailed analysis of various cislunar operations for the EMC Hybrid architecture as well as the result of the higher fidelity end-to-end trajectory analysis to understand the implications of the design choices on the Mars exploration campaign.

Chai, Patrick R.↗

Random Access Frame (RAF) System Neutral Buoyancy Evaluations

The Random Access Frame (RAF) concept is a system for organizing internal layouts of space habitats, vehicles, and outposts. The RAF system is designed as a more efficient improvement over the current International Standard Payload Rack (ISPR) used on the International Space Station (ISS), which was originally designed to allow for swapping and resupply by the Space Shuttle. The RAF system is intended to be applied in variable gravity or microgravity environments. This paper discusses evaluations and results of testing the RAF system in a neutral buoyancy facility simulating low levels of gravity that might be encountered in a deep space environment.

human spaceflight↗

How the Allocation of Lander Functions Impacts Human Lunar Exploration Architecture Propellant Demands

As NASA looks to the moon as a proving ground for the technologies required to conduct the first human exploration campaign of Mars, this study assesses the potential propellant demands that a sustained human lunar presence would require. In particular, this study evaluates how the allocation and distribution of vehicle functions to a different number of vehicles can impact the propellant required to conduct a human lunar exploration mission. Four different transportation architectures for human lunar exploration and three different refueling assumptions were defined. The impact on the propellant required for a mission was assessed for all architectures and refueling assumptions for ranges of crew payload mass, vehicle inert mass fraction, and a sensitivity to the mission maneuver velocity magnitudes. The results of this analysis show that aggregating vehicle functions to a single-stage lander vehicle can have a positive impact on the architecture's level of vehicle reusability and that an increase in the number of refueling opportunities reduces the mass of the vehicles and of the propellant required per mission.

Matteo A. Clark↗

The Exploration Crew Health and Performance System of the Future - A Shared Mental Model

The challenges involved in vehicle/habitat design and operation for long-duration deep space missions are complex, and the needs of a human crew must be considered in the context of all the system trades required to enable such missions. An exploration Crew Health and Performance (CHP) system complements all the other vehicle/habitat systems to achieve one specific and critical endpoint – ensuring that the astronauts can perform the job that they were sent into space to do. This includes accounting for all aspects of the physiological, psychological, medical, and environmental realities that the human crew must face in deep space. Along with this system complexity comes the additional need for increased autonomy of the crew due to the immense distance from Earth. The design of future systems must respect the real human capabilities and limitations within the context of a mission to the Moon or Mars. The NASA Moon to Mars Objectives document outlines the need for advanced CHP system designs: • Develop systems that monitor and maintain crew health and performance throughout all mission phases, including during communication delays to Earth, and in an environment that does not allow emergency evacuation or terrestrial medical assistance. • Evaluate and validate progressively Earth-independent crew health & performance systems and operations with mission durations representative of Mars-class missions. • Validate readiness of systems and operations to support crew health and performance for the initial human Mars exploration campaign. This presentation will outline the initial work that Exploration Medical Capability is leading on the development of a prototype design for an exploration Crew Health and Performance (CHP) system for future NASA human deep space long-duration missions. This effort will require commitment from all stakeholders to a shared mental model of what a future exploration CHP system should look like, one that will address the needs, goals, and objectives of the Agency and help to ensure mission success in deep space.

K R Lehnhardt↗

Mars Ascent Vehicle (MAV) Solid Motor Technology Plans

Recent trades have taken place on solid propulsion options to support a potential Mars Sample Retrieval Campaign. Mass and dimensional requirements for a Mars Ascent Vehicle (MAV) are being assessed. One MAV vehicle concept would utilize a solid propulsion system. Key challenges to designing a solid propulsion system for MAV include low temperatures beyond common tactical and space requirements, performance, planetary protection, mass limits, and thrust vector control system. Two solutions are addressed, a modified commercial commercially available system, and an optimum new concept.

Prince, Andrew↗

Earth Entry System Atmosphere Model Study

The Mars Sample Return Campaign has the ambitious goal of returning Mars samples back to Earth [1]. The Earth Entry System (EES), containing the samples, conducts entry, descent, and landing (EDL) on a direct Earth trajectory. During EDL, the EES traverses through many regions of Earth’s atmosphere before impacting the ground at Utah Test and Training Range (UTTR). This poster highlights preliminary results from a study that assessed the flight mechanics simulation sensitivity to atmosphere model settings and investigated the validity of current atmosphere models as compared to available atmospheric data measurements.

Rohan Deshmukh↗

Integrated Design Results for the MSR SRC Mars Ascent Vehicle

The primary mission of the NASA Mars Sample Return (MSR) Campaign is to return samples of the Martian surface to Earth for scientific study. As part of this campaign, NASA is developing a Mars Ascent Vehicle (MAV). This vehicle must survive an approximate two year journey to the Martian surface as a payload aboard a separate lander spacecraft. After residing on the surface for another year, the MAV will carry a payload of samples into orbit. From there, following ejection from the MAV, the samples will rendezvous with an Earth return spacecraft for capture, and ultimately, return to Earth.The design of the MAV represents a number of unique challenges, as no launch vehicle has ever left the surface of a planet other than Earth. Although conceptual designs for a MAV have been in various levels of development since the 1970s, none have achieved the level of fidelity and support that exists in the current MSR-MAV design. Early MSR-MAV concept studies examined multiple methods of propulsion, ultimately deciding that a Two Stage to Orbit (TSTO) solid propulsion vehicle would provide the most capable performance in a Martian environment. Following this key architecture decision, the vehicle design was further matured to a Solid-Solid Guided-Guided (SSGG) architecture for NASA Key Decision Point A (KDP-A). Although the SSGG design was able to meet all mission constraints, concerns were raised regarding limited mass margin on other elements of the MSR campaign at such an early phase. A design challenge was issued to reduce MAV total mass by as much as possible. It was ultimately determined that by moving a number of components of the vehicle second stage to the first stage, the overall vehicle mass could be reduced significantly. The new design featured a much smaller and completely unguided second stage. This paper describes the resultant Solid-Solid Guided-Unguided (SSGU) MAV design concept developed as part of the Systems Requirement Cycle (SRC). This design was developed primarily by NASA Marshall Space Flight Center (MSFC), in association with NASA Jet Propulsion Laboratory (JPL) and NASA Langley Research Center (LaRC). The TSTO vehicle includes one solid rocket motor per stage. As the vehicle second stage is unguided, it features spin-stabilization to maintain vehicle stability during flight. An electromechanically actuated Thrust Vector Control (TVC) and a monopropellant Reaction Control System (RCS) is employed for active guidance on the first stage. The vehicle is designed to deliver up to 0.47kg of Martian samples to a Mars circular orbit of 380km at 27° inclination. Due to the extremely unique design constraints of this mission, and a recent transition to a Risk Class A posture, the MAV team was compelled to devise unconventional solutions to the vehicle design. The detailed design and analysis of these subsystems and the vehicle as a whole are discussed in this paper relative to all of the engineering disciplines involved.

MSR↗

Integrated Design Results for the MSR SRC Mars Ascent Vehicle

The primary mission of the NASA Mars Sample Return (MSR) Campaign is to return samples of the Martian surface to Earth for scientific study. As part of this campaign, NASA is developing a Mars Ascent Vehicle (MAV). This vehicle must survive an approximate two-year journey to the Martian surface as a payload aboard a separate lander spacecraft. After residing on the surface for another year, the MAV will carry a payload of samples into orbit. From there, following ejection from the MAV, the samples will rendezvous with an Earth return spacecraft for capture, and ultimately, return to Earth. The design of the MAV represents a number of unique challenges, as no launch vehicle has ever left the surface of a planet other than Earth. Although conceptual designs for a MAV have been in various levels of development since the 1970s, none have achieved the level of fidelity and support that exists in the current MSR-MAV design. Early MSR-MAV concept studies examined multiple methods of propulsion, ultimately deciding that a Two-Stage-to-Orbit (TSTO) solid propulsion vehicle would provide the most capable performance in a Martian environment. Following this key architecture decision, the vehicle design was further matured to a Solid-Solid Guided-Guided (SSGG) architecture for NASA Key Decision Point A (KDP-A). Although the SSGG design was able to meet all mission constraints, concerns were raised regarding limited mass margin on other elements of the MSR campaign at such an early phase. A design challenge was issued to reduce MAV total mass by as much as possible. It was ultimately determined that by moving a number of components of the vehicle second stage to the first stage, the overall vehicle mass could be reduced significantly. The new design features a much smaller and completely unguided second stage. This paper describes the resultant Solid-Solid Guided-Unguided (SSGU) MAV design concept developed as part of the Systems Requirement Cycle (SRC). This design was developed primarily by NASA Marshall Space Flight Center (MSFC), in association with NASA Jet Propulsion Laboratory (JPL) and NASA Langley Research Center (LaRC). The TSTO vehicle includes one solid rocket motor per stage. As the vehicle second stage is unguided, it features spin-stabilization to maintain vehicle stability during flight. An electromechanically actuated Thrust Vector Control (TVC) system and a monopropellant Reaction Control System (RCS) are employed for active guidance on the first stage. The vehicle is designed to deliver up to 0.47kg of Martian samples to a Mars circular orbit of 380km at 27° inclination. Due to the extremely unique design constraints of this mission, and a recent transition to a Risk Class A posture, the MAV team was compelled to devise unconventional solutions to the vehicle design. The detailed design and analysis of these subsystems and the vehicle as a whole are discussed in this paper relative to all of the engineering disciplines involved.

MAV↗

Visual Odometry Thinking While Driving for the Curiosity Mars Rover's Three-Year Test Campaign: Impact of Evolving Constraints on Verification and Validation

Over the first 9 years of the Mars Science Laboratory (MSL) Curiosity rover's surface mission, more than 87\% of its driving has been performed using Visual Odometry (VO). The benefits of using VO during driving are that it minimizes rover position uncertainty and can be used to monitor wheel slip, halting a drive if excessive wheel slip is occurring. The VO implementation on board Curiosity acquires and processes VO images in between drive steps while the rover is stationary. A VO Thinking While Driving (VTWD) flight software capability has been developed which enables the processing of VO images during rover driving, increasing the distance Curiosity can drive with VO in a given time period up to as much as 1.75x total distance. Verification and Validation (V\&V) of the capability has been challenging due to impacts from the COVID-19 pandemic and unavailability of the JPL Mars Yard outdoor test site. The VTWD V\&V test procedures were modified to use a small indoor space with Mars-like terrain. This paper describes the 3 year V\&V effort under challenging conditions to approve the VTWD capability for use on the Curiosity rover.

Rankin, Arturo↗

The Containment Assurance Risk Framework of the Mars Sample Return Program

The Mars Sample Return campaign aims at bringing rock and atmospheric samples from Mars to Earth through a series of robotic missions. These missions would collect the samples being cached and deposited on Martian soil by the Perseverance rover, place them in a container, and launch them into Martian orbit for subsequent capture by an orbiter that would bring them back. Given there exists a non-zero probability that the samples contain biological material, precautions are being taken to design systems that would break the chain of contact between Mars and Earth. These include techniques such as sterilization of Martian particles, redundant containment vessels, and a robust reentry capsule capable of accurate landings without a parachute. Requirements exist that the probability of containment not assured of Martian-contaminated material into Earth’s biosphere be less than one in a million. To demonstrate compliance with this strict requirement, a statistical framework was developed to assess the likelihood of containment loss during each sample return phase and make a statement about the total combined mission probability of containment not assured. The work presented here describes this framework, which considers failure modes or fault conditions that can initiate failure sequences ultimately leading to containment not assured. Reliability estimates are generated from databases, design heritage, component specifications, or expert opinion in the form of probability density functions or point estimates and provided as inputs to the mathematical models that simulate the different failure sequences. The probabilistic outputs are then combined following the logic of several fault trees to compute the ultimate probability of containment not assured. Given the multidisciplinary nature of the problem and the different types of mathematical models used, the statistical tools needed for analysis are required to be computationally efficient. While standard Monte Carlo approaches are used for fast models, a multi-fidelity approach to rare event probabilities is proposed for expensive models. In this paradigm, inexpensive low-fidelity models are developed for computational acceleration purposes while the expensive high-fidelity model is kept in the loop to retain accuracy in the results. This work presents an example of end-to-end application of this framework highlighting the computational benefits of a multi-fidelity approach.

Giuseppe Cataldo↗

International Human Mission to Mars: Analyzing A Conceptual Launch and Assembly Campaign

In July of 2013, U.S. Congressman Kennedy (D-Mass.) successfully offered an amendment to H.R. 2687, the National Aeronautics and Space Administration Authorization Act of 2013. "International Participation—The President should invite the United States partners in the International Space Station program and other nations, as appropriate, to participate in an international initiative under the leadership of the United States to achieve the goal of successfully conducting a crewed mission to the surface of Mars." This paper presents a concept for an international campaign to launch and assemble a crewed Mars Transfer Vehicle. NASA’s “Human Exploration of Mars: Design Reference Architecture 5.0” (DRA 5.0) was used as the point of departure for this concept. DRA 5.0 assumed that the launch and assembly campaign would be conducted using NASA launch vehicles. The concept presented utilizes a mixed fleet of NASA Space Launch System (SLS), U.S. commercial and international launch vehicles to accomplish the launch and assembly campaign. This concept has the benefit of potentially reducing the campaign duration. However, the additional complexity of the campaign must also be considered. The reliability of the launch and assembly campaign utilizing SLS launches augmented with commercial and international launch vehicles is analyzed and compared using discrete event simulation.

Cates, Grant↗

Booster Obsolescence and Life Extension (BOLE) for Space Launch System (SLS)

A human mission to the moon and Mars is the stated space exploration goal of the United States and the international community. To achieve these goals, NASA is developing the Space Launch System (SLS) and the Orion crew capsule as key elements in the architecture for missions to the moon and Mars. As part of the SLS Booster Obsolescence and Life Extension (BOLE) program, Northrop Grumman Innovation Systems is working to address booster obsolescence issues in design and manufacturing. The upgraded boosters will also provide increased performance that will benefit future lunar campaigns, science missions, and the eventual Mars campaign.

Tobias, Mark E.↗

Booster Obsolescence and Life Extension (BOLE) for Space Launch System (SLS)

A human mission to the moon and Mars is the stated space exploration goal of the United States and the international community. To achieve these goals, NASA is developing the Space Launch System (SLS) and the Orion crew capsule as key elements in the architecture for missions to the moon and Mars. As part of the SLS Booster Obsolescence and Life Extension (BOLE) program, Northrop Grumman Space Systems is working to address booster obsolescence issues in design and manufacturing. The upgraded boosters will also provide increased performance that will benefit future lunar campaigns, science missions, and the eventual Mars campaign.

Tobias, Mark E.↗

Thermal Cycling for Development of Hybrid Fuel for a Notional Mars Ascent Vehicle

A Mars Ascent Vehicle (MAV) would be a critical part of a potential Mars sample return campaign. As currently envisioned, the MAV would launch samples from Mars into Mars orbit. Challenging requirements would be placed on a MAV as it would need to be able to survive in the harsh Martian environment which can get as cold as -120°C in the winter. At these cold temperatures, survival heating could be necessary to keep the MAV within the allowable flight temperature range. Estimates for survival heating power show that a fuel capable of operating at low temperature would significantly reduce the total required energy of the MAV. This has led to consideration of a hybrid propulsion system due to its anticipated low temperature capability. A new wax-based fuel, SP7, has been developed for a notional MAV mission. Thermal modeling of the fuel in the Mars environment was completed in order to estimate the temperature response of the fuel during Mars diurnal temperature cycling. Preliminary thermal testing was conducted to determine the max temperature range, radial gradient, and ramp rate the fuel could tolerate without cracking. The modeling and preliminary testing was used to develop a comprehensive, 100-day thermal cycling campaign. A total of 200 cycles are planned that are representative of 200 Martian diurnal cycles, roughly one-third of a Martian year. After 150 cycles, the fuel samples show no signs of cracking that would jeopardize the rocket’s performance. Though not yet complete, this testing is showing that SP7 has the potential to successfully be used on a MAV mission.

Farias, Edgardo↗

Mars Analog Rio Tinto Experiment (MARTE): 2003 Drilling Campaign to Search for a Subsurface Biosphere at Rio Tinto Spain

The MARTE (Mars Astrobiology Research and Technology Experiment) project, an ASTEP field experiment, is exploring for a hypothesized subsurface anaerobic chemoautotrophic biosphere in the region of the Tinto River- or Rio Tinto- in southwestern Spain. It is also demonstrating technology needed to search for a subsurface biosphere on Mars. The project has three primary objectives: (1) search for and characterize subsurface life at Rio Tinto along with the physical and chemical properties and sustaining energy sources of its environment, (2) perform a high fidelity simulation of a robotic Mars drilling mission to search for life, and (3) demonstrate the drilling, sample handling, and instrument technologies relevant to searching for life on Mars. The simulation of the robotic drilling mission is guided by the results of the aseptic drilling campaign to search for life at Rio Tinto. This paper describes results of the first phase of the aseptic drilling campaign.

Stoker, Carol↗