Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MANPOWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Wind-Tunnel-Model Leak-Checking System

Voice-actuated system allows one operator to do work of three. System uses voice-recognition-and-response unit and graphics terminal to interact with technician and to provide technician visual feedback. Computer-based Leakcheck system allows computer to do more of total work in checking model for leaks to reduce time and manpower required to perform task.

Larson, W. E.↗

The role of artificial intelligence and expert systems in increasing STS operations productivity

Artificial Intelligence (AI) is discussed. A number of the computer technologies pioneered in the AI world can make significant contributions to increasing STS operations productivity. Application of expert systems, natural language, speech recognition, and other key technologies can reduce manpower while raising productivity. Many aspects of STS support lend themselves to this type of automation. The artificial intelligence section of the mission planning and analysis division has developed a number of functioning prototype systems which demonstrate the potential gains of applying AI technology.

Culbert, C.↗

On orbit mission planning using the shuttle trajectory and launch window expert system

With the Space Transportation System (STS) entering the operational era, the need for standardized, automated, mission planning computer tools has become apparent. In order to support an increased flight rate without an increase in manpower, quicker and more efficient methods are needed to perform standard tasks. The Shuttle Trajectory and Launch Window Expert System (STALEX) was developed to automate many aspects of early mission planning for space shuttle missions carrying geosynchronous communications satellites. Most of the commercial Shuttle missions planned for the next 3 years will carry at least one of this type of satellite. The applications of STALEX include payload deployment scheduling, launch window analysis, orbital trajectory determination, and landing opportunity selection.

Ahlf, P. R.↗

Space shuttle descent design: From development to operations

The descent guidance system, the descent trajectories design, and generating of the associated flight products are discussed. The programs which allow the successful transitions from development to STS operations, resulting in reduced manpower requirements and compressed schedules for flight design cycles are addressed. The topics include: (1) continually upgraded tools for the job, i.e., consolidating tools via electronic data transfers, tailoring general purpose software for needs, easy access to tools through an interactive approach, and appropriate flexibility to allow design changes and provide growth capability; (2) stabilizing the flight profile designs (I-loads) in an uncertain environment; and (3) standardizing external interfaces within performance and subsystems constraints of the Orbiter.

Crull, T. J.↗

Space station common module power system network topology and hardware development

Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.

Landis, D. M.↗

Assessing the proficiency of software developers

The trend lines presented can be useful in a number of ways. They provide a baseline of comparision from which software developers can compare their performance against a large database of similar projects. This will often identify a organizational style. It was possible to quantify the organizational style using the Manpower Buildup Gradient. That the developer was a better than average producer on RAM based systems was shown. The Ck associated with the ROM system suggests that it is a different class of work. When this system is compared against the Firmware database it is very creditable. It is important to recognize that there are non linearities present in the software process. The non linearities are tied to system size. For comparative purposes one must always make judgements based on similar sizes. In the past the tendency has been to calculate a few ratios on several projects and then compare them without any regard to amount of functionality that was created. This practice can be very misleading and dangerous. The method described, used in a thoughtful analytic manner, can be very helpful.

Putnam, L. H.↗

TDRSS and the STGT

A Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT) is envisioned as the next step in providing expanded support service for data transmission between spaceborne NASA and related missions, including Space Station and the earth-based user community. This need for expanded support service is projected to exist during the early to late 1990's time frame. This concept description reflects the current NASA requirements for a life-cycle cost-effective acquisition of the STGT. The significant features of this STGT configuration include autonomous subsystems, decentralized control processes and modular functional implementation. These features are expected to reduce acquisition risk and provide efficient manpower utilization during the operational years.

Chang, R.↗

Operations and support for the next-generation space transportation system

The role of operations and support in the design of future space transportation systems (STSs) is studied. There is a need to reduce launch and operation costs for future space systems. Methods for reducing the cost of ground operations and supports for a STS are described. Technological advances such as expert systems, robotics, and sensors, and reduction in management of operations are discussed. Changes in the management of flight operations and control, from a manpower intensive monitoring to a strong vehicle autonomy, are examined. The development of equipment and procedures to improve space operations and reduce costs is analyzed. The use of a clean sheet approach for building a STS is proposed.

Sawaya, G. J.↗

Orbital transfer vehicle launch operations study. Volume 2: Detailed summary

A series of Operational Design Drivers were identified. Several of these could have significant impact(s) on program costs. These recommendations, for example, include such items as: complete factory assembly and checkout prior to shipment to the ground launch site to make significant reductions in time required at the launch site as well as overall manpower required to do this work; minimize use of nonstandard equipment when orbiter provided equipment is available; and require commonality (or interchangeability) of subsystem equipment elements that are common to the space station, Orbit Maneuvering Vehicles, and/or Orbit Transfer Vehicles. Several additional items were identified that will require a significant amount of management attention (and direction) to resolve. Key elements of the space based processing plans are discussed.

Source record↗

Physics through the 1990s: An overview

The volume details the interaction of physics and society, and presents a short summary of the progress in the major fields of physics and a summary of the other seven volumes of the Physics through the 1990s series, issues and recommended policy changes are described regarding funding, education, industry participation, small-group university research and large facility programs, government agency programs, and computer database needs. Three supplements report in detail on international issues in physics (the US position in the field, international cooperation and competition-especially on large projects, freedom for scientists, free flow of information, and education of foreign students), the education and supply of physicists (the changes in US physics education, employment and manpower, and demographics of the field), and the organization and support of physics (government, university, and industry research; facilities; national laboratories; and decision making). An executive summary contains recommendations for maintaining excellence in physics. A glossary of scientific terms is appended.

Source record↗

Artificial intelligence planning applications for space exploration and space robotics

Mission sequencing involves the plan for actuation of the experiments to be conducted aboard a spacecraft; automation is under study by NASA as a means to reduce time and manpower costs in mission planning and in robotic implementation. The development of a mission sequence is conditioned by the limited duration of advantageous spacecraft encounters with objects of study, more research requests than can be satisfied, and requested changes in objectives. Autonomous robot development is hampered by the absence of task-level programming languages, the existence of anomalies in real-world interactions, and a lack of required capabilities in current sensor technology.

Rokey, Mark↗

Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

Klus, W. L.↗

IMIS: Integrated Maintenance Information System. A maintenance information delivery concept

The Integrated Maintenance Information System (IMIS) will optimize the use of available manpower, enhance technical performance, improve training, and reduce the support equipment and documentation needed for deployment. It will serve as the technician's single, integrated source of all the technical information required to perform modern aircraft maintenance.

Vonholle, Joseph C.↗

Turnaround operations analysis for OTV. Volume 2: Detailed technical report

The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

Source record↗

Pyrotechnic system failures: Causes and prevention

Although pyrotechnics have successfully accomplished many critical mechanical spacecraft functions, such as ignition, severance, jettisoning and valving (excluding propulsion), failures continue to occur. Provided is a listing of 84 failures of pyrotechnic hardware with completed design over a 23-year period, compiled informally by experts from every NASA Center, as well as the Air Force Space Division and the Naval Surface Warfare Center. Analyses are presented as to when and where these failures occurred, their technical source or cause, followed by the reasons why and how these kinds of failures persist. The major contributor is a fundamental lack of understanding of the functional mechanisms of pyrotechnic devices and systems, followed by not recognizing pyrotechnics as an engineering technology, insufficient manpower with hands-on experience, too few test facilities, and inadequate guidelines and specifications for design, development, qualification and acceptance. Recommendations are made on both a managerial and technical basis to prevent failures, increase reliability, improve existing and future designs, and develop the technology to meet future requirements.

Bement, Laurence J.↗

A scheduling and resource management system for space applications

Every spacecraft, whether in orbit around the earth or an a deep space flight, has at its disposal limited amounts of the resources for it to accomplish its mission. Activity scheduling is currently a costly, human intensive task which requires a great deal of expertise. It belongs to a class of problems whose complexity increases exponentially with the number of operations. NASA has in the past accomplished this task by using a great deal of manpower, a large number of negotiating sessions, interminable bouts of phone tag, and mountains of paperwork. Lately the situation has improved with the introduction of automated scheduling techniques, but these to date still require expert involvement and fall short in some important ways. A prototype activity scheduler, MAESTRO, is introduced which is capable of meeting the needs of many NASA missions, eventually to include the Space Station. The approach to resource constrained scheduling is first discussed, then the intended domain for MAESTRO is described along with its design and current capabilities. A description of planned enhancements and revisions to the systems is also presented.

Britt, Daniel L.↗

Space Shuttle operations experience

Lessons learned from Shuttle operations are discussed with emphasis placed on: (1) reusability of flight systems, (2) orbiter ground turnaround, (3) flight design, (4) payload integration, and (5) training. Attention is also given to the impact of the Challenger accident on Shuttle operations. Operations experience in flight design, payload integration, and flight controller and astronaut training reveals that initial projections underestimated the compexity, time, and manpower required. This can be attributed to the demands of customizing each mission to maximize the science return in a shrinking Shuttle flight program, and to frequent changes of the cargo manifest to optimize the mix of science and applications payloads.

Gunn, Charles R.↗

Intelligent systems and robotics for an evolutionary Space Station

The Space Station will be a multipurpose space facility to acquire and exploit unique knowledge with a planned lifetime of greater than 20 years. It will include laboratories for science and manufacturing, provide a platform for earth and interplanetary observations, conduct satellite servicing, and serve as a transportation node for potential manned geosynchronous, lunar, and Mars missions. Environmental safety considerations and limited manpower resources require the extensive use of intelligent systems and flexible robotics on the Space Station. Design accommodations must be planned in advance to allow incorporation of these advancing technologies on the evolutionary Space Station.

Erickson, Jon D.↗