Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Hypergol Maintenance Facility North, SWMU 090, Year 3 Air Sparge System Performance Monitoring Report, Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents Year 3 Air Sparge (AS) System operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from September 2022 to August 2023. The HMFN AS IM was implemented in 2019-2020 to treat a chlorinated solvent groundwater plume that resulted from historical operations supporting the National Aeronautics and Space Administration (NASA) Space Program. The system includes 213 AS wells, with screen depths ranging from 25 feet to 45 feet below land surface (bls) and treats approximately 1.62 acres of contaminated groundwater. The objective of the AS IM is to actively reduce groundwater concentrations exceeding Florida Department of Environmental Protection Natural Attenuation Default Concentrations (NADCs) (identified as the High Concentration Plume [HCP]) to levels that facilitate transition into a Long-Term Monitoring program. The AS IM targets all of the HCP, except for a source zone area within the HCP where trichloroethene (TCE) concentrations exceed 11,000 micrograms per liter (μg/L) at depths greater than 45 feet bls. This is because site lithology was found to not be conducive to the AS treatment technology at these deeper depths. NASA will re-visit plans for potentially utilizing another remedial technology for residual deeper contamination following completion of the AS IM. OM&M activities and results from Year 3 indicate that the AS system at HMFN is operating as designed and is meeting performance criteria. Groundwater performance monitoring results indicate that following the third year of AS system operation, TCE concentrations in wells across all treated depth intervals have been reduced by an average of more than 99 percent. Overall, the areal extent of the plume showed a reduction following Year 3 of AS operations; however, continued operation of the AS system is required to meet the IM objective.

VOCs↗

Prototype Training Materials for Acceptance Criteria of Maintenance ASAP Events Occurring Within Social Context

The aviation maintenance community is at a crossroads with respect to implementing the Aviation Safety Action Program (ASAP). While there is considerable interest, several key issues have emerged that cast doubt on how to assure a successful implementation, including buy-in from all levels of the company and training for key participants. There are two objectives for the present report. The first is to provide an examination of limits (or more properly, examples) of the degree of acceptability of more problematic events for risk-based decisions within the current ASAP guidelines. The second objective is to apply these limits of community standards to a set of further refined ASAP training scenarios.

ASAP (AVIATION SAFETY ACTION PROGRAM)↗

Launch Complex 39A, SWMU 008, Operations, Maintenance, and Monitoring Report, Kennedy Space Center, FL

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from Year 1 operation of the air sparging (AS) groundwater interim measure (IM) for High-Concentration Plumes (HCPs) and Low-Concentration Plumes (LCPs) within the perimeter fence line at Launch Complex 39A (LC39A) located at Kennedy Space Center (KSC), Florida. The objective of the LC39A groundwater IM is to actively decrease concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC) in groundwater in the HCP and LCP within the pad perimeter fence line via AS to levels less than Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTLs). The objective was developed because LC39A is currently being leased to Space Exploration Technologies (SpaceX), and the original IM for monitored natural attenuation (MNA) over an extended period of time was not suitable for future planned site use.

Operations↗