Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lighting Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Rework Recipe Development, Analysis and Results of Select 9-Cell Cavities for LCLS-II

The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are collaborating in this project. The cryomodules for this project each consist of eight 1.3-GHz cavities produced by two vendors, Research Instruments GmbH in Germany (RI*) and Ettore Zanon S.p.a. in Italy (EZ*), using niobium cell material from Tokyo Denkai Co., Ltd. (TD) and Ningxia Orient Tantalum Industry Co., Ltd. (OTIC/NX)). During the initial production run, cavity performance from one of the vendors (Vendor A) was far below expectation. All the cavities had low Q0, later attributed to minimal EP as well as high-flux-trapping NX material, early quench behaviour below 18 MV/m, with many having Q0 roll-off at 12-16 MV/m. Production was stopped multiple times over the following 6 months, with test batches of cavities being made to ascertain the root cause of the problem. The final root cause of the problem was found to be inappropriate grinding of the RF surface prior to welding which left normal conducting inclusions in the surface. In addition, most cavities showed internal and external weld spatter which required post weld grinding and a very rough surface from operating the electropolishing machine in an etching rather than polishing regime. All issues have been corrected on new cavities and rework is underway on the originally effected cavities.

Macha, Kurt M.↗

Optimizing procurement strategies for LCLS-II

The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab), are participating in this project. JLab is responsible for procuring a number of critical components. Over the course of this project, JLab has evolved several procurement strategies to minimize risk and improve performance while working within the constraints of budget and schedule. This paper discusses the impact of procurement choices on project technical success.

Wilson, Katherine M.↗

Thermal Vacuum Control Systems Options for Test Facilities

This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.

Marchetti, John↗

ComStock Measure Documentation: Thermostat and Lighting Control for Load Shedding + Photovoltaics With 40% Rooftop Coverage

This report describes the modeling methodology for an upgrade package of two end-use savings shape measures - Thermostat Control for Load Shedding and Lighting Control for Load Shedding - and briefly introduces key results. The package combines thermostat control for load shedding, lighting control for load shedding, and PV with 40% rooftop coverage measures to reduce the net building load during the building's electricity peak window every weekday. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start and end times of the predicted peak window, and then relaxes the thermostat setpoints and dims the lighting level from the original schedules during the peak window to reduce the peak demand, while applying the fixed rooftop PV application for onsite electricity generation. The measure is applicable to (large, medium and small) offices, warehouses, and primary and secondary schools, which correspond to approximately 68% of the stock floor area of commercial buildings in ComStock analysis. The measure demonstrates 5%-15% daily peak demand reduction performance for applicable buildings, and around 1% total site energy savings (0 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

14 SOLAR ENERGY↗

Overview of Lattice Design and Evaluation for the APS Upgrade

The Advanced Photon Source (APS) is a 7-GeV synchrotron light source that has been in operation since 1996. Since that time, the effective emittance has been decreased from 8 nm to 3.1 nm, which is very competitive for a 3rd-generation light source. However, newer facilities such as PETRA-III, NSLS-II, and MAX-IV are pushing the emittance to significantly smaller values. MAX-IV in particular has set the current benchmark with an emittance of about 300 pm at 3 GeV. This was accomplished by use of a multi-bend achromat lattice, which takes advantage of the 1/M3 scaling of the emittance with respect to the number of dipoles M. In order to ensure that our facility remains competitive, APS is pursuing a major upgrade, which involves replacement of the existing double-bend lattice with a seven-bend achromat lattice, promising a 40-fold reduction in emittance. This paper describes the process of developing and evaluating candidate lattice designs. Two candidate 6-GeV lattices are described: one providing a natural emittance of 67 pm and the other providing 41 pm. Our analysis includes single-particle dynamics as well as single- and multi-bunch collective effects.

07 ISOTOPE AND RADIATION SOURCES↗

Better Buildings High Efficiency Troffer Lighting

This fact sheet summarizes key components of the Better Buildings High-Efficiency Troffer Lighting Specification and how to apply it to save energy and money by upgrading to high- efficiency LED technology.

high-efficiency, LED, troffer, lighting, technical↗

Wavefront preserving X-ray optics for Synchrotron and Free Electron Laser photon beam transport systems

We report in the last two decades, after the first light from the new Free Electron Lasers, either in the UV (FLASH and FERMI@Elettra) or X-ray (LCLS and SACLA), more and more new diffraction limited sources have been either constructed or planned. Third generation storage rings are upgraded to provide a more collimated, brighter, and coherent light for the next generation experimental techniques. X-ray optics are the bridge between the light sources and the experimental stations. They are the key to the success of advanced experiments but also the potential bottleneck preventing the exploitation of the full characteristics of the source. The beam degradation originated by any mirror defect (either from mirror polishing or from contamination) is amplified with a coherent source. Delivering diffraction-limited spots, including the option for variable spot sizes in and out of focus, requires the control of the surface of the optics at the 1 nm rms level, if not better. At LCLS, only very recently an almost perfectly uniform beam out of focus has been obtained in the hard X-rays. It has been obtained after two 1-m long mirrors with 0.5 nm rms shape precision (after installation). Those mirrors were not readily available just a decade ago. But, thanks to the pioneering work performed at the Osaka University, those optics are now commercially available with arbitrary tangential profiles. This new generation of mirrors permits achieving unprecedented results. However, they do not remove all road blocks to a perfect photon transport system. Instead, they highlighted the critical importance of mirror mounting, handling of the thermal deformation, and the need of advanced diagnostics to properly exploit all the new potentiality of these optics. Besides the need of “perfect” mirrors, other aspects of the beamline design and elements may impact the quality of the beam in the experimental station, from the lack of blaze gratings to the need of advanced simulation tools, just to cite two. In this article, after a brief historical excursus, we will present the current state of the art of mirrors, gratings, crystals, lenses, diagnostics, and simulation tools. The main problems yet to solve and a look ahead at what would be achievable in the next decade will give the reader an idea on the search for an almost ideal photon transport system and how the path toward experiments, not conceivable today, will unfold.

47 OTHER INSTRUMENTATION↗

Multi-objective direct optimization of dynamic acceptance and lifetime for potential upgrades of the Advanced Photon Source.

The Advanced Photon Source (APS) is a 7 GeV storage ring light source that has been in operation for well over a decade. In the near future, the ring may be upgraded, including changes to the lattice such as provision of several long straight sections (LSS). Because APS beamlines are nearly fully built out, we have limited freedom to place LSSs in a symmetric fashion. Arbitrarily-placed LSSs will drastically reduce the symmetry of the optics and would typically be considered unworkable. We apply a recently-developed multi-objective direct optimization technique that relies on particle tracking to compute the dynamic aperture and Touschek lifetime. We show that this technique is able to tune sextupole strengths and select the working point in such a way as to recover the dynamic and momentum acceptances. We also show the results of experimental tests of lattices developed using these techniques.

43 PARTICLE ACCELERATORS↗

HIGH-LEVEL CONTROL SYSTEM IN C#

We have started upgrading the control room programs for the injector at the Advanced Light Source (ALS). We chose to program in C* exclusively on the .NET Framework to create EPICS client programs on Windows Vista PCs. This paper reports the status of this upgrade project.

43 PARTICLE ACCELERATORS↗

An Imaging Spectrometric Observatory (ISO)

The Imaging Spectrometric Observatory (ISO) is designed for low light level spectroscopy of both the day and night side of the earth. The instrument is composed of five spectrometers, each of which covers part of the total wavelength range of 30 to 1300 nm spanned by the instrument. Wavelength resolution varies between 0.2 and 0.6 nm over the spectral range. The five spectrometers are each optimized for a portion of the spectrum by the choice of mirror reflective coatings and detector photocathode materials. The full spectral range for each spectrometer is covered in a total of 11 grating steps. The Imaging Spectrometric Observatory was flown for the first time on the Spacelab 1 mission during which it acquired almost 40 hr of observations. The ISO investigation to be flown on the Atmospheric Laboratory for Applications and Science (ATLAS 1) mission will draw on the experience gained from the data gathered on Spacelab 1. The detector system in each spectrometer was upgraded to provide both higher sensitivity at low light levels and simultaneous imaging over larger spectral segments than was achieved on Spacelab 1. In addition, the instrument and the observing sequences were modified to allow observation of the sun in the extreme ultraviolet. A summary of ISO parameters for ATLAS 1 (scheduled for late 1990) is given.

Torr, M. R.↗

Calibration improvements expand filterscope diagnostic use

The filterscope diagnostic on DIII-D utilizes photomultiplier tubes to measure visible light emission from the plasma. The system has undergone a substantial upgrade since previous attempts to cross-calibrate the filterscope with other spectroscopic diagnostics were unsuccessful. The optics now utilize a dichroic mirror to initially split the light at nearly 99% transmission or reflectance for light below or above 550 nm. This allows the system to measure D α emission without degrading visible light emission from the plasma for wavelengths below 550 nm (to measure D β , D γ , W–I, C-III, etc.). Additional optimization of the optical components and calibration techniques reduce the error in the signal up to 10% in some channels compared to previous methods. Cross-calibration measurements with two other high resolution spectroscopic diagnostics now show excellent agreement for the first time. This expands the capabilities of the filterscope system allowing measurement of divertor detachment, emission profiles, edge-localized mode behavior, and plasma–wall interactions. Additionally, it enables direct comparisons against calculations from boundary plasma simulations. These were not possible before.

47 OTHER INSTRUMENTATION↗

Fast and flexible control of beam longitudinal phase space for high-repetition-rate x-ray free-electron lasers

The wide-ranging requirements for the photon properties from multiple beamlines in superconducting based free-electron lasers (FELs) demand more challenging beam manipulation techniques. Shot-by-shot control of electron beam bunch length and peak current at high repetition rate up to megahertz is highly desired. In this paper, we present a comprehensive study of a method based on a 2-m-long normal conducting radio-frequency cavity to achieve fast and flexible control of beam compression and realize the full potential of the facility, including theoretical analysis, beam dynamics simulations, and conceptual cavity design for the Linac Coherent Light Source II and its high-energy upgrade. We illustrate the physical mechanism of the chirping cavity on the control of the final beam compression and propose methods to lower the requirements for the cavity parameters. The application of this method will allow tailored photon properties of individual beamlines to optimize their performance and drastically improve the multiplexing capabilities of a high-repetition rate FEL facility.

42 ENGINEERING↗

Characterization of the upgraded single-line-of-sight time-resolved x-ray imager using short-pulse visible and UV lasers

The single-line-of-sight time-resolved x-ray imager (SLOS-TRXI), a fast-gated x-ray imager used for capturing x-ray self-emission in inertial confinement fusion experiments on OMEGA, has been upgraded and characterized. SLOS-TRXI combines an electron-dilation imager and a hybrid complementary metal–oxide–semiconductor (hCMOS) sensor to capture multiple gated frames on a single line of sight with a temporal resolution of ~40 ps and a spatial resolution of 10 µm. The original hCMOS sensor with four frames was replaced with a newer-generation hCMOS sensor having eight frames. Gate characterizations of both the sensor and the entire SLOS-TRXI diagnostic were performed using ~10-ps FWHM visible (2ω) and UV (4ω) short-pulse lasers, respectively. A stepped echelon was used to generate a train of five UV laser pulses having an interpulse separation of 30 ± 3 ps. Characterization results of the hCMOS gating (2.28 ± 0.02-ns FWHM on average) and a temporal resolution of the upgraded SLOS-TRXI (34 ± 4-ps FWHM on average) are presented. A temporal magnification for the electron-dilation imager between 40 and 60 was inferred from the characterization results. Furthermore, the spatial resolution of the upgraded SLOS-TRXI remains the same in light of this work.

47 OTHER INSTRUMENTATION↗

LLRF Control of High Loaded-Q Cavities for the LCLS-II

The SLAC National Accelerator Laboratory is planning an upgrade (LCLS-II) to the Linear Coherent Light Source with a 4 GeV CW Superconducting Radio Frequency (SCRF) linac. The nature of the machine places stringent requirements in the Low-Level RF (LLRF) system, expected to control the cavity fields within 0.01 degrees in phase and 0.01% in amplitude, which is equivalent to a longitudinal motion of the cavity structure in the nanometer range. This stability has been achieved in the past but never for hundreds of superconducting cavities in Continuous-Wave (CW) operation. The difficulty resides in providing the ability to reject disturbances from the cryomodule, which is incompletely known as it depends on the cryomodule structure itself (currently under development at JLab and Fermilab) and the harsh accelerator environment. Previous experience in the field and an extrapolation to the cavity design parameters (relatively high Q_{L}c≈ 4×10⁷ , implying a half-bandwidth of around 16 Hz) suggest the use of strong RF feedback to reject the projected noise disturbances, which in turn demands careful engineering of the entire system.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production Experience and Lessons Learned at Fermilab

LCLS-II is a planned upgrade project for the linear co-herent light source (LCLS) at SLAC. The LCLS-II Linac will consist of thirty-five 1.3 GHz and two 3.9 GHz super-conducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab are currently producing in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW opera-tion. Two prototype cryomodules had been assembled and tested. After prototype cryomodule tests, both laboratories have increased their cryomodule production rate to meet the challenging LCLS-II project installation schedule requirements of approximately one cryomodule per month per laboratory. To date, Fermilab has completed the assembly and testing of eighteen 1.3GHz cryomodules. Fermilab has successfully shipped nine cryomodules to SLAC and will continue to ship approximately every two weeks. The first 3.9 GHz cryomodule assembly is scheduled to start in June 2019. Production readiness verifications are currently in process. This paper presents LCLS-II 1.3GHz cryomodule assembly and production experience, emphasizing the challenges, mitigations, and lessons learned.

43 PARTICLE ACCELERATORS↗

Strengthening Building Retrofit Markets

The Business Energy Financing (BEF) program offered commercial businesses in Michigan affordable financing options and other incentives designed to support energy efficiency improvements. We worked through partnerships with Michigan utilities, lenders, building contractors, trade associations, and other community organizations to offer competitive interest rates and flexible financing terms to support energy efficiency projects that otherwise would not have happened. The BEF program targeted the retail food market, including restaurants, grocery stores, convenience stores, and wholesale food vendors, with the goal of achieving energy efficiency retrofits for 2 percent of the target market. We offered low interest rates, flexible payments, easy applications and approval processes, and access to other incentives and rebates. Through these efforts, we sought to help customers strive for energy savings retrofits that would save 20 percent or more on their energy use. This program helped Michigan businesses reduce costs by financing energy efficient lighting, heating and cooling systems, insulation, refrigeration, equipment upgrades, and more. Businesses completed the upgrades with the help of our authorized contractors, and, through our lending partners, we provided affordable financing options.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The LCLS-II LLRF System

The SLAC National Accelerator Laboratory is planning an upgrade (LCLS-II) to the Linear Coherent Light Source with a 4 GeV CW superconducting (SCRF) linac. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded Q L of ~ 4x10 7 . The RF system will have 3.8 kW solid state amplifiers driving single cavities. To ensure optimum field stability a single-source single-cavity control system has been chosen. It consists of a precision four-channel cavity receiver and RF stations (Forward, Reflected and Drive signals). In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) is being modeled and cavity microphonic testing has started. This paper describes the LLRF system under consideration, including recent modeling and cavity tests.

43 PARTICLE ACCELERATORS↗

Methods for natural gas and heavy hydrocarbon co-conversion

A reactor for reactive co-conversion of heavy hydrocarbons and hydrocarbon gases and includes a dielectric barrier discharge plasma cell having a pair of electrodes separated by a dielectric material and passageway therebetween. An inlet is provided for feeding heavy hydrocarbons and other reactive materials to the passageway of the discharge plasma cell, and an outlet is provided for discharging reaction products from the reactor. A packed bed catalyst may optionally be used in the reactor to increase efficiency of conversion. The reactor can be modified to allow use of a variety of light sources for providing ultraviolet light within the discharge plasma cell. Methods for upgrading heavy hydrocarbons are also disclosed.

03 NATURAL GAS↗