Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Benefits of VTOL aircraft in offshore petroleum logistics support

The mission suitability and potential economic benefits of advanced VTOL aircraft were investigated for logistics support of petroleum operations in the North Sea and the Gulf of Mexico. Concepts such as the tilt rotor and lift/cruise fan are promising for future operations beyond 150 miles offshore, where their high cruise efficiency provides savings in trip time, fuel consumption, and capital investment. Depending upon mission requirements, the aircraft operating costs are reduced by as much as 20 percent to 50 percent from those of current helicopters.

Wilcox, D. E.↗

Set covering algorithm, a subprogram of the scheduling algorithm for mission planning and logistic evaluation

A computer program using Lemke, Salkin and Spielberg's Set Covering Algorithm (SCA) to optimize a traffic model problem in the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) was documented. SCA forms a submodule of SAMPLE and provides for input and output, subroutines, and an interactive feature for performing the optimization and arranging the results in a readily understandable form for output.

Chang, H.↗

Scheduling algorithm for mission planning and logistics evaluation users' guide

The scheduling algorithm for mission planning and logistics evaluation (SAMPLE) program is a mission planning tool composed of three subsystems; the mission payloads subsystem (MPLS), which generates a list of feasible combinations from a payload model for a given calendar year; GREEDY, which is a heuristic model used to find the best traffic model; and the operations simulation and resources scheduling subsystem (OSARS), which determines traffic model feasibility for available resources. The SAMPLE provides the user with options to allow the execution of MPLS, GREEDY, GREEDY-OSARS, or MPLS-GREEDY-OSARS.

Chang, H.↗

Nuclear Lunar Logistics Study

This document has been prepared to incorporate all presentation aid material, together with some explanatory text, used during an oral briefing on the Nuclear Lunar Logistics System given at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, on 18 July 1963. The briefing and this document are intended to present the general status of the NERVA (Nuclear Engine for Rocket Vehicle Application) nuclear rocket development, the characteristics of certain operational NERVA-class engines, and appropriate technical and schedule information. Some of the information presented herein is preliminary in nature and will be subject to further verification, checking and analysis during the remainder of the study program. In addition, more detailed information will be prepared in many areas for inclusion in a final summary report. This work has been performed by REON, a division of Aerojet-General Corporation under Subcontract 74-10039 from the Lockheed Missiles and Space Company. The presentation and this document have been prepared in partial fulfillment of the provisions of the subcontract. From the inception of the NERVA program in July 1961, the stated emphasis has centered around the demonstration of the ability of a nuclear rocket to perform safely and reliably in the space environment, with the understanding that the assignment of a mission (or missions) would place undue emphasis on performance and operational flexibility. However, all were aware that the ultimate justification for the development program must lie in the application of the nuclear propulsion system to the national space objectives.

Source record↗

Habitat and logistic support requirements for the initiation of a space manufacturing enterprise

A detailed scenario for the initiation of a space manufacturing enterprise using lunar materials to construct solar power satellites (SPS) was developed, with particular attention to habitat design and logistic support requirements. If SPS's can be constructed exclusively from lunar materials, the entire enterprise can be initiated in a 7 year period of launch activity (beginning as early as 1985) using the Space Shuttle and a low-cost, Shuttle-derived heavy lift vehicle. If additional chemical feedstocks must be imported from earth in significant quantities, it may be necessary to bring the next-generation launch vehicle (single-stage-to-orbit) into operation by 1991. The scenario presented features use of the mass-driver reaction engine for orbit-to-orbit transfer of cargos and makes extensive use of the expendable Shuttle external propellant tanks.

Vajk, J. P.↗

Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 3: The GREEDY algorithm

The functional specifications, functional design and flow, and the program logic of the GREEDY computer program are described. The GREEDY program is a submodule of the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) program and has been designed as a continuation of the shuttle Mission Payloads (MPLS) program. The MPLS uses input payload data to form a set of feasible payload combinations; from these, GREEDY selects a subset of combinations (a traffic model) so all payloads can be included without redundancy. The program also provides the user a tutorial option so that he can choose an alternate traffic model in case a particular traffic model is unacceptable.

Dupnick, E.↗

The challenge of logistics facilities development

The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.

Davis, James R.↗

Logistics and operations integration requirements to support Space Station servicing of free flying spacecraft - OMV flight operation

The logistics of OMV free-flyer servicing are examined, with emphasis on integrating the OMV operations into the overall STS-Space Station system. The depletion rate of consumables and lifetimes of free-flyer components are known quantities, which permits definition of a predictable maintenance schedule. Servicing with an OMV will depend on the position and capabilities of the OMV, Shuttle and Station when free-flyer maintenance is needed. Optimized orbital servicing of free-flyers will involve coordination of and resolution of schedule conflicts among STS, the OMV and the Station. The scheduled availability of any of the three components will be predicted in terms of probabilities that any one of the components will not be needed for another mission while performing the mission they are on.

Bell, Jerome A.↗

Preliminary analysis of an integrated logistics system for OSSA payloads. Volume 4: Supportability analysis of the 1.8m centrifuge

Supportability issues for the 1.8 meter centrifuge in the Life Science Research Facility are addressed. The analysis focuses on reliability and maintainability and the potential impact on supportability and affordability. Standard logistics engineering methodologies that will be applied to all Office of Space Science and Applications' (OSSA) payload programs are outlined. These methodologies are applied to the 1.8 meter centrifuge.

Palguta, T.↗

Space station synergetic RAM-logistics analysis

NASA's Space Station Maintenance Planning and Analysis (MP&A) Study is a step in the overall Space Station Program to define optimum approaches for on-orbit maintenance planning and logistics support. The approach used in the MP&A study and the analysis process used are presented. Emphasis is on maintenance activities and processes that can be accomplished on orbit within the known design and support constraints of the Space Station. From these analyses, recommendations for maintainability/maintenance requirements are established. The ultimate goal of the study is to reduce on-orbit maintenance requirements to a practical and safe minimum, thereby conserving crew time for productive endeavors. The reliability, availability, and maintainability (RAM) and operations performance evaluation models used were assembled and developed as part of the MP&A study and are described. A representative space station system design is presented to illustrate the analysis process.

Dejulio, Edmund T.↗

Applying the OTV to lunar logistics

The Orbit Transfer Vehicle (OTV), representing the next generation of upper stages, has recently been studied in a Phase A concept definition study managed by NASA's Marshall Space Flight Center. The vehicle has been previously defined as strictly an orbit-to-orbit type transfer device. Recently its application to the task of lunar surface logistics was investigated. Transfer options to the surface were considered which included direct transfer, and transfer via lunar orbit as well as the L1 libration point. The subsystem modifications required to enable lunar landings were established for the following elements: aerobrake, main propulsion system, landing legs, primary structure, and avionics. It is concluded that the majority of the basic systems required for efficient transfer to the lunar surface are already contained in the OTV.

Willcockson, W. H.↗

Future civil space program logistics

The NASA Shuttle-C unmanned launch vehicle and the Shuttle/Space Station-based Orbital Maneuver Vehicle will be used in support of NASA Space Station assembly and logistics operations, as well as for the orbital servicing of the Hubble Space Telescope (1989), the Advanced X-ray Astrophysical Facility (1996), and the Space Infrared Telescope Facility (1998). Accounts are presently given of these observatories' configurations, capabilities, and mission scenarios, as well as of the Shuttle-C-based Space Station assembly sequence.

Steincamp, James W.↗

Logistics support of space facilities

The logistic support of space facilities is described, with special attention given to the problem of sizing the inventory of ready spares kept at the space facility. Where possible, data from the Space Shuttle Orbiter is extrapolated to provide numerical estimates for space facilities. Attention is also given to repair effort estimation and long duration missions.

Lewis, William C.↗

Logistics comes to space

Logistic difficulties associated with the Space Station Freedom are discussed. Proposed ground and on-orbit operations and procedures for supplying the Station are described. The transfer operations of supplies to the modules, the use of expendable launch vehicles for supplying the Station, and the use of EVA suits for assembling and servicing are considered. Ground support activities for resupplying and maintaining the spacecraft are examined.

Paules, Granville E., III↗

The MFIVE Space Station Crew Activity Scheduler and Stowage Logistics Clerk

An interactive computer scheduling tool, the MFIVE Space Station Crew Activity Scheduler and Stowage Logistics Clerk, is described. The MFIVE employs the intelligent perturbation method, which was developed to schedule complex time and resource constrained problems. This algorithm was used to minimize the completion time of sample scheduling problems and solutions were derived which averaged within 7 percent of optimum where standard solution techniques gave solutions 23 percent longer than optimum.

Kurtzman, Clifford R.↗

NASA Shuttle Logistics Depot (NSLD) - The application of ATE

The concept of the NASA Shuttle Logistics Depot (NSLD) developed for the Space Shuttle Orbiter Program is described. The function of the NSLD at Cape Canaveral is to perform the acceptance and diagnostic testing of the Shuttle's space-rated line-replaceable units and shop-replaceable units (SRUs). The NSLD includes a comprehensive electronic automatic test station, program development stations, and assorted manufacturing support equipment (including thermal and vibration test equipment, special test equipment, and a card SRU test system). The depot activities also include the establishment of the functions for manufacturing of mechanical parts, soldering, welding, painting, clean room operation, procurement, and subcontract management.

Simpkins, Lorenz G.↗

Logistics and operations implications of manual control of spacecraft docking maneuvers

The implications of logistics and operations on the manual control of spacecraft docking are discussed. The results of simulation studies to investigate fuel and time cost tradeoffs are reviewed and discussed. Comparisons of acceleration control and pulse control are presented to evaluate the effects of astronauts being instructed to use pulse mode for fuel conservation. The applications of the findings to moon and Mars missions are addressed.

Brody, Adam R.↗