Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

What Do Experienced Water Managers Think of Water Resources of Our Nation and Its Management Infrastructure?

This article represents the second report by an ASCE Task Committee “Infrastructure Impacts of Landscape-driven Weather Change” under the ASCE Watershed Management Technical Committee and the ASCE Hydroclimate Technical Committee. Herein, the ‘infrastructure impacts” are referred to as infrastructure-sensitive changes in weather and climate patterns (extremes and non-extremes) that are modulated, among other factors, by changes in landscape, land use and land cover change. In this first report, the article argued for explicitly considering the well-established feedbacks triggered by infrastructure systems to the land-atmosphere system via landscape change. In this report by the ASCE Task Committee (TC), we present the results of this ASCE TC’s survey of a cross section of experienced water managers using a set of carefully crafted questions. These questions covered water resources management, infrastructure resiliency and recommendations for inclusion in education and curriculum. We describe here the specifics of the survey and the results obtained in the form of statistical averages on the ‘perception’ of these managers. Finally, we discuss what these ‘perception’ averages may indicate to the ASCE TC and community as a whole for stewardship of the civil engineering profession. The survey and the responses gathered are not exhaustive nor do they represent the ASCE-endorsed viewpoint. However, the survey provides a critical first step to developing the framework of a research and education plan for ASCE. Given the Water Resources Reform and Development Act passed in 2014, we must now take into account the perceived concerns of the water management community.

54 ENVIRONMENTAL SCIENCES↗

A modeling framework for investment planning in interdependent infrastructures in multi-hazard environments.

Currently, much of protection planning is conducted separately for each infrastructure and hazard. Limited funding requires a balance of expenditures between terrorism and natural hazards based on potential impacts. This report documents the results of a Laboratory Directed Research & Development (LDRD) project that created a modeling framework for investment planning in interdependent infrastructures focused on multiple hazards, including terrorism. To develop this framework, three modeling elements were integrated: natural hazards, terrorism, and interdependent infrastructures. For natural hazards, a methodology was created for specifying events consistent with regional hazards. For terrorism, we modeled the terrorist s actions based on assumptions regarding their knowledge, goals, and target identification strategy. For infrastructures, we focused on predicting post-event performance due to specific terrorist attacks and natural hazard events, tempered by appropriate infrastructure investments. We demonstrate the utility of this framework with various examples, including protection of electric power, roadway, and hospital networks.

Brown, Nathanael J. K.↗

Recovery from chemical, biological, and radiological incidents. Critical infrastructure and economic impact considerations

To restore regional lifeline services and economic activity as quickly as possible after a chemical, biological or radiological incident, emergency planners and managers will need to prioritize critical infrastructure across many sectors for restoration. In parallel, state and local governments will need to identify and implement measures to promote reoccupation and economy recovery in the region. This document provides guidance on pre disaster planning for two of the National Disaster Recovery Framework Recovery Support Functions: Infrastructure Systems and Economic Recovery. It identifies key considerations for infrastructure restoration, outlines a process for prioritizing critical infrastructure for restoration, and identifies critical considerations for promoting regional economic recovery following a wide area disaster. Its goal is to equip members of the emergency preparedness community to systematically prioritize critical infrastructure for restoration, and to develop effective economic recovery plans in preparation for a wide area CBR disaster.

61 RADIATION PROTECTION AND DOSIMETRY↗

Nuclear Energy Infrastructure Database Description and User’s Manual

In 2014, the Deputy Assistant Secretary for Science and Technology Innovation initiated the Nuclear Energy (NE)–Infrastructure Management Project by tasking the Nuclear Science User Facilities, formerly the Advanced Test Reactor National Scientific User Facility, to create a searchable and interactive database of all pertinent NE-supported and -related infrastructure. This database, known as the Nuclear Energy Infrastructure Database (NEID), is used for analyses to establish needs, redundancies, efficiencies, distributions, etc., to best understand the utility of NE’s infrastructure and inform the content of infrastructure calls. The Nuclear Science User Facilities developed the database by utilizing data and policy direction from a variety of reports from the U.S. Department of Energy, the National Research Council, the International Atomic Energy Agency, and various other federal and civilian resources. The NEID currently contains data on 802 research and development instruments housed in 377 facilities at 84 institutions in the United States and abroad. The effort to maintain and expand the database is ongoing. Detailed information on many facilities must be gathered from associated institutions and added to complete the database. The data must be validated and kept current to capture facility and instrumentation status as well as to cover new acquisitions and retirements. This document provides a short tutorial on the navigation of the NEID web portal at NSUF-Infrastructure.INL.gov.

42 ENGINEERING↗

Enhanced INL Power Grid Test Bed Infrastructure – Phase I

Idaho National Laboratory (INL), a Department of Energy (DOE) laboratory, owns, operates, and maintains transmission and distribution power grid infrastructure to support the INL multi program mission. Sections of this power infrastructure, known as the INL Power Grid Test Bed, have been and are being used by government and industry to develop, demonstrate, and validate technologies for the modern grid, including smart grid, on a full scale utility test bed. INL’s power grid includes 61 miles of 140 MW, 138 kV rated electrical power transmission supplying seven main substations, each feeding a separate facility complex (or ‘city’) within the INL’s 890 square mile Site. This power grid is fed by three commercial utilities into the INL’s main control substation, but is operated independently from the commercial utility through its primary substation and command and control center. Within the INL complex, one of the seven complexes, the Critical Infrastructure Test Range Complex (CITRC), has been designated as the INL complex for supporting critical infrastructure research and testing. This complex includes its own substation and 13.8kV distribution network, all configurable and controlled by the INL research and development programs. Through investment partnership with the DOE Office of Electricity Delivery and Energy Reliability (DOE OE), INL is enhancing its existing distribution infrastructure to expand the types of testing that can be conducted and increase flexibility for testing configurations. The enhancement of the INL Power Grid Test Bed will enable development and full scale testing of smart-grid-related technologies and smart devices including testing interoperability, operational performance, reliability, and resiliency contribution at multiple distribution voltage classes, specifically 15kV, 25kV, and 35kV. The expected time frame for completion of the Phase I portion of the enhancement would be 4th quarter fiscal year (FY) 2015.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Onsite and Electric Backup Capabilities at Critical Infrastructure Facilities in the United States

The following analysis, conducted by Argonne National Laboratory’s (Argonne’s) Risk and Infrastructure Science Center (RISC), details an analysis of electric power backup of national critical infrastructure as captured through the Department of Homeland Security’s (DHS’s) Enhanced Critical Infrastructure Program (ECIP) Initiative. Between January 1, 2011, and September 2014, 3,174 ECIP facility surveys have been conducted. This study focused first on backup capabilities by infrastructure type and then expanded to infrastructure type by census region.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mixed Integer Nonlinear Programming Approaches to Enhance Resiliency and Response Strategies in Critical Infrastructure

Motivation. Critical infrastructures are large, complex engineered systems that must be operated robustly under abnormal conditions resulting from natural hazards or intentional acts. For example, electric power systems must be robust to line faults, water utilities must rapidly mitigate contamination incidents, and computing networks must adapt to adversarial intrusions to protect critical information. Problem. It is difficult for decision-makers within resiliency analysis in critical infrastructure to optimize designs and develop effective response strategies that can account for uncertainties. Facing incomplete information and the sheer scope that a natural hazard or attack vector may incorporate, response can be ineffective without reliable, scalable decision support tools. These problems are intrinsically nonlinear and involve discrete decisions, and unfortunately, existing off-the-shelf mathematical programming methods cannot support optimization-based decision-making of these nonlinear at scale. Method/Approach and Results. This project emphasized development of fundamental optimization strategies that supported real- time mitigation and response for critical infrastructures. In particular, the project developed multi- tree approaches based on piecewise outer-approximations for solution of mixed-integer nonlinear programming (MINLP) problems. These techniques alternate between an MILP or MISOCP relaxation to obtain a lower bound and candidate discrete solutions and an NLP subproblem to obtain upper bounds. Using tailored relaxations based on problem structure, these methods were used to solve several key applications in resilience and response of critical infrastructure. This work resulted in two open-source, copyrighted software packages: CORAMIN (https://github.com/Coramin/Coramin) -- an object-oriented mathematical programming framework that supports tailored multi-tree algorithms for solution of large- scale mixed-integer nonlinear programming; and EGRET (Electrical Grid Research and Engineering Toolkit) (https://github.com/grid- parity-exchange/Egret) -- a declarative mathematical programming framework built upon CORAMIN and Pyomo for formulation and solution of resilience and operations problems in power grid systems. Furthermore, these tools resulted in several important published results, including the following: The first known global optimization approach that could solve the unit-commitment problem with nonlinear power flow constraints on medium-sized test problems; Improved parallel optimization-based bounds tightening and strengthening of relaxations of AC power flow constraints; and, Optimization-based approaches for improved grid resilience and use of demand response to improve grid resilience with reduction in capital requirements. Result Implications. This project developed first-of-a-kind algorithms for decision-making in critical infrastructure resilience operations and planning, as well as a next-generation toolkit for MINLP researchers. These approaches leveraged high-performance computing architectures to solve some of the largest, most challenging nonlinear discrete optimization problems to global optimality, and these successes were captured in open-source software to enable optimization-based decision-making, and efficient solution of MINLP formulations for electric power transmission grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator (Q4 2020)

The U.S. Department of Energy’s (DOE’s) Alternative Fueling Station Locator contains information on public and private non-residential alternative fueling stations in the United States and Canada and currently tracks ethanol (E85), biodiesel, compressed natural gas, electric vehicle (EV) charging, hydrogen, liquefied natural gas, and propane stations. Of these fuels, EV charging continues to experience rapidly changing technology and growing infrastructure. This report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2020 (Q4). Using data from the Station Locator, this report breaks down the growth of public and private charging infrastructure by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared with the projected amount needed to meet charging demand by 2030. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape for EV charging. This is the fourth report in a series. Previous reports for the first (Q1), second (Q2), and third (Q3) calendar quarters of 2020 can be found in the Alternative Fuels Data Center (AFDC) and National Renewable Energy Laboratory (NREL) publication databases.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle and Infrastructure Systems Modeling in Washington D.C. and Baltimore

This report documents the Argonne-Exelon effort to develop and utilize an agent-based model (ATEAM) of charging demand and infrastructure expansion applicable to the Washington, DC–Baltimore, MD consolidated metropolitan area. This study extends the ATEAM model time horizon to 10 years (from 2020 to 2030), expands agent behavior modeling capabilities, incorporates more granular and extensive empirical data on charging behavior, and analyzes charging needs for a much larger population of PEVs, in keeping with regional goals for significant adoption of ZEVs. With given targets for annual BEV adoption, five scenarios were developed to examine public infrastructure needs and resulting charging load, considering different home charging availabilities, as well as different PEV consumer profiles and public charging infrastructure deployment strategies. Scenario results show that if new chargers (both L2 and DCFC) are spread more widely (as with ubiquitous deployment strategies), there will be less variation in the number of chargers added to each census tract in the study area. More importantly, widespread public charging infrastructure with ubiquitous deployment strategies reduces unmet charging demand and improves charging success, even with heavy reliance on public charging. About 80 percent of BEV drivers can charge on their first attempt in scenarios with ubiquitous deployment strategies. Moreover, widespread public charging infrastructure better meets the demand for more charging, and in return, increases BEV adoption. Low home charging availability produces higher charging loads in public locations, especially during the early morning (around 8:00 a.m.) and late afternoon (around 6:00 p.m.). The evening peak load indicates that drivers are taking advantage of public charging before heading home. Study results also indicate that even with 20 percent home charging availability in 2030, just 20 percent of drivers attempt to charge on a given day. With their relatively high electric range (200+ miles), the BEVs expected to be on the road in 2030 can handle daily commutes without re-charging for a couple of days.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ACES: Infrastructure As Code. Model Optimization and Performance Capability

Infrastructure as Code (IaC) refers to managing infrastructure (networks, physical/virtual machines, storage, and connection topology) in a descriptive model/language, rather than configuring it manually or using interactive configuration tools. Just like source code can be compiled to generate the same binary code, IaC enables generating the same environment every time it is applied. IaC is a key DevOps practice and is generally used in conjunction with continuous integration (CI) and continuous delivery (CD). In CI, all code changes are merged into a mainline branch and validated multiple times a day as developers check in their changes to the source code. In CD on the other hand, code changes are automatically packaged for a new release-to-production on a regular basis. This typically enables teams to deliver software changes much more quickly and often. Developing and managing the ACES platform using (IaC) is vital for the robust deployment and continued sustainment of this foundational computing capability. IaC and DevOps practices will help us solve many of the common challenges often encountered in developing and maintaining compute infrastructure. First, it will make the provisioning, deployment, and maintenance of the compute infrastructure across multiple environments much more efficient. Second, these processes help make the overall system much more stable by continuously testing new changes as they are introduced to the system. Third, it allows us to be much more confident of the security controls in place since they can be tested as part of the CI process and all new changes can be audited and tracked. Finally, IaC enables the ACES Platform to be adaptable to the emerging technologies due to its ability to spin up different test beds to evaluate and incorporate these technologies. This document addresses common infrastructure-management challenges, describes what happens if they are not addressed, and highlights the value of utilizing IaC to tackle them. Finally, we will provide a high-level overview of the IaC and DevOps practices being utilized by the ACES Platform team.

97 MATHEMATICS AND COMPUTING↗

Technoeconomic Analysis of Infrastructure Buildout Scenarios

The success of CCUS deployment in the southeast will depend on the optimized pipeline network from CO 2 point sources to geologic sinks for CO 2 storage. An optimal pipeline framework will reduce both environmental impacts and pipeline building cost. However, finding an optimal pipeline/transport infrastructure design is a non-trivial task and requires simultaneous usage of large volumes of data, computational resources, and a state-of-the-art simulator. Such a transport infrastructure model must consider point sources for CO 2 capture and associated volumes, sinks for CO 2 storage, and transportation from source to sink via pipeline networks. These considerations must be addressed simultaneously and systemically in an optimization process, in which a defined objective function (i.e., capital, variable CO 2 capture, transport, and storage cost function) is required to be minimized with the consideration of practical constraints (e.g., CO 2 flow through pipelines is less than the maximum capacity). Although optimization has been widely used in subsurface resources production and CO 2 storage, its application in large scale CCUS infrastructure design is rarely reported in the literature. SimCCS, developed by Los Alamos National Laboratory, is an open-source CCUS pipeline infrastructure design toolset that facilitates the optimization of pipeline infrastructure networks.

99 GENERAL AND MISCELLANEOUS↗

Integrated Research Infrastructure Architecture Blueprint Activity (Final Report 2023)

The complexity of scientific pursuits is increasing rapidly with aspects that require dynamic integration of experiment, observation, theory, modeling, simulation, visualization, machine learning (ML), artificial intelligence (AI), and analysis. Research projects across the Department of Energy (DOE) are increasingly data and compute intensive. Innovative research teams are accelerating the pace of discovery by using high-performance computational and data tools in their research workflows and leveraging multiple research infrastructures. Additionally, several recent high-level U.S. government reports underscore the necessity of a new advanced computing ecosystem for international competitiveness and national security. International competitors are moving forward with major research infrastructure integration efforts that seek to capture a competitive advantage in the global innovation race. Owing to its unparalleled constellation of world-class experimental and observational facilities and high-performance and extreme-scale computational, data, and networking infrastructure, DOE is positioned to be a global leader in this new era of integrated science. However, this new integration paradigm will demand continuing evolution to ensure the U.S. remains a global leader in research and innovation. The DOE Office of Science (SC) has seized on the strategic importance of integration and has adopted a vision for Integrated Research Infrastructure (IRI): To empower researchers to meld DOE’s world-class research tools, infrastructure, and user facilities seamlessly and securely in novel ways to radically accelerate discovery and innovation. To respond to the evolving computational requirements of research and the competitive international innovation landscape, experimental facilities could be connected with high performance computing resources for near real-time analysis, and resources should be provided for merging enormous and diverse data for AI/ML techniques and analysis.

97 MATHEMATICS AND COMPUTING↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Augmented Reality for Enabling Smart Nuclear Infrastructure

This work presents a novel, comprehensive framework that leverages emerging augmented reality headset technology to enable smart nuclear industrial infrastructure that a human can easily interact with to improve their performance in terms of safety, security, and productivity. Nuclear industrial operations require some of the most complicated infrastructure that must be managed today. Nuclear infrastructure and their associated industrial operations typically features stringent requirements associated with seismic, personnel management (e.g., access control, equipment access), safety (e.g., radiation, criticality, mechanical, electrical, spark, and chemical hazards), security (cyber/physical), and sometimes international treaties for nuclear non-proliferation. Furthermore, a wide variety of manufacturing and maintenance operations take place within these facilities further complicating their management. Nuclear facilities require very thorough and stringent documentation of the operations occurring within these facilities as well as maintaining a tight chain-of-custody for the materials being stored within the facility. The emergence of augmented reality and a variety of Internet of Things (IoT) devices offers a possible solution to help mitigate these challenges. This work provides a demonstration of a prototype smart nuclear infrastructure system that leverages augmented reality to illustrate the advantages of this system. It will also present example augmented reality tools that can be leveraged to create the next generation of smart nuclear infrastructure. The discussion will layout future directions of research for this class of work.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen and Electric Charging Infrastructure for Heavy-Duty Trucks: A Nationally Scalable Megaregion Assessment

Decarbonizing regional and long-haul freight is challenging due to the limitations of battery-electric commercial vehicles and infrastructure constraints. Hydrogen fuel cell medium- and heavy-duty vehicles (MHDVs) offer a viable alternative, aligning with the decarbonization goals of the Department of Energy and commercial entities. Historically, alternative fuels like compressed natural gas and liquefied propane gas have faced slow adoption due to barriers like infrastructure availability. To avoid similar issues, effective planning and deploying zero-emission hydrogen fueling infrastructure is crucial. This research develops deployment plans for affordable, accessible, and sustainable hydrogen refueling stations, supporting stakeholders in the decarbonized commercial vehicle freight system. It aims to benefit underserved and rural energy-stressed communities by improving air quality, reducing noise pollution, and enhancing energy resiliency. This research also provides a blueprint for replacing diesel in over-the-road Class 8 freight truck applications with hydrogen fueling solutions. The study focuses on the Texas Triangle Megaregion (I-45, I-35, and I-10), the I-10 corridor between San Antonio, TX, and Los Angeles, CA, and the I-5/CA-99 corridors between Los Angeles, CA, and San Francisco, CA. This area represents a significant portion of U.S. heavy-duty freight movement, carrying ~8.5% of the national freight volume. Using the OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport) modeling framework, the study conducts an advanced assessment of commercial vehicles, road and freight networks, and energy systems. The framework integrates data on freight mobility, traffic, weather, and energy pathways to deliver a region-specific, optimized vehicles powertrain architectures, infrastructure deployment solutions, operational logistics, and energy pathways. By considering all vehicle origin-destination pairs utilizing these corridors and all feasible fueling station location options, the framework's genetic algorithm identifies the minimum number and optimal locations of hydrogen refueling stations, ensuring no vehicle is stranded. It also determines fuel schedules and quantities at each station. A roadmap for station deployment based on multiple adoption trajectories ensures a strategic rollout of hydrogen refueling infrastructure.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗

Requirements for a global data infrastructure in support of CMIP6

The World Climate Research Programme (WCRP)'s Working Group on Climate Modelling (WGCM) Infrastructure Panel (WIP) was formed in 2014 in response to the explosive growth in size and complexity of Coupled Model Intercomparison Projects (CMIPs) between CMIP3 (2005–2006) and CMIP5 (2011–2012). This article presents the WIP recommendations for the global data infrastructure needed to support CMIP design, future growth, and evolution. Developed in close coordination with those who build and run the existing infrastructure (the Earth System Grid Federation; ESGF), the recommendations are based on several principles beginning with the need to separate requirements, implementation, and operations. Other important principles include the consideration of the diversity of community needs around data – a data ecosystem – the importance of provenance, the need for automation, and the obligation to measure costs and benefits. This paper concentrates on requirements, recognizing the diversity of communities involved (modelers, analysts, software developers, and downstream users). Such requirements include the need for scientific reproducibility and accountability alongside the need to record and track data usage. One key element is to generate a dataset-centric rather than system-centric focus, with an aim to making the infrastructure less prone to systemic failure. With these overarching principles and requirements, the WIP has produced a set of position papers, which are summarized in the latter pages of this document. They provide specifications for managing and delivering model output, including strategies for replication and versioning, licensing, data quality assurance, citation, long-term archiving, and dataset tracking. They also describe a new and more formal approach for specifying what data, and associated metadata, should be saved, which enables future data volumes to be estimated, particularly for well-defined projects such as CMIP6. The paper concludes with a future facing consideration of the global data infrastructure evolution that follows from the blurring of boundaries between climate and weather, and the changing nature of published scientific results in the digital age.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Infrastructures for Processing Plastic Waste using Pyrolysis-Based Chemical Upcycling Pathways

Modern mechanical recycling infrastructure for plastic is capable of processing only a small subset of waste plastics, reinforcing the need for parallel disposal methods such as landfilling and incineration. Emerging pyrolysis-based chemical technologies can "upcycle" plastic waste into high-value polymer and chemical products and process a broader range of waste plastics. In this work, we study the economic and environmental benefits of deploying an upcycling infrastructure in the continental United States for producing low-density polyethylene (LDPE) and polypropylene (PP) from post-consumer mixed plastic waste. Our analysis aims to determine the market size that the infrastructure can create, the degree of circularity that it can achieve, the prices for waste and derived products it can propagate, and the environmental benefits of diverting plastic waste from landfill and incineration facilities it can produce. We apply a computational framework that integrates techno-economic analysis, life cycle assessment, and value chain optimization. Our results demonstrate that the infrastructure generates an economy of nearly 20 billion USD and positive prices for plastic waste, opening opportunities for compensation to residents who provide plastic waste. Our analysis also indicates that the infrastructure can achieve a plastic-to-plastic degree of circularity of 34% and remains viable under various external factors (including technology efficiencies, capital investment budgets, and polymer market values). Finally, we present significant environmental benefits of upcycling over alternative landfill and incineration waste disposal methods, and comment on ongoing work expanding our modeling methodology to other chemical upcycling pathway case studies, including hydroformylation of specific plastics to chemicals.

Interdisciplinary↗

Reliable Communication Models in Interdependent Critical Infrastructure Networks

Modern critical infrastructure networks are becoming increasingly interdependent where the failures in one network may cascade to other dependent networks, causing severe widespread national-scale failures. A number of previous efforts have been made to analyze the resiliency and robustness of interdependent networks based on different models. However, communication network, which plays an important role in today's infrastructures to detect and handle failures, has attracted little attention in the interdependency studies, and no previous models have captured enough practical features in the critical infrastructure networks. In this paper, we study the interdependencies between communication network and other kinds of critical infrastructure networks with an aim to identify vulnerable components and design resilient communication networks. We propose several interdependency models that systematically capture various features and dynamics of failures spreading in critical infrastructure networks. We also discuss several research challenges in building reliable communication solutions to handle failures in these models.

Lee, Sangkeun↗