Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Remote sensing techniques applied to multispectral recognition of the Aranjuez pilot zone

A rectangular (7 x 14 km) area 40 km S of Madrid was remote-sensed with a three-stage recognition process. Ground truth was established in the first phase, airborne sensing with a multispectral scanner and photographic cameras were used in the second phase, and Landsat satellite data were obtained in the third phase. Agronomic and hydrological photointerpretation problems are discussed. Color, black/white, and labeled areas are displayed for crop recognition in the land-use survey; turbidity, concentrations of pollutants and natural chemicals, and densitometry of the water are considered in the evaluation of water resources.

Lemos, G. L.↗

Data systems elements technology assessment and system specifications, issue no. 1

The ability to satisfy the objectives of future NASA Office of Applications Programs is dependent on technology advances in a number of areas of data systems. The technology of end-to-end data systems (space generator elements through ground processing, dissemination, and presentation, is examined in terms of state of the art, trends, and projected developments in the 1980 to 1985 timeframe. Capability is considered in terms of elements that are either commercially available or that can be implemented from commercially available components with minimal development.

Source record↗

Thematic mapper design parameter investigation

This study simulated the multispectral data sets to be expected from three different Thematic Mapper configurations, and the ground processing of these data sets by three different resampling techniques. The simulated data sets were then evaluated by processing them for multispectral classification, and the Thematic Mapper configuration, and resampling technique which provided the best classification accuracy were identified.

Colby, C. P., Jr.↗

Performance of ground attitude determination procedures for HEAO-1

Ground attitude support for HEAO 1 provided at GSFC by the HEAO 1 Attitude Ground Support System (AGSS) is described. Information telemetered from Sun sensors, gyroscopes, star trackers, and an onboard computer are used by the AGSS to compute updates to the onboard attitude reference and gyro calibration parameters. The onboard computer utilizes these updates in providing continuous attitudes (accurate to 0.25degree) for use in the observatory's attitude control procedures. The relationship between HEAO 1 onboard and ground processing, the procedures used by the AGSS in computing attitude and gyro calibration updates, and the performance of these procedures in the HEAO 1 postlaunch environment is discussed.

Fallon, L., III↗

High rate data acquisition from Spacelab/Shuttle

The need for high data rates from a variety of experiments on Spacelab/Shuttle produced the requirement for the Spacelab High Rate Multiplexer/Demultiplexer system. This system acquires serial digital data at asynchronous bit rates from up to sixteen experiments, two data buses, three voice links, two tape recorders, and a universal time channel. Experiment data rates may vary from 200 bps to 16 Mbps while recorded data rates range from 250 Kbps to 32 Mbps. The High Rate Multiplexer (HRM) accepts these data inputs and forms a serial PCM output at flexible rates up to 48 Mbps. This PCM output is transmitted to ground by a Ku-Band RF link via the Tracking and Data Relay Satellite System (TDRSS) or recorded on board for delayed transmission. A complementary ground based High Rate Demultiplexer (HRDM) accepts and demultiplexes the composite PCM data at ground processing locations.

Coffey, R.↗

Plans for West Coast STS launch capability

The layout and scope of operations of the Vandenberg AFB West Coast Launch Site for the Space Shuttle are examined. The launch site intended for the first West Coast launch in December 1983 is being constructed by the United States Air Force. Topic discussed include site/selection/management/concepts, Shuttle hardware flow and related facilities, launch pad operations, orbiter erection at SLC-6 VAFB, solid rocket booster operations, and payload ground processing. In conclusion it is noted that NASA and DOD personnel are working together to ensure that the launch site is completed on schedule at minimum cost.

Murphy, W. P.↗

Efficient telemetry format

Format would simplify ground processing of telemetry data. Also, missing minor frame would create error in only one set of source data instead of disrupting all sets. Format organizes data from various sources into autonomous blocks. Data are pre-processed, in effect, so main computer only needs to determine block type and process data set as batch.

Greenberg, E.↗

Seasat. Volume 4: Attitude determination

The Seasat project was a feasibility demonstration of the use of orbital remote sensing for global ocean observation. The satellite was launched in June 1978 and was operated successfully until October 1978. A massive electrical failure occurred in the power system, terminating the mission prematurely. The actual implementation of the Seasat Attitude Determination system and the contents of the attitude data files generated by that system are documented. The deviations from plan caused by the anomalous Sun interference with horizon sensors, inflight calibration of Sun sensor head 2 alignment and horizon sensor biomass, estimation of yaw interpolation parameters, Sun and horizon sensor error sources, and yaw interpolation accuracy are included. Examples are given of flight attitude data from all modes of the Orbital Attitude Control System, of the ground processing effects on attitude data, and of cold cloud effects on pitch, and roll data.

Treder, A. J.↗

Some significant considerations in the planning of sortie missions

Opportunities and limitations to be considered in the planning of Space Shuttle/Spacelab sortie missions are discussed. As shown by a simple model of the flow of STS equipment through ground processing and flights under ideal conditions, mission duration is constrained by Orbiter availability, which is determined initially by the Orbiter production schedule and the turnaround time required between missions, and by the usage rate and quantity limitations of mission consumables. Additional considerations affecting mission duration include reductions in crew productivity upon increased mission duration and crew size, spacecraft and experiment degradation, equipment and processing facility cost effectiveness, and requirements for a power extension package, which considerations imply that increased allowable landing weight would make co-manifesting (the combination of Spacelab and deliverable payload missions) more attractive. Advantages related to payload recoverability, human presence, ease of access and the availability of different orbits are also pointed out.

Loftus, J. P., Jr.↗

Technical issues in focal plane development for terrestrial resource observations

Performance goals for solid-state detector arrays operating in the pushbroom scan mode for the high-resolution, high-accuracy remote sensing of earth resources from space are discussed and some of the focal plane and system trades involved are identified. Issues in the development of solid-state pushbroom arrays with radiometric calibration to 0.5% precision detector-to-detector over a dynamic range of 1000:1 are considered, with calibration, temporal stability and spectral response conditions noted. Factors influencing the geometric precision of satellite-borne pushbroom scan mode sensors are then examined, including satellite orbit track and attitude errors, and geometric and radiometric correlation between information in the various spectral bands. Approaches to the alignment of linear arrays of thousands of detectors are then discussed that take into account tradeoffs between fabrication and test complexity and ground processing requirements. Continuing science experiments are indicated as necessary to establish tolerances on performance goals.

Thompson, L. L.↗

Production and analysis of output data products for Landsat-4 in the engineering check-out phase

The Landsat-D (now Landsat-4) program was initiated by NASA in the mid-1970's. The spacecraft was launched on July 16, 1982. Instruments on the satellite include the fourth Multispectral Scanner (MSS) and the new higher-resolution Thematic Mapper (TM). In order to achieve the planned engineering and scientific objectives, attention has to be given to the validation of spacecraft and instrument performance, the adjustment of ground processing procedures, and the definition of the measures of the TU utility. To satisfy these requirements, a Landsat Assessment System (LAS) was conceived, and the Applications Developmental Data System (ADDS) was instituted. The set of component systems collectively became known as the 'Scrounge' system. The present investigation is concerned with the Scrounge system and the results of radiometric and geometric data evaluations. Attention is given to the TM geometric correction, TM data resampling, a radiometric correction functional description, and the results of the TM geometric and radiometric correction.

Lyon, J. C.↗

LANDSAT-4 sensor performance

Preflight and in-orbit sensor and data measurements indicate that TM meets or exceeds most specifications. Measured spectral band edges meet instrument specifications in 12 out of 14 cases; there is ample dynamic range. The signal-to-noise ratio exceeds specifications, except for band 3, channel 4; and band 7 channel 7 is very noisy but still meets specifications. The modulation transfer function of channel 4, band 2, is smaller than specified. Registration errors between the primary focal plane (PFP) and the cold focal plane (CFP) are about 0.75 pixels along-scan and 0.2 pixels across scan. Forward and reverse scan discontinuities, are well within ground-processing capabilities to rectify. Instrument gain variability, up to 7% for band 5, requires use of the internal calibration (IC) system to assure radiometric accuracy. Preliminary applications evaluation of image contents indicates that TM provides much better definition of edges than MSS.

Barker, J. L.↗

APQ-102 imaging radar digital image quality study

A modified APQ-102 sidelooking radar collected synthetic aperture radar (SAR) data which was digitized and recorded on wideband magnetic tape. These tapes were then ground processed into computer compatible tapes (CCT's). The CCT's may then be processed into high resolution radar images by software on the CYBER computer.

Griffin, C. R.↗

Radiometric Accuracy Assessment of LANDSAT-4 Multispectral Scanner (MSS) Data

The LANDSAT-4 mission has unique characteristics relative to previous LANDSAT missions. The spacecraft is new; the orbit is lower with a more frequent repeat cycle; and the ground processing facility consists of new hardware with different algorithms being applied. How some of these changes affect the character of the radiometric data quality is explored. Banding effects; radiometric differences between LANDSAT 3 and 4; and the woodgrain pattern observed visually in the images are considered.

Alford, W. L.↗

Prelaunch absolute radiometric calibration of LANDSAT-4 protoflight Thematic Mapper

Results are summarized and analyzed from several prelaunch tests with a 122 cm integrating sphere used as part of the absolute radiometric calibration experiments for the protoflight TM sensor carried on the LANDSAT-4 satellite. The calibration procedure is presented and the radiometric sensitivity of the TM is assessed. The internal calibrator and dynamic range after calibration are considered. Tables show dynamic range after ground processing, spectral radiance to digital number and digital number to spectral radiance values for TM bands 1, 2, 3, 4, 5, 7 and for channel 4 of band 6.

Barker, J. L.↗

Landsat 4 results and their implications for agricultural surveys

Progress on defining the minimum Landsat-4 data characteristics needed for agricultural information in the U.S. and assessing the value-added capability of current technology to extract that level of information is reported. Emphasis is laid on the thematic mapper (TM) data and the ground processing facilities. TM data from all 7 bands for a rural Arkansas scene were examined in terms of radiometric, spatial, and geometric fidelity characteristics. Another scene sensed over Iowa was analyzed using three two-channel data sets. Although the TM data were an improvement over MSS data, no value differential was perceived. However, the development of further analysis techniques is still necessary to determine the actual worth of the improved sensor capabilities available with the TM, which actually has an MSS within itself.

Erickson, J. D.↗

Application of a recursive distortion estimator to the geodetic correction of thematic mapper imagery

It is pointed out that the higher resolution provided by the Thematic Mapper increases the demands on the accuracy needed by the ground processing in correcting for geodetic errors deriving from internal misalignments and uncertainties in the knowledge of spacecraft ephemeris and attitude. In addition, the Thematic Mapper will also process longer imagery intervals than previous missions. The recursive distortion estimator to be used is a Kalman filter. Here, a minimum variance spacecraft state error vector is estimated for known initial covariance of the elements of that vector and known image noise. Tests of the recursive distortion estimator with various spacecraft models carried out using a simulation of real world state vector dynamics are described. A determination is made of the density of control points needed to meet specified geometric correction requirements; it is expressed as a function of imagery interval length and control point measurement error.

Arnold, P.↗