Space sciences data-handling and mission operations
Real-time ground processing of space mission telemetry data from orbiting telescopes
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Real-time ground processing of space mission telemetry data from orbiting telescopes
Results on specimen evaluation and discussion of solidification behavior in each case are reported in the following order: (1) specimen SL-1.6, (2) specimen SL-2.8, (3) specimen SL-2.4, (4) specimen SL-1.10 and (5) specimen SL-1.11. Comparison is made with ground-processed specimens of similar composition, whenever pertinent and meaningful. Among the nondestructive evaluation methods the measurement of sphericity was conducted by micrometric and shadowgraphic techniques. The intricate shape of specimens in some cases appeared difficult to define. In measuring the density, liquid penetration inside cavities that outcrop on the surface was avoided by sealing off these cavities. Among the destructive evaluation methods the use of the Quantimet 720 required particular attention, because of the small difference in contrast between second phases and micropores. With regard to microporosity microvoids in the core of some specimens were so fine that X-ray microradiography had to be used.
The OMEGA Position Location Experiment (OPLE) was performed in 1967 by the Goddard Space Flight Center in order to demonstrate a position location and data collection system. OMEGA navigation signals were received at a remote site and retransmitted via a synchronous satellite to a ground processing center where data collecting and position determination were performed. Recent technological advances have made it possible to develop an Advanced OPLE System towards a global search and rescue application. This application generated some new problem areas such as the OMEGA lane ambiguity, random access, location accuracy, real-time processing, and size and weight of the Search and Rescue Communications (SARCOM). This experiment demonstrates the feasibility of instantaneous alarm and position location by using a relatively inexpensive, battery operated, three-pound package.
Cost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.
The development of a test engineer oriented language has been under way at the Kennedy Space Center for several years. The result of this effort is the Ground Operations Aerospace Language, GOAL, a self-documenting, high-order language suitable for coding automatic test, checkout and launch procedures. GOAL is a highly readable, writable, retainable language that is easily learned by nonprogramming oriented engineers. It is sufficiently powerful for use at all levels of Space Shuttle ground processing, from line replaceable unit checkout to integrated launch day operations. This paper will relate the language development, and describe GOAL and its applications.
The engineering analyses and evaluation studies conducted for the Software Requirements Analysis are discussed. Included are the development of the study data base, synthesis of implementation approaches for software required by both mandatory onboard computer services and command/control functions, and identification and implementation of software for ground processing activities.
An approach to early identification of operational requirements is discussed together with an assessment of the impact of these requirements on the development and acquisition phase of a program. The approach is applied to the Space Tug program. Some of the more salient results of the Tug Fleet and Ground Operations Schedules and Controls study performed under a NASA/Marshall Space Flight Center contract are provided. Ground-processing requirements and flows are presented, including a summary of facility requirements, timelines, activities and options/contingency-provision recommendations. Programmatic recommendations resulting from the study are presented in areas of payload integration, activation requirements, fleet utilization, fleet sizing, costs, and WTR delta requirement for the Tug.
A rectangular (7 x 14 km) area 40 km S of Madrid was remote-sensed with a three-stage recognition process. Ground truth was established in the first phase, airborne sensing with a multispectral scanner and photographic cameras were used in the second phase, and Landsat satellite data were obtained in the third phase. Agronomic and hydrological photointerpretation problems are discussed. Color, black/white, and labeled areas are displayed for crop recognition in the land-use survey; turbidity, concentrations of pollutants and natural chemicals, and densitometry of the water are considered in the evaluation of water resources.
The ability to satisfy the objectives of future NASA Office of Applications Programs is dependent on technology advances in a number of areas of data systems. The technology of end-to-end data systems (space generator elements through ground processing, dissemination, and presentation, is examined in terms of state of the art, trends, and projected developments in the 1980 to 1985 timeframe. Capability is considered in terms of elements that are either commercially available or that can be implemented from commercially available components with minimal development.
This study simulated the multispectral data sets to be expected from three different Thematic Mapper configurations, and the ground processing of these data sets by three different resampling techniques. The simulated data sets were then evaluated by processing them for multispectral classification, and the Thematic Mapper configuration, and resampling technique which provided the best classification accuracy were identified.
Ground attitude support for HEAO 1 provided at GSFC by the HEAO 1 Attitude Ground Support System (AGSS) is described. Information telemetered from Sun sensors, gyroscopes, star trackers, and an onboard computer are used by the AGSS to compute updates to the onboard attitude reference and gyro calibration parameters. The onboard computer utilizes these updates in providing continuous attitudes (accurate to 0.25degree) for use in the observatory's attitude control procedures. The relationship between HEAO 1 onboard and ground processing, the procedures used by the AGSS in computing attitude and gyro calibration updates, and the performance of these procedures in the HEAO 1 postlaunch environment is discussed.
The need for high data rates from a variety of experiments on Spacelab/Shuttle produced the requirement for the Spacelab High Rate Multiplexer/Demultiplexer system. This system acquires serial digital data at asynchronous bit rates from up to sixteen experiments, two data buses, three voice links, two tape recorders, and a universal time channel. Experiment data rates may vary from 200 bps to 16 Mbps while recorded data rates range from 250 Kbps to 32 Mbps. The High Rate Multiplexer (HRM) accepts these data inputs and forms a serial PCM output at flexible rates up to 48 Mbps. This PCM output is transmitted to ground by a Ku-Band RF link via the Tracking and Data Relay Satellite System (TDRSS) or recorded on board for delayed transmission. A complementary ground based High Rate Demultiplexer (HRDM) accepts and demultiplexes the composite PCM data at ground processing locations.
The layout and scope of operations of the Vandenberg AFB West Coast Launch Site for the Space Shuttle are examined. The launch site intended for the first West Coast launch in December 1983 is being constructed by the United States Air Force. Topic discussed include site/selection/management/concepts, Shuttle hardware flow and related facilities, launch pad operations, orbiter erection at SLC-6 VAFB, solid rocket booster operations, and payload ground processing. In conclusion it is noted that NASA and DOD personnel are working together to ensure that the launch site is completed on schedule at minimum cost.
Format would simplify ground processing of telemetry data. Also, missing minor frame would create error in only one set of source data instead of disrupting all sets. Format organizes data from various sources into autonomous blocks. Data are pre-processed, in effect, so main computer only needs to determine block type and process data set as batch.
The Seasat project was a feasibility demonstration of the use of orbital remote sensing for global ocean observation. The satellite was launched in June 1978 and was operated successfully until October 1978. A massive electrical failure occurred in the power system, terminating the mission prematurely. The actual implementation of the Seasat Attitude Determination system and the contents of the attitude data files generated by that system are documented. The deviations from plan caused by the anomalous Sun interference with horizon sensors, inflight calibration of Sun sensor head 2 alignment and horizon sensor biomass, estimation of yaw interpolation parameters, Sun and horizon sensor error sources, and yaw interpolation accuracy are included. Examples are given of flight attitude data from all modes of the Orbital Attitude Control System, of the ground processing effects on attitude data, and of cold cloud effects on pitch, and roll data.
Opportunities and limitations to be considered in the planning of Space Shuttle/Spacelab sortie missions are discussed. As shown by a simple model of the flow of STS equipment through ground processing and flights under ideal conditions, mission duration is constrained by Orbiter availability, which is determined initially by the Orbiter production schedule and the turnaround time required between missions, and by the usage rate and quantity limitations of mission consumables. Additional considerations affecting mission duration include reductions in crew productivity upon increased mission duration and crew size, spacecraft and experiment degradation, equipment and processing facility cost effectiveness, and requirements for a power extension package, which considerations imply that increased allowable landing weight would make co-manifesting (the combination of Spacelab and deliverable payload missions) more attractive. Advantages related to payload recoverability, human presence, ease of access and the availability of different orbits are also pointed out.
Performance goals for solid-state detector arrays operating in the pushbroom scan mode for the high-resolution, high-accuracy remote sensing of earth resources from space are discussed and some of the focal plane and system trades involved are identified. Issues in the development of solid-state pushbroom arrays with radiometric calibration to 0.5% precision detector-to-detector over a dynamic range of 1000:1 are considered, with calibration, temporal stability and spectral response conditions noted. Factors influencing the geometric precision of satellite-borne pushbroom scan mode sensors are then examined, including satellite orbit track and attitude errors, and geometric and radiometric correlation between information in the various spectral bands. Approaches to the alignment of linear arrays of thousands of detectors are then discussed that take into account tradeoffs between fabrication and test complexity and ground processing requirements. Continuing science experiments are indicated as necessary to establish tolerances on performance goals.
The Landsat-D (now Landsat-4) program was initiated by NASA in the mid-1970's. The spacecraft was launched on July 16, 1982. Instruments on the satellite include the fourth Multispectral Scanner (MSS) and the new higher-resolution Thematic Mapper (TM). In order to achieve the planned engineering and scientific objectives, attention has to be given to the validation of spacecraft and instrument performance, the adjustment of ground processing procedures, and the definition of the measures of the TU utility. To satisfy these requirements, a Landsat Assessment System (LAS) was conceived, and the Applications Developmental Data System (ADDS) was instituted. The set of component systems collectively became known as the 'Scrounge' system. The present investigation is concerned with the Scrounge system and the results of radiometric and geometric data evaluations. Attention is given to the TM geometric correction, TM data resampling, a radiometric correction functional description, and the results of the TM geometric and radiometric correction.