Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Observing System Simulation Experiments (OSSEs) for the Mid-Columbia Basin

The overall goal of this multi-phased research project known as WindSENSE is to develop an observation system deployment strategy that would improve wind power generation forecasts. The objective of the deployment strategy is to produce the maximum benefit for 1- to 6-hour ahead forecasts of wind speed at hub-height ({approx}80 m). In this phase of the project the focus is on the Mid-Columbia Basin region, which encompasses the Bonneville Power Administration (BPA) wind generation area (Figure 1) that includes the Klondike, Stateline, and Hopkins Ridge wind plants. There are two tasks in the current project effort designed to validate the Ensemble Sensitivity Analysis (ESA) observational system deployment approach in order to move closer to the overall goal: (1) Perform an Observing System Experiment (OSE) using a data denial approach. The results of this task are presented in a separate report. (2) Conduct a set of Observing System Simulation Experiments (OSSE) for the Mid-Colombia basin region. This report presents the results of the OSSE task. The specific objective is to test strategies for future deployment of observing systems in order to suggest the best and most efficient ways to improve wind forecasting at BPA wind farm locations. OSSEs have been used for many years in meteorology to evaluate the potential impact of proposed observing systems, determine tradeoffs in instrument design, and study the most effective data assimilation methodologies to incorporate the new observations into numerical weather prediction (NWP) models (Atlas 1997; Lord 1997). For this project, a series of OSSEs will allow consideration of the impact of new observing systems of various types and in various locations.

17 WIND ENERGY↗

Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).

On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridors and then schedule prompt action to identify, designate, and incorporate the corridors into applicable land use plans. To comply with the congressional direction provided in Section 368(b), the Agencies investigated corridor identification issues in the Section 368(b) states; this report to Congress provides information that could be relevant to possible future designation of energy corridors. Future designations, if appropriate and necessary, would occur when the Agencies undertake revisions and/or updates to land use plans that guide management decisions on lands located within individual administrative units, such as specific National Forests, National Parks, or Wildlife Refuges. At this time, the Agencies are not proposing any actions or decisions related directly or indirectly to designating energy corridors on federal land under Section 368(b) of EPAct.

08 HYDROGEN↗

Los Alamos National Laboratory W76 Pit Tube Lifetime Study

A metallurgical study was requested as part of the Los Alamos National Laboratory (LANL) W76-1 life-extension program (LEP) involving a lifetime analysis of type 304 stainless steel pit tubes subject to repeat bending loads during assembly and disassembly operations at BWXT/Pantex. This initial test phase was completed during the calendar years of 2004-2006 and the report not issued until additional recommended tests could be performed. These tests have not been funded to this date and therefore this report is considered final. Tubes were reportedly fabricated according to Rocky Flats specification P14548 - Seamless Type 304 VIM/VAR Stainless Steel Tubing. Tube diameter was specified as 0.125 inches and wall thickness as 0.028 inches. A heat treat condition is not specified and the hardness range specification can be characteristic of both 1/8 and 1/4 hard conditions. Properties of all tubes tested were within specification. Metallographic analysis could not conclusively determine a specified limit to number of bends allowable. A statistical analysis suggests a range of 5-7 bends with a 99.95% confidence limit. See the 'Statistical Analysis' section of this report. The initial phase of this study involved two separate sets of test specimens. The first group was part of an investigation originating in the ESA-GTS [now Gas Transfer Systems (W-7) Group]. After the bend cycle test parameters were chosen (all three required bends subjected to the same amount of bend cycles) and the tubes bent, the investigation was transferred to Terri Abeln (Metallurgical Science and Engineering) for analysis. Subsequently, another limited quantity of tubes became available for testing and were cycled with the same bending fixture, but with different test parameters determined by T. Abeln.

36 MATERIALS SCIENCE↗

SLAC Cosmic Ray Telescope Facility

SLAC does not have a test beam for the HEP detector development at present. We have therefore created a cosmic ray telescope (CRT) facility, which is presently being used to test the FDIRC prototype. We have used it in the past to debug this prototype with the original SLAC electronics before going to the ESA test beam. Presently, it is used to test a new waveform digitizing electronics developed by the University of Hawaii, and we are also planning to incorporate the new Orsay TDC/ADC electronics. As a next step, we plan to put in a full size DIRC bar box with a new focusing optics, and test it together with a final SuberB electronics. The CRT is located in building 121 at SLAC. We anticipate more users to join in the future. This purpose of this note is to provide an introductory manual for newcomers.

43 PARTICLE ACCELERATORS↗

Prediction of Total Dissolved Gas Exchange at Hydropower Dams

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

13 HYDRO ENERGY↗

Application of Ensemble Sensitivity Analysis to Observation Targeting for Short-term Wind Speed Forecasting in the Tehachapi Region Winter Season

This study extends the wind power forecast sensitivity work done by Zack et al. (2010a, b) in two prior research efforts. Zack et al. (2010a, b) investigated the relative predictive value and optimal combination of different variables/locations from correlated sensitivity patterns. Their work involved developing the Multiple Observation Optimization Algorithm (MOOA) and applying the algorithm to the results obtained from the Ensemble Sensitivity Analysis (ESA) method (Ancell and Hakim 2007; Torn and Hakim 2008).

17 WIND ENERGY↗

Replacement of Wooden Wing Walls and Deteriorated Concrete Pad at Manhattan Project Era Magazine TA-16-58

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes to replace missing and broken asbestos shingles, reconstruct deteriorated wooden wing walls, and remove and replace a concrete pad on Building 58 in Technical Area (TA) 16 at Los Alamos National Laboratory (LANL). Building TA-16-58 is a Manhattan Project Era magazine that was evaluated and determined eligible, in consultation with the State Historic Preservation Office (June 5, 2003 and June 22, 2003, respectively), for listing in the National Register of Historic Places (Register) in ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16 and in Sentinels of the Atomic Dawn: A Multiple -Property Evaluation of the Remaining Manhattan Project Properties at Los Alamos (1942–1946) (McGehee et al. 2003a, 2003b). The building is a LANL candidate for preservation as identified in A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (LANL 2017a ). It is also eligible for inclusion in the Manhattan Project National Historical Park (i.e., identified in the Park legislation), and is located within the TA-16 potential Cold War historic district (McGeh ee 1995a, 1995b; LANL 2012,).

99 GENERAL AND MISCELLANEOUS↗

Compensatory Mitigation and Comprehensive Mitigation Planning for Solar Energy Development

This report provides an overview of compensatory mitigation (CM) used to compensate for unavoidable adverse impacts at solar energy facilities. The report discusses the types of CM actions taken, as well as the methods used to satisfy CM requirements. It also addresses recent changes in CM requirements from the Department of the Interior. The goal of the report is to provide a comprehensive background on how CM has been applied to existing solar energy projects and how it may be applied in the future based on federal, state, and local requirements and policies. Using best available data, we present CM requirements and costs for solar energy facilities that vary in size, geographical location, and resources affected in order to better understand the variability in CM costs. In general, higher CM costs have been associated with: CM requirements under the Clean Water Act (CWA) and Endangered Species Act (ESA); land acquisition, preservation, and/or restoration methods; large solar energy facility nameplate capacity (MW); solar energy facilities located in states that have additional state-specific CM requirements.

14 SOLAR ENERGY↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Circular Economy for Lithium-Ion Batteries Used in Mobile and Stationary Energy Storage: Drivers, Barriers, Enablers, and U.S. Policy Considerations

As large-format battery energy storage (BES) capacity increases in the United States, so will the volume of spent lithium-ion batteries (LiBs) (Bade 2019). Estimates based on a 10-year lifetime assumption found that the volume of LiBs that have reached the end of their utility for electric vehicle (EV) applications could total two million units (four million metric tons) annually by 2040 in the United States (Richa et al. 2014; Ai and Borucki 2018). Although there is currently no publicly available decommissioning or end-of-life (EoL) projection for stationary BES systems, the U.S. energy storage market is expected to grow from an annual deployment of 523 megawatts in 2013 to 7.3 gigawatts in 2025 (Wood MacKenzie and ESA 2020; Wesoff 2020). Despite potential secondary market opportunities and the potential benefits associated with the reuse/recovery of LiB material, anecdotal evidence suggests that in the United States most decommissioned LiBs from EVs are landfilled or otherwise disposed of (Steward et al. 2019; Salim et al. 2019; CPUC 2019; DTSC 2019d; NREL 2019b; Jacoby 2019; DOE 2019). The reuse of large-format LiBs is not at commercial scale and to date consists of only a handful of U.S.-led pilot projects. Similarly, less than 5% of LiBs from EVs are sent to recycling facilities in the United States (Steward et al. 2019; Jacoby 2019; America Made 2019; Patel 2017). As awareness of current practices grows, and the demand for critical LiB materials increases, U.S. industry stakeholders, regulators, and policymakers are starting to (1) consider solutions to drive and enable environmentally sustainable materials management decisions and behaviors and (2) identify barriers to a circular economy for LiBs (Figure 1). Circular economy principles (Figure 1) attempt to transition from a “take-make-consume-dispose” linear economic system to a circular system that allows for the long life, high performance, and the reuse/recovery of products and materials (Ellen MacArthur Foundation 2016). We begin this report by summarizing drivers, barriers, and enablers to a circular economy for LiBs used in mobile and stationary BES systems in the United States. We then report on our analysis of federal and state regulatory considerations that may impact the reuse/recovery and disposal of LiBs, and potential civil and criminal liabilities associated with noncompliance. We conclude by highlighting state policies and initiatives in the United States that expressly address reuse/recovery and disposal of large-format LiBs. Our results are based on legal and literature-based research and interviews with mobile and stationary BES industry stakeholders, regulators, and policymakers. While this report addresses stationary BES, as well as mobile BES, much of the information and experience with LiB decommissioning and EoL material management is derived from the increasing management of spent EV LiBs in the United States.

25 ENERGY STORAGE↗