Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Characterization of Fish Passage Conditions through the Fish Weir and Turbine Unit 1 at Foster Dam, Oregon, Using Sensor Fish, 2012

Fish passage conditions through a Kaplan turbine and spillway fish weir at Foster Dam, located on the South Santiam River in Linn County, Oregon, were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers, Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions, identifying potential fish injury regions encountered during passage via specific routes. The investigation was performed in May 2012, concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to characterize the passage exposure conditions through the spillway fish weir and turbine Unit 1 at Foster Dam at two forebay pool elevations (616 and 634 ft mean sea level [MSL]) and to estimate data relationships with live fish injury and mortality estimates. For the spillway fish weir evaluation, Sensor Fish and live fish were deployed through injection system piping mounted on the weir. The bottom of the injection pipe was at an elevation of approximately 614 ft during testing at the 616-ft MSL (low) forebay elevation and at 632 ft during the 634-ft MSL (high) forebay level tests. Two systems were used—a 4-in. pipe for juvenile fish releases and an 8-in. pipe for adult releases at each elevation.

Duncan, Joanne P.↗

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010

This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

Weiland, Mark A.↗

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011

This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

Weiland, Mark A.↗

Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012

The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACE’s continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

54 ENVIRONMENTAL SCIENCES↗

Lac Courte Oreilles Hydro Dam Assessment

The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

13 HYDRO ENERGY↗

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

54 ENVIRONMENTAL SCIENCES↗

Climate variability and fill rate impacts on downstream flows from the Grand Ethiopian Renaissance Dam [Sheets]

Conclusions of this report include: Flow conditions (wet, normal, dry) are strong determinant of success in filling the dam; Some improvement for longer fill periods; Downstream Flow Compact only met under wetter flow conditions, rare otherwise; Results generated using other inflow datasets (not shown) indicate selection of data important for filling dam and highlight difficulty in determining which one to trust.

54 ENVIRONMENTAL SCIENCES↗

Financial Analysis of the 2019 Glen Canyon Dam Bug Flow Experiment

This report was prepared by Argonne National Laboratory (Argonne) in support of a financial analysis of the Glen Canyon Dam (GCD) flow experiment that was intended to support downstream macroinvertebrate production that are a primary food supply for fishes in the Colorado River. Also known as “bug flow” experiments, these experimental water releases were conducted on the weekends and holidays from the beginnings of May 2019 through the end of August 2019. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy’s Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical memorandum with assistance from WAPA’s CRSP and Energy Marketing and Management Offices (EMMO).

13 HYDRO ENERGY↗

Economic Analysis of Changes in Hydropower Operations at the Flaming Gorge Dam and the Aspinall Unit Due to the Upper Colorado River Endangered Fish Recovery Program

This report was prepared by Argonne National Laboratory (Argonne) in support of an economic analysis of operational restrictions at the Flaming Gorge Dam (FG) and the Aspinall Unit conducted for the U.S. Department of Energy’s Western Area Power Administration (WAPA). WAPA markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation (Reclamation). The facilities known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. This report presents detailed findings of an economic analysis of operational restrictions implemented at FG during water years (WYs) 2001 to 2016, and at the Aspinall Cascade during WYs 2013 to 2016. Staff members of Argonne’s Energy Systems Division prepared this document with assistance from staff members of WAPA’s Colorado River Storage Project (CRSP) Management Center and Reclamation, Upper Colorado Region.

13 HYDRO ENERGY↗

Financial Analysis of the 2020 Macroinvertebrate Production Flow Experiment at Glen Canyon Dam

This report was prepared by Argonne National Laboratory (Argonne) in support of a financial analysis of the Glen Canyon Dam (GCD) flow experiment that was intended to support downstream macroinvertebrate production that are a primary food supply for fishes in the Colorado River. Also known as “bug flow” experiments, these experimental water releases were conducted on the weekends and holidays from the beginnings of May 2020 through the end of August 2020. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy’s Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical memorandum with assistance from WAPA’s CRSP and Energy Marketing and Management Offices (EMMO).

13 HYDRO ENERGY↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2021

This report was prepared by Argonne National Laboratory (Argonne) in support of a financial analysis of two Glen Canyon Dam (GCD) flow experiments that were conducted in Water Year 2021. The first experiment, called “spring disturbance flow”, was conducted from March 15 to 26, 2021. This disturbance flow experiment is designed to simulate a spring-timed runoff event so scientists can study its effects on the Colorado River ecosystem. The second experiment was a reduced and steady discharge from May 29 to June 4, 2021. This reduced steady flow experiment was conducted for the United States Geological Survey (USGS) to collect high-resolution aerial imagery over Grand Canyon National Park. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy’s Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical memorandum with assistance from WAPA’s CRSP and Energy Marketing and Management Offices (EMMO).

58 GEOSCIENCES↗

Financial Analysis of the 2022 Macroinvertebrate Production Flow Experiment at Glen Canyon Dam

This report was prepared by Argonne National Laboratory (Argonne) in support of a financial analysis of the Glen Canyon Dam (GCD) flow experiment that was intended to support downstream macroinvertebrate production that are a primary food supply for fishes in the Colorado River. Also known as “bug flow” experiments, these experimental water releases were conducted on the weekends and holidays from the beginnings of May 2022 through the end of August 2022. This analysis was funded by and prepared for the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy’s Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems and Infrastructure Analysis Division prepared this technical memorandum with assistance from WAPA’s CRSP and Energy Marketing and Management Offices (EMMO).

13 HYDRO ENERGY↗

Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at Lower Granite Dam, 2018

The purpose of this passage and survival study was to estimate fish performance metrics associated with passage through Lower Granite Dam (LGR) for migrating yearling (CH1) and subyearling (CH0) Chinook salmon (Oncorhynchus tshawytscha) and steelhead smolts (O. mykiss, STH) in 2018. Researchers at the Pacific Northwest National Laboratory (PNNL) collaborated with the U.S. Army Corps of Engineers (USACE) Walla Walla District (CENWW), the University of Washington, and Mainstem Fish Research to conduct a 2018 study to estimate dam passage survival and other performance metrics for CH1, CH0, and STH at LGR.

54 ENVIRONMENTAL SCIENCES↗

A Reduced-form Cost Model for Prefeasibility Analysis of Hydropower at Non-Powered Dams

This study presents a reduced-form model to support a better understanding of the capacity potential and drivers of costs for hydropower development at U.S. non-powered dams (NPD), which are existing dams that are not currently used for hydropower. With information on nineteen reference sites, a set of reduced-form design and cost equations were estimated to enable rapid assessments of aggregate costs and their components for a large number of NPD sites. The model was then applied to 36,000+ potential U.S. NPD sites using the limited data commonly available. Although the cost estimates span a wide range, there exists a significant amount of U.S. NPD hydropower capacity potential, which are considered cost-competitive in the current market using baseline technologies.

13 HYDRO ENERGY↗

Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

13 HYDRO ENERGY↗

Fall Chinook Salmon Spawning Ground Surveys in the Snake River Basin Upriver of Lower Granite Dam, 2007 Annual Report.

Redd counts are routinely used to document the spawning distribution of fall Chinook salmon (Oncorhynchus tshawytscha) in the Snake River basin upriver of Lower Granite Dam. The first reported redd counts were from aerial searches conducted intermittently between 1959 and 1978 (Irving and Bjornn 1981, Witty 1988; Groves and Chandler 1996)(Appendix 1). In 1986, the Washington Department of Fish and Wildlife began an annual monitoring program that, in addition to the Snake River, included aerial searches of the Grande Ronde River the first year (Seidel and Bugert 1987), and the Imnaha River in subsequent years (Seidel et al. 1988; Bugert et al. 1989-1991; Mendel et al. 1992). The U. S. Fish and Wildlife Service and Idaho Power Company began contributing to this effort in 1991 by increasing the number of aerial searches conducted each year and adding underwater searches in areas of the Snake River that were too deep to be searched from the air (Connor et al. 1993; Garcia et al. 1994a, 1994b, 1996-2007; Groves 1993; Groves and Chandler 1996). The Nez Perce Tribe added aerial searches in the Clearwater River basin beginning in 1988 (Arnsberg et. al 1992), and the Salmon River beginning in 1992. Currently searches are conducted cooperatively by the Nez Perce Tribe, Idaho Power Company, and U. S. Fish and Wildlife Service. Our objective for this report was to consolidate the findings from annual redd searches counted upstream of Lower Granite Dam into a single document, containing detailed information about the searches from the most recent spawning season, and summary information from previous years. The work conducted in 2007 was funded by the Bonneville Power Administration and Idaho Power Company.

13 HYDRO ENERGY↗

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

13 HYDRO ENERGY↗

Ex post power economic analysis of record of decision operational restrictions at Glen Canyon Dam.

On October 9, 1996, Bruce Babbitt, then-Secretary of the U.S. Department of the Interior signed the Record of Decision (ROD) on operating criteria for the Glen Canyon Dam (GCD). Criteria selected were based on the Modified Low Fluctuating Flow (MLFF) Alternative as described in the Operation of Glen Canyon Dam, Colorado River Storage Project, Arizona, Final Environmental Impact Statement (EIS) (Reclamation 1995). These restrictions reduced the operating flexibility of the hydroelectric power plant and therefore its economic value. The EIS provided impact information to support the ROD, including an analysis of operating criteria alternatives on power system economics. This ex post study reevaluates ROD power economic impacts and compares these results to the economic analysis performed prior (ex ante) to the ROD for the MLFF Alternative. On the basis of the methodology used in the ex ante analysis, anticipated annual economic impacts of the ROD were estimated to range from approximately $15.1 million to $44.2 million in terms of 1991 dollars ($1991). This ex post analysis incorporates historical events that took place between 1997 and 2005, including the evolution of power markets in the Western Electricity Coordinating Council as reflected in market prices for capacity and energy. Prompted by ROD operational restrictions, this analysis also incorporates a decision made by the Western Area Power Administration to modify commitments that it made to its customers. Simulated operations of GCD were based on the premise that hourly production patterns would maximize the economic value of the hydropower resource. On the basis of this assumption, it was estimated that economic impacts were on average $26.3 million in $1991, or $39 million in $2009.

13 HYDRO ENERGY↗