Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Multi-operator Production Cost Modeling

As contiguous power systems are often operated by several regional system operators, optimization models have traditionally been designed to generate optimal system-wide scheduling decisions. This report introduces an approach to reflect the existence of multiple system operators making scheduling decisions within an interconnected power system. The approach is explicitly designed to reflect each operator's limited knowledge about other regions when making scheduling decisions. Detailed analysis using a modified IEEE Reliability Test System reveals that the approach mimics real system operations by providing imperfect information to each operator about external operations and external constraints. The approach scales to a 78,000-bus model of the Eastern Interconnection, where a regression analysis provides quantitative insight into which constraints cause inefficiencies when improperly managed in a multi-operator simulation. Because the approach generates distinct regional scheduling problems, unit commitment and economic dispatch simulations can be applied to individual regions and solved in parallel, enabling production cost simulations at a previously intractable scale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Vehicle Lightweighting: 40% and 45% Weight Savings Analysis: Technical Cost Modeling for Vehicle Lightweighting

The U.S. Department of Energy’s Vehicle Technologies Office, Materials area commissioned a study to model and assess manufacturing economics of alternative design and production strategies for a series of lightweight vehicle concepts. The strategic targets were a 40% and a 45% mass reduction relative to a standard North American midsize passenger sedan at an effective cost of $3.42 per pound (lb) saved. The baseline vehicle was an average of several available vehicles in this class. Mass and cost breakdowns from several sources were used, including original equipment manufacturers’ (OEMs’) input through U.S. Department of Energy’s Vehicle Technologies Office programs and public presentations, A2Mac1 LLC’s teardown information, Lotus Engineering Limited and FEV, Inc. breakdowns in their respective lightweighting studies, and IBIS Associates, Inc.’s decades of experience in automotive lightweighting and materials substitution analyses. Information on lightweighting strategies in this analysis came from these same sources and the ongoing U.S. Department of Energy-funded Vehma International of America, Inc. /Ford Motor Company Multi-Material Lightweight Prototype Vehicle Demonstration Project, the Aluminum Association Transportation Group, and many United States Council for Automotive Research’s/United States Automotive Materials Partnership LLC lightweight materials programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing the New Home Market Opportunity: Case Study and Cost Modeling for Solar and Storage in 2030

In 2020, the United States had a cumulative 19 gigawatts (GWdc) of residential solar photovoltaic (PV) capacity. A growing percentage of these solar installations are paired with battery storage, up from 0.1% in 2015 to 8.1% in 2020. Some states are considering or have already adopted policy mandates to require solar and storage systems. The cost of installing residential solar and battery storage projects remains a barrier to widespread adoption nationwide. For example, the cost of a typical residential retrofit solar and storage system ranges from $\$ 26,153$ to $\$ 37,909$, which is 38% to 100% higher than a standalone PV system.

14 SOLAR ENERGY↗

Baseline Cost Model for Hydropower: Documentation (2025)

Hydropower currently contributes about 80 GW of conventional and 23 GW of pumped storage capacity to the United States (US) power grid. Previous studies have estimated a considerable amount of remaining US hydropower resources, including non-powered dams (NPD) (Hadjerioua et al., 2012), new stream-reach developments (NSD) (Kao et al., 2014), pumped storage hydropower (PSH) and canal/conduit (Kao et al., 2022). The combined theoretical capacity potential of these various hydropower resources is comparable to the existing US hydropower capacity. There is a continuing interest in developing this hydropower potential, particularly to help meet the increasing demand for electricity. However, available data (Sasthav and Oladosu, 2022) show that the rate of new hydropower development has slowed considerably over time despite the interest of industry stakeholders. This is partly due to the competition from other energy resources and from the highly dispersed nature of remaining hydropower resources, which lead to high information requirements for evaluating the feasibility of potential projects. Cost information provides the most succinct summary of the feasibility of a potential hydropower project required by stakeholders, including developers, investors, policymakers, consumer groups, etc., considering investment options. The best estimates of hydropower costs can be obtained through detailed engineering design and cost assessments of individual projects. However, this approach has high data and resource (time, funds, cross-disciplinary expertise) requirements that render it inapplicable for rapid cost estimation with limited data. Although innovative approaches can overcome some of these impediments (see Oladosu and Ma, 2024 for such an application to potential NPD projects), the development of such approaches still requires significant amounts of resources and are not generally applicable to all hydropower project types. Therefore, statistical and parametric methods using simpler cost specifications remain of significant utility to hydropower stakeholders and are, at the least, complementary to more detailed approaches, particularly when evaluating many potential projects.

13 HYDRO ENERGY↗

Calibration of a COTS Integration Cost Model Using Local Project Data

The software measures and estimation techniques appropriate to a Commercial Off the Shelf (COTS) integration project differ from those commonly used for custom software development. Labor and schedule estimation tools that model COTS integration are available. Like all estimation tools, they must be calibrated with the organization's local project data. This paper describes the calibration of a commercial model using data collected by the Flight Dynamics Division (FDD) of the NASA Goddard Spaceflight Center (GSFC). The model calibrated is SLIM Release 4.0 from Quantitative Software Management (QSM). By adopting the SLIM reuse model and by treating configuration parameters as lines of code, we were able to establish a consistent calibration for COTS integration projects. The paper summarizes the metrics, the calibration process and results, and the validation of the calibration.

Boland, Dillard↗