Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Control and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Identification and Testing of Electric Vehicle Fast Charger Cybersecurity Mitigations

Fast-charging infrastructure for electric vehicles (EVs) is needed to enable and achieve the national goals of transitioning the vehicle fleet toward more electrification. Idaho National Laboratory, Oak Ridge National Laboratory, and the National Renewable Energy Laboratory (NREL) have jointly worked to identify, evaluate, and mitigate potential cyber-related consequences associated with fast charger systems. NREL contributed by considering cyberattack scenarios and consequences associated with integrating distributed energy resources (DERs) at fast-charging stations. The dynamic nature of fast-charger load profiles would encourage site operators to incorporate solar for energy cost reduction and energy storage for peak demand cost management at future charging facilities with multiple fast chargers at a site. These energy resources would be monitored and coordinated via a site energy management controller with data exchange between devices and local power metering infrastructure; thus, networking between devices and the design of the system becomes important in the overall cybersecurity posture. In addition, component vendors and system operators might have remote interfaces to any of these systems. It is therefore important to understand the breadth of the cyberattack surface and potential strategies to mitigate impacts. This project has focused on components and protocols expected to be found within a local charging site that includes multiple chargers and DER resources. Our methods and results are summarized in this final report.

42 ENGINEERING↗

RELIABILITY PROGRAMS FOR ''L'' SYSTEMS

The AFSC Program Structure assigns numbers and letters to the various programs in order to identify the efforts for management control. The fact that most of the command and control systems have the designator "L" affixed has prompted the reference to them as the "L" systems. In this paper the mission of "L" systems has been described, the complexity of the equipment indicated, and the importance of these systems to our national defense efforts pointed out. The efforts by the Electronic Systems Division to comply With the Air Force policy that a comprehensive reliability program be required for each contract to assure delivery of reliable systems and equipment to the Air Force inventory are described in considerable detail.

RELIABILITY↗

Limited life item management

Plans are available for age-sensitive hardware management. Control plan identifies shelf life or age control requirements for materials considered age sensitive, use sensitive, or time service or shelf life controlled items, and describes methods of arriving at age controls through adherence to detailed specifications.

Eaglen, R. L.↗

Apollo experience report: Certification test program

A review of the Apollo spacecraft certification (qualification) test program is presented. The approach to devising the spectrum of dynamic and climatic environments, the formulation of test durations, and the relative significance of the formal certification test program compared with development testing and acceptance testing are reviewed. Management controls for the formulation of test requirements, test techniques, data review, and acceptance of test results are considered. Significant experience gained from the Apollo spacecraft certification test program which may be applicable to future manned spacecraft is presented.

Levine, J. H.↗

Shuttle mission simulator requirements report, volume 1, revision A

The tasks are defined required to design, develop produce, and field support a shuttle mission simulator for training crew members and ground support personnel. The requirements for program management, control, systems engineering, design and development are discussed along with the design and construction standards, software design, control and display, communication and tracking, and systems integration.

Burke, J. F.↗

Apollo experience report: Problem reporting and corrective action system

The Apollo spacecraft Problem Reporting and Corrective Action System is presented. The evolution from the early system to the present day system is described. The deficiencies and the actions taken to correct them are noted, as are management controls for both the contractor and NASA. Significant experience gained from the Apollo Problem Reporting and Corrective Action System that may be applicable to future manned spacecraft is presented.

Adams, T. J.↗

Management systems research study

The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.

Bruno, A. V.↗

The effects of selected modern technological concepts on the performance and handling characteristics of LTA vehicles

The results of an airship design sensitivity study are presented. A wide variety of airship design concepts, including the classical and high aero-lift augmented-hybrids are examined with regard to specific technological improvements, and consequent gains in performance, stability and control and flying qualities. Variations in size, payload, power required and airspeed are quantitatively analyzed for airships representing aero-to-buoyant lift ratios of zero to 3.0 over a range of technology improvements implying reduced drag, reduced structural weight fractions and lighter, more efficient propulsion systems. Qualitatively, future airships are discussed in terms of stability, control and flying qualities requirements dictated by projected demands for vastly improved operational effectiveness and ease of handling. Such topics include stability augmentation systems, load-alleviation systems and total computer state-sensing and controls management systems. It was shown that, for the most part, highly refined conventional designs offer attractive gains in both performance and ease of handling. Hybrid airships represent a good potential for missions requiring the transport of heavy payloads at higher airspeeds over shorter ranges without the capability for sustained hover and vertical flight.

Mazza, C. J.↗

MSFC Skylab corollary experiments

The evolution of the development and integration of Skylab experiments from initial concepts through mission operations is documented. All experiment systems are covered as well as management controls which were developed and exercised to assure acceptable operational capability and optimize data acquisition for final scientific results.

Source record↗

Operations manual: Vertical Motion Simulator (VMS) S.08

The Ames Research Center Vertical Motion Simulator (VMS) is described in terms useful to the researcher who intends to use it. A description of the VMS and its performance are presented together with the administrative policies governing its operation. The management controls over its use are detailed, including data requirements, user responsibilities, and scheduling procedures. This information is given in a form that should facilitate communication with the NASA operations group during initial simulator use.

Jones, A. D.↗

Management of optics

American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

Kirchner, T. E.↗

An approach to software baseline generation

A current Data & Analysis Center for Software (DACS) effort to develop software baselines is summarized. This baseline effort is an on-going activity; that is, the baselines are meant to be updated as new software data becomes available. The information presented and processed was organized to make periodic updating a much simpler task. A baseline, for this effort, consists of an estimation of any characteristic of a software project that is helpful to a developer, manager, or monitor to manage, control, or influence a software product. The objective of these baselines is to provide a tool for aiding software developers in their daily work. Baselines were synthesized from an empirical dataset provided by the Software Engineering Laboratory at NASA Goddard Space Flight Center (NASA/SEL). These data were selected because the data collection effort developed at the NASA/SEL is the most thorough and complete available.

Romeu, J. L.↗

Verification of post permanently manned configuration Space Station elements

An account is given of the techniques and ground systems designed to fulfill post permanently manned configuration (PMC) Space Station verification tasks. Consideration is given to analysis using computer math models and computer-aided interface verification systems, testing using simulators and interface mixtures, and special inspection. It is noted that an initial Space Station design that accommodates and facilitates verification is crucial to an effective verification program as well as proper instrumentation, built-in test capability, and a precise configuration management, control and record system. It is concluded that post PMC verification should be accounted for both in the initial Space Station design and in the subsequent development of initial assembly flight verification techniques and capabilities.

Scully, E. J.↗

Orbital Maneuvering Vehicle space station communications design

The authors present an Orbital Maneuvering Vehicle space station communications systems design approach which is intended to satisfy the stringent link requirements. The operational scenario, system configuration, signal design, antenna system management, and link performance analysis are discussed in detail. It is shown that the return link can transmit up to 21.6 Mb/s and maintain at least a 3-dB link margin through proper power and antenna management control at a maximum distance of 37 km. It is suggested that the proposed system, which is compatible with the space station multiple-access system, can be a model for other space station interoperating elements or users to save the development cost and reduce the technical and schedule risks.

Arndt, D.↗

Autonomous power expert system

The Autonomous Power Expert (APEX) system was designed to monitor and diagnose fault conditions that occur within the Space Station Freedom Electrical Power System (SSF/EPS) Testbed. APEX is designed to interface with SSF/EPS testbed power management controllers to provide enhanced autonomous operation and control capability. The APEX architecture consists of three components: (1) a rule-based expert system, (2) a testbed data acquisition interface, and (3) a power scheduler interface. Fault detection, fault isolation, justification of probable causes, recommended actions, and incipient fault analysis are the main functions of the expert system component. The data acquisition component requests and receives pertinent parametric values from the EPS testbed and asserts the values into a knowledge base. Power load profile information is obtained from a remote scheduler through the power scheduler interface component. The current APEX design and development work is discussed. Operation and use of APEX by way of the user interface screens is also covered.

Walters, Jerry L.↗

Software development environments: Status and trends

Currently software engineers are the essential integrating factors tying several components together. The components consist of process, methods, computers, tools, support environments, and software engineers. The engineers today empower the tools versus the tools empowering the engineers. Some of the issues in software engineering are quality, managing the software engineering process, and productivity. A strategy to accomplish this is to promote the evolution of software engineering from an ad hoc, labor intensive activity to a managed, technology supported discipline. This strategy may be implemented by putting the process under management control, adopting appropriate methods, inserting the technology that provides automated support for the process and methods, collecting automated tools into an integrated environment and educating the personnel.

Duffel, Larry E.↗

CELSS Breadboard Project at the Kennedy Space Center

The CELSS Breadboard Project is described, noting that it was initiated to study aspects of a CELSS for long-term space missions. Topics for extensive investigation included air and water regeneration, engineering control, and food production. The many options available for growing food crops in commercial plant growth chambers were investigated and the best of this information was translated to the Biomass Production Chamber (BPC). The chamber contains 20 sq m of crop growing area under 96 400 W HPS lamps; sixteen 0.25 sq m plant growth trays used on each of four growing shelves for a total of 64 trays; and one 256-L nutrient solution reservoir with the appropriate continuous-flow, thin-film plumbing for each shelf. A heating, ventilating, and air-conditioning system maintains atmospheric conditions and serves to distribute oxygen and carbon dioxide and maintain pressure at 12 mm of water. The control and monitoring subsystem, which uses a programmable logic controller, manages the BPC subsystems.

Prince, R. P.↗

Implementation of a virtual link between power system testbeds at Marshall Spaceflight Center and Lewis Research Center

The Marshall Space Flight Center (MSFC) owns and operates a space station module power management and distribution (SSM-PMAD) testbed. This system, managed by expert systems, is used to analyze and develop power system automation techniques for Space Station Freedom. The Lewis Research Center (LeRC), Cleveland, Ohio, has developed and implemented a space station electrical power system (EPS) testbed. This system and its power management controller are representative of the overall Space Station Freedom power system. A virtual link is being implemented between the testbeds at MSFC and LeRC. This link would enable configuration of SSM-PMAD as a load center for the EPS testbed at LeRC. This connection will add to the versatility of both systems, and provide an environment of enhanced realism for operation of both testbeds.

Doreswamy, Rajiv↗