Transit Habitat Concept and Mars Analog in Cislunar Orbit

- Transit Habitat Overview - Supports 4-crew during Lunar-Mars Analog missions leading up to a 700-1110-day Mars mission - Hybrid inflatable-metallic habitat structure - Launched commercially and outfitted with logistics in cis-lunar orbit (NRHO) - Docks w/ an interim propulsion bus or Gateway for first ~5 years until Mars Propulsion System (MPS) elements available - Extends Gateway operations beyond 60 days - Contingency Airlock and EVA capability - Planned reuse for multiple missions over 15-year lifetime - Builds on ISS and commercial investment in deep space habitation - Mid-2030s launch with late 2030s Mars Departure

Mars↗

EOS Terra Constellation Exit Review

This package presents the plans for Terra lowering its orbit by 5-6 kms and effectively removing itself from the 705km constellation in October 2022. Also, presented is all the work done to get ready for these maneuvers from both the Flight Dynamics and Flight Operations Team perspective, as well discussion of any contingencies and their associated pre-planned responses.

Dimitrios Mantziaras↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

Van Cise, E. A.↗

Renewable Energy Contingencies in Power Systems: Concept and Case Study

This paper introduces the concept of renewable energy contingencies that represent long-term/extended variability of variable renewable energy (VRE) resources, namely, significant periods (e.g., days/weeks) of low wind/solar availability. These contingencies have not received much attention to date but are likely to emerge as a major issue in some countries such as India as the share of VRE increases. Using 38 years of climate model reanalysis data for wind over India, we demonstrate that low periods of wind contingency below long-term (Indian) national average of 5 m/s can extend for more than 100 days in several zones some of which are deploying large wind farms. Even in some of the best wind resource areas in India with long term average wind speed close to 7 m/s, low wind days (e.g., 5 m/s which is substantially below average) can extend up to 60 days. We propose a four-step methodology around a co-optimization based energy-ancillary services dispatch model to assess the impact of renewable contingency and implemented it for the state of Tamil Nadu, the most wind-rich state of India. We have estimated that annual renewable contingency cost impact of 5 GW additional wind in Tamil Nadu to be in the range of US$27-76 million pa. Planning analysis should embrace the concept of renewable contingency to recognize these costs and put in place necessary spinning reserve and back-up generation resources.

Mohar Chattopadhyay↗

Event-Driven Modeling and Execution of Robotic Activities and Contingencies in the Europa Lander Mission Concept Using BPMN

TRACE (Traceable Robotic Activity Composer and Executive) is a tool designed to address the model-ing, verification, and execution of planned and con-tingent activities during robotic space missions. These activities can be modeled (i.e., planned) graph-ically in TRACE using the Business Process Model and Notation (BPMN) language. This standardized language is used to model a sequence of robotic ac-tivities tied together by logical constructs, events, and time. TRACE includes verification tools to en-sure feasibility before mission models are executed by TRACE’s executive, which is integrated into the autonomy subsystem via a connector. In this paper, we describe TRACE in detail as it would apply to a conceptual Europa Lander surface mission with planned excavation and sample collection activities, as well as, contingency activities when execution is off-nominal—all highlighting our novel use of BPMN as a lingua franca for the pipeline from mis-sion planning to autonomous execution.

Lim, Grace↗

Orbit lifetime characteristics for Space Station

The factors that influence the orbital lifetime characteristics of the NASA Space Station are discussed. These include altitude, attitude, launch date, ballistic coefficient, and the presence of large articulating solar arrays. Examples from previous program systems studies are presented that illustrate how each factor affects Station orbit lifetime. The effect of atmospheric density models on orbit lifetime predictions is addressed along with the uncertainty of these predictions using current trajectory analysis of the Long Duration Exposure Facility spacecraft. Finally, nominal reboost altitude profiles and fuel requirement considerations are presented for implementing a reboost strategy based on planned Shuttle Orbiter rendezvous strategy and contingency considerations.

Deryder, L.↗

SPASIM: A Spacecraft Simulator

The SPAcecraft SIMulator (SPASIM) simulates the functions and resources of a spacecraft to quickly perform conceptual design (Phase A) trade-off and sensitivity analyses and uncover any operational bottlenecks during any part of the mission. Failure modes and operational contingencies can be evaluated allowing operational planning (what-if scenarios) and optimization for a range of mission scenarios. The payloads and subsystems are simulated, using a hierarchy of graphical models, in terms of how their functions affect resources such as propellant, power, and data. Any of the inputs and outputs of the payloads and subsystems can be plotted during the simulation or stored in a file so they can be used by other programs. Most trade-off analyses, including those that compare current versus advanced technology, can be performed by changing values in the parameter menus. However, when a component is replaced by one with a different functional architecture, its graphical model can also be modified or replaced by drawing from a component library. SPASIM has been validated using several spacecraft designs that were at least at the Critical Design Review level. The user and programmer guide, including figures, is available on line as a hypertext document. This is an easy-to-use and expandable tool which is based on MATLAB(R) and SIMULINK(R). It runs on Silicon Graphics Inc. workstations and personal computers with Windows 95(TM) or NT(TM).

Liceaga, Carlos A.↗

Evaluations of Three Methods for Remote Training

Long duration space missions require a change in training methods and technologies. For Shuttle missions, crew members could train for all the planned procedures, and carry documentation of planned procedures for a variety of contingencies. As International Space Station (ISS) missions of three months or longer are carried out, many more tasks will need to be performed for which little or no training was received prior to launch. Eventually, exploration missions will last several years, and communications with Earth will have long time delays or be impossible at times. This series of three studies was performed to identify the advantages and disadvantages of three types of training for self-instruction: video-conferencing; multimedia; and virtual reality. These studies each compared two types of training methods, on two different types of tasks. In two of the studies, the subject's were in an isolated, confined environment analogous to space flight; the third study was performed in a laboratory.

Woolford, B.↗

Evaluation of Candidate Materials for a High-Temperature Stirling Convertor Heater Head

The Department of Energy (DOE) and NASA have identified Stirling Radioisotope Generators (SRG) as a candidate power system for use on long-duration, deep-space science missions and Mars rovers. One of the developments planned for an upgraded version of the current SRG design is to achieve higher efficiency by increasing the overall operating temperature of the system. Currently, the SRG operates with a heater head temperature of 650 C and is fabricated from the nickel base superalloy 718. This temperature is at the limit of Alloy 718's capability, and any planned increase in temperature will be contingent on identifying a more capable material from which to fabricate the heater head. To this end, an assessment of material candidates was performed assuming a range of heater head temperatures. The chosen alternative material candidates will be discussed, along with the development efforts needed to ensure that these materials can meet the demanding system requirements of long-duration operation in hostile environments.

Bowman, Randy↗

RTO Technical Publications: A Quarterly Listing

A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

Source record↗

Candidate Materials Evaluated for a High-Temperature Stirling Convertor Heater Head

The Department of Energy and NASA have identified Stirling Radioisotope Generators (SRGs) as a candidate power system for use on long-duration, deep-space science missions and Mars rovers. One of the developments planned for an upgraded version of the current SRG design is to achieve higher efficiency by increasing the overall operating temperature of the system. Currently, the SRG operates with a heater head temperature of 650 C and is fabricated from the nickel-base superalloy 718. The current operating temperature is at the limit of alloy 718 s capability, and any planned increase in temperature will be contingent on identifying a more capable material from which to fabricate the heater head. To this end, personnel at the NASA Glenn Research Center are evaluating advanced materials for a high-temperature heater head to allow a higher convertor temperature ratio and, thus, increase the system efficiency. A generic list of properties that were used to screen the candidate materials follows: (1) creep, (2) fabricability, (3) helium gas containment, (4) long-term stability and compatibility, (5) ability to form a hermetical closeout seal, and (6) ductility and toughness.

Bowman, Randy R.↗

Mars Science Laboratory Propulsive Maneuver Design and Execution

The NASA Mars Science Laboratory (MSL) rover, Curiosity, was launched on November 26, 2011 and successfully landed at the Gale Crater on Mars. For the 8-month interplanetary trajectory from Earth to Mars, five nominal and two contingency trajectory correction maneuvers (TCM) were planned. The goal of these TCMs was to accurately deliver the spacecraft to the desired atmospheric entry aimpoint in Martian atmosphere so as to ensure a high probability of successful landing on the Mars surface. The primary mission requirements on maneuver performance were the total mission propellant usage and the entry flight path angle (EFPA) delivery accuracy. They were comfortably met in this mission. In this paper we will describe the spacecraft propulsion system, TCM constraints and requirements, TCM design processes, and their implementation and verification.

maneuver↗

Summary of Technical Interchange Meetings (TIMs) Designed to Enable Earth Independent Medical Operations (EIMO)

The Exploration Medical Capability Element (ExMC) in NASA’s Human Research Program hosted a series of TIMs in 2023-2024 designed to stimulate discussion around specific topics with the goal of enabling EIMO. In context of the thematic constituent elements of EIMO, namely pre-mission planning, acute/emergent/prolonged medical decision making, supply/resource management and task load management, subject matter experts from industry, academia and government (NASA and other Agencies) provided valuable and actionable guidance and recommendations. Earth-based medical experts will remain indispensable for pre-mission planning, however, management of acute/emergent medical contingencies will require a gradual transition of medical care and decision making from terrestrial to space-based assets to enable support of astronaut health and performance and reduce overall mission risk. Key to achieving these enhancements is providing an integrated data system platform capable of utilizing multiple data streams in concert with a variety of on-board databases and passive monitoring of video and wearable sensors to enable a multi-modal, agentic AI-based clinical decision support system (CDSS) to support crew medical officer (CMO) medical decision-making. The EIMO series of TIMs (I-V) have proven to be instructive and portend a significant paradigm shift will be necessary to maintain crew health and performance on exploration class missions. Importantly, since the expected paradigm shift will be significantly different from the methods of operation that have been employed for the majority of missions from the inception of human spaceflight to date, any proposed methods must be deployed in the setting of ongoing operations early and be “tested, reviewed and practiced” while reliable back-up is available to facilitate an Enterprise-wide level of comfort and acceptance. Serious constraints on data transmission coupled with a large and expanding universe of on-board medical informatics data streams will necessitate implementation of a CDSS to supplant the current reliance on support provided by ground-based SMEs. Establishment of trust in the system by CMO/crew and the ground-based medical support team will be essential. Co-development of a CDSS with industry partners will assure that state of the art tools can be employed, and industry efficiencies can be leveraged. Training regimens, materials and tools must evolve to be responsive (just-in-time training) and facilitate autonomous execution of procedures. Proficiency metrics should be established and be based on validated competencies or milestones as opposed to a prescribed number of training hours. Training should be prioritized for broad, translatable skills that have universal application across a variety of medical conditions. Repetition was deemed to be the key to achieving proficiency and emphasis should lie in procedural training which is known to extinguish more rapidly than diagnostic skills. Advanced tools, e.g., extended reality, can provide more realistic and effective training. Use of advanced probabilistic risk assessment tools will be essential to optimize the medical system capability while carefully balancing risk relative to mass/power/volume limitations. Importance of factoring use-life of medical supplies and maintaining awareness of redundancy and opportunity to re-purpose under off nominal situations was emphasized. Consideration of adopting optimized performance standards vs. “good-enough” performance thresholds is warranted. The use of legacy systems as opposed to creating new systems may be preferable. Managing task load and associated cognitive load will be essential to maintain operational safety and behavioral health. ExMC aspires to create a shared EIMO paradigm and strategic vision for advancing medical system design through novel technologies, training, protocols, and support capabilities, built upon the spirit of successful strategies and innovations over the past six decades of space medicine operations.

Jay Lemery↗

PAAV Concept Document

The Pathfinding for Airspace with Autonomous Vehicles (PAAV) Concept Document, version 1.0, lays out the key challenges and potential solutions for the use of uncrewed aircraft (UA) technology for future regional air cargo operations. The challenges and solutions described in this document were informed by communications with the UA industry community (e.g., RTCA, the Federal Aviation Administration, and regional air cargo business operators), as well as the PAAV team’s research activities during the last two years including four tabletop exercises, a human-in-the-loop simulation study, a numerical simulation study, a functional allocation study, and flight data analysis (Appendix A). This document first describes the expected operational context of PAAV (Section 2), such as the flight mission, baseline UAS components, nominal operations, m:N operations (i.e., "m" remote pilots per "N" aircraft), and off-nominal operations. This context sets the scope for the PAAV concept development work. PAAV concept development assumes that UA operations will be increasingly autonomous. Thus, near- and far-term assumptions are defined (Section 3). PAAV identified seven key challenges for UA operations (Section 4): - Flight route planning - Separation and flow management - Traffic pattern integration - Contingency management - Taxi, takeoff, and landing - m:N operations - Communications operations The following 13 potential solutions to these challenges are then described (Section 5): - Scalable communications architecture - Data link - Designated UAS corridors - Crew planning for m:N operations - Flight route optimization - Traffic load-level control - Trajectory solutions with data link - Automated hazard avoidance for m:N operations - Traffic pattern integration (TPI) tool - Standard lost command and control (C2) link (LC2L) procedures - Automated hazard avoidance under LC2L - Auto-taxi, auto-takeoff, and auto-land - Ground control station (GCS) user interface for m:N operations The document attempts to link each of these solutions to one or more of the challenge areas. Novel solutions involving numerous automation technologies are needed to mitigate traffic and airspace management challenges, especially for realizing m:N operations and ensuring safety under LC2L conditions. The purpose of this document is to help understand alternatives and tradeoffs among potential solutions and provide a foundation for a cohesive PAAV concept that will be described and refined in subsequent concept versions.

Unmanned aircraft, uncrewed aircraft, regional air↗

Automated Contingency Management for Water Recycling System

To enable effective management, planning, and operations for future missions that involve a crewed space habitat, operational support must be migrated from Earth to the habitat. Intelligent System Health Management technologies (ISHM) promise to enable the future space habitats to increase the safety and mission success while minimizing operational risks. In this paper, Water Recycling System (WRS) deployed at NASA Ames Research Center's Sustainability Base is used for verification and validation of the proposed solution. Our work includes the development of the WRS simulation model based on its dynamic physical characteristics and the design of Automatic Contingency Management (ACM) framework that integrates fault diagnosis and optimization. In WRS modeling, a nominal model with fault injectors is developed. Fault detection and isolation techniques are then developed for isolating causes and identifying the severity of the faults. Dynamic Programming (DP) based fault mitigation strategies are designed to accommodate the faults in the system. A series of simulations are presented with different fault modes and the results indicate that the proposed ACM system can alleviate the fault in the WRS optimally regarding energy consumption and effects of the fault.

Systems Health Management↗

Completable scheduling: An integrated approach to planning and scheduling

The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

Gervasio, Melinda T.↗

Cost estimation: An expert-opinion approach

A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

Buffalano, C.↗