Optimal hybrid power plants for electric vehicle charging demand

Transmission constraints, increasing motivations to decarbonize, and concerns over peak electric vehicle (EV) load impacts on local grids have driven electric customers to consider behind-the-meter, hybrid power plant generation and storage at the distributed-grid level for EV charging. In this study, we develop capabilities to optimize hybrid power plant component capacities for EV charging. We then demonstrate these capabilities in a case study for Boulder, Colorado, using public EV charging data as well as wind and solar resource data. Our results show system designs that balance the cost of energy with load-meeting and peak shaving performance. Within the case study, systems designed for wind, solar photovoltaic (PV), and storage resulted in lower cost of energy than those optimized for PV and storage only. This indicates that in areas where wind resource exists, hybrid power plants that include wind, PV, and battery assets can better meet EV charging loads (including peak loads that are prone to overloading local grids) than PV and battery assets alone. Future work to address limitations in this paper include extending cost modeling to include performance losses (e.g., based on operations or weather) and charging station costs to estimate levelized cost of charging, and quantifying uncertainty and error in our aggregation methods for estimating EV charging loads at the hourly timescale.

14 SOLAR ENERGY↗

Water Atlas Features Database

Water availability was mapped across the United States and considers multiple sources of fresh water including fresh surface and groundwater, wastewater and brackish groundwater. This dataset includes cost estimates to access, treat and convey each unique source of water. This submission contains a zip file with the Water Atlas Features Database (as an ArcGIS geodatabase).

Availability↗

Revenue prediction for integrated renewable energy and energy storage system using machine learning techniques

Revenue estimation for integrated renewable energy and energy storage systems is important to support plant owners or operators’ decisions in battery sizing selection that leads to maximized financial performances. A common approach to optimizing revenues of a hybrid hydro and energy storage system is using mixed-integer linear programming (MILP). Although MILP models can provide accurate production cost estimations, they are typically very computationally expensive. To provide a fast yet accurate first-step information to hydropower plant owners or operators who consider integrating energy storage systems, we propose an innovative approach to predicting optimal revenues of an integrated energy generation and storage system. In this study, we examined the performance of two prediction techniques: Generalized Additive Models (GAMs) and machine learning (ML) models developed based on artificial neural networks (ANN). Predictive equations and models are generated based on optimized solutions from a market participation optimization model, the Conventional Hydropower Energy and Environmental Resource System (CHEERS) model. The two predicting techniques reduce the computational time to evaluate annual revenue for one set of battery configurations from 3 h to 1 to 4 min per run while also being implementable with significantly less data. The model validation prediction errors of developed GAMs and ML models are generally below 5%; for model testing predictions, the ML models consistently outperform the regression equations in terms of root mean square errors. This new approach allows plant owners, operators, or potential investors to quickly access multiple battery configurations under different energy generation and market scenarios. This new revenue prediction method will therefore help reduce the barriers, and thereby promoting the deployment of battery hybridization with existing renewable energy sources.

13 HYDRO ENERGY↗

Future Circular Collider Feasibility Study Report

Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region. The report describes the development of the project scenario based on the ‘avoid-reduce-compensate’ iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain—including numerous urban, economic, social, and technical aspects—confirmed the project’s technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a summary of the studies conducted to document the current state of the environment.

Benedikt, M. [European Organization for Nuclear Re↗

Identifying Barriers to Solar and Storage Hybrids: Modeled vs. empirical wholesale market value and net-value for co-located solar + storage projects [Slides]

Large-scale (1MW+) co-located solar and battery storage projects are expanding rapidly in the United States, but their realized contribution to the bulk power system remains poorly understood because public project-level operating data are limited. The Lawrence Berkeley National Laboratory estimates the wholesale market value of 280 operational photovoltaic-plus-storage (PV+S) projects across the seven ISOs/RTOs and 19 additional balancing authorities, representing roughly 95% of the U.S. PV+S fleet in 2024. We model optimized hourly dispatch under energy, capacity, and ancillary-service market opportunities and compare the resulting value with standalone PV value, project-specific levelized cost estimates, and empirical operating or revenue data where available.

14 SOLAR ENERGY↗

Cost-Efficiency balanced polymer acceptors based on lowly fused Dithienopyrrolo[3, 2b]benzothiadiazole for 16.04% efficiency All-Polymer solar cells

All-polymer solar cells (All-PSCs) attracted increasing attention due to the outstanding thermal stability and mechanical properties. The current prevailing polymer acceptors for most efficient All-PSCs are polymerized high-performance small molecule acceptor of Y6, i.e. the dithienothiopheno[3,2-b]-pyrrolobenzothiadiazole (BTTP) based polymers. However, the BTTP-based polymers often show relatively shallow highest occupied molecular orbital (HOMO) energy level and high figure of merit (FOM), which limit the rational selection of paring donor polymers. Herein, we presented two low-cost polymer acceptors, namely as BTP-T2F and BTP-2T2F, based on lowly fused dithienopyrrolo[3,2b]benzothiadiazole (BTP, removing two thiophene cycles from BTTP). Here the BTP-based polymers exhibited deeper HOMO levels around –5.90 eV, which could match variable donor polymers with low-lying HOMO levels, such as low-cost PTQ10. Additionally, the synthesis was significantly simplified compared to BTTP-based polymers. A power conversion efficiency (PCE) of 14.32% was achieved in binary blend device containing PTQ10:BTP-2T2F. By adding a miscibility-enhancing PBDTCl-TPD as a third component, the top PCE of 16.04% was obtained in ternary blend All-PSCs. Combining the high device performance and low estimated cost, extraordinary cost-efficiency balance was realized within these BTP-based polymer acceptors.

36 MATERIALS SCIENCE↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗

Wind turbine blade material in the United States: Quantities, costs, and end-of-life options

Wind energy has experienced enormous growth in the past few decades; as a result, there are thousands of wind turbines around the world that will reach the end of their design lifetimes in the coming years. Much of the material in those turbines can be recycled using conventional processes, but the composite material that is the main component of the blades is more challenging to recycle. In the United States, turbine blades may be disposed of in landfills, adding a new solid waste stream to the material already being landfilled. This paper presents a spatially resolved estimate of the mass and volume of wind turbine blade waste in each state by 2050 and compares these amounts to estimates of the remaining landfill capacity by state. In this work, we estimate costs for each stage of the disposal process to indicate cost levels for alternatives. Assuming a 20-year turbine lifetime, the cumulative blade waste in 2050 is approximately 2.2 million tons. This value represents approximately 1% of remaining landfill capacity by volume, or 0.2% by mass. We also find that the current cost of disposing of blades in large segments or through grinding is relatively low in comparison to the overall life-cycle cost of energy. Based on these findings, landfill space constraints and disposal costs appear unlikely to motivate a change in waste handling strategies under current policy conditions. Instead, more profound shifts in recycling technologies, blade materials, or policy may be needed to move towards a circular economy for wind turbine blades.

17 WIND ENERGY↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Biomass supply chain equipment for renewable fuels production: A review

The production of renewable fuels is a critical component of global strategies to reduce greenhouse gas (GHG) emissions. Moreover, the collection of raw materials for its production can provide added benefits such as reduction of wildfire risk, additional income for farmers, and decreased disposal costs. Although there is substantial literature on design and modeling of supply chains, the authors were unable to find a single reference with the information needed for the selection and cost estimation of each type of equipment involved in the supply chain. Therefore, the goal of this research is to gather information necessary for the construction and utilization of models that might drive the identification of a feasible supply chain to produce renewable fuels at a commercial scale. The primary objectives are to 1) understand the supply chain of critical feedstocks for renewable fuels production; 2) identify the equipment commercially available for collection and adequation of feedstock; and 3) consolidate information regarding equipment cost, energy consumption, and efficiency, as well as feedstock storage and transportation systems. This paper provides a compilation for five feedstock types studied for sustainable aviation fuel production: 1) agricultural residues and grasses, 2) forest residues, 3) urban wood waste, 4) oilseeds, 5) fats, oils & greases. All the technologies involved from the field to the gate of the preprocessing or conversion unit were reviewed. The information on fats, oils & greases supply chains and equipment purposely designed for forest thinning and pruning was very limited.

: Feedstock, Collection and Adequation, Renewable ↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

Optimizing bioenergy biofuel harvest: a comparative analysis of stepwise and integrated methods for economic and environmental sustainability

Switchgrass is a promising bioenergy feedstock due to its high biomass yield potential, adaptability to marginal lands, and low carbon intensity for feedstock production. However, accurate cost estimation and assessment of greenhouse gas (GHG) emissions for the energy-intensive harvesting process are essential for evaluating the sustainability of bioenergy. This study provides a comparative analysis of two harvesting methods: the Stepwise Method, which separates operations into multiple stages, and the Integrated Method, which combines mowing and raking into a single pass. The analysis was conducted under four scenarios based on field sizes and biomass yields. Using three years of field-scale switchgrass harvest data from 125 sites, GHG emissions, energy consumption, and harvesting costs were quantified using the GREET model and techno-economic analysis. Additionally, regression analysis identified key climate and operational factors affecting fuel consumption. The Stepwise method was the most cost-effective for large fields with high biomass yield, achieving the lowest harvesting costs ($37.70 per ton). In contrast, the Integrated Method performed better in small fields and low-yield conditions, reducing GHG emissions by 9 % and energy use by 5 %. Regression analysis confirmed that a larger field size reduced fuel consumption, while higher biomass yield and longer operational time increased fuel use. Maximum temperature also contributed to a slight increase in fuel consumption. Furthermore, these results provide actionable insights for optimizing harvesting strategies based on field-specific conditions and operational goals, contributing to the economic and environmental sustainability of bioenergy production.

60 APPLIED LIFE SCIENCES↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Potential Supply Chain and Cost Reduction Strategies for Advanced Nuclear Reactors

This milestone represents a level of effort to provide recommendations for a supply chain plan and establish relationships between advanced reactor companies and large companies in the oil & gas and chemical industries. It represents a starting point to develop the plan with options, general equipment lists, and rough associated cost estimates of major equipment and the associated systems needed. This effort will provide an opportunity to leverage the experience that oil & gas and chemicals companies possess in large capital equipment procurement, modularization, acquisition and installation. Potential supply chain solutions will be discussed and preliminary options for worldwide manufacturers will be elucidated. The goal of this effort will be to leverage the years of accumulated experience in the oil & gas and chemical industries in the area of capital equipment acquisition to understand the potential supply chain options and to reduce potential acquisition costs by optimizing the supply chain options for advanced nuclear reactor modularization, manufacturing and acquisition.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Variability in Diurnal and Seasonal Ambient Conditions on Geothermal Plant Performance and Cost: Preprint

Geothermal plant performance is bounded by the second law efficiency, which accounts for the quantity of exergy that can be converted into useful work. This in turn is dependent on the geothermal resource temperature and the temperature of the heat sink (i.e., the ambient temperature). In this study we show that ambient temperature variability on a diurnal and seasonal basis can affect performance and cost estimations for geothermal plants. We have utilized the updated System Advisor Model (SAM) to assess nine geothermal sites with existing resource capacities across three climate zones. Our analysis shows that both evaporatively-cooled flash and air-cooled binary cycle plants are affected by temperature, with a slightly higher effect in EGS binary sites. By assuming an ambient (wet bulb) temperature baseline of 15.6 degrees C (60 degrees F) and comparing baseline results to those from site-specific data we observe up to 15% underestimation of plant performance and up to 20% overestimation of cost.

ambient temperature↗