At least 199 records · Page 11

SU-F-T-365: Clinical Commissioning of the Monaco Treatment Planning System for the Novalis Tx to Deliver VMAT, SRS and SBRT Treatments

Purpose: To commission the Monaco Treatment Planning System for the Novalis Tx machine. Methods: The commissioning of Monte-Carlo (MC), Collapsed Cone (CC) and electron Monte-Carlo (eMC) beam models was performed through a series of measurements and calculations in medium and in water. In medium measurements relied Octavius 4D QA system with the 1000 SRS detector array for field sizes less than 4 cm × 4 cm and the 1500 detector array for larger field sizes. Heterogeneity corrections were validated using a custom built phantom. Prior to clinical implementation, an end to end testing of a Prostate and H&N VMAT plans was performed. Results: Using a 0.5% uncertainty and 2 mm grid sizes, Tables I and II summarize the MC validation at 6 MV and 18 MV in both medium and water. Tables III and IV show similar comparisons for CC. Using the custom heterogeneity phantom setup of Figure 1 and IGRT guidance summarized in Figure 2, Table V lists the percent pass rate for a 2%, 2 mm gamma criteria at 6 and 18 MV for both MC and CC. The relationship between MC calculations settings of uncertainty and grid size and the gamma passing rate for a prostate and H&N case is shown in Table VI. Table VII lists the results of the eMC calculations compared to measured data for clinically available applicators and Table VIII for small field cutouts. Conclusion: MU calculations using MC are highly sensitive to uncertainty and grid size settings. The difference can be of the order of several per cents. MC is superior to CC for small fields and when using heterogeneity corrections, regardless of field size, making it more suitable for SRS, SBRT and VMAT deliveries. eMC showed good agreement with measurements down to 2 cm − 2 cm field size.

60 APPLIED LIFE SCIENCES↗

SU-F-T-506: Development and Commissioning of the Effective and Efficient Grid Therapy Using High Dose Rate Flattening Filter Free Beam and Multileaf Collimator

Purpose: Treating bulky tumors with grid therapy (GT) has demonstrated high response rates. Long delivery time (∼15min), with consequent increased risk of intrafraction motion, is a major disadvantage of conventional MLC-based GT (MLC-GT). The goal of this study was to develop and commission a MLC-GT technique with similar dosimetric characteristics, but more efficient delivery. Methods: Grid plan was designed with 10X-FFF (2400MU/min) beam and MLC in a commercial treatment planning system (TPS). Grid size was 1cm by 1cm and grid-to-grid distance was 2cm. Field-in-field technique was used to flatten the dose profile at depth of 10cm. Prescription was 15Gy at 1.5cm depth. Doses were verified at depths of 1.5cm, 5cm and 10cm. Point dose was measured with a plastic scintillator detector (PSD) while the planar dose was measured with calibrated Gafchromic EBT3 films in a 20cm think, 30cmx30cm solid water phantom. The measured doses were compared to the doses calculated in the treatment planning system. Percent depth dose (PDD) within the grid was also measured using EBT3 film. Five clinical cases were planned to compare beam-on time. Results: The valley-to-peak dose ratio at the 3 depths was approximately 10–15%, which is very similar to published result. The average point dose difference between the PSD measurements and TPS calculation is 2.1±0.6%. Film dosimetry revealed good agreement between the delivered and calculated dose. The average gamma passing rates at the 3 depths were 95% (3%, 1mm). The average percent difference between the measured PDD and calculated PDD was 2.1% within the depth of 20cm. The phantom plan delivery time was 3.6 min. Average beam-on time was reduced by 66.1±5.6% for the 5 clinical cases. Conclusion: An effective and efficient GT technique was developed and commissioned for the treatment of bulky tumors using FFF beam combined with MLC and automation. The Department of Radiation Oncology at Henry Ford Health System receives research support from Varian Medical Systems and Philips Health Care.

60 APPLIED LIFE SCIENCES↗

SU-G-BRB-06: Commissioning and Evaluation of EPID-Based in Vivo Dosimetry Software Using a Tissue-Maximum Ratio Approach

Purpose: To commission and evaluate an in vivo EPID-based transit dosimetry software (EPIgray, DOSIsoft, Cachan, France) using simple fields and TG119-based IMRT treatment plans. Methods: EPIgray was commissioned on a Truebeam based on finite tissue-maximum ratio (fTMR) measurements with solid water blocks of thicknesses between 0 and 37 cm. Field sizes varied from 2×2 to 20×20 cm{sup 2}. Subsequently, treatment plans of single and opposed beams with field sizes between 4×4 and 15×15 cm{sup 2} as well as IMRT plans were measured to evaluate the dose reconstruction accuracy. Single field dose predictions were made for anterior-posterior and lateral beams. IMRT plans were created based on TG119 recommendations. The reconstructed dose was compared to the planned dose for selected points at isocenter and away from isocenter. Results: For single square fields, the dose in EPIgray was reconstructed within 3% accuracy at isocenter relative to the planned dose. Similarly, the relative deviation of the total dose was accurately reconstructed within 3% for all IMRT plans with points placed inside a high dose region near the isocenter. Predictions became less accurate than 5% when the evaluation point was outside the majority of IMRT beam segments. Additionally, points 5 cm or more away from the isocenter or within an avoidance structure were predicted less reliably. Conclusion: EPIgray formalism accuracy is adequate for an efficient error detection system. It provides immediate intra-fractional feedback on the delivery of treatment plans without affecting the treatment beam. Besides the EPID, no additional hardware is required, which makes it accessible to all clinics. The software evaluates point dose measurements to verify treatment plan delivery and patient positioning within 5% accuracy, depending on the placement of evaluation points. EPIgray is not intended to replace patient-specific quality assurance but should be utilized as an additional layer of safety for continuous patient treatment verification. This research is supported by DOSIsoft.

60 APPLIED LIFE SCIENCES↗

Poster - 20: Detector selection for commissioning of a Monte Carlo based electron dose calculation algorithm

Objective: Commissioning of a Monte Carlo based electron dose calculation algorithm requires percentage depth doses (PDDs) and beam profiles which can be measured with multiple detectors. Electron dosimetry is commonly performed with cylindrical chambers but parallel plate chambers and diodes can also be used. The purpose of this study was to determine the most appropriate detector to perform the commissioning measurements. Methods: PDDs and beam profiles were measured for beams with energies ranging from 6 MeV to 15 MeV and field sizes ranging from 6 cm × 6 cm to 40 cm × 40 cm. Detectors used included diodes, cylindrical and parallel plate ionization chambers. Beam profiles were measured in water (100 cm source to surface distance) and in air (95 cm source to detector distance). Results: PDDs for the cylindrical chambers were shallower (1.3 mm averaged over all energies and field sizes) than those measured with the parallel plate chambers and diodes. Surface doses measured with the diode and cylindrical chamber were on average larger by 1.6 % and 3% respectively than those of the parallel plate chamber. Profiles measured with a diode resulted in penumbra values smaller than those measured with the cylindrical chamber by 2 mm. Conclusion: The diode was selected as the most appropriate detector since PDDs agreed with those measured with parallel plate chambers (typically recommended for low energies) and results in sharper profiles. Unlike ion chambers, no corrections are needed to measure PDDs, making it more convenient to use.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Final Report Start-Up and Commissioning Tests on the DuraMelter 1200 HLW Pilot Melter System Using AZ-101 HLW Simulants

This document provides the final report on data and results obtained from commissioning tests performed on the one-third scale DuraMelter{trademark} 1200 (DM 1200) HLW Pilot Melter system that has been installed at VSL with an integrated prototypical off-gas treatment system. That system has replaced the DM1000 system that was used for HLW throughput testing during Part BI [1]. Both melters have similar melt surface areas (1.2 m{sup 2}) but the DM1200 is prototypical of the present RPP-WTP HLW melter design whereas the DM1000 was not. These tests were performed under a corresponding RPP-WTP Test Specification and associated Test Plan. This report is a followup to the previously issued Preliminary Data Summary Report. The DM1200 system will be used for testing and confirmation of basic design, operability, flow sheet, and process control assumptions as well as for support of waste form qualification and permitting. This will include data on processing rates, off-gas treatment system performance, recycle stream compositions, as well as process operability and reliability. Consequently, this system is a key component of the overall HLW vitrification development strategy. The results presented in this report are from the initial series of short-duration tests that were conducted to support the start-up and commissioning of this system prior to conducting the main body of development tests that have been planned for this system. These tests were directed primarily at system 'debugging,' operator training, and procedure refinement. The AZ-101 waste simulant and glass composition that was used for previous testing was selected for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Navajo Hopi Land Commission Renewable Energy Development Project (NREP)

The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

14 SOLAR ENERGY↗

The Spallation Neutron Source Beam Commissioning and Initial Operations

The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

43 PARTICLE ACCELERATORS↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recommendations to Improve Nuclear Licensing: Update to INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process

In 2023, various stakeholders had asked for BEA’s thoughts and recommendations to improve the U.S. Nuclear Regulatory Commission’s (NRC) licensing review and approval process. This included an April 14, 2023 request from the House Committee on Energy and Commerce on “information and recommendations to improve the licensing review and approval process, . . . as well as the siting, licensing, construction, and oversight of advanced nuclear reactor technologies.” In response to these requests, BEA prepared and published INL/RPT-23-72206, Recommendations to Improve the Nuclear Regulatory Commission Reactor Licensing and Approval Process (2023 Report). The 2023 Report included 13 recommendations related to streamlining NRC hearings, expediting NRC safety and environmental reviews, otherwise improving NRC licensing, and providing financial benefits to new reactor projects. Many of these earlier recommendations were addressed through various legislative actions or changes made by the NRC. Section 2 of this report addresses the current status of those earlier recommendations. BEA recently received a new request from the House Committee on Energy and Commerce seeking any suggestions for additional areas to examine or potential reforms “that may assist in modernizing the licensing and regulatory process that affects civil nuclear deployment.” Additionally, the new Secretary of Energy has identified initial DOE actions to support unleashing the golden era of American energy dominance, including “Unleash Commercial Nuclear Power in the United States” and “Streamline Permitting and Identify Undue Burdens on American Energy.” Given these developments, BEA has prepared a new set of updated recommendations in this report. The recommendations include updated versions of recommendations from the 2023 Report which have not been fully adopted, as well as entirely new recommendations. This set of recommendations has a slightly broader focus with some recommendations focused on DOE authorizations and some recommendations related to nuclear licensing beyond new reactors. Each recommendation below also identifies whether the recommendation would require legislative action or could be addressed directly by the respective agency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commissioning MMS: Challenges and Lessons Learned

This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

Space Operations Center↗

Commissioning MMS

This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

Space Operations Center↗

Kepler Commissioning Data for Measurement of the Pixel Response Function and Focal Plane Geometry

This document describes the Kepler PRF/FPG data release. This data was taken on April 27-29, 2009, during Kepler's commissioning phase in order to measure the pixel response function (PRF) (Bryson et al., 2010a) and focal plane geometry (FPG) (Tenenbaum and Jenkins, 2010). 33,424 stellar targets were observed for 243 long cadences, each with a duration of 14.7 minutes (half the duration of a normal Kepler long cadence). During these 243 cadences the Kepler photometer was moved, pointing in a dither pattern to facilitate PRF measurement. Motion occurred during the even cadences (second, fourth, etc.), with the telescope in stable fine point at each pointing in the dither pattern during the odd cadences (first, third, etc.). The first and last cadences were at the center of the dither pattern. Motion cadences are included in this release, but they do not contain any data. For details on how this data was used to derive the Kepler PRF and FPG models, see Bryson et al. (2010a) and Tenenbaum and Jenkins (2010). Descriptions of the PRF and FPG models are found in Thompson et al. (2016), x2.3.5.17 and x2.3.5.16 respectively. The data in this release can be used to recompute the Kepler PRF and FPG. Such a reconstruction, however, would not reflect measured seasonal changes in the PRF described in Van Cleve et al. (2016b), x5.2.The dither pattern is shown in Figure 1. The crosses show the commanded pointings and the circles show the measured pointings. Measured pointings are different from the commanded pointings due to the early state of calibration of the fine guidance sensors during commissioning (Van Cleve et al., 2016a). The measured offsets from the center of the pattern are given in RADEC offsets and pixel offsets in Table 1. The order of the offsets was randomized during data collection to avoid time-dependent systematics.

Kepler↗

Lattice Commissioning Stretgy Simulation for the B Factory

To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.

43 PARTICLE ACCELERATORS↗

COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

43 PARTICLE ACCELERATORS↗

Commissioning of the 112 MHz SRF Gun and 500 MHz bunching cavities for the CeC PoP Linac

The Coherent electron Cooling Proof-of-Principle (CeC PoP) experiment at BNL includes a short electron linac. During Phase 1, a 112 MHz superconducting RF photo-emission gun and two 500 MHz normal conducting bunching cavities were installed and are under commissioning. The paper describes the Phase1 linac layout and presents commissioning results for the cavities and associated RF, cryogenic and other sub-systems

43 PARTICLE ACCELERATORS↗

Commissioning results of Nb 3 Sn cavity vapor diffusion deposition system at JLab

Nb 3 Sn as a BCS superconductor with a superconducting critical temperature higher than that of niobium offers potential benefit for SRF cavities via a lower-than-niobium surface resistance at the same temperature and frequency. A Nb 3 Sn vapor diffusion deposition system designed for coating of 1.5 and 1.3 GHz single-cell cavities was built and commissioned at JLab. As the part of the commissioning, RF performance at 2.0 K of a single-cell 1.5 GHz CEBAF-shaped cavity was measured before and after coating in the system. Before Nb 3 Sn coating the cavity had a Q 0 of about 10 10 and was limited by the high field Q-slope at E acc ≅ 27 MV/m. Coated cavity exhibited the superconducting transition at about 17.9 K. The low-field quality factor was about 5∙10 9 at 4.3 K and 7∙10 9 at 2.0 K decreasing with field to about 1∙10 9 at E acc ≅ 8 MV/m at both temperatures. The highest field was limited by the available RF power.

36 MATERIALS SCIENCE↗

CEBAF SRF Performance during Initial 12 GeV Commissioning

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3×10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

43 PARTICLE ACCELERATORS↗