Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technoeconomic Modeling of Battery Energy Storage in SAM

Detailed comprehensive lead-acid and lithium-ion battery models have been integrated with photovoltaic models in an effort to allow System Advisor Model (SAM) to offer the ability to predict the performance and economic benefit of behind the meter storage. In a system with storage, excess PV energy can be saved until later in the day when PV production has fallen, or until times of peak demand when it is more valuable. Complex dispatch strategies can be developed to leverage storage to reduce energy consumption or power demand based on the utility rate structure. This document describes the details of the battery performance and economic models in SAM.

14 SOLAR ENERGY↗

A Comprehensive Strategy for Grid Forming Control in DC Coupled Photovoltaic and Battery Energy Storage Inverters

This paper presents an integrated DC-DC and DCAC grid-forming control strategy for DC-coupled photovoltaic (PV) plus battery energy storage systems, considering the effect of DC link voltage variations caused by direct PV connections. A power reference algorithm determines power distribution between the PV and battery to the grid while observing device power ratings to prevent the over-rating of components and keep the battery's state of charge within an acceptable range. The simulated utility-scale model in MATLAB/Simulink illustrates its ability against extreme phase angle variation contingencies in the grid while controlled through grid-forming control with a fast dynamic on DC link voltage. The simulation results confirm the effectiveness of the proposed control in integrating PV plus battery configurations with grid forming control and maintaining reliable grid operation under severe grid disturbances.

battery, boost, control, energy storage, grid form↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Optimal Power Management for Battery Energy Storage Systems: A Novel Accelerated Tracking ADMM Approach

Optimal power management (OPM) is critical for large-scale battery energy storage systems. Today’s methods often require formidable computational effort due to the design based on centralized numerical optimization. Thus, this paper investigates computationally distributed OPM where the agents based on the cells communicate over a network to cooperatively solve the OPM problem. We propose an accelerated tracking alternating direction method of multipliers (ADMM) algorithm to solve the distributed OPM. The proposed algorithm embeds dynamic average consensus and Nesterov’s acceleration technique in the ADMM algorithm. Not only is the proposed algorithm fully distributed without a need for fusion or aggregating nodes, but it also accelerates convergence. The paper formulates the OPM in a model predictive control framework where it seeks to regulate the charging/discharging power of each battery cell to minimize the total power losses and promote balanced use of the constituent cells while complying with the safety constraints. The paper provides ample simulation results to demonstrate the effectiveness and advantages of the proposed distributed OPM in terms of computation and convergence.

Farakhor, Amir↗

Snohomish Public Utility District MESA 2: An Assessment of Flow Battery Energy Storage System Technical Performance

This report investigates the technical performance of the 2.2 MW, 8 MWh MESA 2 advanced vanadium flow battery energy storage system (FBESS), consisting of four 0.55 MW, 2 MWh strings, based on a number of baseline and use case tests. The FBESS is located at the Everett, Washington substation and owned by SnoPUD. The FBESS was procured by SnoPUD with matching funds by the Washington Clean Energy. Baseline tests were intended to assess the general technical capability of the FBESS (e.g., stored energy capacity, ramp rate performance, ability to track varying charge/discharge commands, direct current (DC) battery internal resistance). Use case tests were used to examine the performance of the FBESS while engaged in specific grid services (e.g., arbitrage, power factor correction). The project measured and/or calculated parameters that are important for understanding FBESS performance when subjected to actual field operation for achieving economic benefits, e.g., round trip efficiency (RTE) with and without rest, with and without auxiliary loads, auxiliary power consumption, signal command tracking, temperature trends during operation, parasitic power loss unaccounted by auxiliary load during rest, and state of charge (SOC) excursions. These baseline and use case parameters were analyzed using recorded test results. In addition, the results and lessons presented herein are also beneficial for any task or effort that needs technical assessment on similar and different types of FBESS based on technical specifications and/or field deployment results, since the assessment methodology remains the same.

25 ENERGY STORAGE↗

Battery Energy Storage System (BESS) Licensing and Permitting [Slides]

This presentation provides an overview of the licensing, permitting, and regulatory frameworks governing Battery Energy Storage Systems (BESS) across multiple international contexts. It outlines foundational permitting considerations - including safety standards, siting requirements, regulatory and environmental obligations, and interconnection processes - alongside typical pathways for installation, approval, and inspection. The presentation summarizes key technical standards such as NFPA 855 and IEEE guidelines, and emphasizes best practices for safe and effective deployment. A series of detailed case studies from South Africa, Chile, Mexico, Brazil, Costa Rica, Honduras, and the Dominican Republic illustrates how different countries structure approval authority, evaluate environmental impacts, and integrate BESS into national grid systems. The deck concludes with insights on emerging challenges, including evolving regulatory frameworks, financial viability, and the need for pricing mechanisms that accurately value storage services.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Impacts of Battery Energy Storage System Functionalities on Distribution Systems Using Power Hardware in-the-Loop Simulation: Preprint

In this paper, we present results from a power hardware-in-the-loop (PHIL) simulation that was performed to test and demonstrate the impact of a battery energy storage system (BESS) on a distribution feeder. The PHIL platform includes a simulated distribution grid in a real-time digital simulator (RTDS), AC and DC power amplifiers, and a battery inverter as the device under test. Guidelines of specific procedures to set up a PHIL platform are provided on how to set up a PHIL platform to evaluate the impact of grid integrated systems. Accelerated time-series PHIL simulations of peak shaving and Volt/Var functionalities were performed using a 540 kVA BESS. These experimental results illustrate how PHIL simulations can be used to evaluate the impact of BESS functionalities on the distribution grid prior to installation in the field.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Battery Energy Storage Systems: A Review of Energy Management Systems and Health Metrics

With increasing concerns about climate change, there is a transition from high-carbon-emitting fuels to green energy resources in various applications including household, commercial, transportation, and electric grid applications. Even though renewable energy resources are receiving traction for being carbon-neutral, their availability is intermittent. To address this issue to achieve extensive application, the integration of energy storage systems in conjunction with these resources is becoming a recommended practice. Additionally, in the transportation sector, the increased demand for EVs requires the development of energy storage systems that can deliver energy for rigorous driving cycles, with lithium-ion-based batteries emerging as the superior choice for energy storage due to their high power and energy densities, length of their life cycle, low self-discharge rates, and reasonable cost. As a result, battery energy storage systems (BESSs) are becoming a primary energy storage system. The high-performance demand on these BESS can have severe negative effects on their internal operations such as heating and catching on fire when operating in overcharge or undercharge states. Reduced efficiency and poor charge storage result in the battery operating at higher temperatures. To mitigate early battery degradation, battery management systems (BMSs) have been devised to enhance battery life and ensure normal operation under safe operating conditions. Some BMSs are capable of determining precise state estimations to ensure safe battery operation and reduce hazards. Precise estimation of battery health is computed by evaluating several metrics and is a central factor in effective battery management systems. In this scenario, the accurate estimation of the health indicators (HIs) of the battery becomes even more important within the framework of a BMS. This paper provides a comprehensive review and discussion of battery management systems and different health indicators for BESSs, with suitable classification based on key characteristics.

Nazaralizadeh, Solmaz (ORCID:0009000737004039)↗

Predictive-Maintenance Practices: For Operational Safety of Battery Energy Storage Systems

Changes in the Demand Profile and a growing role for renewable and distributed generation are leading to rapid evolution in the electric grid. These changes are beginning to considerably strain the transmission and distribution infrastructure. Utilities are increasingly recognizing that the integration of energy storage in the grid infrastructure will help manage intermittency and improve grid reliability. This recognition, coupled with the proliferation of state-level renewable portfolio standards and rapidly declining lithium-ion (Li-ion) battery costs, has led to a surge in the deployment of battery energy storage systems (BESSs). Additionally, although BESSs represented less than 1% of grid-scale energy storage in the United States in 2019, they are the preferred technology to meet growing demand because they are modular, scalable, and easy to deploy across diverse use cases and geographic locations.

25 ENERGY STORAGE↗

Integrating solar into Florida's power system: Potential roles for flexibility

Although Florida has very little photovoltaic (PV) generation to date, it is reasonable to expect significant deployment in the 2020s under a variety of future policy and cost scenarios. To understand these potential futures, we model Florida Reliability Coordinating Council operations in 2026 over a wide range of PV penetrations with various combinations of battery storage capacity, demand response, and increased operational flexibility. By calculating the value of PV under a wide range of conditions, we find that at least 5%, and more likely 10-24%, PV penetration is cost competitive in Florida within the next decade with baseline flexibility and all but the most pessimistic of assumptions. For high PV penetrations, we demonstrate Florida's electrical net-load variability (duck curve) challenges, the associated reduction of PV's value to the system, and the ability of flexibility options-in particular energy-shifting resources-to preserve value and increase the economic carrying capacity of PV. A high level of demand response boosts the economic carrying capacity of PV by up to 0.5-2 percentage points, which is comparable to the impact of deploying 1 GW of battery storage. Adding 4 GW of battery storage expands the economic carrying capacity of PV by up to 6 percentage points.

14 SOLAR ENERGY↗

Hybrid Vehicle Comparison Testing Using Ultracapacitor vs. Battery Energy Storage (Presentation)

With support from General Motors, NREL researchers converted and tested a hybrid electric vehicle (HEV) with three energy storage configurations: a nickel metal-hydride battery and two ultracapacitor (Ucap) modules. They found that the HEV equipped with one Ucap module performed as well as or better than the HEV with a stock NiMH battery configuration. Thus, Ucaps could increase the market penetration and fuel savings of HEVs.

25 ENERGY STORAGE↗

Battery energy storage control systems and methods for a grid tie inverter coupled to a photovoltaic system

A distributed control system uses a central controller in Internet communication with a local controller to manage grid tie attachment with a battery to form an integrated battery energy storage system (BESS). The BESS is capable of charging or discharging the battery, as well as correcting grid phase with volt amp reactive (VAR) leading or lagging operation modes. Examples shown include simple BESS charging and discharging, BESS integrated with renewable energy sources (here photovoltaic), and direct current fast charge (DCFC) connections with an electric vehicle.

Gadh, Rajit↗

Co-optimized trading of hybrid wind power plant with retired EV batteries in energy and reserve markets under uncertainties

To be competitive in the electricity markets, various technologies have been reported to increase profits of wind farm owners. Combining battery storage system, wind farms can be operated as conventional power plants which promotes the integration of wind power into the power grid. However, high expenses on batteries keep investors away. Retired EV batteries, fortunately, still have enough capacity to be reused and could be obtained at a low price. In this work, a two-stage optimization of a wind energy retired EV battery-storage system is proposed. The economic performance of the proposed system is examined concerning its participation in the frequency containment normal operation reserve (FCR-N) market and the spot market simultaneously. To account uncertainties in the wind farm output, various electricity market prices, and up/down regulation status, a scenario-based stochastic programming method is used. The sizing of the equipment is optimized on top of daily operations of the hybrid system which formulates a mixed-integer linear programming (MILP) problem. Scenarios are generated with the Monte Carlo simulation (MCS) and Roulette Wheel Mechanism (RWM), which are further reduced with the simultaneous backward method (SBM) to increase computational efficiency. A 21 MW wind farm is selected as a case study. Here, the optimization results show that by integrating with a retired EV battery-storage system (RESS) and a bi-directional inverter, the wind farm can increase its profits significantly when forwarding bids in both of the aforementioned electricity markets.

17 WIND ENERGY↗