Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Dataset of U.S. School Bus Depots

A large body of public health literature describes how undesirable or dangerous facilities, such as truck depots and industrial plants, located in or near communities can lead to health harms. Research also describes the high levels of traffic-related air and noise pollution that is linked to health harms and may be disproportionately distributed near many schools. Therefore, a primary use case for this dataset is to analyze the location of school bus depots and to create an evidence base that would better enable the work of community members, advocates, and other stakeholders toward improving air quality and public health. Other possible uses for this school bus depot dataset include electricity grid planning and reliability, given recent momentum toward school bus electrification. This dataset was created using an object-based approach with remote sensing data. The primary source of aerial imagery was the National Agriculture Imagery Program (NAIP) dataset. NAIP imagery was analyzed to locate individual school buses based on their color and size, and then classified clusters of school buses as potential depots, which were then verified visually. The resulting dataset contains 11,309 depots across the 48 contiguous U.S. states and Washington, D.C. Fifty-one percent (5,730 depots) are at schools, defined as being 350 meters or less from the nearest school. The accuracy of the dataset was assessed by comparing it with independent reference datasets containing 506 depots from the records of two school transportation companies. We found good agreement, with an omission error rate of 15.2% (77 depots). This dataset represents one of the only remote sensing projects to conduct object detection using data at the sub-meter to 1-meter resolution for a continental-scale application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FleetREDI Insight: Intrastate Coach Bus Dataset

Capturing real-world data is critical to improving efficiency and supporting technology advancements in commercial vehicles. FleetREDI’s insights provide detailed duty cycle information and highlight unique aspects of the given dataset. Each insight delivers a quick look at the collected data by summarizing the operation and identifying key findings of the initial analysis. This FleetREDI insight explores coach buses operating in Colorado. Coach buses are a primary mover for intrastate transit and are primarily used for longer trips with more comfortable seats and a restroom. All Aboard America! Holdings Inc. offers various fixed-service and charter routes across Colorado on its Bustang fleet out of its depot in Golden, Colorado. NLR installed logging devices and collected operational data on nine 40-foot Bustang motorcoaches operating on fixed routes from May through August 2022. Using NLR’s FleetREDI data platform, this dataset provides a summary of daily operation to help understand duty cycle characteristics. This includes daily distance, fuel use, and estimated engine-produced energy consumption for nine motorcoaches that operated more than 33,000 miles. These vehicles primarily operated on Interstate 25 and Interstate 70. ![FleetREDI interstate bus](FleetREDI-interstate-bus.jpg)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Valuation and cost reduction of behind-the-meter hydrogen production in Hawaii

A 250kW hydrogen electrolysis facility was recently installed at the Natural Energy Laboratory of Hawaii Authority's (NELHA's) campus. This facility that will begin operation in 2020 to produce hydrogen for fuel cell buses on the island to demonstrate of the application of hydrogen to decarbonize transportation. Given the size of the electrolysis station, it has the potential to significantly increase electricity costs for the campus, which is subject to energy and peak demand charges from the local utility. In this paper, we analyze the cost of hydrogen production at NELHA given the rate structure options available from the utility. Production costs are estimated using optimal versus constant scheduling of the facility to meet the buses’ demand. A model of the electrolysis station is used to capture changes in production efficiency over the power range in the optimization routine. The effects of combining the station and campus load versus standalone operation and increasing solar generation are also explored. The analyses surrounding this scenario show the importance of multiple factors on the potential profitability of hydrogen production in behind-the-meter applications and show trends that could have implications for other similar installations.

08 HYDROGEN↗

BC Transit Fuel Cell Bus Project: Evaluation Results Report

This report evaluates a fuel cell electric bus demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. This evaluation report covers two years of revenue service data on the buses from April 2011 through March 2013.

30 DIRECT ENERGY CONVERSION↗

BC Transit Fuel Cell Bus Project Evaluation Results: Second Report

Second report evaluating a fuel cell electric bus (FCEB) demonstration led by British Columbia Transit (BC Transit) in Whistler, Canada. BC Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory to evaluate the buses in revenue service. NREL published its first report on the demonstration in February 2014. This report is an update to the previous report; it covers 3 full years of revenue service data on the buses from April 2011 through March 2014 and focuses on the final experiences and lessons learned.

08 HYDROGEN↗

Transportable Emissions Testing Laboratory for Alternative Vehicles Emissions Testing

The overall objective of this project was to perform research to quantify and improve the energy efficiency and the exhaust emissions reduction from advanced technology vehicles using clean, renewable and alternative fuels. Advanced vehicle and alternative fuel fleets were to be identified, and selected vehicles characterized for emissions and efficiency. Target vehicles were to include transit buses, school buses, vocational trucks, delivery trucks, and tractor-trailers. Gaseous species measured were to include carbon monoxide, carbon dioxide, oxides of nitrogen, hydrocarbons, and particulate matter. An objective was to characterize particulate matter more deeply than by mass. Accurate characterization of efficiency and emissions was to be accomplished using a state-of-the-art portable emissions measurement system and an accompanying chassis dynamometer available at West Virginia University. These two units, combined, are termed the Transportable Laboratory. An objective was to load the vehicles in a real-world fashion, using coast down data to establish rolling resistance and wind drag, and to apply the coast down data to the dynamometer control. Test schedules created from actual vehicle operation were to be employed, and a specific objective of the research was to assess the effect of choosing a test schedule which the subject vehicle either cannot follow or can substantially outperform. In addition the vehicle loading objective was to be met better with an improved flywheel system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OSU TOMF Program Site Selection and Preliminary Concept Design Report

The purpose of this report is to confirm the programmatic requirements for the new facilities, identify the most appropriate project site, and develop preliminary site and building concepts that successfully address the overall project goals and site issues. These new facilities will be designed to accommodate the staff, drivers and maintenance requirements for the future mixed fleet of passenger vehicles, Transit Style Buses and School Buses.

33 ADVANCED PROPULSION SYSTEMS↗

American Fuel Cell Bus Project Evaluation: Third Report

This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB, which was developed as part of the Federal Transit Administration's (FTA) National Fuel Cell Bus Program, was delivered to SunLine in November 2011 and was put in revenue service in mid-December 2011. Two new AFCBs with an upgraded design were delivered in June/July of 2014 and a third new AFCB was delivered in February 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report covers the performance of the AFCBs from July 2015 through December 2016.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Battery Electric Bus Demonstration Results: Second Report

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel and Pomona Valley region of Los Angeles County, California. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory to evaluate its fleet of Proterra BEBs in revenue service. The focus of this evaluation is to compare performance of the BEBs to that of conventional technology and to track progress over time toward meeting performance targets. This project has also provided an opportunity for DOE to conduct a detailed evaluation of the BEBs and charging infrastructure. This is the second report summarizing the results of the BEB demonstration at Foothill Transit and it provides data on the buses from August 2015 through December 2016. Data are provided on a selection of compressed natural gas buses as a baseline comparison.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2017 through Dec. 2017

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2016. This report extends the data analysis through December 2017. NREL plans to publish progress reports on the Foothill Transit fleet every six months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jul. 2018 through Dec. 2018

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2018. This report extends the data analysis through the end of 2018. The data period focus of this report is July 2018-December 2018. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Sustainable Data Evolution Technology (SDET) for Power Grid Optimization (Final Report)

This project develops an innovative sustainable data evolution technology (SDET) to create open-access power grid datasets and facilitate updates to these datasets by the power grid community. The lack of open-access, realistic large-scale datasets significantly limits the ability of researchers, developers and ultimately end users to develop, benchmark and compare new methods and tools for optimizing the operation and planning of the grid, which leads to slow adoption by end users. Available open datasets include the IEEE sponsored 14-300 bus transmission test cases and distribution test feeders, the Edinburgh Power Systems Test Case Archive (39-2224 buses), and the Polish cases (2383-3375 buses) available with MATPOWER. These datasets serve certain purposes, but for power grid optimization, they are insufficient in one or more of these aspects: 1) they are too small; 2) they are incomplete in both models and scenarios for optimization purposes; and 3) they are static and are not keeping up with grid needs. The SDET technology delivers large-scale realistic datasets and data-creation tools capable of generating new datasets. We work closely with the Category-2 data repository project awarded by the same GRID DATA program. The generated datasets and data creation tools are compatible with and available through the data repository. The objective is to make this a sustained effort within and beyond the ARPA-E GRID DATA program so that the datasets can evolve over time and meet the current and future needs for power grid optimization and potentially other applications in power grid operation and planning. The novel and disruptive features of SDET differentiate itself from prior work in the following aspects: 1) SDET derives features and metrics for both transmission and distribution (T&D) systems by analyzing many public and private datasets provided by our industry partners National Rural Electric Cooperative Association (NRECA) and PJM Interconnection (PJM). 2) SDET develops data-creation tools and use these tools to generate large-scale open-access realistic datasets that comply with the metrics for both T&D systems. 3) SDET validates the created datasets using industry tools provided by our vendor partner GE Energy Solution. The data creation tools, as well as the created datasets, are integrated into the data repository (DR. POWER) funded by ARPA-E GRID DATA program in Category 2. Users can use the datasets and access these data creation tools to create and update datasets, thus datasets can evolve per user requirements and power grid development. The SDET is a novel and disruptive technology compared to current ad hoc and static dataset generation. It is expected the SDET technology will fundamentally enhance the development, assessment, and adoption of new methods and tools for power grid optimization and other applications, which in turn would significantly improve the reliability, resiliency, and efficiency of the power grid – a major ARPA-E mission objective.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2019 through Jun. 2019 [Slides]

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2018. This report extends the data analysis through June 2019. The data period focus of this report is January 2019-June 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Stochastic Optimization for Grid Resilience. FY18 Final Technical Report

The optimal restoration problem lies at the foundation of the evaluation and improvement of resilience in power systems. In this report we present a scalable decomposition algorithm for solving this problem for realistic power systems. The algorithm has been developed in three major research threads, corresponding to the chapters in the present report. Chapter 1 studies mixed-integer programming (MIP) formulations for the requirement that each electrical island that appears after a recon guration must have at least one energized generator. We provide three alternative MIP formulations for this restriction, show their equivalence, and prove that two of them are stronger in terms of their linear programming relaxation than the formulation most commonly used in the power systems literature. Since the time to solve MIPs can vary signi cantly between equivalent formulations, we also present computational experiments on IEEE test systems for the Intentional Controlled Islanding (ICI) and the Black Start Allocation (BSA) problems. We observe that a polynomially separable, exponential in size, strong formulation yields the best performance for the BSA problem and exhibits a comparable performance to a linear in size, weak formulation for the ICI problem. Chapter 2 presents a methodology to generate mixed-integer linear approximations of the AC power ow equations governing lines, transformers (including tap regulators and phase shifters), shunt and series compensators, and consumption responsive to voltage. Our approximations are capable of capturing limitations for power grids under abnormal or uncommon operating conditions where common assumptions used in power ow relaxations may not hold. Particularly, the approximation captures overvoltages under almost no load, which is a major concern when energizing lines after a blackout. The method constructs piecewise linear approximations of the non-linear power ow equations by minimizing the squared approximation error over a subset of the feasible domain. We test the method using a realistic database for the Chilean system (1548 buses, 1114 lines, 564 transformers). The resulting approximations yield root mean square errors in the order of 0.05pu and are successfully applied to solve a transmission switching instance for the Chilean system. Chapter 3 presents our algorithm for optimal restoration. The algorithm works by partitioning the problem into a master problem and a slave problem. The master problem optimizes over energization sequences of generators, buses and branches, for the entire restoration horizon, while respecting the energization requiments studied in Chapter 1. The slave problem veri es that there exist power ow solutions supporting the energization sequences proposed by the master problem, adding cuts to the master if an infeasible sequence is detected.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long Beach Transit BEB Progress Report (Jan-Jun 2019)[Slides]

This report summarizes results of a battery electric bus (BEB) evaluation at Long Beach Transit, located in Southern California. Long Beach Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. NREL completed a previous report funded by the Federal Transit Administration that documented results from January 2018 through December 2018. This report extends the data analysis through June 2019. The data period focus of this report is January 2019–June 2019. NREL plans to publish another written report on the Long Beach Transit fleet covering all of 2019.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Battery Electric Bus Progress Report (Jul-Dec 2019)

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2019. This report extends the data analysis through December 2019. The data period focus of this report is July 2019–December 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report. Data Period Focus: Jan. 2020 through June 2020

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2019. This report extends the data analysis through June 2020. The data period focus of this report is January 2020-June 2020. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluation of Safety Standards for Fuel System and Fuel Container Integrity of Alternative Fuel Vehicles

There are two Federal Motor Vehicle Safety Standards (FMVSS) in place that specify requirements for integrity of the fuel system and fuel container on compressed natural gas (CNG) fuel vehicles. These are FMVSS Nos. 303, “Fuel system integrity of compressed natural gas vehicles,” and FMVSS No. 304, “CNG fuel container integrity.” At this time, no FMVSS are defined for the fuel system and fuel container integrity of propane and liquefied natural gas (LNG) vehicles or fuel system integrity requirements for heavy-duty CNG vehicles on the road. However, there are voluntary industry design standards and best practices, as well as regulations defined in other countries. FMVSS No. 303 specifies requirements for the integrity of the CNG fuel system of light-duty vehicles and school buses, and FMVSS No. 304 specifies requirements for fuel container integrity on all CNG vehicles. FMVSS No. 304 applies to containers used for vehicle propulsion, whereas containers used to transport CNG and transportation of CNG containers are regulated by the DOT Pipeline and Hazardous Materials Safety Administration. FMVSS Nos. 303 and 304 are performance-based standards to consistently test and validate equipment and are not design restrictive. Despite the increasing number of natural gas and propane medium- and heavy-duty vehicles on the road, there are no FMVSS fuel system integrity requirements beyond light-duty and school buses for CNG vehicles and no FMVSS fuel system integrity requirements for propane vehicles. NHTSA is researching fuel system safety for medium- and heavy-duty natural gas and propane vehicles to update FMVSS Nos. 303 and 304. NHTSA is also researching current best practices and standards for high pressure fuel tanks in motor vehicles as they may apply to FMVSS No. 304.

30 DIRECT ENERGY CONVERSION↗